Response_to_Questions.pdf
PDF 97 KB Posted
- Attached to
- FEMA On-site Generator Maintenance Federal contract opportunity
- Solicitation number
- HSFE40-16-R-0008
About this file
Response to Questions received to synopsis & PWS posted 22 Feb 2017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_Pricing_18Apr2017.xlsx | XLSX spreadsheet | |
| Attachment_1_Pricing_14Apr2017.xlsx | XLSX spreadsheet | |
| Attachment_1_Pricing_13Apr2017.xlsx | XLSX spreadsheet | |
| Response_to_Questions_13Apr2017.docx | DOCX document | |
| Attachment_2_PWS_13April2017.pdf | ||
| Amendment_4_Details.pdf | ||
| Response_to_Questions-Comments_24Mar2017.pdf | ||
| Attachment_2_PWS_2Mar2017.pdf | ||
| Attachment_5_QASP.pdf | ||
| Attachment_11_Wage_Determinations.pdf | ||
| Attachment_9_Generator_Maintenance_Profile_Sheet.pdf | ||
| Attachment_6_Quality_Assurance_Monitoring.pdf | ||
| Attachment_8_Authorization_for_Repair.pdf | ||
| Instructions_and_Evaluations_Factor.pdf | ||
| Attachment_7_Customer_Complaint_Form.pdf | ||
| Attachment_1_Pricing.xlsx | XLSX spreadsheet | |
| Attachment_10_PPQ.pdf | ||
| Attachment_4_Inventory.xlsx | XLSX spreadsheet | |
| Combined_Synopsis.docx | DOCX document | |
| Attachment_2_PWS.pdf | ||
| Attachment_3_SF91.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSFE40-16-R-0008 Amendment 1
Item Question /Change/Comment Response 1 Is this was a new requirement? This is not a new requirement. However the previous contract expired on 18 Dec 2016. The services are currently not being performed.
2 Was there was an incumbent contractor/contractors currently performing these services?
The previous contractor who performed these services was:
Megawattage Generator, Inc.
3a 3b 3c 3d 3c
If there is an incumbent can you please provide:
- Contractor
- Contract #
- Award date
- Expiration
- Value for each of the incumbents?
3a. See response to question 2.
3b. HSFE70-13-C-0083 3c. 19 Jun 2013 3d. 18 Dec 2016 3c. $6,839,587.77 which includes base and all option periods
4 Is an incumbent contractor currently performing these services or if this is a new requirement?
See response to questions 1 and 3a.
5 If there is an incumbent, could you please provide the contract number?
See response to question 3b.
6 Attachment 2: PWS, page 8, last paragraph of section 4.4.2, reads as follows:
“The contractor must hold a State Electrical Contractor License for each state where generator maintenance is being performed.”
Attachment 2: PWS, page 8, last paragraph of section 4.4.2. This sentence has been changed to read as follows.
“The contractor must hold a State Electrical Contractor License in any of the fifty (50) states.”
The updated “Attachment 2 PWS 2Mar2017” is uploaded to the package entitled “Generator Attachments” in FBO.
7 Being that the generators are not a permanent installation, why are the DC's requiring specific State Electrical Contractor licensing for each state where generator maintenance is being performed on portable units?
Per PWS change:
Contractor must hold a State Electrical Contractor License. As services are on a Federal Facility does not require electrical license in EACH state.
See updated “Attachment 2 PWS 2Mar2017” which has been uploaded to the package entitled “Generator Attachments” in FBO.
8 Will FEMA honor other state reciprocal electrical licensing?
Yes – per PWS change. See updated “Attachment 2 PWS 2Mar2017” which has been uploaded to the package entitled “Generator Attachments” in
FBO.
HSFE40-16-R-0008 Amendment 1
9 Can you specify which Tier 4 qualifications are needed as there are numerous Tier 4 regulations and types?
Per PWS Section 4.4.2 Key Personnel, page 8:
To be considered acceptable and current, generator maintenance certificates must meet the following qualifications:
1) Tier 4 generator training from a registered manufacture (i.e.: Cummins, Onan, CAT, MQ Power, Generac) or trainer(s) and
2) Certification of paralleling capability training from a registered manufacture or trainer(s).
10 How many generators have been converted to Tier 4?
Currently FEMA has no generators that have been converted to Tier 4. By the end of March 2017, FEMA expects to replace 18 generators with Tier 4 capability.
11 How long will it take to convert the remainder of the generators to Tier 4?
FEMA expects this will be a process that will be done over the next five – seven years.