Blank_IGE_Rev-0.xls
XLS spreadsheet 31 KB Posted
- Attached to
- CGC RESOLUTE (WMEC-620) DRYDOCK REPAIRS
- Solicitation number
- HSCG80-13-Q-P45B18
About this file
Schedule of Supplies/Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4_Questions_CGC_RESOLUTE.docx | DOCX document | |
| RESOLUTE_DD_Large_FY13_Spec_Rev-2.pdf | ||
| RESOLUTE_AMEND_3.pdf | ||
| 627-WMEC_152_1_1_-_G_Aircastle_repairs.pdf | ||
| Amendment_2_Questions_CGC_RESOLUTE.docx | DOCX document | |
| 627-WMEC_581_1_1_-_A_Anchor_chain_fair_lead.pdf | ||
| SPEC_Rev-1_RESOLUTE_DD_FY13.pdf | ||
| Amendment_1_Questions.docx | DOCX document | |
| Spec_RESOLUTE_Rev-0.doc | DOC document | |
| Performance_Questionnaire_based_on_CPARS_Template.docx | DOCX document | |
| RFQ_PDF_RFQ_HSCG80-13-Q-P45B18_Date_4-25-13_Posted.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| GOVERNMENT ESTIMATE FOR: | |||||
| USCGC RESOLUTE (WMEC-210B) DRYDOCK AVAILABILITY FY13 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | ||
| D-002 | Appendages (U/W), Leak Test | JOB | 1 | ||
| D-003 | Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair | JOB | 2 | ||
| D-004 | Appendages (U/W) - Internal, Preserve | JOB | 1 | ||
| D-005 | Voids (Non-Accessible), Leak Test | JOB | 1 | ||
| D-006 | Work item Deleted | JOB | 0 | ||
| D-007 | Propulsion Shaft Bearings (External), Renew | JOB | 2 | ||
| D-008 | Controllable Pitch Propeller Hub Assembly, Renew | JOB | 2 | ||
| D-009 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-010 | Underwater (Speed) Log Transducer, Renew | JOB | 1 | ||
| D-011 | Sea Valves and Waster Pieces, Overhaul or Renew | JOB | 1 | ||
| D-012 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | ||
| D-013 | Rudder Stock Bearings, Check Clearances | JOB | 12 | ||
| D-014 | U/W Body, Preserve “100%” | JOB | 1 | ||
| D-015 | Hull Plating Freeboard, Preserve - Partial | JOB | 1 | ||
| D-016 | Superstructure, Preserve “Partial” | JOB | 1 | ||
| D-017 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | ||
| D-018 | Work Item Deleted | JOB | 0 | ||
| D-019 | Voids (Non-Accessible), Preserve Internal Surfaces | JOB | 1 | ||
| D-020 | Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service | JOB | 2 | ||
| D-021 | Drydocking | JOB | 1 | ||
| O-022 | Propulsion Shaft Coating, Renew | JOB | 2 | ||
| O-023 | Propulsion Shafting, Straighten | JOB | 2 | ||
| D-024 | Aft Vestibule Deck, Repair & Joiner Door, Renew | JOB | 1 | ||
| D-025 | Aircastle Superstructure Supports, Repair | JOB | 1 | ||
| D-026 | Starboard Anchor Chain Fairlead, Renew | JOB | 1 | ||
| D-027 | Bilge T-Bars, Renew | JOB | 1 | ||
| D-028 | Bridge Wing Propulsion Controls, Inspect and Overhaul | JOB | 1 | ||
| D-029 | Bulkhead Top Connection, Renew | JOB | 1 | ||
| D-030 | Deck Fittings, Renew | JOB | 1 | ||
| D-031 | Fan Coli Unit (FCU) Drain, Restore to Original Configuration | JOB | 1 | ||
| D-032 | Fire Station Hose Support, Renew | JOB | 1 | ||
| D-033 | Flight Deck Drain Piping, Renew | JOB | 1 | ||
| D-034 | Kickpipes, Renew | JOB | 1 | ||
| D-035 | Deck Drains, Lower | JOB | 1 | ||
| D-036 | Mortar Deck Stanchions and Handrails, Renew | JOB | 1 | ||
| D-037 | Hull Plate and Striker Plate, Renew | JOB | 1 | ||
| D-038 | Port Lights and Windows, Overhaul | JOB | 1 | ||
| D-039 | Structural, Repairs | JOB | 1 | ||
| D-040 | XO’s Ladder Kick Plate, Renew | JOB | 1 | ||
| D-041 | Rudder Assembly, Remove, Inspect and Reinstall | JOB | 2 | ||
| D-042 | Welin Lambie Davit Foundation, Reinforce | JOB | 1 | ||
| D-043 | Work Item Deleted | JOB | 0 | ||
| D-044 | Work Item Deleted | JOB | 0 | ||
| D-045 | Propulsion Propeller Shaft, Renew | JOB | 2 | ||
| D-046 | Propulsion Shaft Seal (Mechanical and Inflatable) Assemblies, Renew | JOB | 2 | ||
| D-047 | Propulsion Stern Tube Bearing, Renew | JOB | 2 | ||
| D-048 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 2 | ||
| O-00A | Composite Labor Rate | Hour | |||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | $0.00 | Day | 5 | $0.00 |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(12/27/2012) Draft-1 - Page &P of &N
File details come from the government source that posted it. Updated .