Spec_RESOLUTE_Rev-0.doc
DOC document 1 MB Posted
- Attached to
- CGC RESOLUTE (WMEC-620) DRYDOCK REPAIRS
- Solicitation number
- HSCG80-13-Q-P45B18
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4_Questions_CGC_RESOLUTE.docx | DOCX document | |
| RESOLUTE_DD_Large_FY13_Spec_Rev-2.pdf | ||
| RESOLUTE_AMEND_3.pdf | ||
| 627-WMEC_152_1_1_-_G_Aircastle_repairs.pdf | ||
| Amendment_2_Questions_CGC_RESOLUTE.docx | DOCX document | |
| 627-WMEC_581_1_1_-_A_Anchor_chain_fair_lead.pdf | ||
| SPEC_Rev-1_RESOLUTE_DD_FY13.pdf | ||
| Amendment_1_Questions.docx | DOCX document | |
| Performance_Questionnaire_based_on_CPARS_Template.docx | DOCX document | |
| RFQ_PDF_RFQ_HSCG80-13-Q-P45B18_Date_4-25-13_Posted.pdf | ||
| Blank_IGE_Rev-0.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC RESOLUTE (WMEC 620)
210 FOOT "B CLASS" MEDIUM ENDURANCE CUTTER
SPECIFICATION FOR DRYDOCK REPAIRS
FY2013
Developed By: Peter D Pilla (Rev-0, 21 February 2013)
TABLE OF CONTENTS
ivRevisions Record vConsolidated List of References xiConsolidated List of Government-furnished Property xiiiConsolidated List of Critical Inspection Items xivPrincipal Characteristics
1General Requirements
18WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing
21WORK ITEM 2: Appendages (U/W), Leak Test
24WORK ITEM 3: Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair
27WORK ITEM 4: Appendages (U/W) - Internal, Preserve
29WORK ITEM 5: Voids (Non-Accessible), Leak Test
32WORK ITEM 6: Propulsion Intermediate/Line Shafts, Inspect
34WORK ITEM 7: Propulsion Shaft Bearings (External), Renew
37WORK ITEM 8: Controllable Pitch Propeller Hub Assembly, Renew
43WORK ITEM 9: Fathometer Transducer, Renew
47WORK ITEM 10: Underwater (Speed) Log Transducer, Renew
49WORK ITEM 11: Sea Valves and Waster Pieces, Overhaul or Renew
55WORK ITEM 12: Sea Strainers - Duplex (All Sizes), Overhaul
59WORK ITEM 13: Rudder Stock Bearings, Check Clearances
63WORK ITEM 14: U/W Body, Preserve “100%”
66WORK ITEM 15: Hull Plating Freeboard, Preserve - Partial
71WORK ITEM 16: Superstructure, Preserve “Partial”
77WORK ITEM 17: Cathodic Protection / Zinc Anodes, Renew
80WORK ITEM 18: Propulsion Shaft Bearings (External), Check Clearances
83WORK ITEM 19: Voids (Non-Accessible), Preserve Internal Surfaces
85WORK ITEM 20: Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service
89WORK ITEM 21: Drydocking
92WORK ITEM 22: Propulsion Shaft Coating, Renew
95WORK ITEM 23: Propulsion Shafting, Straighten
97WORK ITEM 24: Aft Vestibule Deck, Repair & Joiner Door, Renew
100WORK ITEM 25: Aircastle Superstructure Supports, Repair
102WORK ITEM 26: Starboard Anchor Chain Fairlead, Renew
105WORK ITEM 27: Bilge T-Bars, Renew
107WORK ITEM 28: Bridge Wing Propulsion Controls, Inspect and Overhaul
110WORK ITEM 29: Bulkhead Top Connection, Renew
112WORK ITEM 30: Deck Fittings, Renew
115WORK ITEM 31: Fan Coli Unit (FCU) Drain, Restore to Original Configuration
118WORK ITEM 32: Fire Station Hose Support, Renew
120WORK ITEM 33: Flight Deck Drain Piping, Renew
122WORK ITEM 34: Kickpipes, Renew
124WORK ITEM 35: Deck Drains, Lower
127WORK ITEM 36: Mortar Deck Stanchions and Handrails, Renew
129WORK ITEM 37: Hull Plate and Striker Plate, Renew
131WORK ITEM 38: Port Lights and Windows, Overhaul
133WORK ITEM 39: Structural, Repairs
136WORK ITEM 40: XO’s Ladder Kick Plate, Renew
138WORK ITEM 41: Rudder Assembly, Remove, Inspect and Reinstall
143WORK ITEM 42: Welin Lambie Davit Foundation, Reinforce
146WORK ITEM 43: Work Item Deleted
150WORK ITEM 44: Rudder Assembly; Remove, Inspect and Reinstall
155WORK ITEM 45: Propulsion Propeller Shaft, Renew, Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Arrangement of Steam Feed & Condensate System Piping
Coast Guard Drawing 627 WMEC 161-001, Rev B; Arrangement & Details Stern Tube & Strut (NOTE: For purpose of bid, Contractor shall assume rope guards are welded in.)
Coast Guard Drawing 627 WMEC 085-201, Rev C, Booklet of General Plans
Coast Guard Drawing 627 WMEC 085-212, Rev C, Docking Plan
Coast Guard Drawing 627 WMEC 085-212, Rev C, Docking Plan
Coast Guard Drawing 627 WMEC 085-232, Rev C; Docking Plan
Coast Guard Drawing 627 WMEC 111-001, Rev A, Shell Expansion Framing and CVK
Coast Guard Drawing 627 WMEC 111-001, Rev A; Shell Expansion Framing & C.V.K.
Coast Guard Drawing 627 WMEC 117-001, Rev B, Transverse Web Frames, Forward and Aft of Mid Ship
Coast Guard Drawing 627 WMEC 117-003, Rev A, Mid-ship and Type Sections
Coast Guard Drawing 627 WMEC 13, Rev F, Bill of Materials, Arrangement of F/O System
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second & Main Deck Plating & Supports
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second and Main Deck Plating and Supports
Coast Guard Drawing 627 WMEC 136, Rev E, Bill of Materials, Rails, Stanchions and Handrails
Coast Guard Drawing 627 WMEC 136-001, Rev G, 01, 02 & Bridge Deck Plating & Support
Coast Guard Drawing 627 WMEC 136-001, Rev G, 01, 02 & Bridge Deck Plating & Supports
Coast Guard Drawing 627 WMEC 152-001, Rev G, Superstructure-Aircastle, 01 & 02 Deckhouse and Stack
Coast Guard Drawing 627 WMEC 184-004, Rev E, Doppler Sea Valve Foundations
Coast Guard Drawing 627 WMEC 201-003, Rev B, Arr. of Aux Machinery Space
Coast Guard Drawing 627 WMEC 243-002, Rev C, Arrangement and Details of Piping and Hydraulics
Coast Guard Drawing 627 WMEC 243-005, Rev-, Coupling (Muff) Thrust Ring & Key
Coast Guard Drawing 627 WMEC 243-006, Rev A, Line Shaft
Coast Guard Drawing 627 WMEC 243-006, Rev C, Line Shaft
Coast Guard Drawing 627 WMEC 243-006, Rev-, Line Shaft
Coast Guard Drawing 627 WMEC 243-007, Rev A, Tail Shaft
Coast Guard Drawing 627 WMEC 243-007, Rev B, Tail Shaft
Coast Guard Drawing 627 WMEC 243-007, Rev-, Tail Shaft
Coast Guard Drawing 627 WMEC 243-008, Rev H, Shaft Installation
Coast Guard Drawing 627 WMEC 243-008, Rev-, Shaft Installation
Coast Guard Drawing 627 WMEC 243-008, Rev-J, Shaft Installation
Coast Guard Drawing 627 WMEC 243-1, Rev D, Arrangement and Detail Stern Tube Seal
Coast Guard Drawing 627 WMEC 243-10, Rev-, CPP Hydraulic Storage Tank and Piping Arrangement
Coast Guard Drawing 627 WMEC 243-2, Rev C, Arrangement and Details of Piping and Hydraulics
Coast Guard Drawing 627 WMEC 243-6, Rev C, Line Shaft
Coast Guard Drawing 627 WMEC 243-8, Rev J, Shaft Installation
Coast Guard Drawing 627 WMEC 243-9, Rev A, Arrangement and Details Installation of New John Crane Seal (Type MX9)
Coast Guard Drawing 627 WMEC 244-001, Rev B, Propulsion Shaft Alignment
Coast Guard Drawing 627 WMEC 244-1, Rev B, Propulsion Shaft Alignment
Coast Guard Drawing 627 WMEC 245-1, Rev-, Hub Assy (LH)
Coast Guard Drawing 627 WMEC 245-10, Rev-, Pitch Stop Installation
Coast Guard Drawing 627 WMEC 245-2, Rev-, Hub Assy (RH)
Coast Guard Drawing 627 WMEC 245-21, Rev A, CPP Hub Modification Details
Coast Guard Drawing 627 WMEC 245-22, Rev-, Pitch Limit Bracket
Coast Guard Drawing 627 WMEC 245-3, Rev-, Control Plate Assy (LH)
Coast Guard Drawing 627 WMEC 245-4, Rev-, Control Plate Assy (RH)
Coast Guard Drawing 627 WMEC 245-8, Rev-, CPP Hydraulic System Schematic
Coast Guard Drawing 627 WMEC 245-9, Rev A, Pitch Limit Bracket
Coast Guard Drawing 627 WMEC 252-002, Rev C, Pilothouse and Bridge Wing Control Linkages
Coast Guard Drawing 627 WMEC 261-002, Rev E, Arrangement of F/O System
Coast Guard Drawing 627 WMEC 262-003, Rev-, Arrangement of L/O System
Coast Guard Drawing 627 WMEC 321-001, Rev D, Main Cableways, Arrangements and Details, 02 Level and Above
Coast Guard Drawing 627 WMEC 49, Rev E, Bill of Materials, Diagram of Sounding Tubes & Air Escapes
Coast Guard Drawing 627 WMEC 492-004, Rev A, Helicopter VIS Landing Aids, Lighting Arrangements and Details
Coast Guard Drawing 627 WMEC 506-001, Rev C, Diagram of Sounding Tubes & Air Escapes
Coast Guard Drawing 627 WMEC 506-002, Rev E, Arrangement of Sounding Tubes and Air Escapes
Coast Guard Drawing 627 WMEC 521-002, Rev G, Arrangement, Fire Main, Sprinkling and Washdown, Main Deck and Above
Coast Guard Drawing 627 WMEC 521-003, Rev F, Arr. of Firemain, Sprinkling and Washdown System 2nd Dk. & Below
Coast Guard Drawing 627 WMEC 521-003, Rev G, Arr. of Firemain, Sprinkling and Washdown System 2nd Dk. & Below
Coast Guard Drawing 627 WMEC 521-004, Rev B, Details of Fire Main System
Coast Guard Drawing 627 WMEC 526-001, Rev G, Arrangement of Weather Deck & A/C Drains
Coast Guard Drawing 627 WMEC 528-001, Rev H, Arrangement of Plumbing System and Drains
Coast Guard Drawing 627 WMEC 528-002, Rev E, Diagram of Plumbing and Deck Drains
Coast Guard Drawing 627 WMEC 528-004, Rev -, Arrangements of Plumbing System Drains
Coast Guard Drawing 627 WMEC 535-002, Rev F, Arrangement of Stm., Feed & Condensate System Piping
Coast Guard Drawing 627 WMEC 535-002, Rev G, Arrangement of Steam Feed & Condensate System Piping
Coast Guard Drawing 627 WMEC 535-002, Rev G, Arrangement of Stm., Feed & Condensate System Piping
Coast Guard Drawing 627 WMEC 562-001, Rev D, Arrg't & Details Rudder Stocks, Bearings, & Stuffing Box
Coast Guard Drawing 627 WMEC 562-001, Rev F, Arrgt & Details Rudder Stocks, Bearings, & Stuff Box
Coast Guard Drawing 627 WMEC 562-003, Rev -, Rudder Construction
Coast Guard Drawing 627 WMEC 562-003, Rev A, “A” & “B” Class Rudder Construction
Coast Guard Drawing 627 WMEC 581-001, Rev-, Anchor Handling
Coast Guard Drawing 627 WMEC 583-041, Rev F, OTHB Davit Installation
Coast Guard Drawing 627 WMEC 601-004, Rev D, General Arrangement of Main & 01 Deck
Coast Guard Drawing 627 WMEC 601-004, Rev D, General Arrangement, Main and 01 Deck
Coast Guard Drawing 627 WMEC 601-1, Rev C; Outboard Profile
Coast Guard Drawing 627 WMEC 61, Rev G, Bill of Materials, Arrangement of Steam Feed & Condensate System Piping
Coast Guard Drawing 627 WMEC 612-001, Rev E, Rails, Stanchions and Handrails
Coast Guard Drawing 627 WMEC 621-005, Rev D, Joiner Part, Details
Coast Guard Drawing 627 WMEC 624-001, Rev F, Joiner Door Schedule
Coast Guard Drawing 627 WMEC 625-002, Rev -, Schedule of Fixed Lights and Windows
Coast Guard Drawing 627 WMEC 633-001, Rev B, Hull Zinc Protectors
Coast Guard Drawing 628 WMEC 103-004, Rev A, Gen Arrg Main And 01 Decks
Coast Guard Drawing 628 WMEC 103-005, Rev A, Gen Arrg 02 Lvl, Brdge Dk & House Top
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual Identification Numeral & Letter for Ships
Coast Guard Fleet Drawing FL 2804-12, Rev -, USCG. Emblem
Coast Guard Fleet Drawing FL 2804-13, Rev G, Visual Identification Kit Schedule
Coast Guard Fleet Drawing FL 2804-15, Rev-, Draft Figures
Guard Drawing 627 WMEC 152-001, Rev G, Superstructure -Aircastle, 01 & 02 Deckhouse & Stack
Guard Drawing 627 WMEC 601-1, Rev C, Outboard Profile
Guard Drawing 627 WMEC 85-231, Rev A, Booklet Of General Plan
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 0701, Feb 2009, Ship Instruction Manual - Propellers and Shafting - Operation and Service KAMEWA Controllable Pitch Marine Propeller
Coast Guard Technical Publication (TP) 0701, Section 245, Feb 2009, Report – Shaft and Bearing Design Calculations
Coast Guard Technical Publication (TP) 0701, SWBS 245, Section A, Mar 2000, Ship Instruction Manual - Propellers and Shafting - Operation and Service KAMEWA Controllable Pitch Marine Propeller
Coast Guard Technical Publication (TP) 2718, SWBS 555, Jun 2006, Fire extinguishing Systems (270 WMEC A-Class)
Coast Guard Technical Publication (TP) 3231B SWBS 252, Mar 1994, Propulsion Pneumatic Control System
Coast Guard Technical Publication (TP) 3446, Jun 2009, Doppler Speed Log, Model SRD-500 Dual Axis
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), Jan 2012, Install New Deck Covering System
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2012, Drydocking
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2012, Temporary Hull Accesses
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2012, Temporary Hull Accesses
OTHER REFERENCES
HYPERLINK "http://208.233.211.117/cgi-bin/SoftCart.exe/STORE/PAGES/SP1.htm?L+sspcstore+wukd3494+1057295146" \o "http://208.233.211.117/cgi-bin/SoftCart.exe/STORE/PAGES/SP1.htm?L+sspcstore+wukd3494+1057295146" The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
HYPERLINK "http://www.assistdocs.com/search/document_details.cfm?ident_number=205641&StartRow=1&PaginatorPageNumber=1&doc%5Fid=A%2DA%2D59316&search%5Fmethod=BASIC" \o "http://www.assistdocs.com/search/document_details.cfm?ident_number=205641&StartRow=1&PaginatorPageNumber=1&doc%5Fid=A%2DA%2D59316&search%5Fmethod=BASIC" Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) A53, 2005, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4174, Re-approved 2005, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust-Petrolatum
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Commercial Item Descriptions (CID) A-A-59316, Nov 2003; Abrasive Materials for Blasting
Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and Weldless
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for Coding Level of Contamination by Solid Particles
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-C-16173, Jan 1993, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-DTL-23549, Feb 2007, Grease, General Purpose
MIL-DTL-2845, Rev E, Aug 1999, Propulsion Systems, Boat and Ship; Main Shafting, Propellers, Bearings, Gauges, Special Tools, and Associated Repair Parts; Preservation, Packaging, Packing and Storage of
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-2191, Nov 1992, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
MIL-STD-2199, Oct 1993, Glass Reinforced Plastic Coverings for Propeller Shafting
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Jan 2006, Chapter 16, Cofferdams
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning.
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting
The Society for Protective Coatings (SSPC)/NACE International (NACE), 2004, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 6 |
| Y |
| **Line Shaft |
| NSN: 2010-01-141-3512 |
| 2 ea. |
| 10,000.00 |
| 7 |
| N |
| Aft strut bearing |
| NSN: 3120-01-027-0025 |
| 2 ea. |
| $5516 |
| 7 |
| N |
| Intermediate strut bearing |
| NSN: 3120-01-024-6328 PN: 620WPC-4301-55-BA2 |
| 2 ea. |
| $3101 |
| 8 |
| Y |
| **Hub Assembly (R/H) |
| NSN: 2010-01-091-5056 |
| 1 ea. |
| 90,219.50 |
| 8 |
| Y |
| **Hub Assembly (L/H) |
| NSN: 2010-01-092-0440 |
| 1 ea. |
| 87,439.00 |
| 8 |
| N |
| **Hub Installation Kit |
| NSN: 2010-01-466-4844 |
| 1 ea. |
| 2,924.50 |
| 8 |
| Y |
| **Port Propeller Blades (R/H) |
| NSN: 2010-01-134-7238 |
| 1 set |
| 33,090.26 |
| 8 |
| Y |
| **Starboard Propeller Blades (L/H) |
| NSN: 2010-01-134-0378 |
| 1 set |
| 33,090.26 |
| 8 |
| N |
| **Propeller Blade Bolts |
| NSN: 5306-01-225-2920 |
| 48 ea. |
| 1,900.02 |
| 9 |
| N |
| *** Fathometer Transducer, shallow water, 50-200 kHz |
| NSN: 5845-01-470-2500 Airmar Technology SS505 |
| 1 ea. |
| 148.92 |
| 9 |
| Y |
| *** Fathometer transducer, deep water, 28 kHz |
| NSN: 5845-01-496-9770 |
| 1 ea. |
| 6,834.47 |
| 10 |
| Y |
| ***Sperry SRD 500 Doppler speed log |
| NSN:5999-01-472-7499 |
| 1 ea. |
| 12,936.00 |
| 20 |
| N |
| Shaft CPP OD Box kit |
| PN: A066SM04109 |
| 1 ea. |
| 945.00 |
| 20 |
| N |
| High Pressure Seals |
| NSN: 5330-01-045-2799 |
| 8 ea. |
| 345.00 |
| 20 |
| N |
| Servo Box seal kit (NOTE: Parts may require machining for proper fit.) |
| NSN: 5330-01-476-2026 |
| 1 ea. |
| 850.00 |
| 20 |
| N |
| Servo Box seal |
| P/N: 9891-LUP |
| 1 ea. |
| 25.00 |
| 21 |
| Y |
| *Transducer Cover Plate |
| N/A |
| 3 ea. |
| 50.00 |
| 35 |
| N |
| Deck Drain, Bronze, Round, Flush, Bolted, 4 - 19/32 inch Diameter |
| NSN: 4510-00949-5580 |
| 7 ea. |
| 263.13 |
| 38 |
| N |
| Window |
| #CC-734 W/gaskets |
| 2 ea. |
| $250.00 |
| 41 |
| N |
| Upper Roller Bearing Assembly |
| NSN: 3110-01-080-0814 |
| 2 ea. |
| 41 |
| N |
| Lower Micarta Split Bearing Assembly (9-3/8"ID x 10-1/8"OD x 14" Lg) |
| NSN: 3120-01-148-3763 |
| 2 ea. |
| 41 |
| N |
| **Rudder stock sleeve |
| NSN: 2010-01-094-8938 |
| 2 ea. |
| $4,429..00 |
| 44 |
| N |
| Upper Roller Bearing Assembly |
| NSN: 3110-01-080-0814 |
| 2 ea. |
| 44 |
| N |
| Lower Micarta Split Bearing Assembly (9-3/8"ID x 10-1/8"OD x 14" Lg) |
| NSN: 3120-01-148-3763 |
| 2 ea. |
| 44 |
| N |
| **Rudder stock sleeve |
| NSN: 2010-01-094-8938 |
| 2 ea. |
| $4,429..00 |
| 45 |
| Y |
| Propeller shaft |
| NSN: 2010-01-092-5810 |
| 2 ea. |
| $54,080.00 |
| 45 |
| Y |
| ***Propeller shaft |
| NSN; 2010-01-141-3512 |
| 2 ea. |
| $49,650.50 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 1 |
| Hull Plating (U/W Body), Ultrasonic Testing |
| 2 |
| Appendages (U/W), Leak Test |
| 4 |
| Appendages (U/W) - Internal, Preserve |
| 5 |
| Voids (Non-Accessible), Leak Test |
| 6 |
| Propulsion Intermediate/Line Shafts, Inspect |
| 13 |
| Rudder Stock Bearings, Check Clearances |
| 15 |
| Hull Plating Freeboard, Preserve - Partial |
| 18 |
| Propulsion Shaft Bearings (External), Check Clearances |
| 20 |
| Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service |
| 23 |
| Propulsion Shafting, Straighten |
| 26 |
| Starboard Anchor Chain Fairlead, Renew |
| 33 |
| Flight Deck Drain Piping, Renew |
| 41 |
| Rudder Assembly, Remove, Inspect and Reinstall |
| 43 |
| Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) |
| 44 |
| Rudder Assembly; Remove, Inspect and Reinstall |
PC_210B_WMEC_0113
Principal Characteristics
210' WMEC (B-Class)
Physical Characteristics
| Length Overall |
| 210' 6" |
| Length Between Perpendiculars |
| 200' 0" |
| Beam Molded |
| 34' 0" |
| Depth Molded, Main Deck Amidships |
| 19' 6" |
| Full Load Displacement |
| 1,170 long tons |
Draft, Full Load to Baseline Amidships
*Baseline is 9” Below Keel Amidships 12' 0"
| Design Drag Between Perpendiculars |
| 1' 6" |
Highest Projection Above Baseline
*VHF-FM ADF Antenna 90' 0"
| Shore Tie Voltage Requirements |
| 400A / 440V |
| Frame Spacing |
| 1' 0" |
Machinery Characteristics
| Main Propulsion |
| 2 ALCO Model 16-251-B Diesel Engines, |
5,000 BHP total
| Ship's Service Generators |
| 2 Caterpillar Model 3406B Diesel-driven SR4, |
250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle
| Emergency Generator |
| Caterpillar Model 3306B Diesel-driven SR4, |
180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle
| Number of Propellers |
| 2 |
| Propeller Diameter |
| 7' 6" |
| Number of Blades, Each |
| 4 |
| Pitch |
| Controllable |
| Shaft RPM |
| 300 |
| Shaft Diameter |
| 8.25" at exit of hull |
| Anchor & Chain |
| Two 2,800 lb Navy Stockless Anchors, |
7 shots of chain each
Tank Capacities (gallons)
| Diesel Fuel Total (95%) |
| 48,427 |
| Fresh Water Total (100%) |
| 11,693 |
| JP-5 Fuel Total (95%) |
| 4,683 |
| Lube Oil Total (95%) |
| 2,390 |
00000_PWB_0312_FLT
REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0212) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
Coast Guard Drawings
None.
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Other References
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
Or
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
Or
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.3.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-130.
3.3.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.3.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Interim changes and additions to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes and additions to the 2009 Edition of SFLC Std Spec 0000:
3.5.1 Acronyms and term definitions – paragraph 1.3 (Acronym and term definitions).
3.5.1.1 The term “COTR” has been replaced with “COR”, which is defined as follows:
“COR”: Contracting Officer’s Representative – the person delegated by the KO as the on-scene representative for matters concerning performance of work; this includes correctness, timeliness, and quality of the Contractor’s work. Normally, the CO/OINC is designated the COR.”
3.5.1.2 Definition addition for the term “Ungrounded, as follows:
· “Ungrounded”: A power system where all of the current-carrying conductors and windings (including any neutral connection) are insulated from ground. In contrast, a generator or transformer in which at least one conductor or point (usually the midpoint or corner of a delta winding or the common center of a wye winding) is intentionally grounded, either solidly or through an impedance, is considered grounded. Note that the distinction concerns only current-carrying conductors; for both ungrounded and grounded power systems, non-current carrying metal parts and equipment grounding conductors are always bonded to earth ground for personnel safety. At non-Governmental facilities, dockside wye connected transformer secondary windings are almost always grounded and are generally not suitable for connection to a Coast Guard cutter without a separate Contractor furnished isolation transformer.”
3.5.2 Changes to paragraph 3.2.4 2.3 (QP-1 Inspector or Tech Rep duties).
“3.2.4.2.3 QP 1 Inspector or Tech Rep duties.
3.2.4.2.3.1 The Coating Inspector for the “QP 1-certified” Contractor or the Contractor-provided NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of “critical-coated surfaces”:
· Verify inspection instrument calibration.
· Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.
· Verify all aspects of surface preparation – including, but not limited to:
· Cleanliness of compressed air.
· Adequacy of solvent cleaning.
· Proper handling of blast media.
· Actual surface preparation procedure.
· Inspect and approve final surface preparation, before application of primer coat.
· Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.
· Determine when applied coats have sufficiently cured for overcoating, or for system service resumption (see paragraph A2.1.18 (Critical drying time requirements)).
· Complete and sign the quality assurance (QA) inspection forms (see QA-1 thru QA-5), provided in Appendix A (Requirements for Preservation of Ship Structures) of this document.
· Submit all completed QA inspection forms to the COR (through the Contractor), upon completion of work.
3.2.4.2.3.2 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform of all duties listed above. Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.”
3.5.3 Changes to contents of paragraph 3.2.5 (Planning document).
“3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:
· Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).
· Shows overall period of performance for each CLIN, with start and stop dates of major sub-tasks.
· Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast Guard Inspector presence.
· Identifies all work item time periods that require OEM Tech Rep assistance.
· Identifies the “critical paths” for the project.
· Shows calculations for the “float” along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.
NOTE
Float is the number of days that the critical paths can be delayed without affecting the final delivery date.
3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all Tech Reps required by the Contract - indicating they are available for work during the proposed time period.
3.2.5.2 Submit a preliminary electronic copy of the PD to the COR - for Government review - no later than one week after contract award.
3.2.5.3 Submit 3 copies of the PD to the COR, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.
NOTE
A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor’s internal scheduling document is preferred.
FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL
3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.
NOTE
The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to ‘crash’ the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.”
3.5.4 Additional sub-paragraphs to paragraph to 3.2.6.5 (Inspection report particulars).
“3.2.6.5.3 CFR tracking system. The Contractor shall create and maintain a CFR tracking system for the project. At a minimum, ensure that the CFR tracking system shall list all required reports, broken down by the following:
· Work item and paragraph number.
· Due dates.
· Submission dates.
· CFR/CIR submission number.
3.2.6.5.3.1 Be aware that the COR will respond via the CFR reply as to whether the CIR/CFR ‘fully’ or ‘partially’ satisfied the inspection and reporting requirements in the associated work item.
3.2.6.5.3.2 When submitting a CFR, ensure that the applicable work item and paragraph number for which the inspection report is being submitted is included on the CFR.
3.2.6.5.3.3 Submit a copy of the CFR tracking sheet to the COR at the arrival conference.
3.2.6.5.3.4 At a minimum the Contractor shall update and submit a copy of the CFR tracking sheet to the COR the day before each weekly progress meeting. At the required CFR due date, submit the CFR tracking sheet to the COR via a CFR for review and formal archiving with the project records.”
3.5.5 Changes to contents of paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems).
“3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems. When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:
· Shower stalls are equipped with privacy screens.
· Sinks are provided with fresh hot and cold water.
· Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric Code (NEC), are located in vicinity of sinks.
· Toilets have doors or privacy dividers.
· Lockers are capable of being locked.”
3.5.6 Changes to contents of paragraph 3.3.2.1.1 (Water depth).
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
· Ordinary low water mark on non-tidal rivers.
· At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
3.5.7 Electrical compliance planning.
“3.3.14 Electrical compliance planning. For cutter availabilities, the Contractor shall submit to the KO the following electrical compliance planning documentation during the pre-award phase of the contract.
3.3.14 1 Shore power. When ungrounded shore power is to be provided per SFLC Std Spec 8635, provide a one line electrical diagram showing how such power will be supplied, including the winding and grounding configuration and rating of any generator or isolation transformer. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.
3.3.14.2 Arc welding. When electric arc welding is to be performed per SFLC Std Spec 0740 while the vessel is waterborne, provide a diagram showing the general proposed location of each welding machine, the grounding configuration of each machine, and the return current conductor size and length. For drydock availabilities, separate diagrams may be necessary for waterborne and non-waterborne periods.
3.3.14.3 Hull bonding and lightning protection. For work periods while the vessel is not waterborne, provide a diagram showing how the hull grounding straps required by SFLC Std Spec 8635 will be sized (length and gauge) and connected.
3.3.14.4 Tool and equipment power. Provide a diagram showing how Contractor tool and equipment power will be supplied and distributed for dockside and shipboard use in accordance with SFLC Std Spec 0450. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.”
3.5.8 Changes to paragraph to A2.1.1.3 (Document submission).
A1.1 “A2.1.1.3 Document submission.
A1.2 A2.1.1.3.1 For all work involving preservation of “critical-coated surfaces”, ensure the following is submitted to the COR at the Arrival Conference, for each coating system intended to be applied:
· Coating system manufacturer’s name.
· Product data sheets.
· MSDS.
· COC.
A1.3 A2.1.1.3.2 Documentation shall be broken out by work item, to also include the following information:
· Brand name.
· Color.
· Intended mil thickness.
· Time between coats.
· Intended final cure time prior to immersion or full duty rating, as applicable.
A1.4 A2.1.1.3.3 For work involving preservation of surfaces not designated as “critical-coated surfaces”, submit all product data sheets, MSDS, and COC to the COR, prior to commencement of work.”
3.5.9 Requirements changes to paragraphs A2.1.5 (Tenting) and A2.1.6 (Ambient condition control).
“A2.1.5 Tenting and ambient condition control – “for critical-coated surfaces”.
A2.1.5.1 When the ambient condition parameters necessary for full paint cure or to meet environmental conditions, as required in paragraph A.2.1.4 (Ambient condition parameters), cannot be met for successful application and curing of “critical-coated” surface coating systems, the Contractor shall provide the following, at no additional cost to the Government:
· Suitable tenting, as applicable, for exterior surface preservation.
· Suitable ambient condition control equipment, which may include, but not be limited to the below-listed, to create and maintain ambient conditions recommended by the coating system’s manufacturer, and facilitate successful coating application and curing.
· AC system.
· Heaters.
· Blowers.
· Dehumidifiers.
A2.1.5.2 Submit an ambient condition control plan to the COR within 24 hours prior to initiating ambient condition control process
NOTE
The Contractor is expected to be aware of the advent of environmental conditions that are adverse to preservation of critical-coated surfaces and include all costs in
3.5.10 Pre-surface preparation requirements – additional to paragraph A2.1.7 (Pre-surface preparation requirements).
“A2.1.7.4 Coupon test. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item:
A2.1.7.4.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Use a new metal plate, of the same metal type and material properties as the area to be blasted, steel or aluminum plate, as applicable. For steel plates, the new plate shall have the mill scale intact and the plate will be in a Rust Grade "A" condition, per the SSPC-VIS 1 visual standard cards. No existing anchor profile, other than the surface irregularities from the manufacturing process are permitted on the test coupon. The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot. The test coupon shall be affixed so as to not permit excessive movement during the performance test.
CAUTION!
Do not affix the coupon to the vessel nor shall the blast media from the performance test strike the vessel during the test
A2.1.7.4.2 Ensure that the abrasive blasting operation test on the test coupon is with the very same setup that will be used to blast the vessel. The setup shall include, but not be limited to:
· The abrasive media to be used (material and media size).
· Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
· Delivery rate and pressure settings.
A2.1.7.4.3 Blast an one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the applicable work item and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, method A or C. Notify the COR in advance of the abrasive blasting operation test, to permit the witnessing of the test by appropriate Coast Guard personnel. Submit a CFR documenting the results of the abrasive blasting operation test. CFR shall include at a minimum, the following:
· Area of the vessel that the verified setup will be used to abrasive blast with.
· The abrasive media used.
· The nozzle size and type.
· The delivery rate and pressure.
· The test coupon starting properties (material type and surface conditions).
· The resultant anchor profile readings from the test.
NOTES
1. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph A2.1.7.4 (Coupon test) are met.
A2.1.7.4.3 Repeat the abrasive blasting operation test in the following instances:
· The setup, as defined in paragraph A2.1.7.4.1 is changed.
· The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
· Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
· The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
· When Directed by the COR.
NOTE
A performance test of the abrasive blasting operations on a test coupon and measuring the anchor profile prior to performing the operation on the cutter, in order to confirmed that the anchor profile range that the operation is going to produce. An abrasive blasting operation test is prudent, as there are enough variables in the equipment setup and media properties that the resulting anchor profiles from one contractor to the next vary significantly.
3.5.11 Post-surface preparation requirements - additional to paragraph A2.1.8 (Post-surface preparation requirements).
A2.1.8.8 Substrate profile measurements - during and post-surface preparation. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item for complete preservation of a ”critical-coated” surface:
A2.1.8.8.1 During surface preparation by abrasive blasting or waterjetting operations, spot check the existing anchor profile per 500-square feet, in order to 'project' the need to manage the excessive anchor inspect for both excessive and insufficient anchor profiles . When the Contractor elects to prepare a substrate by waterjetting, the Contractor shall inspect the substrate for areas of insufficient or excessive anchor profile, both visually and in accordance with ASTM D4417, Method A or C. Submit a CFR detailing the location, square footage, measured anchor profiles, and the anchor profile range required for the applicable coating system.
A2.1.8.8 2 Post completion of surface preparation, measure the profile of the resultant bare surfaces, in accordance with ASTM D4417, Method A or C.”
3.5.12 Caution verbiages – additional to paragraph A2.1.18 (Critical drying and cure time requirements).
“CAUTIONS!
1. Hard cure times or cure time prior to immersion for any “critical coated system” shall be met as published on the Product Data Sheets available online. No early undocking or relaxation of these published requirements is permitted without prior approval from the KO. Coating system manufacturer’s Sales or Technical Representatives may not relax these requirements. Painting and curing of all tank coating systems (except for tanks that are inboard and not touching the skin of the vessel (side and/or bottom) shall occur while the cutter is out of the water.
2. CAPAC systems shall not be energized until full cure of all underwater paint systems has occurred.”
3.5.13 Preservation Plan.
“A2.2 Preservation Plan (PP). The contractor shall submit a PP to the COR at the arrival conference, to allow for review of all work items pertaining to the preservation of the vessel. At a minimum, PP shall include the following and be broken down by work item:
· Coatings to be applied – listed by manufacturer and product identification numbers.
· Target wet and dry film thickness values.
· Authorized reducers/solvents - including maximum percent by volume for reducers/solvents.
· Colors by FED-STD-595 color number.
· Application method for each coat.
· Application pressure and nozzle size requirements listed on the manufacturer’s product data sheet(s).
· Minimum recoat windows for applying subsequent coats, maximum recoat windows to apply subsequent coats, adjusted for anticipated temperatures.
· Any special instructions or environmental limits listed by the coating manufacturer.
· Intended final cure times prior to immersion or full duty rating (as applicable).”
3.5.14 Changes to paragraph B2.2.3.3.1.
“B2.2.3.3.1 Do not release lead or lead-contaminated materials into the environment. Conduct periodic air monitoring (as appropriate) for lead in the worker’s breathing zone, during the course of any abatement work involving lead containing materials, to prevent exposure at or above the PEL. Submit results of all air monitoring samples to the COR, within 24 hours of completion of sampling.”
3.5.15 Booming requirements during the offload or on-load of petroleum products.
“B2.2.10 Booming requirements during the offload or load of petroleum products. The Contractor shall provide a containment boom system and boom off the cutter during all petroleum cargo on-loads and offloads. The cutter shall be boomed off by the contractor during both shipyard functions and the final bunkering of the cutter by ship's force. The contractor is responsible to provide the labor to deploy and recover the boom during all operations, including operations conducted by ship's force.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .