Questions and Responses

13 KB Posted

Attached to
Surface Transportation Contract Federal contract opportunity
Solicitation number
HTC711-09-R-0040
Issued by
Department of Defense United States Transportation Command

About this file

Questions and Responses (52-57)

Text of this file

SURFACE TRANSPORTATION CONTRACT (STC)

SOLICITATION HTC711-09-R-0040

QUESTIONS & RESPONSES

Questions 52 - 57

52) Do you have a standard proposal format?

RESPONSE: I do not have a standard USTRANSCOM approved format. Offerors must follow the directions provided in the solicitation.

53) In 4. Volume III -Price Proposal in STC solicitation Part B. states: All offers shall include pricing based on all regions and all lanes.

1) Does this mean that the offeror must bid on all regions and all lanes? or

2) Can the offeror bid only those lanes in which the offeror will be able to service according to the conditions states in the PWS.

RESPONSE: All offers shall include pricing based on all regions and all lanes. This means that offerors must bid on all regions and all lanes.

54) Our employees are Hazmat certified. Do I have to submit each of our employees’ certificates with the proposal? Or are you talking about another certification issued specifically for the Company? If so, which one?

RESPONSE: Do not submit each employee's certification. Offerors should state that they are capable of transporting HAZMAT shipments. The contracting officer will verify the company's HAZMAT certification with SDDC.

55) Since the on-line pricing has been extended, the maximum net amount for all three years will be unavailable to report, in Volume III, until then. Should the price proposal be sent without those figures?

RESPONSE: The pricing system must remain open during the same time as the solicitation. It is the offeror's responsibility to submit their rates in the on-line system in a timely manner to meet the solicitation requirement and the offer due date/time.

Reference Addendum to FAR 52.212-1 Paragraph (b)(12)4. Volume III – Price Proposal

a. This volume shall consist of Schedule B (Schedule B consists of pages 3, 4 and 5 of this solicitation). The MAX NET AMOUNT in the Schedule B shall be obtained from the Base Year Total, Option Year 1 Total and Option Year 2 Total obtained from the on-line pricing website identified in paragraph (b) below.

56) Can you please tell me if the Solicitation, signed documents, Hazmat certification & the financial questionnaire are to be included in Volume I, if not where do they go?

RESPONSE: Please reference Addendum to FAR 52.212-1 Paragraph (b)(12).

57) Is a subcontracting plan necessary even if we are a small business concern as defined in this solicitation? Is this solicitation a partial set-aside? It appears we only would need to comply with 52.219-14:

RESPONSE: The solicitation does not require a subcontracting plan. The solicitation is a 100% small business set-aside.

The solicitation does require a Limitation on Subcontracting Plan. Reference Addendum to FAR 52.212-1 Paragraph (b)(17).

Reference Addendum to FAR 52.212-2 Paragraph (d)8.

The Government will evaluate the offeror’s Limitations on Subcontracting plan to determine if the offeror can meet the requirements of FAR Clause 52.219-14—Limitations on Subcontracting. Compliance with this FAR Clause 52.219-14 is mandatory and the clause is considered a material term of the solicitation; therefore, offers that fail to furnish a Limitations on Subcontracting plan or offers that are unable or unwilling to meet the Limitations on Subcontracting requirement will be considered unacceptable and will not be considered for award.

Other files for this federal contract opportunity

Other files attached to Surface Transportation Contract, newest first.
File Type Posted
Solicitation Amendment P0006.pdf PDF
Attachment 2 - STC Pricing Schedule.xls XLS spreadsheet
Solicitation Amendment P0005.pdf PDF
Solicitation Amendment P0004.pdf PDF
Attachment 2 - STC Pricing Schedule —
HTC711-09-R-0040 Amendment P0003.pdf PDF
STC PTP Lanes with SPLC.pdf PDF
Questions and Responses —
Questions and Responses —
Attachment 2 - STC Pricing Schedule.xls XLS spreadsheet
Questions and Responses —
HTC711-09-R-0040 Amendment P0002.pdf PDF
Questions and Responses —
HTC711-09-R-0040 Amendment P0001.pdf PDF
Questions and Responses —
PWS Appendix D - STC Transit Time Guide.pdf PDF
PWS Appendix A - STC Performance Requirements Summary —
Attachment 3 - STC Past Performance Survey.doc DOC document
Attachment 1 - STC Performance Work Statement —
PWS Appendix B - STC Origin Regions.pdf PDF
PWS Appendix F - STC Shipper Unique Requirements.pdf PDF
HTC711-09-R-0040 Solicitation.pdf PDF
Attachment 4 - STC Financial Information Questionnaire .doc DOC document
PWS Appendix E - STC Accessorials.pdf PDF
PWS Appendix C - STC Destination Regions.pdf PDF
Attachment 2 - STC Pricing Schedule.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .