Abstract.pdf
PDF 174 KB Posted
- Attached to
- Programmable Logic System
- Solicitation number
- IFBP06031600001
About this file
Abstract of Bids received on 3/28/16
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Corrected_Abstract_OF_1419.pdf | ||
| Pre-Bid_Questions_and_Responses.pdf | ||
| 3-Amendment.pdf | ||
| 3-_Amendment_Att_4_Panel_1_lower_half.JPG | JPG image | |
| 3-_Amendment_Att_4_Panel_3.JPG | JPG image | |
| 3-_Amendment_Att_4_Panel_1.JPG | JPG image | |
| 3-_Amendment_Att_4_Panel_2.JPG | JPG image | |
| 3-_Amendment_Att_4_Panel_1_top_half.JPG | JPG image | |
| Amendment_Two.pdf | ||
| pre-bid_meeting_minutes_1_1.pdf | ||
| SS_6.3.TIF | TIF image | |
| SS_5.1.TIF | TIF image | |
| SS_6.9.TIF | TIF image | |
| SS_6.2.TIF | TIF image | |
| Amendment_One.pdf | ||
| 2-19-16_Wage_Determination.pdf | ||
| PLC_Upgrade_SOW_corrected.pdf | ||
| Drawings.pdf | ||
| 1-15-16_WD_King_Sounty_Washington_WA160036.pdf | ||
| 1_-_Coverletter.pdf | ||
| SF_24_Bid_Bond.pdf | ||
| BP_A0660.pdf | ||
| Pictures.pdf | ||
| IFB_Solicitation_Document_1.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 13. DATE OPENED PAGE OF
IFBP0603160001 02/18/2016 03/28/2016 1 I 2 PAGES
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Federal Bureau of Prisons I CERTIFY that I have opened, read, and Field Acquisition Office - Western Region recorded on this abstract all offers Diana Cormier ContractinQ Officer 7338 Shoreline Drive received in response to this solicitation. ~ s;w~ ,1//
DATE SIGNED
Stockton, CA 95219 "//'-' - - 03/28/2016
5. PROJECT TITLE
, - 9. OFFERS
FDC SeaTac 8. GOVERNMENT ESTIMATE NO. 1 NO. 2 UPGRADE PROGRAMMABLE LOGIC CONTROL SYSTEM (Check A, B or C and complete D, E, and F) A. OFFEROR A. OFFEROR
Project 6D1A
D A. HIRED LABOR
Solid State Segnatek
D B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit) corporate 20% individual 20%
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLECONTRACT C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
[8]
(Including Profit) Yes Yes 7A.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST. D. E. UNIT F. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED·
ITEM QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT NO.
1 Upgrade Programmable Logic Control Sys 1 JB 195,138.54 195,138.54 247,200.00 247,200.00 259,995.00 259,995.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (1 1-88)
1. SOLICITATION NUMBER I PAG2 OF I IFBP06031600001 2 PAGES
ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction , when more than 2 offers are
CONTINUATION SHEET received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE 4. OFFERS (Continued)
NO.: 3 NO.: 4 NO.: NO.:
FDC SeaTac A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
UPGRADE PROGRAMMABLE American Alarm, Co., Inc. KUBL Group
LOGIC CONTROL SYSTEM
Project 6D1A B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) corporate 20% corporate 20%
3. CONTRACT ITEMS C.AMENDMENTSACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A. B. C. Yes Yes ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE
1 1 JB 341,000.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
341 ,000.00
OPTIONAL FORM 1419A (11-88)
File details come from the government source that posted it. Updated .