The file's text, extracted by GovTribe without its formatting.
Place of Performance (2)
| Location | Name | Position | Email | Office Number | Cell Number | Place of Performance Address |
| FLEET (REGION X) | CHARLES GOODWIN | PROGRAM MANAGER | charles.goodwin@fema.dhs.gov | 425-487-2202 | 202-304-5398 | FEMA HQ's Team |
| FLEET (ATLANTA, GA) | KIMBERLY HARRIS | PRIMARY COR | kimberly.johnson@fema.dhs.gov | 404-279-6393 | 202-549-1847 | |
| DC ATLANTA | PAUL HART | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | paul.hart@fema.dhs.gov | 404-279-6394 | 202-322-6317 | 3780 Southside Industrial Parkway Atlanta, GA 30354 |
| DC ATLANTA | RANDY WESBTROOK | ALTERNATE TECHNICAL MONITOR | randy.westbrook@fema.dhs.gov | (404) 279-6388 | (404) 867-6628 | |
| DC ATLANTA | LEONARD (DAVE) JOHNSON | DISTRIBUTION CENTER MANAGER | leonard.johnson@fema.dhs.gov | (404) 279-6390 | 202-480-1253 | |
| DC FREDERICK | TODD WHITSON | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | todd.whitson@fema.dhs.gov | 301-874-4259 | 301-674-4623 | 4420 Buckeystown Pike Frederick, MD 21704 |
| DC FREDERICK | KEITH CLEVENGER | ALTERNATE TECHNICAL MONITOR | keith.clevenger@fema.dhs.gov | 301-874-4219 | 202-802-6640 | |
| DC FREDERICK | SCOTT CROMWELL | DISTRBUTION CENTER MANAGER | scott.cromwell@fema.dhs.gov | 301-874-4200 | 240-372-4831 | |
| DC FORT WORTH | MICHAEL DAVIS | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | Michael.davis1@fema.dhs.gov | (817) 838-4849 | (202) 297-1584 | 501 W. Felix Street Fort Worth, TX 76115 |
| DC FORT WORTH | STEVEN SLATER | ALTERNATE TECHNICAL MONITOR | steven.slater@fema.dhs.gov | 817-838-4843 | 202-706-1057 | |
| DC FORT WORTH | JOHN THOMPSON | DISTRIBUTION CENTER MANAGER | louis.anderson@fema.dhs.gov | 817-759-4752 | 817-832-3530 | |
| DC MOFFETT | SCOTT MCDONALD | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | scott.mcdonald@fema.dhs.gov | 650-603-8505 | 202-322-6329 | Building 144 Door 7 NASA AMES Research Center Moffett Field, CA 94035 |
| DC MOFFETT | CESAR AERROLA | ALTERNATE TECHNICAL MONITOR | cesar.arreola@fema.dhs.gov | 650-603-8498 | 650-906-4679 | |
| DC MOFFETT | JEFFREY ANONGOS | DISTRIBUTION CENTER MANAGER | jeffrey.anongos@fema.dhs.gov | 650-603-8496 | 650-906-9935 | |
mailto:charles.goodwin@fema.dhs.govmailto:scott.mcdonald@fema.dhs.govmailto:paul.hart@fema.dhs.govmailto:leonard.johnson@fema.dhs.govmailto:randy.westbrook@fema.dhs.govmailto:steven.slater@fema.dhs.govmailto:kimberly.johnson@fema.dhs.govmailto:todd.whitson@fema.dhs.govmailto:keith.clevenger@fema.dhs.govmailto:scott.cromwell@fema.dhs.govmailto:louis.anderson@fema.dhs.govmailto:cesar.arreola@fema.dhs.govmailto:jeffrey.anongos@fema.dhs.govmailto:Michael.davis1@fema.dhs.gov Annual Service
| ANNUAL SERVICE - PRICING | | | | | | | | | | | | | | | |
| BASE PERIOD (CLIN 0001) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 1 (CLIN 1001) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 2 (CLIN 2001) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 3 (CLIN 3001) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 4 (CLIN 4001) | | | | | | | | | | | | | | | | |
| DC ATLANTA | | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| CONUS ANNUAL SERVICE CONTRACT TOTAL | | | | | TOTAL GENERATORS UNDER CONTRACT | | | | | | | | | | | |
| CONTRACT YEAR | CLIN | TOTAL | | | LOCATION | TOTAL | | | | | | | | | | |
| BASE YEAR | 0001 | $ - 0 | | | DC ATLANTA | 117 | | | | | | | | | | |
| OPTION YEAR 1 | 1001 | $ - 0 | | | DC FREDERICK | 114 | | | | | | | | | | |
| OPTION YEAR 2 | 2001 | $ - 0 | | | DC FORT WORTH | 126 | | | | | | | | | | |
| OPTION YEAR 3 | 3001 | $ - 0 | | | DC MOFFETT | 108 | | | | | | | | | | |
| OPTION YEAR 4 | 4001 | $ - 0 | | | TOTAL | 465 | | | | | | | | | | |
| OVERALL TOTAL: | | $ - 0 | | | | | | | | | | | | | | |
RFP: HSFE40-16-R-0008
&F &D &A
Quarterly Run Ups
| QUARTERLY GENERATOR MAINTENANCE - PRICING | | | | | | | | | | | | | | | | | | | | | | | |
| BASE PERIOD (CLIN 0001) | | | | | | | | | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL |
| 0- 49kw | 9 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 36 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 26 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 28 | | $ - 0 | 3 | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 3 | $ - 0 | 50-99kw | 25 | | $ - 0 | 3 | $ - 0 | 50-99kw | 28 | | $ - 0 | 3 | $ - 0 | 50-99kw | 29 | | $ - 0 | 3 | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 3 | $ - 0 | 100-199kw | 26 | | $ - 0 | 3 | $ - 0 | 100-199kw | 39 | | $ - 0 | 3 | $ - 0 | 100-199kw | 35 | | $ - 0 | 3 | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 3 | $ - 0 | 200-299kw | 7 | | $ - 0 | 3 | $ - 0 | 200-299kw | 11 | | $ - 0 | 3 | $ - 0 | 200-299kw | 3 | | $ - 0 | 3 | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 5 | | $ - 0 | 3 | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 3 | $ - 0 | 400-499kw | 3 | | $ - 0 | 3 | $ - 0 | 400-499kw | 4 | | $ - 0 | 3 | $ - 0 | 400-499kw | 2 | | $ - 0 | 3 | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 3 | | $ - 0 | 3 | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 3 | $ - 0 | 700-899kw | 0 | | $ - 0 | 3 | $ - 0 | 700-899kw | 2 | | $ - 0 | 3 | $ - 0 | 700-899kw | 3 | | $ - 0 | 3 | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 3 | $ - 0 | 900 + kw | 4 | | $ - 0 | 3 | $ - 0 | 900 + kw | 3 | | $ - 0 | 3 | $ - 0 | 900 + kw | 0 | | $ - 0 | 3 | $ - 0 |
| 117 | TOTAL CLIN 0002 | | | $ - 0 | | 114 | TOTAL CLIN 0002 | | | $ - 0 | | 126 | TOTAL CLIN 0002 | | | $ - 0 | | 108 | TOTAL CLIN 0002 | | | $ - 0 |
| OPTION PERIOD- YEAR 1 (CLIN 1001) | | | | | | | | | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL |
| 0- 49kw | 9 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 36 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 26 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 28 | | $ - 0 | 3 | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 3 | $ - 0 | 50-99kw | 25 | | $ - 0 | 3 | $ - 0 | 50-99kw | 28 | | $ - 0 | 3 | $ - 0 | 50-99kw | 29 | | $ - 0 | 3 | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 3 | $ - 0 | 100-199kw | 26 | | $ - 0 | 3 | $ - 0 | 100-199kw | 39 | | $ - 0 | 3 | $ - 0 | 100-199kw | 35 | | $ - 0 | 3 | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 3 | $ - 0 | 200-299kw | 7 | | $ - 0 | 3 | $ - 0 | 200-299kw | 11 | | $ - 0 | 3 | $ - 0 | 200-299kw | 3 | | $ - 0 | 3 | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 5 | | $ - 0 | 3 | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 3 | $ - 0 | 400-499kw | 3 | | $ - 0 | 3 | $ - 0 | 400-499kw | 4 | | $ - 0 | 3 | $ - 0 | 400-499kw | 2 | | $ - 0 | 3 | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 3 | | $ - 0 | 3 | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 3 | $ - 0 | 700-899kw | 0 | | $ - 0 | 3 | $ - 0 | 700-899kw | 2 | | $ - 0 | 3 | $ - 0 | 700-899kw | 3 | | $ - 0 | 3 | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 3 | $ - 0 | 900 + kw | 4 | | $ - 0 | 3 | $ - 0 | 900 + kw | 3 | | $ - 0 | 3 | $ - 0 | 900 + kw | 0 | | $ - 0 | 3 | $ - 0 |
| 117 | TOTAL | | | $ - 0 | | 114 | TOTAL | | | $ - 0 | | 126 | TOTAL | | | $ - 0 | | 108 | TOTAL | | | $ - 0 |
| OPTION PERIOD- YEAR 2 (CLIN 2001) | | | | | | | | | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL |
| 0- 49kw | 9 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 36 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 26 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 28 | | $ - 0 | 3 | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 3 | $ - 0 | 50-99kw | 25 | | $ - 0 | 3 | $ - 0 | 50-99kw | 28 | | $ - 0 | 3 | $ - 0 | 50-99kw | 29 | | $ - 0 | 3 | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 3 | $ - 0 | 100-199kw | 26 | | $ - 0 | 3 | $ - 0 | 100-199kw | 39 | | $ - 0 | 3 | $ - 0 | 100-199kw | 35 | | $ - 0 | 3 | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 3 | $ - 0 | 200-299kw | 7 | | $ - 0 | 3 | $ - 0 | 200-299kw | 11 | | $ - 0 | 3 | $ - 0 | 200-299kw | 3 | | $ - 0 | 3 | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 5 | | $ - 0 | 3 | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 3 | $ - 0 | 400-499kw | 3 | | $ - 0 | 3 | $ - 0 | 400-499kw | 4 | | $ - 0 | 3 | $ - 0 | 400-499kw | 2 | | $ - 0 | 3 | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 3 | | $ - 0 | 3 | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 3 | $ - 0 | 700-899kw | 0 | | $ - 0 | 3 | $ - 0 | 700-899kw | 2 | | $ - 0 | 3 | $ - 0 | 700-899kw | 3 | | $ - 0 | 3 | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 3 | $ - 0 | 900 + kw | 4 | | $ - 0 | 3 | $ - 0 | 900 + kw | 3 | | $ - 0 | 3 | $ - 0 | 900 + kw | 0 | | $ - 0 | 3 | $ - 0 |
| 117 | TOTAL | | | $ - 0 | | 114 | TOTAL | | | $ - 0 | | 126 | TOTAL | | | $ - 0 | | 108 | TOTAL | | | $ - 0 |
| OPTION PERIOD- YEAR 3 (CLIN 3001) | | | | | | | | | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL |
| 0- 49kw | 9 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 36 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 26 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 28 | | $ - 0 | 3 | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 3 | $ - 0 | 50-99kw | 25 | | $ - 0 | 3 | $ - 0 | 50-99kw | 28 | | $ - 0 | 3 | $ - 0 | 50-99kw | 29 | | $ - 0 | 3 | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 3 | $ - 0 | 100-199kw | 26 | | $ - 0 | 3 | $ - 0 | 100-199kw | 39 | | $ - 0 | 3 | $ - 0 | 100-199kw | 35 | | $ - 0 | 3 | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 3 | $ - 0 | 200-299kw | 7 | | $ - 0 | 3 | $ - 0 | 200-299kw | 11 | | $ - 0 | 3 | $ - 0 | 200-299kw | 3 | | $ - 0 | 3 | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 5 | | $ - 0 | 3 | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 3 | $ - 0 | 400-499kw | 3 | | $ - 0 | 3 | $ - 0 | 400-499kw | 4 | | $ - 0 | 3 | $ - 0 | 400-499kw | 2 | | $ - 0 | 3 | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 3 | | $ - 0 | 3 | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 3 | $ - 0 | 700-899kw | 0 | | $ - 0 | 3 | $ - 0 | 700-899kw | 2 | | $ - 0 | 3 | $ - 0 | 700-899kw | 3 | | $ - 0 | 3 | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 3 | $ - 0 | 900 + kw | 4 | | $ - 0 | 3 | $ - 0 | 900 + kw | 3 | | $ - 0 | 3 | $ - 0 | 900 + kw | 0 | | $ - 0 | 3 | $ - 0 |
| 117 | TOTAL | | | $ - 0 | | 114 | TOTAL | | | $ - 0 | | 126 | TOTAL | | | $ - 0 | | 108 | TOTAL | | | $ - 0 |
| OPTION PERIOD- YEAR 4 (CLIN 4001) | | | | | | | | | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | COST (per QTR) | # SERVICES | YEARLY TOTAL |
| 0- 49kw | 9 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 36 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 26 | | $ - 0 | 3 | $ - 0 | 0- 49kw | 28 | | $ - 0 | 3 | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 3 | $ - 0 | 50-99kw | 25 | | $ - 0 | 3 | $ - 0 | 50-99kw | 28 | | $ - 0 | 3 | $ - 0 | 50-99kw | 29 | | $ - 0 | 3 | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 3 | $ - 0 | 100-199kw | 26 | | $ - 0 | 3 | $ - 0 | 100-199kw | 39 | | $ - 0 | 3 | $ - 0 | 100-199kw | 35 | | $ - 0 | 3 | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 3 | $ - 0 | 200-299kw | 7 | | $ - 0 | 3 | $ - 0 | 200-299kw | 11 | | $ - 0 | 3 | $ - 0 | 200-299kw | 3 | | $ - 0 | 3 | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 7 | | $ - 0 | 3 | $ - 0 | 300-399kw | 5 | | $ - 0 | 3 | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 3 | $ - 0 | 400-499kw | 3 | | $ - 0 | 3 | $ - 0 | 400-499kw | 4 | | $ - 0 | 3 | $ - 0 | 400-499kw | 2 | | $ - 0 | 3 | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 6 | | $ - 0 | 3 | $ - 0 | 500-699kw | 3 | | $ - 0 | 3 | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 3 | $ - 0 | 700-899kw | 0 | | $ - 0 | 3 | $ - 0 | 700-899kw | 2 | | $ - 0 | 3 | $ - 0 | 700-899kw | 3 | | $ - 0 | 3 | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 3 | $ - 0 | 900 + kw | 4 | | $ - 0 | 3 | $ - 0 | 900 + kw | 3 | | $ - 0 | 3 | $ - 0 | 900 + kw | 0 | | $ - 0 | 3 | $ - 0 |
| 117 | TOTAL | | | $ - 0 | | 114 | TOTAL | | | $ - 0 | | 126 | TOTAL | | | $ - 0 | | 108 | TOTAL | | | $ - 0 |
| CONUS QUARTERLY SERVICE CONTRACT TOTAL | | | TOTAL GENERATORS UNDER CONTRACT | |
| CONTRACT YEAR | CLIN | TOTAL | LOCATION | TOTAL |
| BASE YEAR | 0001 | $ - 0 | DC ATLANTA | 117 |
| OPTION YEAR 1 | 1001 | $ - 0 | DC FREDERICK | 114 |
| OPTION YEAR 2 | 2001 | $ - 0 | DC FORT WORTH | 126 |
| OPTION YEAR 3 | 3001 | $ - 0 | DC MOFFETT | 108 |
| OPTION YEAR 4 | 4001 | $ - 0 | TOTAL | 465 |
| OVERALL TOTAL: | | $ - 0 | | |
RFP: HSFE40-16-R-0008
&F &D
Return to Storage_CONUS
| CONUS_RETURN TO STORAGE - PRICING | | | | | | | | | | | | | | | |
| BASE PERIOD (CLIN 0003) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 1 (CLIN 1003) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 2 (CLIN 2003) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 3 (CLIN 3003) | | | | | | | | | | | | | | | |
| DC ATLANTA | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| OPTION PERIOD- YEAR 4 (CLIN 4003) | | | | | | | | | | | | | | | | |
| DC ATLANTA | | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FREDERICK | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC FORT WORTH | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST | DC MOFFETT | TOTAL # GENERATORS | COST PER GENERATOR | TOTAL COST |
| 0- 49kw | | 9 | | $ - 0 | 0- 49kw | 36 | | $ - 0 | 0- 49kw | 26 | | $ - 0 | 0- 49kw | 28 | | $ - 0 |
| 50-99kw | | 52 | | $ - 0 | 50-99kw | 25 | | $ - 0 | 50-99kw | 28 | | $ - 0 | 50-99kw | 29 | | $ - 0 |
| 100-199kw | | 30 | | $ - 0 | 100-199kw | 26 | | $ - 0 | 100-199kw | 39 | | $ - 0 | 100-199kw | 35 | | $ - 0 |
| 200-299kw | | 8 | | $ - 0 | 200-299kw | 7 | | $ - 0 | 200-299kw | 11 | | $ - 0 | 200-299kw | 3 | | $ - 0 |
| 300-399kw | | 4 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 7 | | $ - 0 | 300-399kw | 5 | | $ - 0 |
| 400-499kw | | 5 | | $ - 0 | 400-499kw | 3 | | $ - 0 | 400-499kw | 4 | | $ - 0 | 400-499kw | 2 | | $ - 0 |
| 500-699kw | | 4 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 6 | | $ - 0 | 500-699kw | 3 | | $ - 0 |
| 700-899kw | | 3 | | $ - 0 | 700-899kw | 0 | | $ - 0 | 700-899kw | 2 | | $ - 0 | 700-899kw | 3 | | $ - 0 |
| 900 + kw | | 2 | | $ - 0 | 900 + kw | 4 | | $ - 0 | 900 + kw | 3 | | $ - 0 | 900 + kw | 0 | | $ - 0 |
| Total Generators | | 117 | $ - 0 | | Total Generators | 114 | $ - 0 | | Total Generators | 126 | $ - 0 | | Total Generators | 108 | $ - 0 | |
| CONUS RETURN TO STORAGE CONTRACT TOTAL | | | | | TOTAL GENERATORS UNDER CONTRACT | | | | | | | | | | | |
| CONTRACT YEAR | CLIN | TOTAL | | | LOCATION | TOTAL | | | | | | | | | | |
| BASE YEAR | 0003 | $ - 0 | | | DC ATLANTA | 117 | | | | | | | | | | |
| OPTION YEAR 1 | 1003 | $ - 0 | | | DC FREDERICK | 114 | | | | | | | | | | |
| OPTION YEAR 2 | 2003 | $ - 0 | | | DC FORT WORTH | 126 | | | | | | | | | | |
| OPTION YEAR 3 | 3003 | $ - 0 | | | DC MOFFETT | 108 | | | | | | | | | | |
| OPTION YEAR 4 | 4003 | $ - 0 | | | TOTAL | 465 | | | | | | | | | | |
| OVERALL TOTAL: | | $ - 0 | | | | | | | | | | | | | | |
RFP: HSFE40-16-R-0008
&F &D
Labor Rate CONUS Generator Maintenance
| Standard Labor Rate |
| Specialized Labor Rate |
RFP: HSFE40-16-R-0008
CONUS Generator Maintenance Labor Rate
CONUS_SUMMARY
| B.1 PRICE/COST SCHEDULE | | | | | |
| ITEM NO. | DESCRIPTION OF SUPPLIES /SVCS | QTY | UNIT | UNIT PRICE | TOTAL AMOUNT (from respective tabs) |
| BASE YEAR (CLIN 0001 - CLIN 0003) | | | | | |
| 0001 | The Contractor shall perform quarterly and annual maintenance in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | $ - 0 | $ - 0 |
| 0002 | Repairs and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $100k - TIME and MATERIAL | NTE | EA | NTE | $ 100,000.00 |
| 0003 | The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) | 4 | EA | $ - 0 | $ - 0 |
| TOTAL BASE PERIOD: | | | | | $ 100,000.00 |
| OPTION YEAR 1 (CLIN 1001 - CLIN 1003) | | | | | |
| 1001 | The Contractor shall perform quarterly and annual maintenance in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | $ - 0 | $ - 0 |
| 0002 | Repairs and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $100k - TIME and MATERIAL | NTE | EA | NTE | $ 100,000.00 |
| 1003 | The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) | 4 | EA | $ - 0 | $ - 0 |
| TOTAL OPTION YEAR 1: | | | | | $ 100,000.00 |
| OPTION YEAR 2 (CLIN 2001 - CLIN 2003) | | | | | |
| 2001 | The Contractor shall perform quarterly and annual maintenance in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | $ - 0 | $ - 0 |
| 0002 | Repairs and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $100k - TIME and MATERIAL | NTE | EA | NTE | $ 100,000.00 |
| 2003 | The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) | 4 | EA | $ - 0 | $ - 0 |
| TOTAL OPTION YEAR 2: | | | | | $ 100,000.00 |
| OPTION YEAR 3 (CLIN 3001 - 3003) | | | | | |
| 3001 | The Contractor shall perform quarterly and annual maintenance in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | $ - 0 | $ - 0 |
| 0002 | Repairs and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $100k - TIME and MATERIAL | NTE | EA | NTE | $ 100,000.00 |
| 3003 | The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) | 4 | EA | $ - 0 | $ - 0 |
| TOTAL OPTION YEAR 3: | | | | | $ 100,000.00 |
| OPTION YEAR 4 (CLIN 4001 - CLIN 4003) | | | | | |
| 4001 | The Contractor shall perform quarterly and annual maintenance in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | $ - 0 | $ - 0 |
| 0002 | Repairs and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $100k - TIME and MATERIAL | NTE | EA | NTE | $ 100,000.00 |
| 4003 | The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) | 4 | EA | $ - 0 | $ - 0 |
| TOTAL OPTION YEAR 4: | | | | | $ 100,000.00 |
| CONUS GENERATOR CONTRACT TOTAL | | | | | $ 500,000.00 |
| RFP: HSFE40-16-R-0008 |
| &F | &D |
CLIN Structure
| CLIN | DESCRIPTION OF SUPPLIES /SVCS | QTY | UNIT | UNIT PRICE |
| BASE YEAR (CLIN 0001 - CLIN 0003) | | | | |
| 0001 | The Contractor shall perform quarterly and annual maintenances services in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | Will be determined by vendor |
0002 Reparis and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $75k 12 EA NTE ($75,000)
0003 The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) 4 EA NTE (amount determined by vendor)
| OPTION YEAR 1 (CLIN 1001 - CLIN 1003) | | | | |
| 1001 | The Contractor shall perform quarterly and annual maintenances services in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | Will be determined by vendor |
1002 Reparis and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $75k 12 EA NTE ($75,000)
1003 The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) 4 EA NTE (amount determined by vendor)
| OPTION YEAR 2 (CLIN 2001 - CLIN 2003) | | | | |
| 2001 | The Contractor shall perform quarterly and annual maintenances services in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | Will be determined by vendor |
2002 Reparis and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $75k 12 EA NTE ($75,000)
2003 The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) 4 EA NTE (amount determined by vendor)
| OPTION YEAR 3 (CLIN 3001 - 3003) | | | | |
| 3001 | The Contractor shall perform quarterly and annual maintenances services in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | Will be determined by vendor |
3002 Reparis and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $75k 12 EA NTE ($75,000)
3003 The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) 4 EA NTE (amount determined by vendor)
| OPTION YEAR 4 (CLIN 4001 - CLIN 4003) | | | | |
| 4001 | The Contractor shall perform quarterly and annual maintenances services in accordance with the PWS and all attachments. (Ref. PWS PART 6: SPECIFIC TASKS) | 12 | MTH | Will be determined by vendor |
4002 Reparis and Installation: The Contractor shall perform repairs and installation in accordance with the PWS and all attachments. (Ref. PWS PART 6:SPECIFIC TASKS: 6.2 REPAIRS) NTE $75k 12 EA NTE ($75,000)
4003 The Contractor shall perform return to storage (RTS) IAW PWS and all attachments as required. (Ref. PWS PART 6: SPECIFIC TASKS: 6.3 RETURN TO STORAGE) 4 EA NTE (amount determined by vendor)
| CLIN Structure Breakdown |
| CONUS Generator Recompete | &D |
Place of Performance
| Location | Name | Position | Email | Office Number | Cell Number | Place of Performance Address |
| FLEET (REGION X) | CHARLES GOODWIN | PROGRAM MANAGER | charles.goodwin@fema.dhs.gov | 425-487-2202 | 202-304-5398 | FEMA HQ's Team |
| FLEET (ATLANTA, GA) | KIMBERLY HARRIS | PRIMARY COR | kimberly.johnson@fema.dhs.gov | 404-279-6393 | 202-549-1847 | |
| DC ATLANTA | PAUL HART | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | paul.hart@fema.dhs.gov | 404-279-6394 | 202-322-6317 | 3780 Southside Industrial Parkway Atlanta, GA 30354 |
| DC ATLANTA | RANDY WESBTROOK | ALTERNATE TECHNICAL MONITOR | randy.westbrook@fema.dhs.gov | (404) 279-6388 | (404) 867-6628 | |
| DC ATLANTA | LEONARD (DAVE) JOHNSON | DISTRIBUTION CENTER MANAGER | leonard.johnson@fema.dhs.gov | (404) 279-6390 | 202-480-1253 | |
| DC FREDERICK | TODD WHITSON | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | todd.whitson@fema.dhs.gov | 301-874-4259 | 301-674-4623 | 4420 Buckeystown Pike Frederick, MD 21704 |
| DC FREDERICK | KEITH CLEVENGER | ALTERNATE TECHNICAL MONITOR | keith.clevenger@fema.dhs.gov | 301-874-4219 | 202-802-6640 | |
| DC FREDERICK | SCOTT CROMWELL | DISTRBUTION CENTER MANAGER | scott.cromwell@fema.dhs.gov | 301-874-4200 | 240-372-4831 | |
| DC FORT WORTH | MICHAEL DAVIS | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | Michael.davis1@fema.dhs.gov | (817) 838-4849 | (202) 297-1584 | 501 W. Felix Street Fort Worth, TX 76115 |
| DC FORT WORTH | STEVEN SLATER | ALTERNATE TECHNICAL MONITOR | steven.slater@fema.dhs.gov | 817-838-4843 | 202-706-1057 | |
| DC FORT WORTH | JOHN THOMPSON | DISTRIBUTION CENTER MANAGER | louis.anderson@fema.dhs.gov | 817-759-4752 | 817-832-3530 | |
| DC MOFFETT | SCOTT MCDONALD | ELECTRIC POWER CONTROLLER/TECHNICAL MONITOR | scott.mcdonald@fema.dhs.gov | 650-603-8505 | 202-322-6329 | Building 144 Door 7 NASA AMES Research Center Moffett Field, CA 94035 |
| DC MOFFETT | CESAR AERROLA | ALTERNATE TECHNICAL MONITOR | cesar.arreola@fema.dhs.gov | 650-603-8498 | 650-906-4679 | |
| DC MOFFETT | JEFFREY ANONGOS | DISTRIBUTION CENTER MANAGER | jeffrey.anongos@fema.dhs.gov | 650-603-8496 | 650-906-9935 | |
mailto:charles.goodwin@fema.dhs.govmailto:scott.mcdonald@fema.dhs.govmailto:paul.hart@fema.dhs.govmailto:leonard.johnson@fema.dhs.govmailto:randy.westbrook@fema.dhs.govmailto:steven.slater@fema.dhs.govmailto:kimberly.johnson@fema.dhs.govmailto:todd.whitson@fema.dhs.govmailto:keith.clevenger@fema.dhs.govmailto:scott.cromwell@fema.dhs.govmailto:louis.anderson@fema.dhs.govmailto:cesar.arreola@fema.dhs.govmailto:jeffrey.anongos@fema.dhs.govmailto:Michael.davis1@fema.dhs.gov