Attachment_1C_-_Facility_Square_Footage_Detail.pdf
PDF 648 KB Posted
- Attached to
- Base Operations Support (BOS) Services for the CBP Advanced Training Center (ATC), Harpers Ferry, WV
- Solicitation number
- HSBP1013R0045
About this file
Attachment 1C (Facility Square Footage Detail)
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSBP1013R0045 Attachment 1C - Facility Square Footage
Building # Room # Room Name L W Area Carpet Matting VCT Ceramic/P orcelain
Hard Wood
Sealed Concrete
Epoxy Flooring
Access Flooring
Recessed Walk-Off
Mat 4 Tactical Trailer 1 Tactical Trailer 1 1200 1100 100 4 Tactical Trailer 2 Tactical Trailer 2 1200 1100 100 4 Tactical Trailer 3 Tactical Trailer 3 1200 1100 100 4 Tactical Trailer 4 Tactical Trailer 4 1200 1100 100 4 Tactical Trailer 5 Tactical Trailer 5 1200 1100 100 5 101 Vestibule 124 124 5 102 Reception 190 190 5 103 Lobby 1140 1140 5 117 Lunch Room 963 963 5 112 Conference Room 355 355 5 106 Audio Video Closet 83 83 5 110 Mgmt Office 1 243 243 5 111 Mgmt Office 2 189 189 5 109 Staff Office 475 475 5 113 Records Storage Maint 299 299 5 104 Auditorium 1300 1300 5 118 Medic Station 142 142 5 132 Computer Lab 807 807 5 121 Fitness Center (Ops) 708 708 5 124 Lan Room 200 200 5 115 Staff Restroom 142 142 5 114 Staff Restroom Women 144 144 5 129 Mens Room 202 202 5 128 Womens Room 203 203 5 122 Mens Shower/Locker 205 205 5 123 Womens Shower Locker 210 210 5 135 Janitors Closet 24 24 5 134 Mechanical Room 522 522 5 136 Electrical Room 69 69 5 125 Resource Center 1437 1437 5 116 Kitchen 189 189 5 131 Seminar Class Room 807 807 5 130 Corridor 54 8 432 432 5 127 Corridor 123 8 984 984 5 120 Corridor 31 8 248 248 5 119 Stair 1 172 172 5 133 Stair 2 155 155 5 137 Storage 34 44 5 201 Seminar 1 1579 1579 5 202 Storage 41 41 5 203 Elevator Equipment Room 62 62 5 204 Womens Restroom 142 142 5 205 Mens Restroom 143 143 5 206 Stair 1 15 15 5 207 Janitors Closet 29 29 5 208 Fitness 280 280 5 209 Break Out 1 320 320 5 210 Break Out 2 314 314 5 211 Break Out 3 312 312 5 212 Breakout 4 258 258 5 213 Pantry 190 190 5 214 Storage 151 151 5 215A Coats 1 13 13 5 215B Coats 2 13 13 5 215 Corridor 555 555 5 216 Corridor 522.75 522.75 5 217 Corridor 522.75 522.75 5 218 Seminar 3 1577 1577 5 219 Cooridor 34 8 272 272 5 220 Womens Restroom #2 202 202 5 221 Mens Restroom #2 192 192 5 222 Electrical Room 168 168 5 223 Mechanical Room 471 471 5 224 Stair #2 129 129 5 225 Seminar 1 461 461 5 226 Seminar 2 803 803 6 127 Class Room 1 729 729 6 126 Class Room 2 729 729 6 125 Class Room 3 729 729 6 118 Matt Room 1 2545 581 1964 6 119 Matt Room 2 2545 581 1964 6 122 Matt Room 3 2482 612 1870 6 113 Instructor Open Office 2496 2496 6 103 Copy Supply Records 500 500 6 106 Managers Office 1 134 134 6 105 Managers Office 2 134 134 6 104 Managers Office 3 134 134 6 117 Equipment Storage 1 180 180 6 121 Equipment Storage 2 295 295 6 120 Equipment Storage 3 302 302 6 101 Lobby 163 163 6 100 Entrance Vestibule 87 87 6 109 Staff Restroom Men 339 339 6 112 Womens Staff Retsoom 349 349 6 133 Mens Restroom 209 209 6 132 Womens Restroom 194 194 6 131 Janitors Closet 59 59 6 116 Mechanical 352 352 6 115 Electrical 134 134 6 128 lan Room 59 59
Building # Room # Room Name L W Area Carpet Matting VCT Ceramic/P orcelain
Hard Wood
Sealed Concrete
Epoxy Flooring
Access Flooring
Recessed Walk-Off
Mat 6 107 Staff Lounge 534 534 6 108 Laundry 172 172 6 110 Mens Shower 239 239 6 111 Womens Shower 245 245 6 102 Fire Arms Lockers 220 220
6 129 JPSR 1 277 277
6 130 JPSR 2 274 274
6 123 Maintenance Bay 792 792 6 124 Maint Office 132 132 6 Corridoor 168 7 1176 1176 6 Corridoor 71 7 497 497 6 Corridoor 38 5 190 190 7 105 Classroom 1 24 31 744 744 7 106 Classroom 2 24 31 744 744 7 124 Classroom 3 23 34 782 782 7 125 Classroom 4 23 34 782 782 7 104 Range Control 16 10 160 160 7 102 Loby 102 15 20 300 300 7 101 Vestibule 101 15 9 135 135 7 103 Instuctor Office 18.5 10 185 185 7 128 Clean Room 23 23 529 529 7 126 Clean Room 23 23 529 529 7 130 Mens Room 12 14 168 168 7 129 Womens Room 12 14 168 168 7 127 Mechanical Room 23 23 529 529 7 127A Electrical Room 11 23 253 253 7 127B LAN Room 8 8 64 64 7 110 Janitors Closet 5.5 8 44 44 7 111 Janitors Storage 5.5 8 44 44 7 108 Range Control Room 1 11.5 9 103.5 103.5 7 113 Range Control Room 2 11.5 9 103.5 103.5 7 115 Range Control Room 3 11.5 9 103.5 103.5 7 118 Range Control Room 4 11.5 9 103.5 103.5 7 121 Range Control Room 5 11.5 9 103.5 103.5 7 107 Rainge 1 Waiting Area 11 8 88 88 7 114 Rainge 2 Waiting Area 11 8 88 88 7 119 Rainge 3 Waiting Area 11 8 88 88 7 123 Rainge 4 Waiting Area 11 8 88 88 7 122 Rainge 5 Waiting Area 11 8 88 88 7 135 Outdoor Range 1 26477 26477 7 134 Indoor Range 2 6321 6321 7 133 Indoor Range 3 6816 6816 7 132 Outdoor Range 4 6816 6816 7 131 Outdoor Range 4 6816 6816 7 Corridoor 282.4 8.5 2400.4 2400.4 9 101 Vetibule 67.7 67.7 9 102 Corridoor 426 426 9 103 Office Support 245 245 9 104 Storage 25 25 9 119 Machine Shop 946 946 9 107 Mens Room 179 179 9 106 Womens Room 179 179 9 108 Lan Room 74 74 9 105 Janitors Closet 25 25 9 109 Electric Room 70 70 9 110 Mechanical 300 300 9 111 Amunition Storage 734 734 9 112 Agency Storage 300 300 9 113 Ante Room 99 99 9 114 Weapons Storage 480 480 9 115 Loading Dock 203 203 9 116 Hall 402 402 9 117 OSO Office 128 128 9 118 Cage 120 120
10 101 Vestibule 82 82 10 102 Toilet 43 43 10 103 Reception 185 185 10 104 Gallery 186 186 10 105 Kitchen 155 155 10 201 Hall 71 71 10 202 Bath 40 40 10 203 Office 151 151 10 204 Sitting Room 83 83 10 205 Office 100 100 10 206 Sercurity Operations 146 146 12 105 Managers Office 107 107 12 104 X-Ray (Kyms Office) 154 154 12 111 Warehouse 1480 1480
12 106 LAN 26 26
12 101 Entrance Hall 38 38 12 100 Entrancce Vestibule 74 74 12 108 Staff Restroom Men 131 131 12 107 Staff Restroom Womens 127 127 12 110 Janitors Closet 26 26 12 109 Mechanical 48 48 12 112 Electrical 67 67 12 103 Reception/Lobby 408 408 12 Corridoor 200 200 19 125 Break Room 350 350 19 124 Print Shop 591 591
Building # Room # Room Name L W Area Carpet Matting VCT Ceramic/P orcelain
Hard Wood
Sealed Concrete
Epoxy Flooring
Access Flooring
Recessed Walk-Off
Mat 19 123 Mail Room 591 591 19 122 Distribution Staging Area 1632 1632 19 120 Driver Toilet 70 70 19 128 Corridoor 1292 1292 19 113 Mens Locker Room 195 195 19 114 Mens Toilet 204 204 19 115 Womens Toilet 204 204 19 116 Womens Locker 195 195 19 117 Janitors Closet 90 90 19 118 Operations Office 368 368 19 119 Shipping and Receiving 1071 1071 19 109 Tactical Office 576 546 19 110 Tactical Supervisor 120 120 19 111 Lan Room 88 88 19 112 Unisex Bathroom 56 56 19 108 Corridoor 1211 1211 19 127 Receving Staging Sally Port 703 703 19 107 Mechanical Room 342 342 19 106 Electrical Room 270 270 19 105 Water Room 198 198 19 104 COOP Storage 980 980 19 103 Armor Gear Storage 1911 1911 19 102 Cleaning Preventative Maintenance 441 441 18 101 Main Lobby 945 945 18 102 Reception 64 54 18 140 Campus LAN Room 864 864 18 103 Business Center 520 520 18 East Stairs 184 184 18 West Stairs 184 184 18 104 Unisex Bathroom 88 88 18 105 Elev. Mach Room 132 105 18 119 Corridor 368 109 18 126 Corridor 744 744 18 159 Corridor 744 744 18 136 Corridor 616 616 18 114 Corridor 616 616 18 160 Mens Toilet 2 493 493 18 162 Womens Toilet 2 493 493 18 128 Womens Toilet 1 493 493 18 154 Mech Room 832 832 18 153 Electrical Room 468 468 18 152 Recycle 170 170 18 150 Service 430 350 80 18 135 Elec 66 66 18 127 Mens Toilet 1 493 493 18 106 Elevator Lobby 112 112 18 107 Security Room 108 108 18 108 Electrical Room 72 72 18 109 Janitor Closet 48 48 18 112 LAN Closet 160 160 18 116 Training Room 1 1840 1840 18 125 Training Room 2 2000 2000 18 132 Training Room 3 1840 1840 18 139 Training Room 4 2000 2000 18 145 Training Room 5 1840 1840 18 155 Training Room 6 2000 2000 18 167 Training Room 7 1840 1840 18 111 Break-Out Room 1 255 255 18 122 Break-Out Room 2 255 255 18 137 Break-Out Room 3 255 255 18 142 Break-Out Room 4 255 255 18 158 Break-Out Room 5 255 255 18 110 Break-Out Room 6 255 255 18 163 Gathering Lounge 2384 2384 18 115 Vestibule 1 184 184 18 121 Vestibule 2 184 184 18 134 Vestibule 4 184 184 18 143 Vestibule 5 184 184 18 149 Vestibule 6 184 184 18 169 Vestibule 7 184 184 18 118 Storage 1 80 80 18 123 Storage 2 114 114 18 131 Storage 3 80 80 18 146 Storage 5 80 80 18 157 Storage 6 114 80 18 166 Storage 7 80 80 18 117 Coats 1 80 80 18 124 Coats 2 100 100 18 133 Coats 3 80 80 18 138 Coats 4 66 80 18 144 Coats 5 80 80 18 156 Coats 6 100 80 18 168 Coats 7 80 80 18 120 Alcove 1 81 81 18 130 Alcove 2 81 81 18 148 Alcove 3 81 81 18 165 Alcove 4 81 81 18 209 Conference Room 2 400 400 18 201 Elevator Lobby 136 136 18 203 LAN Closet 252 252
Building # Room # Room Name L W Area Carpet Matting VCT Ceramic/P orcelain
Hard Wood
Sealed Concrete
Epoxy Flooring
Access Flooring
Recessed Walk-Off
Mat 18 202 Copy Center 255 255 18 207 Conference Room 1 255 255 18 210 Open Office Area 1 2898 2898 18 212 Open Office Area 2 3540 3540 18 228 Open Office 1790 1790 18 222 Conference Room 3 600 600 18 225 Conference Room 4 1080 1080 18 242 Open Office Area 3 3540 3540 18 248 Open Office Area 4 2700 2700 18 214 Office 126 126 18 243 Office 126 126 18 245 Mens Toilet 361 361 18 215 Womens Toilet 361 361 18 223 Hall 660 660 18 246 Hall 484 484 18 217 Hall 484 484 18 208 Hall 500 500 18 200 Upper Lobby 548 548 18 204 Janitor Closet 48 48 18 205 Electrical 72 72 18 206 Storage 77 77 18 224 Vestibule 96 96 18 234 Mechanical Room 165 165 18 233 LAN Room 210 210 18 237 Roof Access 56 56 18 235A Vestibule 146 146 18 235 Break Room 390 18 219 Storage 274 274 18 240 Storage 300 300 18 236 Servery 160 18 238 Storage 24 18 220 Storage 24
13B 100 Office Area 629 629 629 13B 101 Supervisors Office 1 158 158 13B 106 Supervisors Office 2 177 177 13B 103 Search Room 1 80 80 13B 107 Search Room 2 148 148 13B 102 Detention 53 53 13B 110 Mens Room 65 65 13B 109 Womens Room 65 65
13B 112 LAN 32 32
13B 113 Electrical 62 62 13B 111 Janitors Closet 31 31 13B 104 Vestibule Lobby 210 210 13B 108 Vestibule 92 92 13B 114 mechnical 9 9 13C 108 Office 144 144 13C 101 Detention 77 77 77 13C 100 Search Room 86 86 13C 109 Cashier 36 36 13C 104 Mechanical/Janiotors 40 40 13C 105 MensRestroom 43 43 13C 106 Womens Restroom 43 43 13C Main Open Room 1124 1124 1124 13C Lobby Waiting Area 334 334 13C 111 Corridoor 5 16 80 80 13C 102 Corridoor 5 21 105 105 13C 103 LAN Room 55 55 13D Basement 909 909 13D 108 Office 91 91 13D 109 Office 122 122 13D 110 Office Lobby/Reception Area 117 117 13D 107 Unisex Bathroom 70 70 13D 111 Warehouse 947 947 13D 101 Motel Room 1 184 184 13D 106 Motel Room 2 184 184 13D 103 Motel Bathrooms 1 46 46 13D 104 Motel Bathrooms 2 46 46 13D 100 Hotel Lobby Reception 311 311 13D 102 Motel Closets 1 14 14 13D 105 Motel Closets 2 14 14 13D 114 Hotel Room 1 163 163 13D 113 Hotel Room 2 163 163 13D 115 Hotel Bath 1 44 44 13D 112 Hotel Bath 2 44 44 13D 114C Hotel Closet 1 15 15 13D 113C Hotel Closet 2 15 15
1 GROSS SQUARE FOOTAGE 6,321 GSF 8,702 GSF 24,767 GSF
2 NET SQUARE FOOTAGE 5,775 NSF 7,589 NSF 22,227 NSF
3 SF OF CARPET 0 4,903 SF 10,692 SF
4 TOTAL SF OF HARD FLOOR 5,591 SF 1,805 SF 14,036 SF
5 CERAMIC TILE 1,691 SF 933 SF 4,753 SF
6 EPOXY 2,805 SF 0 6,540 SF
7 VINYL COMPOSITION TILE 383 SF 575 SF 808 SF
8 CORK FLOOR 0 0 860 SF
9 CONCRETE FINISH 712 SF 297 SF 1,075 SF
10 TOTAL NUMBER OF RESTROOMS 4 4 4
11 MEN'S RESTROOMS 2 2 2
12 WOMEN'S RESTROOMS 2 2 2
13 TOTAL NUMBER OF RESTROOM FIXTURES 24 12 30
14 TOILETS 8 5 12
15 URINALS 4 1 5
16 SINKS 12 6 13
17 TOTAL NUMBER OF EXTERIOR GLAZING OPENINGS 22 13 18
18 WINDOWS 8 6 6
19 STOREFRONT WINDOWS 14 2 1
20 CURTAIN WALL WINDOWS 0 5 6
21 CLERESTORY WINDOWS 0 0 5
DINING FACILITY
(26)
COMMENTS
THE ADVANCED TRAINING CENTER FACILITIES
SF OF HARD FLOOR
RESTROOMS
RESTROOM FIXTURES
EXTERIOR GLAZING OPENINGS
ITEM # DESCRIPTION SHOWER LOCKER
ROOM FACILITY (34)
WELCOME CENTER &
SECURITY COMMAND
CENTER (30)
czdme6n Typewritten Text HSBP1013R0045 - Attachment 1C (Facility Square Footage Detail) czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text czdme6n Typewritten Text
| Sheet1 |
| Attachment 1C.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .