CLIN Structure

CLIN Type Option Qty U/I Delivery

Schedule/PoP Title

0001 FFP 12 mo 12 months ARO Management 0002 FFP X 12 mo 12 months ARO Software Engineering 0003 FFP X 7 ea 45 days ARO Site Survey 0004 FFP X 7 ea 90 days ARO MT-C2 Installation 0005 FFP X 12 mo 12 months ARO Interim Contractor Support (ICS) 0006 T&M 1 lot 12 months ARO Travel 0007 T&M 1 lot 12 months ARO ODCs 0008 NSP N/A N/A As Req CDRLs

1001 FFP 12 mo 12 months ARO Management 1002 Reserved 1003 FFP X 10 ea 45 days ARO Site Survey 1004 FFP X 10 ea 90 days ARO MT-C2 Installation 1005 FFP X 12 mo 12 months ARO Interim Contractor Support (ICS) 1006 T&M 1 lot 12 months ARO Travel 1007 T&M 1 lot 12 months ARO ODCs 1008 NSP N/A N/A As Req CDRLs

2001 FFP 12 mo 12 months ARO Management 2002 Reserved 2003 FFP X 18 ea 45 days ARO Site Survey 2004 FFP X 18 ea 90 days ARO MT-C2 Installation 2005 FFP X 12 mo 12 months ARO Interim Contractor Support (ICS) 2006 T&M 1 lot 12 months ARO Travel

2007 T&M 1 lot 12 months ARO ODCs 2008 NSP N/A N/A As Req CDRLs

* Currently, 21 Site Surveys and Installations are planned. The total qty included here is higher due to the possibility of schedule shifting. See Notional Install Schedule for more info.