PWS Appendix F - STC Shipper Unique Requirements.pdf

PDF 964 KB Posted

Attached to
Surface Transportation Contract Federal contract opportunity
Solicitation number
HTC711-09-R-0040
Issued by
Department of Defense United States Transportation Command

About this file

Appendix F - Shipper Unique Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Surface Transportation Contract, newest first.
File Type Posted
Solicitation Amendment P0006.pdf PDF
Attachment 2 - STC Pricing Schedule.xls XLS spreadsheet
Solicitation Amendment P0005.pdf PDF
Questions and Responses —
Solicitation Amendment P0004.pdf PDF
Attachment 2 - STC Pricing Schedule —
HTC711-09-R-0040 Amendment P0003.pdf PDF
STC PTP Lanes with SPLC.pdf PDF
Questions and Responses —
Questions and Responses —
Attachment 2 - STC Pricing Schedule.xls XLS spreadsheet
Questions and Responses —
HTC711-09-R-0040 Amendment P0002.pdf PDF
Questions and Responses —
HTC711-09-R-0040 Amendment P0001.pdf PDF
Questions and Responses —
PWS Appendix A - STC Performance Requirements Summary —
Attachment 3 - STC Past Performance Survey.doc DOC document
PWS Appendix C - STC Destination Regions.pdf PDF
Attachment 2 - STC Pricing Schedule.xlsx XLSX spreadsheet
PWS Appendix D - STC Transit Time Guide.pdf PDF
Attachment 1 - STC Performance Work Statement —
PWS Appendix B - STC Origin Regions.pdf PDF
HTC711-09-R-0040 Solicitation.pdf PDF
Attachment 4 - STC Financial Information Questionnaire .doc DOC document
PWS Appendix E - STC Accessorials.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix F

APPENDIX F

Surface Transportation Contract (STC) Shipper Unique Requirements

ORIGIN REGIONS

FROM: ATTACHMENT

Region 1 – Ft Drum, NY 1.A PTP Truck Routes 1.A.1 DRMS Groton, CT 1.B PTP Truck Routes 1.B.1 DRMS Kittery, ME (Portsmouth, NH) 1.C PTP Truck Routes Northeast Naval Facilities (LTL Van only) Naval Air Station, Brunswick, ME 1.D.1 Supervisor of Shipbuilding, Bath, ME 1.D.2 Naval Station Newport, Newport, RI 1.D.3 Naval Submarine Base New London, Groton, CT 1.D.4

Region 2 – Aberdeen Proving Grounds, MD/DRMS 2.A PTP Truck Routes 2.A.1 Fort Meade, MD/DRMS 2.B PTP Truck Routes 2.B.1 DRMS Letterkenny Army Depot, PA 2.C PTP Truck Routes 2.C.1 DRMS Tobyhanna, PA 2.D PTP Truck Routes 2.D.1 Fort Campbell, KY/DRMS 2.E PTP Truck Routes 2.E.1 DRMS Richmond, VA 2.F PTP Truck Routes 2.F.1 DRMS St. Juliens Creek, Chesapeake, VA 2.G PTP Truck Routes 2.G.1 DRMS Washington, DC 2.H DRMS Fort Knox, KY 2.I Virginia Multi Service - DRMS Norfolk 2.J.1

- DRMS Portsmouth 2.J.2

- USFPO, Waller Depot, Richmond 2.J.3

- USFPO, Ft. Pickett (MATES) 2.J.4

- USFPO, Ft. Pickett (Blackstone) 2.J.5

- USFPO, Ft. Pickett Supply Support 2.J.6

- USFPO, for VA (CSMS) 2.J.7

- USFPO, Army Aviation (Sandston) 2.J.8

- Ft. Belvoir 2.J.9

- Ft. A.P. Hill 2.J.10

- VA Air National Guard 192nd FW 2.J.11

- FISC Cheatham Annex 2.J.12

- FHSO Cheatham Annex 2.J.13

- Naval Surface Warfare Center Dahlgren 2.J.14

- Naval Amphibious Base Little Creek 2.J.15

Region 3 – DRMS FT Jackson, SC 3.A PTP Truck Routes 3.A.1 DRMS Camp LeJeune, NC 3.B PTP Truck Routes 3.B.1 DRMS Jacksonville, FL 3.C PTP Truck Routes 3.C.1 DRMS Anniston, AL 3.D PTP Truck Routes 3.D.1 DRMS Ft Benning, GA 3.E PTP Truck Routes 3.E.1 North Carolina Multi Service - MCAS New River 3.F.1

- Seymour Johnson AFB 3.F.2

- Pope AFB 3.F.3

- USFPO for NC, Raleigh 3.F.4

- NC Air NG, 145th AW 3.F.5

- Naval & USMC Reserve Center 3.F.6

- FRA Cherry Point 3.F.7

- Ft Bragg 3.F.8

South Carolina Multi Service - Shaw AFB 3.G.1

- Columbia: USFPO for SC & DRMS 3.G.2

- SC Air NG , McEntire (FB6401) 3.G.3

- LANTORDCOM , Charleston DET 3.G.4

- FISC JAX, Charleston DET 3.G.5

- Naval Hospital Beaufort 3.G.6

- MCAS Beaufort & DRMS 3.G.7

- MCRD Parris Island 3.G.8

- Goose Creek (DRMS) 3.G.9

- Charleston (DRMS) 3.G.10

Georgia Multi Service - Ft Gordon 3.H.1

- Forest Park 3.H.2

- Ft Stewart 3.H.3

- Robins AFB 3.H.4

- Albany 3.H.5

Florida Multi Service - Starke 3.I.1

- Eglin AFB 3.I.2

- Cape Canaveral (Patrick AFB) 3.I.3

- Tampa 3.I.4

- MacDill AFB 3.I.5

- Homestead AFB 3.I.6

Alabama Multi Service - Huntsville 3.J.1

- Redstone Arsenal 3.J.2

Region 4 – DRMS Duluth (MN ANG FB6232) 4.A PTP Truck Routes 4.A.1 NTC Great Lakes, IL 4.B Rock Island, IL 4.C NSWC Crane, IN 4.D

MI ANG FB6221 4.E

Little Falls, MN 4.F Columbus, OH 4.G Wright Patterson AFB, OH 4.H DRMO Sparta, WI 4.I

Region 5 – DRMS Corpus Christi, TX 5.A PTP Truck Routes 5.A.1 DRMS Oklahoma City, OK 5.B PTP Truck Routes 5.B.1 Barksdale AFB, LA 5.C Ft Polk/DRMO Polk, LA 5.D Sheppard AFB, TX 5.E Dedicated Truck Routes 5.E.1 Randolph AFB, TX 5.F Dedicated Truck Routes 5.F.1 Goodfellow-Mathis AFB, TX 5.G Dedicated Truck Routes 5.G.1 Laughlin AFB, TX 5.H Dedicated Truck Routes 5.H.1 Vance AFB, OK 5.I Dedicated Truck Routes 5.I.1 Ft Sill, OK 5.J Ft Riley, KS 5.K Texas Multi Service - Texarkana 5.L.1

- Dyess AFB 5.L.2

- Ft Hood 5.L.3

- San Antonio 5.L.4

- Lackland AFB 5.L.5

- Ft Sam Houston 5.L.6

- Ft Bliss 5.L.7

Region 6 – Offutt AFB, NE 6.A PTP Truck Routes 6.A.1 Malmstrom AFB, MT 6.B Minot AFB, ND 6.C Ellsworth AFB, SD 6.D

DRMO Sparta, WI 6.E

Region 7 – DRMS Tucson/AZ ANG 7.A PTP Truck Routes 7.A.1 Kirkland AFB, NM 7.B PTP Truck Routes 7.B.1 Ft Carson, Colorado Springs, CO 7.C Cannon AFB, NM 7.D Holloman AFB, NM 7.E Hill AFB, UT 7.F Arizona Multi Service - Luke AFB 7.G.1

- Yuma Proving Ground 7.G.2

- MCAS Yuma 7.G.3

- Ft Huachuca 7.G.4

- Phoenix (DRMS) 7.G.5

- 161st Air Refueling Wing 7.G.6

Region 8 – DRMS Mountain Home, ID 8.A PTP Truck Routes 8.A.1 DRMS Barstow, CA 8.B PTP Truck Routes 8.B.1 DRMS Camp Pendleton, CA 8.C PTP Truck Routes 8.C.1 DRMS San Diego, CA 8.D PTP Truck Routes 8.D.1 DRMS Sierra-Pacific/Army Depot, CA 8.E PTP Truck Routes 8.E.1 DRMS Travis AFB, CA 8.F PTP Truck Routes 8.F.1 DRMS Boise, ID 8.G Nellis AFB, NV 8.H Fairchild AFB, WA 8.I Ft Lewis, WA 8.J California Multi Service - Beale AFB 8.K.1

- CA ANG, Moffett Field 8.K.2

- CA ANG, Fresno 8.K.3

- Presidio of Monterey & Annex 8.K.4

- Ord Military Community (Presidio) 8.K.5

- March AFB 8.K.6

- DRMS Stockton 8.K.7

- Vandenberg AFB 8.K.8

- Port Hueneme 8.K.9

DESTINATION REGIONS

TO:

Eastern: NY, CT, MA, RI, NH, VT, ME

Atlantic: DC, DE, KY, MD, NJ, VA, PA, WV

Southern Region: TN, NC, MS, AL, GA, SC, FL

Central Region: MN, IA, WI, IL, IN, MI, OH

Southwest Region: KS, MO, OK, AR, TX, LA

Midwest: MT, ND, SD, NE, WY

Mountain Region: UT, CO, AZ, NM

Pacific Region: WA, OR, ID, NV, CA

Pacific:

WA, OR, ID,

NV, CA

Midwest:

MT, ND, SD, WY, NE

Southwest:

KS, MO, OK,

AR, TX, LA

Southern:

TN, NC, MS,

AL, GA, SC, FL

Central:

MN, IA, WI, IL,

IN, MI, OH

Eastern:

NY, CT, MA, RI,

NH, VT, ME

CA

OR

WA

ID

NV

MT

WY

UT CO

AZ NM

ND

SD

NE

TX

KS

OK

MO

AR

LA

MN

IA

IL IN OH

MI

WI

FL

GAALMS

TN NC

SC

KY VA

WV

PA

NY

ME

VT

MA

NH

CT

NJ

RIMD

DC

DE

Mountain:

UT, CO, AZ, NM

Atlantic:

DC, DE, KY,

MD, NJ, VA,

PA, WV

STC DESTINATION REGIONS

Surface Transportation Contract (STC) Appendix C

Shipper Requirements Attachment __1.A

Origin: Fort Drum, NY Destination: CONUS

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe equipment.

a. LTL, Closed Van, flat floor, 27/28-feet or greater in length.

b. LTL, Flatbed, 27/28-feet or greater in length.

c. T/L Van, Flatbed, Drop-Frame, RGN, Trailers will be 45-feet or greater in length

Substitution: Where substitution of equipment is permitted, no cost adjustments will be allowed. For carrier’s convenience, a carrier may substitute trailers greater than 45 feet in length without additional cost to the government.

Equipment Pool: No trailer pool required at this location. Carrier spots empty trailer at specified loading dock and provide pick-up of loaded trailer.

2. Shipper-Unique Requirements:

Operating Hours: Monday through Friday, 0800 – 1600 hours

Loading/Unloading Instructions: Shipper load and count, and consignee unload.

1. Point of Contact and Other Information:

(Data will be provided after contract award)

Point to Point Truck Lanes (PTP) The destination regions will include PTP truck routes as shown in the appendices. These shipments will include Exclusive Use.

Shipper Requirements

PTP Truck Routes Attachment 1.A.1 Origin: Ft Drum, NY Destinations: See below

GBLOC/SPLC: XXXX/181105250

Lane Destination Ship Day Equip Pickup Time Requirement Number of Deliveries

Delivery Time Requirement

Region 1: Ft Drum:

Mechanicsburg-TLNDTK-PTP- Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification One final delivery Final delivery

Shipper Requirements Attachment _1.B

Origin: DRMS Groton, CT Destination: CONUS

1. Equipment Required:

c. T/L Van, Flatbed, Drop-Frame, RGN, Trailers will be 45-feet or greater in length

2. Shipper-Unique Requirements:

Operating Hours:

Monday through Friday, 0800 – 1600 hours

3. Point of Contact and Other Information:

PTP Truck Routes Attachment 1.B.1 Origin: DRMS Groton, CT Destinations: See below

GBLOC/SPLC: XXXX/165264000

Delivery Time Requirement

Region 1: Groton-Atlantic:

Mechanicsburg-TLNDTK-PTP- Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment _1.C

Origin: DRMS Kittery, ME (Portsmouth, NH) Destination: CONUS

1. Equipment Required:

c. T/L Van, Flatbed, Drop-Frame, RGN, Trailers will be 45-feet or greater in length

2. Shipper-Unique Requirements:

Operating Hours:

Monday through Friday, 0800 – 1600 hours

PTP Truck Routes Attachment 1.C.1 Origin: DRMS Kittery, ME (Portsmouth) Destinations: See below

GBLOC/SPLC: XXXX/119796000

Delivery Time Requirement

Region 1: Portsmouth-Atlantic:

Mechanicsburg-TLNDTK-PTP- Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment _1.D.1

Northeast Naval Facilities

Origin: Naval Air Station, Brunswick, ME Destination: CONUS

SPLC: 119212290

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean, and safe equipment:

LTL, Closed Van, 28-foot or greater in length

Substitution: With shipper's prior approval, and if freight characteristics permit, the carrier may be permitted to substitute the Van equipment of other lengths. Where substitution of equipment is permitted, no cost adjustments will be allowed. Charges will be assessed on the equipment ordered, not on the equipment furnished

Equipment Pool: None

2. Shipper-Unique Requirements:

Operating Hours: *7:00 a.m. to 2:00 p.m., Monday through Friday. Delivery service will be required Monday through Friday, excluding Federal holidays.

*The warehouse is closed for lunch each day from 11:30 a.m. to 12 noon.

Pick-up Location: Bldg. #294, 700 Fitch Ave., NAS-Brunswick, ME

Loading Instructions: Shipments will be loaded under shipper load and carrier count.

Shipment Instructions: Carriers must furnish Van equipment within 24 hours of shipper notification of equipment requirements.

3. Point of Contact and Other Information:

Supply Officer Naval Air Station Code 19330 Brunswick, ME 04011-5000 Ms. Joanne Coombs joanne.r.coombs@navy.mil Telephone: (207) 921-2259

FAX: (207) 921-2541

mailto:joanne.r.coombs@navy.mil

Shipper Requirements Attachment _1.D.2

Northeast Naval Facilities

Origin: Supervisor of Shipbuilding, Bath, ME Destination: CONUS

SPLC: 118850290

1. Equipment Required:

may be permitted to substitute the Van equipment of other lengths. Where substitution of equipment is permitted, no cost adjustments will be allowed. Charges will be assessed on the equipment ordered, not on the equipment furnished

Equipment Pool: None

2. Shipper-Unique Requirements:

Operating Hours: 7:00 a.m. to 2:00 p.m., Monday through Friday Delivery service will be required Monday through Friday, excluding Federal holidays.

Each warehouse location is closed for lunch 11:30 a.m. to 12 noon.

*Pick-up Locations:

*Freight will originate at three (3) different commercial warehouse locations as indicated below. Also, the freight located below will apply to SUPSHIP material only.

1. Bath Iron Works Planning Yard, New Meadow Rd West Bath, ME 04530

SPLC 118867000

2. Bath Iron Works South Yard Distribution Center Washington St.

Bath, ME 04530

SPLC 118850000

3. Bath Iron Works Consolidated Warehouse, Mallett Park Brunswick, ME 04011

SPLC 119211000

Loading Instructions: Shipments will be loaded under shipper load and carrier count.

Shipment Instructions: Carriers must furnish Van equipment within 24 hours of shipper notification of equipment requirements.

3. Point of Contact and Other Information:

Supervisor of Shipbuilding Transportation Officer N62786 Bldg 294, 700 Fitch Ave Brunswick, ME 04011-5000 Ms. Joanne Coombs joanne.r.coombs@navy.mil Telephone: (207) 921-2259

FAX: (207) 921-2541

mailto:joanne.r.coombs@navy.mil

Shipper Requirements Attachment _1.D.3

Northeast Naval Facilities

Origin: Naval Station Newport, Newport, RI Destination: CONUS

SPLC: 154149291

1. Equipment Required:

may be permitted to substitute Van equipment of other lengths. Where substitution of equipment is permitted, no cost adjustments will be allowed. Charges will be assessed on the equipment ordered, not on the equipment furnished

Equipment Pool: None

2. Shipper-Unique Requirements:

Operating Hours: 7:00 a.m. to 3:00 p.m., Monday through Friday Delivery service will be required Monday through Friday, excluding Federal holidays.

Pick-up Location: Bldg. # 47, 47 Chandler St., Newport, RI

Loading Instructions: Shipments will be loaded under shipper load and carrier count.

Shipment Instructions: Carriers must furnish Van equipment within 24 hours of shipper notification of equipment requirements.

3. Point of Contact and Other Information:

Bldg. #47 Code N411.4.1N 47 Chandler St.

Newport, RI 02841-1716 Mrs. Shirley Franco: shirley.franco@navy.mil Telephone: (401) 841-2208/1034

FAX: (401) 841-3099

mailto:shirley.franco@navy.mil

Shipper Requirements Attachment _1.D.4

Northeast Naval Facilities

Origin: Naval Submarine Base Supply Operations Destination: CONUS

New London, Groton, CT

SPLC: 165282290

1. Equipment Required:

may be permitted to substitute the Van equipment of other lengths. Where substitution of equipment is permitted, no cost adjustments will be allowed. Charges will be assessed on the equipment ordered, not on the equipment furnished

Equipment Pool: None

2. Shipper-Unique Requirements:

Operating Hours: 7:30 a.m. to 2:30 p.m., Monday through Friday Delivery service will be required Monday through Friday, excluding Federal holidays. Warehouse closed for lunch each day from 12 noon – 12:30 p.m.

Pick-up Location: Bldg. # 33, UPPER BASE, Groton, CT

Loading Instructions: Shipments will be loaded under shipper load and carrier count.

Shipment Instructions: Carriers must furnish Van equipment within 24 hours of shipper notification of equipment requirements.

3. Point of Contact and Other Information:

Bldg. #33, UPPER BASE Code N411.4.1G Groton, CT 06349-5500 Mr. Dave Danielson (Primary) Telephone: (860) 694-3802 Mr. Paul Buskey (Alternate) buskeyp@subasenlon.navy.mil Telephone: (860) 694-3506

FAX: (860) 694-3369

mailto:buskeyp@subasenlon.navy.mil

Shipper Requirements Attachment __2.A___

Origin: Aberdeen Proving Grounds, MD Destination: CONUS

1. Equipment Required:

d. LTL, Closed Van, flat floor, 27/28-feet or greater in length.

e. LTL, Flatbed, 27/28-feet or greater in length.

f. T/L Van, Flatbed, Drop-Frame, RGN, Trailers will be 45-feet or greater in

PTP Truck Routes Attachment 2.A.1 Origin: Aberdeen Proving Grounds, MD Destinations: See below

GBLOC/SPLC: XXXX/231582250

Delivery Time Requirement

Region 2: Aberdeen-Atlantic:

Mechanicsburg-TLNDTK-PTP- Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __2.B___

Origin: Fort Meade, MD Destination: CONUS

1. Equipment Required:

c. T/L Van, Flatbed, Drop-Frame, RGN, Trailers will be 45-feet or greater in length

PTP Truck Routes Attachment 2.B.1 Origin: Fort Meade, MD Destinations: See below

GBLOC/SPLC: XXXX/236770250

Delivery Time Requirement

Region 2: FT Meade-Atlantic:

Mechanicsburg-TLNDTK-PTP- Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification One final delivery Final delivery

Region 2: FT Meade-Atlantic:

Mechanicsburg-TLNDTK-PTP-

FBED

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Flatbed Pickup within two (2) hrs of notification

Shipper Requirements Attachment __2.C___

Origin: Letterkenny Army Depot, PA Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 2.C.1 Origin: Letterkenny Army Depot, PA Destinations: See below

GBLOC/SPLC: XXXX/209770250

Delivery Time Requirement

Region 2: Letterkenny AD- Atlantic: Mechanicsburg- TLNDTK-PTP-Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __2.D___

Origin: Tobyhanna, PA Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 2.D.1 Origin: Tobyhanna, PA Destinations: See below

GBLOC/SPLC: XXXX/202230250

Delivery Time Requirement

Region 2: Tobyhanna-Atlantic:

Mechanicsburg-TLNDTK-PTP- Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __2.E___

Origin: Fort Campbell, KY Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 2.E.1 Origin: Fort Meade, MD Destinations: See below

GBLOC/SPLC: XXXX/236770250

Delivery Time Requirement

Region 2: FT Campbell-Central:

Columbus-TLNDTK-PTP-Van

Columbus, OH

XXXX/353100000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __2.F__

Origin: Richmond, VA Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 2.F.1 Origin: Richmond, VA Destinations: See below

GBLOC/SPLC: XXXX/257500000

Delivery Time Requirement

Region 2: Richmond-Atlantic:

Mechanicsburg-TLNDTK-PTP- Van

Mechanicsburg, PA

XXXX/206744000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __2.G__

Origin: St. Juliens Creek, Chesapeake, VA Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 2.G.1 Origin: St. Juliens Creek, Chesapeake, VA Destinations: See below

GBLOC/SPLC: XXXX/261200000

Delivery Time Requirement

Region 2: St. Juliens Creek- Atlantic: Norfolk-TLNDTK-PTP- Van

Norfolk, VA

XXXX/261000000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __2.H__

Origin: Washington, DC Destination: CONUS

SPLC: 240000000

1. Equipment Required:

2. Shipper-Unique Requirements:

Pick Up Location:

Shipper Requirements Attachment __2.I__

Origin: Fort Knox, KY Destination: CONUS

SPLC: 294424250

1. Equipment Required:

2. Shipper-Unique Requirements:

Operating Hours: Monday through Friday, 0800 – 1600 hours

Pick Up Location:

Shipper Requirements Attachment 2.J.1 thru 2.J.15

Virginia Multi Service

Origin: Various Locations within VA Destination: CONUS

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe

Equipment Pool:

a. If requested by the shipper, carriers will be required to maintain an equipment pool of empty trailers at specific origin sites.

b. The shipper may adjust the size of this pool based on traffic fluctuations.

Carriers will be required to respond to pool allocation adjustments within 2 weeks after notification.

c. A holding area will be provided where carriers may drop pool equipment and/or empty trailers awaiting carrier placement for loading or placement of loaded trailers awaiting carrier pickup.

d. Charges for detention will not apply to pool equipment.

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, including weekends and Federal holidays. When flatbed equipment is ordered all rates and charges include the carrier provided necessary tarps, straps, and/or chain tie-downs to properly secure and protect the load at no additional cost to the Government.

Operating Hours:

a. Loading and billing procedures are generally conducted Monday through Friday, except for Federal holidays.

(1) Defense Reutilization Marketing Service (DRMS) Norfolk (Data to be provided)

(2) DRMS Portsmouth (Data to be provided)

(3) United States Property and Fiscal Office (USPFO) for VA Waller Depot, Richmond, Tuesday through Friday from 7:04 a.m. to 4:30 p.m.

(4) USPFO for VA, Ft Pickett, Surface Maintenance Activity, (MATES), Building 134 Military Road, from 7:00 a.m. to 4:30 p.m.

(5) USPFO for VA, Ft Pickett, Building 307, Blackstone, 10th Street, from 7:00 a.m. to 4:30 p.m.

(6) USPFO for VA. Ft Pickett, Supply Support Activity Warehouse, Building 142, from 8:00 a.m. to 4:30 p.m.

(7) USPFO for VA, CSMS (Combined Support Maintenance Shop), Tuesday through Friday from 7:00 a.m. to 4:30 p.m.

(8) USPFO for VA, Army Aviation Support Facility, Sandston, Tuesday through Friday from 7:00 a.m. to 4:30 p.m.

(9) Ft Belvoir, Monday through Thursday from 7:00 a.m. to 3:00 p.m., Friday from 7:00 a.m.

to 2:00 p.m.

(10) Ft A. P. Hill, from 8:00 a.m. to 3:30 p.m.

(11) VA Air National Guard 192 FW LGTT, Sandston, from 6:45 a.m. to 5:50 p.m.

(12) FISC, Cheatham Annex, Williamsburg, from 8:00 a.m. to 2:30 p.m.

(13) Fleet Hospital Support Office (FHSO), N68610 Cheatham Annex NWS, Williamsburg, VA, from 7:00 am - 3:30 pm, Monday through Friday

(14) Naval Surface Warfare Center, (NSWC) Dahlgren Division, from 7:00 a.m. to 3:30 p.m.

(15) Naval Amphibious Base Little Creek, Norfolk, from 8:00 a.m. to 3:30 p.m.

b. Operations on Saturdays, Sundays, or holidays will be scheduled when necessary to accomplish mission requirements.

c. Carriers must furnish Van and flatbed equipment within 24 hours after being notified by the shipper of equipment requirements.

3. Shipment Instructions:

This traffic will exclude shipments moving under NAVXPRESS (local delivery), which is defined as: Hampton Roads, i.e. cities of Norfolk, Virginia Beach, Chesapeake, Portsmouth, Hampton, Newport News, Yorktown, Williamsburg, and Suffolk. These cities are all within an approximate 50-mile radius of the Norfolk Naval Base

4. Point of Contact and Other Information: (Data will be provided after contract award) Origin Installations SPLC

(1) DRMS Norfolk 261000000

(2) DRMS Portsmouth 261100260

(4) USPFO for VA, Ft Pickett, Surface Maintenance Activity (MATES) 262959251 POC: MAJ Tom Perkins/Alternate: SGM Johnny Brame (804) 292-2620/2216

(3), (5), (6), (7) and (8) USPFO for VA. (3) 257341250 POC: SFC Jeff Billmyer (T.O.), (804)292-8566 (5)(6) 262959251 (7)(8) 257318250

(9) FT Belvoir 250663250

(10) FT A.P. Hill BHAT/252950250

(11) VA ANG 192ND FW 257313240

(12) FISC, Cheatham Annex, Williamsburg BGNL/256730290

(13) FHSO N68610 Cheatham Annex NWS, Williamsburg BGNL/BKAS/256600000 Delivery and Shipping hours - 8 am - 2 pm, Monday through Friday Contact 757-847-8188 for delivery appointment. Emergency situations will be handled as they occur.

(14) NSWC Dahlgren BGNV/255122290 Pick-up location: Bldg. 125, POC: Karen Hardwick, 540-653-8273 FAX: 540-653-2958

(15) NAB Little Creek BGNT/261300292

Shipper Requirements Attachment __3.A__

Origin: Fort Jackson, SC Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 3.A.1 Origin: Fort Jackson, SC Destinations: See below

GBLOC/SPLC: XXXX/445450250

Delivery Time Requirement

Region 3: Ft Jackson-Southern: Ft Bragg-TLNDTK-PTP-Van

Ft Bragg, NC

BKAS/407737250

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification One final delivery Final delivery

Region 3: Ft Jackson-Southern: Ft Bragg-TLNDTK-PTP-FBED

Ft Bragg, NC

BKAS/407737250

As needed M,Tu,W,Th,F Flatbed Pickup within two (2) hrs of notification

Shipper Requirements Attachment __3.B__

Origin: DRMS Camp LeJeune, NC Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 3.B.1 Origin: DRMS Camp LeJeune, NC Destinations: See below

GBLOC/SPLC: XXXX/405966280

Delivery Time Requirement

Region 3: Camp LeJeune- Southern: Ft Bragg-TLNDTK- PTP-Van

Ft Bragg, NC

BKAS/407737250

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __3.C__

Origin: Jacksonville, FL Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 3.C.1 Origin: Jacksonville, FL Destinations: See below

GBLOC/SPLC: XXXX/491200000

Delivery Time Requirement

Region 3: Jacksonville-Southern:

Eglin-TLNDTK-PTP-Van

Eglin AFB, FL

CTFL/494750240

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification One final delivery Final delivery

Region 3: Jacksonville-Southern:

Eglin-TLNDTK-PTP-FBED

Eglin AFB, FL

CTFL/494750240

As needed M,Tu,W,Th,F Flatbed Pickup within two (2) hrs of notification

Shipper Requirements Attachment __3.D__

Origin: Anniston, AL Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 3.D.1 Origin: Anniston Army Depot, AL Destinations: See below

GBLOC/SPLC: XXXX/471966250

Delivery Time Requirement

Region 3: Anniston-Southern:

Warner Robins-TLNDTK-PTP- Van

Warner Robins

AFB, GA

XXXX/463524240

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification One final delivery Final delivery

Region 3: Anniston-Southern:

Warner Robins-TLNDTK-PTP-

FBED

Warner Robins

AFB, GA

XXXX/463524240

As needed M,Tu,W,Th,F Flatbed Pickup within two (2) hrs of notification One final delivery Final delivery

Region 3: Anniston-Southern:

Warner Robins-TLNDTK-PTP-

STEP

Warner Robins

AFB, GA

XXXX/463524240

As needed M,Tu,W,Th,F Stepbed Pickup within two (2) hrs of notification One final delivery Final delivery

Region 3: Anniston-Southern:

Warner Robins-TLNDTK-PTP-

RGN

Warner Robins

AFB, GA

XXXX/463524240

As needed M,Tu,W,Th,F RGN Pickup within two (2) hrs of notification

Shipper Requirements Attachment __3.E__

Origin: Fort Benning, GA Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 3.E.1 Origin: FT Benning, GA Destinations: See below

GBLOC/SPLC: XXXX/464630250

Delivery Time Requirement

Region 3: Anniston-Southern:

Warner Robins-TLNDTK-PTP- Van

Warner Robins

AFB, GA

XXXX/463524240

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification One final delivery Final delivery

Region 3: Anniston-Southern:

Warner Robins-TLNDTK-PTP-

FBED

Warner Robins

AFB, GA

XXXX/463524240

As needed M,Tu,W,Th,F Flatbed Pickup within two (2) hrs of notification

Shipper Requirements Attachment 3.F.1 thru 3.F.8

North Carolina Multi Service

Origin: Various Locations within NC Destination: CONUS

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, including weekends and Federal holidays. When flatbed equipment is ordered all rates and charges include the carrier provided necessary tarps, straps, and/or chain tie-downs to properly secure and protect the load at no additional cost to the Government.

(1) Marine Corps Air Station (Helicopter), New River, Jacksonville from 8 a.m. to 4:30 p.m.

(2) Seymour Johnson Air Force Base, Goldsboro from 7:30 a.m. to 4:30 p.m.

(3) Pope Air Force Base, Fayetteville from 7:30 a.m. to 4 p.m.

(4) U. S. Property and Fiscal Office for North Carolina, Raleigh from 7:30 a.m. to 4:30 p.m.

(5) North Carolina Air National Guard, 145th AW (FB 6331), Charlotte from 6:30 a.m. to 3:00 p.m.

(6) Naval and United States Marine Corps Reserve Center, 4th Maintenance Battalion, 4th Force Service Support Group, Charlotte from 7:30 a.m. to 4:30 p.m.

(7) FRA Cherry Point from 7:30 a.m. to 4:30 p.m.

(8) Ft Bragg, Fayetteville from 7:30 a.m. to 4:30 p.m.

3. Point of Contact and Other Information: (Data will be provided after contract award) Origin Installations SPLC

(1). Marine Corps Air Station (Helicopter), New River, Jacksonville BMML/405966280 Traffic Management Office Mr. Edward Fountain, Traffic Manager, FountainE@clb.usmc.mil Mr. Phillip R. Shepard, Freight Supervisor, shepardpr@lejeune.usmc.mil Building 1011 Ash Street Camp LeJeune, NC 28540

DSN: 751-2542/1171, (910) 451-2542/1171, FAX: (910) 451-2986/3619

(2). Seymour Johnson Air Force Base BMFL/406630240 4th Transportation Squadron/LGTT Traffic Management Office Mr. Rick Arcurra, Freight Supervisor, rick.arcurra@seymourjohnson.af.mil SSgt Tabitha Eaton, tabitha.eaton@seymourjohnson.af.mil 1295 Goodson Street

Seymour Johnson AFB, NC 27531-2563

DSN: 722-4031/4032, (919) 736-4031/4032, FAX: (919) 736-4033

(3). Pope Air Force Base, Fayetteville AQFL/BKAS/ 407734240

43 LRS/LGRT

Traffic Management Office TSgt Roderick Sherman: Roderick.Sherman@pope.af.mil Mr. Kent Tucker, Freight Supervisor: Kent.Tucker@pope.af.mil 1415 Reilly Road Pope AFB, NC 28308-2895

DSN: 424-7933, (910) 394-7933, FAX: (910) 394-6353

(4). USFPO for North Carolina, Raleigh 411730250 Transportation Management Office Mr. William (Doug) Pittard, Traffic Manager, PittmdD@NC-ARNG NGB.army.mil SFC Ken Hubin, Transportation Coordinator, HubinK@NC-ARNGNGB.army.mil 4201 Ready Creek Drive Raleigh, NC 27607-6412

DSN: 582-6329, (919) 664-6329 FAX: (919) 664-6017

(5). North Carolina Air National Guard, 145 Airlift Wing BKFL/ 417500240 Traffic Management Office/LGT SMSgt David G. Long, Traffic Manager, david.long@ncchar.ang.af.mi 5225 Morris Field Drive Charlotte, NC 28208-5797 DSN: 231-4163 or com'1: (704) 391-4163 FAX: (704) 391-4378

(6). Naval and USMC Reserve Center, Charlotte 417500290 4th Maintenance Battalion, 4th Force Service Support Group, Inspector - Instructor Staff SSG Joseph Lindsey, Traffic Chief, Joseph_C_Lindsey@marfores.usmc.mil CW03 Allen Maxwell, Traffic Officer, Allen_L_Maxwell@marforres.usmc.mil 6115 N Hills Circle Charlotte, NC 28213

(704) 598-0015 FAX: (704) 598-0070/0101

(7). FRA Cherry Point 405537280 (Need POC data)

(8). Ft Bragg Fayetteville 407737250 Transportation Management Office Ms. Sherry Rhynes, Freight Supervisor, RhynesS@Bragg.army.mil Building J-1951 Cook Drive Fort Bragg, NC 28307-5000 DSN: 236-2037 or com'1: (910) 396-2037 FAX: (910) 396-4405

Shipper Requirements Attachment 3.G.1 thru 3.G.10

South Carolina Multi Service

Origin: Various Locations within SC Destination: CONUS

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, including weekends and Federal holidays. When flatbed equipment is ordered all rates and

a. Loading and billing procedures are generally conducted Monday through

Friday, except for Federal holidays.

(1) Shaw Air Force Base, from 8 a.m. to 3:30 p.m.

(2) Columbia: United States Property and Fiscal Office (USFPO) for South Carolina & Defense Reutilization Marketing Service (DRMS) from 8 a.m. to 3:30 p.m.

(3) South Carolina Air National Guard, (FB 6401), McEntire, from 7:30 a.m. to 3:30 p.m.

(4) Navy Munitions Command Detachment Charleston (NMC DET CHASN – formally Naval Weapons Station) from 7:30 a.m. to 3:30 p.m.

(5) Fleet and Industrial Supply Center (FISC) JAX, Charleston Detachment, Goose Creek from 7:30 a.m. to 3:30 p.m.

(6) Naval Hospital, Beaufort from 7:30 a.m. to 4:30 p.m.

(7) MCAS Beaufort & DRMS Beaufort from 7:30 am to 4:30 pm

(8) Marine Corps Recruit Depot, Parris Island from 7:30 am to 4:30 pm

(9) DRMS Goose Creek (Data will be provided after contract award)

(10) DRMS Charleston (Data will be provided after contract award).

3. Point of Contact and Other Information: (Data will be provided after contract award) Origin Installations SPLC

(1) Shaw Air Force Base CEFL/BGNL/ 445372240 20th Transportation Squadron, Transportation Management Office/LGTT 328 Cullen Street Shaw-Air Force Base, SC 29152-5028 Ms Terri Stanley, Freight Supervisor, sharon.stanley@shaw.af.mil Mr. Antwyone Smith, Transportation Assistant, antwyone.smith@shaw.af.mil TSgt Reggie Hickmon, Outbound Cargo NCOIC, reginald.hickmon@shaw.af.mil

(803) 895-9366/2255/2858 DSN: 965-9366/2255/2858 FAX: (803) 668-4011

mailto:sharon.stanley@shaw.af.mil mailto:antwyone.smith@shaw.af.mil mailto:reginald.hickmon@shaw.af.mil

(2) USFPO for SC & DRMS Columbia 445473250

ATTN: TAQ-PF-ST

9 National Guard Road Columbia, SC 29201 SFC Glen Hood, Traffic Manager, Hoodwg@sc-amg.ngb.army.mil SGT Tim Wooten, Transportation Assistant. Wootente@sc-arng.ngb.army.mil

(803) 806-1523/1526 DSN: 583-1523/1526 FAX: (803) 806-1523/1,526.

(3) SC ANG Base, (FB6401), McEntire 445482240 Transportation Officer/LGTT 1325 South Carolina Road Eastover, SC 29044 SGT Ken Gwaltney, Traffic Manager Kgwaltney@scmmt.ang.af.mil SSGT English, Transportation Assistant Jenglish@scmmt.ang.af.mil

(843) 695-8528/8325 DSN: 583-8528/8325 FAX: (843) 776-5121

(4) Navy Munitions Command, Charleston Detachment CAAC/CANM/CENF/447074290 (Formerly Naval Weapons Station) Traffic Management Officer 2316 Red Bank Road Building, Suite 100 Bldg. 987S Goose Creek, SC 29445-8601 Ms. Joanne Mitchell, Transportation Officer, joann.mitchell@navy.mil Com'1: (843) 764-7866/7867 DSN: 794-7866 FAX: (843) 764-7452 After hours: 843-764-7901/7902 Security: 843-764-7555

(5) FISC JAX, Charleston Detachment 447174291 2450 Red Bank Road, Building 1 Goose Creek, SC 29445-8605 Mr. John C. Young, Transportation Officer, john.c.young@navy.mil Mr. Duane A. Clark, Lead Supply Tech, duane.a.clark@navy.mil Mr. Frank E. Smyth, Hazardous Material, frank.e.smyth@navy.mil

(843) 764-7292 DSN: 794-7292 FAX: (843) 764-4086

(6) Naval Hospital, Beaufort 449652290 Building 612, Bay 13 Beaufort, SC 29904 Mr. Dan Duffy, Freight Supervisor, duffyd@beaufort.usmc.mil Ms. Judy Anderson, Transportation Assistant, andersonjc@beaufort.usmc.mil

(843)228-7287/7120; DSN 335-7287/7120 FAX: (843)228-7399

(7) MCAS Beaufort & DRMS Beaufort CAML/449661280 Traffic Management Office/Freight Section Building 612, Bay 13 Beaufort, SC 29904 mailto:Hoodwg@sc-amg.ngb.army.mil mailto:Wootente@sc-arng.ngb.army.mil mailto:Kgwaltney@scmmt.ang.af.mil mailto:Jenglish@scmmt.ang.af.mil mailto:joann.mitchell@navy.mil mailto:john.c.young@navy.mil mailto:duane.a.clark@navy.mil mailto:frank.e.smyth@navy.mil mailto:duffyd@beaufort.usmc.mil mailto:andersonjc@beaufort.usmc.mil

Mr. Dan Duffy, Freight Supervisor, duffyd@beaufort.usmc.mil Ms. Judy Anderson, Transportation Assistant, andersonjc@beaufort.usmc.mil

(843)228-7287/7120; DSN 335-7287/7120 FAX: (843)228-7399

(8) Marine Corps Recruit Depot, Parris Island 449683280 Building 612, Bay 13 Beaufort, SC 29904 Mr. Dan Duffy, Freight Supervisor, duffyd@beaufort.usmc.mil Ms. Judy Anderson, Transportation Assistant, andersonjc@beaufort.usmc.mil

(843)228-7287/6115; DSN: 832-7287/6115 FAX: (843)228-7399

Mr. Robert McComas (Pete), Transportation Assistant, mccomasr@bft.usmc.mil

(843)228-7287/7120; DSN 832-7287/7120 FAX: (843)228-7399

(9) DRMS Goose Creek 447176000 (Data will be provided after contract award)

(10) DRMS Charleston 447850000 mailto:duffyd@beaufort.usmc.mil mailto:andersonjc@beaufort.usmc.mil mailto:duffyd@beaufort.usmc.mil mailto:andersonjc@beaufort.usmc.mil mailto:mccomasr@bft.usmc.mil

Shipper Requirements Attachment 3.H.1 thru 3.H.5

Georgia Multi Service

Origin: Various Locations within GA Destination: CONUS

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, including weekends and Federal holidays. When flatbed equipment is ordered all rates and

a. Loading and billing procedures are generally conducted Monday through

Friday, except for Federal holidays.

(1) Ft Gordon (Data will be provided after contract award)

(2) Forest Park (Data will be provided after contract award)

(3) Ft Stewart (Data will be provided after contract award)

(4) Robins AFB (Data will be provided after contract award)

(5) Albany (Data will be provided after contract award)

3. Point of Contact and Other Information: (Data will be provided after contract award) Origin Installations SPLC

(1) Ft Gordon DRMS (Data will be provided after contract award) 457280250

(2) Forest Park DRMS (Data will be provided after contract award) 459030000

(3) Ft Stewart DRMS (Data will be provided after contract award) 461610250

(4) Robins AFB DRMS (Data will be provided after contract award) 463524240

(5) Albany DRMS (Data will be provided after contract award) 468510000

Shipper Requirements Attachment 3.I.1 thru 3.I.6

Florida Multi Service

Origin: Various Locations within FL Destination: CONUS

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, including weekends and Federal holidays. When flatbed equipment is ordered all rates and

(1) Starke (Data will be provided after contract award)

(2) Eglin AFB (Data will be provided after contract award)

(3) Cape Canaveral (Patrick AFB) (Data will be provided after contract award)

(4) Tampa (Data will be provided after contract award)

(5) MacDill AFB (Data will be provided after contract award)

(6) Homestead AFB (Data will be provided after contract award)

(1) Starke DRMS (Data will be provided after contract award) 492630000

(2) Eglin AFB DRMS (Data will be provided after contract award) 494750240

(3) Cape Canaveral (Patrick AFB) DRMS (Data will be provided after contract award) 496156240

(4) Tampa DRMS (Data will be provided after contract award) 497800000

(5) MacDill AFB DRMS (Data will be provided after contract award) 497800240

(6) Homestead AFB DRMS (Data will be provided after contract award) 499778240

Shipper Requirements Attachment 3.J.1 thru 3.J.2

Alabama Multi Service

Origin: Various Locations within AL Destination: CONUS

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, including weekends and Federal holidays. When flatbed equipment is ordered all rates and

(1) Huntsville (Data will be provided after contract award)

(2) Redstone Arsenal (Data will be provided after contract award)

(1) Huntsville DRMS (Data will be provided after contract award) 471340000

(2) Redstone Arsenal DRMS (Data will be provided after contract award) 471966250

Shipper Requirements Attachment __4.A

Origin: DRMS Duluth (MN ANG FB6232) Destination: CONUS

1. Equipment Required:

PTP Truck Routes Attachment 4.A.1 Origin: DRMS Duluth (MN ANG FB6232) Destinations: See below

GBLOC/SPLC: XXXX/500900240

Delivery Time Requirement

Region 4: Duluth-Southwest: Ft Riley-TLNDTK-PTP-Van

Ft Riley, KS

KOAT/585234250

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment __4.B

Origin: NTC Great Lakes, IL Destination: CONUS

SPLC: 381702290

1. Equipment Required:

a. If requested by the shipper, carriers will be required to maintain an equipment pool of empty trailers at specific origin sites.

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, Shipper Requirements Attachment __4.C

Origin: Rock Island, IL Destination: CONUS

SPLC: 386250250

1. Equipment Required:

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, Shipper Requirements Attachment __4.D

Origin: NSWC Crane, IN Destination: CONUS

SPLC: 376120290

1. Equipment Required:

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, Shipper Requirements Attachment __4.E

Origin: MI Air National Guard FB6221, Selfridge Destination: CONUS

SPLC: 315865240

1. Equipment Required:

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, Shipper Requirements Attachment __4.F

Origin: Little Falls, MN Destination: CONUS

SPLC: 502811250

1. Equipment Required:

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, Shipper Requirements Attachment __4.G

Origin: Columbus, OH Destination: CONUS

SPLC: 353100000

1. Equipment Required:

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, Shipper Requirements Attachment __4.H

Origin: Wright Patterson AFB, OH Destination: CONUS

SPLC: 354496240

1. Equipment Required:

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, Shipper Requirements Attachment __4.I

Origin: Sparta, WI, DRMO Destination: CONUS

GBLOC/SPLC: XXXX / 333647250

1. Equipment Required:

Pick Up Location: (Data will be provided after contract award)

Loading/Unloading Instructions: Shipments will be loaded by the consignor and unloaded by the consignee. Pickup and delivery service will be required Monday through Friday, except for Federal holidays. Charges for pickup/delivery service outside normal business hours, including weekends and Federal holidays. When flatbed equipment is ordered all rates and charges include the carrier provided necessary tarps, straps, and/or chain tie-downs to properly

Shipper Requirements Attachment _5.A

Origin: DRMS Corpus Christi, TX Destination: CONUS

1. Equipment Required:

2. Shipper-Unique Requirements:

Operating Hours:

Monday through Friday, 0800– 1600 hours

PTP Truck Routes Attachment 5.A.1 Origin: DRMS Corpus Christi, TX Destinations: See below

GBLOC/SPLC: XXXX/689100250

Delivery Time Requirement

Region 5: Corpus Christi- Southwest: San Antonio-TLNDTK- PTP-Van

San Antonio, TX

XXXX/687500250

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification

Shipper Requirements Attachment _5.B

Origin: DRMS Oklahoma City, OK (Tinker AFB) Destination: CONUS

1. Equipment Required:

2. Shipper-Unique Requirements:

Operating Hours:

Monday through Friday, 0800– 1600 hours

PTP Truck Routes Attachment 5.B.1 Origin: DRMS Oklahoma City, OK Destinations: See below

GBLOC/SPLC: XXXX/626164000

Delivery Time Requirement

Region 5:Oklahoma City- Southwest: Texarkana-TLNDTK- PTP-Van

Texarkana, TX

XXXX/661150000

As needed M,Tu,W,Th,F Van Pickup within two (2) hrs of notification One final delivery Final delivery

Region 5:Oklahoma City- Southwest: Texarkana-TLNDTK-

PTP-FBED

Texarkana, TX

XXXX/661150000

As needed M,Tu,W,Th,F Flatbed Pickup within two (2) hrs of notification One final delivery Final delivery

Region 5:Oklahoma City- Southwest: Texarkana-TLNDTK-

PTP-STEP

Texarkana, TX

XXXX/661150000

As needed M,Tu,W,Th,F Step Pickup within two (2) hrs of notification One final delivery Final delivery

Region 5:Oklahoma City- Southwest: Texarkana-TLNDTK-

PTP-RGN

Texarkana, TX

XXXX/661150000

As needed M,Tu,W,Th,F RGN Pickup within two (2) hrs of notification

Shipper Requirements Attachment _5.C

Origin: Barksdale Air Force Base, LA Destination: CONUS

GBLOC/SPLC: FSFL / 653770240

1. Equipment Required:

Size and type: Carriers will be required to furnish the following empty, clean and safe equipment and ensure that all previously used blocking and bracing materials have been removed:

LTL Van: Carriers are required to furnish closed Vans with flat floors, 40-foot of greater in length.

Substitution: With prior approval from the shipper, and if freight characteristics permit, the following equipment substitutions may be made:

LTL Van carriers may substitute one 30-foot or less Van for a 40-foot or greater Van.

Where substitution of equipment is permitted, no cost adjustments will be allowed.

Charges will be assessed on the equipment ordered, not on the equipment furnished.

a. Loading and billing procedures are conducted from 7:30 a.m. to 4 p.m., Monday through Friday, excluding Federal holidays. Delivery service will be required Monday through Friday, excluding Federal holidays.

b. On occasion, Saturday pickup may be necessary to accomplish mission requirements. Hours of operation will be 7:30 a.m. to 4 p.m.

c. Carriers must furnish Van equipment shown above within 24 hours after being notified by the shipper.

Loading/Unloading Instructions: Shipments will be l

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .