Final_RFP_A15_WEE.docx

DOCX document 51 KB Posted

Attached to
NBACC FFRDC Federal contract opportunity
Solicitation number
HSHQDC-15-R-00050
Issued by
Department of Homeland Security Office of Procurement Operations

About this file

NBACC FFRDC Final RFP--Attachment 15 (Workload Estimate Information for NBACC)

View the file

Other files for this federal contract opportunity

Other files attached to NBACC FFRDC, newest first.
File Type Posted
A9_SF30.pdf PDF
Final_RFP_Q A_Set_2.docx DOCX document
Revised_Section_M_v2.docx DOCX document
Final_RFP_Q A_Set_1_v5.docx DOCX document
Revised_Final_RFP_Executive_Summary_v1.docx DOCX document
A7_SF30.pdf PDF
Revised_Final_RFP_A14_PPQ.docx DOCX document
Amendment_000007_v1.docx DOCX document
Updated_A3_AT_Plan_v1.docx DOCX document
Award_Term_Evaluation_Process_for_NBACC_v1.vsd VSD drawing
Revised_Final_RFP_A1_CDRL_Package_v2.xlsx XLSX spreadsheet
A5_SF_30.pdf PDF
Updated_A6_Draft_SA_v2.docx DOCX document
Updated_Final_RFP_Section_C_v1.docx DOCX document
Updated_Final_RFP_Section_D_v1.docx DOCX document
Revised_Final_RFP_A13_v1.docx DOCX document
Revised_Final_RFP_A1_CDRL_Package_v1.xlsx XLSX spreadsheet
Updated_Attachment_1_to_CDRL_Package_v1.docx DOCX document
A4_Cover_Page_SF_30.pdf PDF
Updated_Final_RFP_Section_H_v1.docx DOCX document
Updated_Attachment_16_for_Final_NBACC_RFP.txt TXT text file
Amendment_000003.docx DOCX document
Amendment_000003_Cover_Page.pdf PDF
Updated_Final_RFP_A4_Cost_Charts.xlsx XLSX spreadsheet
Amendment_000001.docx DOCX document
Updated_Final_RFP_Section_L.docx DOCX document
Final_RFP_A4_Cost_Charts.xlsx XLSX spreadsheet
Final_A6_Draft_SA.docx DOCX document
Final_RFP_A20_BQSF.docx DOCX document
Final_RFP_Section_H.docx DOCX document
Final_RFP_Section_L.docx DOCX document
Attachment_1_to_CDRL_Package.docx DOCX document
Section_A_Cover_Page.docx DOCX document
Final_RFP_Section_A.pdf PDF
Final_RFP_A7_NBACC_Photo.docx DOCX document
Final_RFP_A21_Table_T1.xlsx XLSX spreadsheet
Award_Term_Evaluation_Process_for_NBACC.vsd VSD drawing
Final_RFP_A16_SCA_WD.pdf PDF
Final_RFP_Section_E.docx DOCX document
Final_RFP_A13_Contract_Directives_List.docx DOCX document
Final_RFP_Executive_Summary.docx DOCX document
Final_RFP_A11_OSHA_Form_300A.xls XLS spreadsheet
Final_RFP_A12_Draft_QASP.docx DOCX document
Final_RFP_Section_J.docx DOCX document
Final_RFP_Section_F.docx DOCX document
Final_RFP_A14_PPQ.docx DOCX document
Final_RFP_Section_G.docx DOCX document
Award_Fee_Evaluation_Process_for_NBACC.vsd VSD drawing
Final_RFP_A3_AT_Plan.docx DOCX document
Final_RFP_Section_B.docx DOCX document
Show all 50

NBACC FFRDC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 15

Workload and Expense Estimates for

NBACC FFRDC

F1. Document Control

· Reference: Attachment 11 Workload and Expense Estimates for NBACC FFRDC RFP, Nov 2005

F2. Change Control

· Changes to this plan are summarized in the following table.

Revision Tracking

Document Version

Date Completed

Reason for Revision

0
October 3, 2014
Initial release
1
February 11, 2015
Revised FFRDC Personnel Count

Table of Contents

1.NBACC Facility:1
2.Sources - Animal Numbers Estimated and Casework:1
3.Travel Estimate:1
4.Work-for-Others (WFO) Program Estimates:2
5.Labor, Overhead/Fringe, ODCs, Fees3

Attachment 15 to HSHQDC-15-R-00050 Page i

Attachment 15 to HSHQDC-15-R-00050 Page ii

1. NBACC Facility:

The NBACC facility has approximately 160,000 gross square feet to include Laboratory space of 20% BSL 4, and 80% BSL 2 and 3. Total estimated staff approximately 168. This includes both technical and administrative staff.

2. Sources - Animal Numbers Estimated and Casework:

· Approximately 15 research efforts per year will be supported by the NBACC BioThreat Characterization Program. Of these studies: Approximately 25% will be conducted within the BSL-2 areas; Approximately 50% will be conducted in the BSL-3 areas and approximately 25% will require BSL-4.

· Approximately 50% of the NBACC BioThreat Characterization Program studies will require the use of animals (rodents, rabbits, guinea pigs and non-human primates). Non-human primate studies will be conducted only after earlier studies with lower animals have demonstrated the need for the primate study.

· For purposes of capacity, the largest species (primates) was measured as the maximum population housed in the appropriate space type. Approximately three primate studies will be necessary per year.

· Bioforensics casework requires 24/7 support.

3. Travel Estimate:

Travel in support of the NBACC is projected, as follows for local CONUS and OCONUS travel. Examples include but are not limited to: travel to national and international meetings, travel to present results, workshops, training, and to support other government agencies.

Travel Estimates:

· For Program Year (PY) 1 Estimate—Not to Exceed (NTE) $300K

· For PY 2 Estimate—NTE $400K

· For PY 3 Estimate—NTE $800K

· For PY 4 Estimate—NTE $800K

· For PY 5 Estimate—NTE $800K

· For Award-Term Incentive Period (AT) 1 PY 6 Estimate—NTE $600K

· For AT 2 PY 7 Estimate—NTE $600K

· For AT 3 PY 8 Estimate—NTE $600K

· For AT 4 PY 9 Estimate—NTE $600K

· For AT 5 PY 10 Estimate—NTE $600K

Total Estimated Travel = $6,100,000

4. Work-for-Others (WFO) Program Estimates:

The Government Estimates work for others for each Program Year and Award-Term Incentive Period as set forth below.

· For PY 1 Estimate--NTE $2,000,000

· For PY 2 Estimate--NTE $3,000,000

· For PY 3 Estimate--NTE $3,000,000

· For PY 4 Estimate--NTE $4,000,000

· For PY 5 Estimate--NTE $4,000,000

· For AT Incentive Period 1 PY 6 Estimate—NTE $4,000,000

· For AT Incentive Period 2 PY 7 Estimate—NTE $4,000,000

· For AT Incentive Period 3 PY 8 Estimate—NTE $4,000,000

· For AT Incentive Period 4 PY 9 Estimate—NTE $4,000,000

· For AT Incentive Period 5 PY 10 Estimate—NTE $4,000,000

Total Estimated WFO = $36,000,000

5. Labor, Overhead/Fringe, ODCs, Fees

The current NBACC contract (HSHQDC-07-C-00020) has incurred actual expenditures from contract inception 20 Dec 2006 through 26 Dec 2013 (77 months) of approximately $244M. This translates into a yearly expense of approximately $38M. However, due to funding reductions over the past few years, the average annual funding has dropped to $32.1M. This reflects funding from three primary sources.

· 45% from Chem/Bio Defense Division (CBD) for the NBACC Biothreat Characterization Program and Bioforensics Operations (NBFAC) program,

· 44% from Office of National Labs (ONL) for Management and Operations (M&O) of the NBACC facility,

· 11% from another federal agency.

Based on historical data from the current NBACC FFRDC contract (HSHQDC-07-C-00020), the annual budget is expensed across the following categories. This allocation does not include Work for Others effort.

Component
Percent of Annual Budget
Labor
29%
Overhead/Fringe
14%
ODCs1
51%
Fees (Fixed and Incentive)
6%
TOTAL
100%

1 = ODCs = Subcontractor, Consultants, Travel, Supplies, Materials, Insurance Liability/Indemnity, Lease/Rent, Other

The above data is subject to change at any time given funding constraints, changing missions and changing priorities.

ONL also provides operations support of the NBACC that is not in NBACC contract. This operations support includes: Utilities to the garrison, Security (commercial contract and NIBC campus contribution), Special Immunization Program, IT/ Communications and Miscellaneous ONL administrative costs of approximately $20M per year.