Amendment_1_Questions.docx
DOCX document 24 KB Posted
- Attached to
- CGC RESOLUTE (WMEC-620) DRYDOCK REPAIRS
- Solicitation number
- HSCG80-13-Q-P45B18
About this file
Amendment A00001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4_Questions_CGC_RESOLUTE.docx | DOCX document | |
| RESOLUTE_DD_Large_FY13_Spec_Rev-2.pdf | ||
| RESOLUTE_AMEND_3.pdf | ||
| 627-WMEC_152_1_1_-_G_Aircastle_repairs.pdf | ||
| Amendment_2_Questions_CGC_RESOLUTE.docx | DOCX document | |
| 627-WMEC_581_1_1_-_A_Anchor_chain_fair_lead.pdf | ||
| SPEC_Rev-1_RESOLUTE_DD_FY13.pdf | ||
| Spec_RESOLUTE_Rev-0.doc | DOC document | |
| Performance_Questionnaire_based_on_CPARS_Template.docx | DOCX document | |
| RFQ_PDF_RFQ_HSCG80-13-Q-P45B18_Date_4-25-13_Posted.pdf | ||
| Blank_IGE_Rev-0.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ MASTER PAGE 62 OF __
USCGC RESOLUTE,
Solicitation: HSCG80-13-Q-P45B18
SF 30, Block 14 Continuation Page
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE |
OF PAGES
2. AMENDMENT/MODIFICATION
A00001
3. EFFECTIVE DATE
May 1, 2013
4. REQUISITION/PURCHASE REQ. NO.
2113803P45B18
5. PROJECT NO.
6. ISSUED BY CODE:
Commander (PBPL) Surface Forces Logistics Center 300 East Main Street, Suite 550 Norfolk, VA 23510-9111
7. ADMINISTERED BY CODE:
8. NAME AND ADDRESS OF CONTRACTOR (No, street, county, state and Zip Code)
CODE: FACILITY CODE:
9a. AMENDMENT OF SOLICITATION NO.
HSCG80-13-Q-P45B18 CGC BEAR (WMEC-901)
9b. DATED (SEE ITEM 11) April 25, 2013
10a. MODIFICATION OF CONTRACT NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning one copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (IF REQUIRED)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in Item 14 are made in the contract order no in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data, etc.) set forth in Item 14 pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into in pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _1____ copy to the issuing office.
14. Description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
USCGC RESOLUTE (WMEC-901)
Solicitation HSCG80-13-Q-P45B18
1. The purpose of this amendment is to answer questions received from potential offerors. See the following continuation page to view the questions and answers.
2. Revision 1 of CGC RESOLUTE Specification dated Apr 30, 2013 is hereby incorporated. See attachment
3. Revised Blank Schedule of Supplies and Services is hereby incorporated. See Attachment
4. The solicitation’s closing date is hereby extended from 5/15/2013 at 3:00 p.m. to 5/17/2013 at 2:00 p.m. EST.
5. All other terms and conditions remain unchanged.
15A. NAME AND TITLE OF SIGNER (Type/Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type/Print) Tara M. Holloway
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY____________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
STANDARD FORM 30
1. In regards to Work Item 1-D calls the contractor to perform UT measurements? If so, is the intent of the Coast Guard to have the contractor quote per shot?
Answer: The paragraph gives no total quantity for the IGE price sheet. The price should be priced as “JOB”. The contractor shall perform a total of 250 UT measurements.
2. Work Item 24 paragraph 3.2.2 and 3.2.7 was left blank and information needs to be filled in.
Answer: All blanks filled out (See attached revised Spec Rev-1)
3. Work Item 25 UT shots was left blank.
Answer: The contractor shall take a total of 25 UT measurements.
4. Work Item 27 paragraph UT shots was left blank and information needs to be filled in.
Answer: There is no UT shots required in Work Item 27
5. Work Item 41 and 41 – Rudder Assembly, Remove, Inspect & Reinstall
Answer: There is no UT shots required in Work Items 41 and 44.
(End of Questions and Answers)
File details come from the government source that posted it. Updated .