IFB1 PMAA 2027000013 - Drawing Set 2 of 2.pdf

PDF 938 KB Posted

Attached to
Project Number: CC2501T11
Solicitation number
IFB1 PMAA 2027000013 5
Issued by
Denver County, Denver City, Colorado

About this file

This is a structural drawing set for the North Connector Bridge Replacement project, a pedestrian bridge infrastructure project in Colorado (Project Number CC2501T11). The project involves the replacement of an existing bridge with a new prefabricated steel truss bridge designed to span 100 feet 7 inches between abutments. The design is shown at 90% completion as of August 28, 2026, and includes detailed specifications for bridge construction, approach slabs, drilled caisson foundations, safety railings, and a reinforced concrete deck. The bridge will accommodate a 6-foot clear trail width with 3-foot clearances on either side, featuring welded steel trusses with a minimum low chord elevation of 5556.70. The design accounts for water surface elevations for both 10-year and 100-year flood events, with final grade elevations established at 5558.70 on both abutments.

The drawing set provides technical specifications prepared under professional engineering supervision and includes longitudinal sections, typical cross-sections, and a profile view with grade line information. The project incorporates standard construction elements including pedestrian railings to match the bridge design, hand rail brackets, and safety considerations consistent with bridge specifications outlined in Section 628. Additional trail plan and profile sheets are referenced for complete horizontal control line and profile grade information. The drawing notation indicates that the truss dimensions and railing configurations shown are general representations subject to verification by the truss designer and full specifications detailed in the contract documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6' -0

FL

O

W

102'-7"

BF ABUT 1 TO BF ABUT 2

3' -0

C

LR

3' -0

C

LR

100'-1"

C ABUT 1 TO C ABUT 2

90°

90°

1+

2+

1.5%

TRAIL HCLC ABUT 1L

C ABUT 2L

BF ABUT 2

2+02.55 N: 1656299.70 E: 3186471.84

WINGWALL (TYP)

L L

N58°00'02"E

C BRIDGE AND

ABUTMENT

L

EDGE OF TRAIL

(TYP.)

PREFABRICATED

STEEL TRUSS BRIDGE

BF ABUT 1

STA. 0+99.97

N:1656229.48 E:3186397.04

PEDESTRIAN RAILING TO

MATCH BRIDGE RAILING

APPROACH

SLAB (TYP)

100'-7"

102'-7"

1'-0" 1'-0"

1+00 2+00

FINAL GRADE

Ex Grade

DRILLED CAISSON

FOUNDATION (TYP.)

BF ABUT 1 TO BF ABUT 2

OUT-TO-OUT STEEL BRIDGE

BF ABUT 1

EL 5558.70

SEE TYPICAL SECTION

FOR MINIMUM LOW

CHORD ELEVATION

REQUIREMENTS

EL 5558.70

BF ABUT 2

APPROACH

SLAB (TYP)

100YR

WSEL = 5559.4

FINAL GRADE

10YR

WSEL = 5557.1

1.50%

TRAIL HORIZ.

CONTROL

LINE

PROFILE

GRADE LINE

REINFORCED CONCRETE SLAB PER

BRIDGE MANUFACTURER DESIGN

SAFETY

RAILS (TYP)

3'-0" 3'-0"

6'-0" (CLEAR)

8'-0"± OUT TO OUT TRUSSES

(ESTIMATED, TO BE VERIFIED BY TRUSS DESIGNER)

3' -6

M

IN

T.O. ABUT SEAT

(LEVEL)

2' -6

AT

BR

ID

G E

AN

D

TR

AI

L

HC

L

2' -9

3' -0

" HAND RAIL

BRACKET

HAND RAIL

WELDED STEEL

TRUSSES (TYP.)

MINIMUM LOW CHORD

ELEVATION = 5556.70

OUT-TO-OUT, DECK

(LIMITS OF PAYMENT FOR ITEM

515 "CONCRETE SEALER")

PROJECT NO. 25-104.01

DRAWING NO.

SHEET NO.

OF

SHEET REVISIONS

NO. DATE DESCRIPTION BY

PREPARED UNDER

THE SUPERVISION OF

DATEDESIGNED:

DRAWN:

CHECKED:

90% DESIGN

NORTH CONNECTOR BRIDGE REPLACEMENT

AMJ

ASP

BRS

S-2

8/28/2026

GENERAL LAYOUT

STRUCTURAL

PLAN

20'10'0'

LONGITUDINAL SECTION

NOTES:

FINISHED GRADE ELEVATION AT PROFILE GRADE LINE.

1. TRUSSES AND RAILING SHOWN ON THIS SHEET ARE A GENERAL

REPRESENTATION ONLY. REFERENCE SPECIFICATIONS, SECTION

628 FOR BRIDGE REQUIREMENTS.

2. SEE TRAIL PLAN AND TRAIL PROFILE SHEETS FOR HCL AND PGL

INFORMATION.

TYPICAL SECTION

PROFILE GRADE

EL

: 5

8.

EL

: 5

8.

100'-7"

.5

D

L C

AM

BE

R

AT

M

ID

SP

AN

-4.50% -4.50%

P:

\2

Pr oj ec ts

\2 5-

4.

N or th

C on ne ct or P ed es tri an

B rid ge R ep la ce m en t -

C

PW

\C

AD

\D ra w in gs \2

5-

4.

_S

TR

_G

EN

ER

AL

L

AY

O U

T.

dw g

(LOOKING AHEAD STATION)

File details come from the government source that posted it. Updated .