QASP 5-22-08.pdf
PDF 341 KB Posted
- Attached to
- P3 AIRCRAFT MAINTENANCE Federal contract opportunity
- Solicitation number
- HSBP1008R1145
About this file
Section J attachment 2 Quality Assurance Surveillance Plan QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HSBP1008R1145- P-3 Solicitation-Amendment 9.doc | DOC document | |
| Amendment 0008 02-11-09.PDF | ||
| Amendment 0008 SOW attachement 2-09.pdf | ||
| Amendment 0007 10-07-08.PDF | ||
| Amendment 0006 09-17-08.PDF | ||
| Amendment 0005 08-20-08.PDF | ||
| CBA Corpus Christi 07-01-08.pdf | ||
| Amendment 0004 07-01-08.PDF | ||
| B.1 A0004 07-01-08.pdf | ||
| The purpose of Amendment A0003 is to provide additional information to the Statement of Work Appendix 1.doc | DOC document | |
| 6 month P-3 Aircraft Projection.doc | DOC document | |
| Sect B.1 Tab 5 6-12-08.pdf | ||
| Amendment 0002 06-12-08.pdf | ||
| CARMAC User Guide 6-12-08.pdf | ||
| Amendment 0001 06-4-08.pdf | ||
| HSBP1008R1145 - RFP 5-23-08.pdf | ||
| CBP Contractor Employee Sep Clear Form-242.pdf | ||
| Depot Level Maintenance Tech Req Doc 5-22-08.pdf | ||
| SB_Subcontracting Plan Outline 4-1-08_2_.pdf | ||
| Performance SOW 5-22-08.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Homeland Security U.S. Customs and Border Protection
Office of CBP Air and Marine
Quality Assurance Surveillance Plan for
P-3 Aircraft Maintenance
In Connection With Acquisition Plan # HSBP-07-03
April 2007
Quality Assurance Surveillance Plan (QASP)
1.0 Introduction
1.1 Since this is performance-based contract, the Government will validate in a timely manner the performance of the Contractor in meeting the services required. This QASP provides a systematic surveillance method for the services, and describes the methodology by which the Contractor’s performance will be monitored.
1.2 The principal focus of the surveillance system is the Contractor’s performance of the indicators identified in the Performance-based Matrix of the Performance Based Statement of Work (PBSOW) (Tab 1).
This plan contains a Customs Border Protection (CBP) Contractor Performance Report (Tab 2) to be utilized in documenting contractor performance for use in motivating the contractor on the current contract; and serves as a database for past performance evaluations for future contracts. The COTR should use this form as the primary motivational tool to encourage high quality contractor performance. The report will be generated yearly or more frequently if necessary to document outstanding or unsatisfactory performance. The contractor should understand that these reports will remain in a database for three years and will be available to all government agencies for source selection purposes. The contractor should understand that the top two scores (4 and 5) are only available if the contractor exceeds the Government requirements at no additional cost to the Government.
The contractor should understand the top two scores 4 and 5 are only available if the contractor exceeds the Government requirements at no additional cost to the Government.
The decision matrix for linking performance quality to payment is at Tab 5.
The QASP:
Identifies the services and products that will be measured.
Establishes the specific standards of performance for each required output.
Establishes the responsibilities for performing the measurement.
Defines the Government’s role in overseeing the performance.
Provides for feedback to the Contractor regarding quality, quantity, and timeliness of the service outputs.
Establishes timeframes for communicating performance improvements needed.
2.0 Method of Surveillance
2.1 The Performance-based Matrix at Tab 1 lists the services to be monitored and the standards to be applied.
2.2 This QASP is based on the premise that the Government desires to maintain a quality standard for required services.
2.3 In accordance with FAR Part 37.602-2 Quality Assurance, the Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.
2.4 In this contract, the Contractor’s quality control program is the basis for service quality. The Contractor is required to deliver only services that conform to or exceed the requirements of this contract.
3.0 Roles and Responsibilities
3.1 It is the Contractor’s primary responsibility to ensure all contract requirements meet required quality levels. The Government shall ensure this responsibility has been met before payment is made to the Contractor. The primary Government team members are the Contracting Officer’s Technical Representative (COTR) and the Contracting Officer
(CO).
3.1.1 The Contracting Officer has the overall responsibility for overseeing the Contractor’s performance. The CO will be responsible for monitoring the contractor’s performance in the areas of contract compliance, contract management, cost control, and the resolution of all issues relative to the language of the contract.
3.1.2 The COTR is responsible for direct monitoring, assessing, recording, and reporting on the technical performance of the Contractor. The COTR will have primary responsibility for signing off on all invoices and documenting the inspection and evaluation of the Contractor’s performance.
3.1.3 The COTR will work closely with the Contractor to ensure good communication and resolve any problems not requiring the CO’s authority.
4.0 Surveillance: The COTR will evaluate the performance objectives through periodic inspections during each service month. The COTR should record both outstanding and unacceptable performance. See Tab 4 for a sample of a COTR Monthly Evaluation Report.
4.1 The following information will be included:
4.1.1 Contract paragraph number referencing the requirement.
4.1.2 Short description of the requirement being surveilled.
4.1.3 Date, time, and location of surveillance.
4.1.4 Results of surveillance.
4.1.5 Signature of individual accomplishing the surveillance.
4.2 All performance will be documented, whether acceptable or unacceptable. When unacceptable performance is documented, the CO will take the following actions:
4.2.1 If Government actions or non-actions caused the unacceptable performance, take steps to prevent it in the future.
4.2.2 If the unacceptable performance was not caused by the Government, inform the Contractor’s Quality Control representative of the unacceptable performance and the reasons why it is unacceptable.
4.2.3 If the Contractor wants to dispute the results of the surveillance, refer the
Contractor to the CO for resolution.
4.3 Performance will be determined unacceptable only after all contributing factors have been considered.
4.4 The Government reserves the right to periodically inspect all services and deliverables prior to acceptance regardless if it is shown on the Performance-based Matrix.
5.0 Standards: The contractor shall meet all standards in the Performance-based Matrix as well as all other deliverable dates and other contractual requirements. Remember the distinction between Time and Material (T&M)/Labor-Hour (L-H) and fixed price orders. For T&M/L-H, you are only buying the contractor’s best efforts to complete the work. The standards are especially useful to establish a basis for rejecting the contractor’s deliverables.
Once rejected, all corrective or replacement hours billed must exclude profit. The standards are also key to the evaluation of the contractor’s performance upon completion of the order.
For fixed price orders, the Government pays for results only. In this case, failure to meet a standard constitutes breach of contract. The Government is entitled to consideration from the Contractor for breach of contract for failure to meet contract requirements. See paragraph
5.1 below for criteria for excusing failures to meet the standards for both fixed price and T&M/L-H.
5.1 Non- or late performance of service is un-excusable unless the contractor can establish all of the following:
5.1.1 The non-performance or lateness was not the contractor’s fault;
5.1.2 The non-performance or lateness was not foreseeable;
5.1.3 It was beyond the contractor’s control to avoid the non-performance or lateness.
5.2 All work shall be performed in accordance with the PBSOW. The COTR will not consider the services complete until all unacceptable performance has been corrected.
5.3 The COTR will determine whether the failure was a minor non-conformance or a substantive non-conformance. (See Tab 3 for a decision matrix for Nonconforming Performance of fixed price contracts.)
6.0 Procedures: The Government will inspect performance to ensure Contractor compliance and record results of inspection, noting the date and time of inspection.
6.1 Unacceptable performance and customer complaints shall be referred to the COTR for investigation/validation. The COTR will investigate/validate the unacceptable performance or customer complaint and notify the Contractor’s Quality Control representative. The Contractor will be given a reasonable amount of time to correct the unacceptable performance and notify the COTR that the deficiency has been corrected. If deficiencies are not corrected, the COTR will notify the CO and recommend a course of action.
6.2 The primary focus of the Government inspection system for Fixed Price Contracts (with the exception of open market FAR Part 12 and FSS MAS buys where in process inspections are allowed only if they are a customary commercial practice) and T&M/L-H is the contractor’s inspection system required by the respective inspection clauses. It is the contractor’s responsibility to ensure all requirements and associated standards are met.
The COTR should continually monitor this system (also called the contractor’s “quality control” system). This system is your primary window into the contractor’s performance.
The system should be acceptable to the COTR. All inspection reports generated by the contractor should be reviewed and evaluated to ensure they are accurate and adequately assess current performance against the standards. The key aspects of this quality control plan the COTR will monitor are: inspection system (who, when, where, and to what standard), the reporting system, the trend analysis system, the corrective action system, and the company audit system that ensures the integrity of the reporting. If the contracting reporting system does not provide the COTR with adequate visibility into the contractor’s operations, then require the contractor to revise the system to provide such visibility. For cost reimbursement and T&M/L-H projects, require the contractor’s quality control system to utilize CPM/PERT and earned value. In addition, for these “best effort” contract types, the contractor’s should also surveil cost control and work efficiency since these are required Government surveillance issues.
7.0 Contract Performance Evaluation
7.1 FAR 42.15 – Contractor Performance Information establishes the Government responsibility for recording and maintaining contractor performance information. This requirement does not apply to procedures used in determining incentive awards or other incentive systems, although the two systems should be mutually supporting.
7.2 FAR 42.1501 states: Past performance information is relevant information, for future source selection purposes, regarding a contractor's actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer.
7.3 The general procedures to be used are addressed in the following FAR section.
42.1503 Procedures.
(a) Agency procedures for the past performance evaluation system shall generally provide for input to the evaluations from the technical office, contracting office and, where appropriate, end users of the product or service. (b) Agency evaluations of contractor performance prepared under this subpart shall be provided to the contractor as soon as practicable after completion of the evaluation. Contractors shall be given a minimum of 30 days to submit comments, rebutting statements, or additional information. Agencies shall provide for review at a level above the contracting officer to consider disagreements between the parties regarding the evaluation. The ultimate conclusion on the performance evaluation is a decision of the contracting agency. Copies of the evaluation, contractor response, and review comments, if any, shall be retained as part of the evaluation. These evaluations may be used to support future award decisions, and should therefore be marked “Source Selection Information.”
7.4 The CBP form at Tab 2 will be completed at least annually and more frequently if necessary to motivate or reward the contractor.
Tab 1: Performance-based Matrix
State the end results or outcomes that the customer will formally accept or reject. Includes all deliverables, submittals and reports, etc.
For each “End Result,” state feature(s) of each end result in Column 1 that can be measured quantitatively or qualitatively
For each “indicator”, state a performance level that, when met means the task has been performed satisfactorily.
A Standard tells the contractor “What Success Looks Like”
For each “Standard”, state the method used to check performance (i.e.
random sampling, 100% inspection, periodic inspection, customer input).
Contractor shall provide CBP with numbers, types, and properly configured aircraft to meet operational commitments.
Launch rate
90% of taskings met. See Incentive Fee for launch rates.
Mission completion
90% of missions completed. See Incentive Fee for mission completion rates.
Incentives (positive and negative)
See Incentive Fee Section
Contractor performance evaluated using the
NIH
Contractor Performance report for use in future source selection.
Depot Level Management
Meets scheduled delivery dates within a 30-day window.
Identifies all major over-and-above repairs within 90 days of induction.
Manages long-lead time material requirements that could lead to a stop work.
See Incentive Fee for Depot Management target.
Tab 2: CBP Report Customs Border Protection
Contractor Performance Report Standard Evaluation
Contract Data
Evaluation Type: Interim _ Final _ (check one) Evaluating Organization: Reporting Period: From to Contracting Office: Contract Number: Order Number:
Contractor Name: Contractor Address:
DUNS: City: State:
Additional or Alternate Contractor Name:
Zip/Postal Code: Country:
TIN: Industrial Code (NAICS): Commodity Code: Contract Type:
Contract Award Date: Contract Expiration Date: Contract Value:
Requirement Description:
Ratings
Summarize contractor performance and check the number which corresponds to the rating for each rating category (See attached Rating Guidelines).
Quality of Product or Service _0=Unsatisfactory _1=Poor _2=Fair _3=Good _4=Excellent _5=Outstanding
Government Comments for Quality of Product or Service (2000 characters maximum):
Cost Control (Rating and Comments for Cost Control are not required if contract type is Fixed-Price)
Government Comments for Cost Control (2000 characters maximum):
Timeliness of Performance
Government Comments for Timeliness of Performance (2000 characters maximum):
Business Relations
Government Comments for Business Relations (2000 characters maximum):
Additional Info
Subcontracts
Are subcontracts involved? __Yes __No (Check one) Government Comment on subcontracts (2000 characters maximum):
Contractor Key Personnel
Contractor Manager/Principal Investigator (name):
Government Comment on Contractor Manager/Principal Investigator (2000 characters maximum):
Contractor Key Person (name):
Government Comment on Contractor Key Person (2000 characters maximum):
Contractor Key Person (name):
Government Comment on Contractor Key Person (2000 characters maximum):
Small Business Subcontracting Plan
Did the contractor make a good faith effort to comply with its subcontracting plan consistent with the goals and objectives, reporting and other aspects of the plan? _Yes _No _N/A (Check one)
If this is a bundled contract, did the contractor meet the goals and objectives for small business participation?
_Yes _No _N/A (Check one)
Government Comments on Small Business Subcontracting Plan (2000 characters maximum):
Small Disadvantaged Business Goals
Did the contractor make a good faith effort to comply with its subcontracting plan consistent with the goals and objectives, for small disadvantaged business (SDB) participation, monetary targets for SDB participation, and required notifications? _Yes _No _N/A (Check one)
Government Comments on Small Disadvantaged Business Goals (2000 characters maximum):
Customer Satisfaction
Is/was the contractor committed to customer satisfaction? _Yes _No (Check one)
Would you recommend the selection of this firm again? _Yes _No (Check one) – FINAL REPORT
ONLY
Government Comments on Customer Satisfaction (2000 characters maximum):
Admin Info
Project Officer/COTR Name:
Phone:
Fax:
E-mail Address:
Contractor Representative Name:
Phone:
Alternate Contractor Representative (Required to insure that at least one person is notified of evaluation)
Phone:
Contracting Officer:
Phone:
evaluation)
Phone:
Contracting Officer:
Phone:
Contractor Comments
Quality of Product of Service
___Contractor has elected not to comment
Contractor Comments for Quality of Product of Service (2000 characters maximum):
Cost Control
Contractor Comments for Timeliness of Performance (2000 characters maximum):
Contractor Comments for Business Relations (2000 characters maximum):
Overall Comment
Rating Guidelines
Quality of Product or Service
0 = Unsatisfactory 1 = Poor 2 = Fair 3 = Good 4 = Excellent 5 = Outstanding
Unsatisfactory Non-conformances are jeopardizing the achievement of contract requirements, despite use of Agency resources. Recovery is not likely. If performance cannot be substantially corrected, it constitutes a significant impediment in consideration for future awards containing similar requirements.
Poor Overall compliance requires significant Agency resources to ensure achievement of contract
Fair Overall compliance requires minor Agency resources to ensure achievement of contract
Good There are no, or very minimal, quality problems, and the Contractor has met the contract
Excellent There are no quality issues, and the Contractor has substantially exceeded the contract performance requirements without commensurate additional costs to the Government.
Outstanding The contractor has demonstrated an outstanding performance level that was significantly in excess of anticipated achievements and is commendable as an example for others, so that it justifies adding a point to the score. It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".
0 = Unsatisfactory 1 = Poor 2 = Fair 3 = Good 4 = Excellent 5 = Outstanding Unsatisfactory Delays are jeopardizing the achievement of contract requirements, despite use of
Agency resources. Recovery is not likely. If performance cannot be substantially corrected, it constitutes a significant impediment in consideration for future awards.
Poor Delays require significant Agency resources to ensure achievement of contract
Fair Delays require minor Agency resources to ensure achievement of contract
Good There are no, or minimal, delays that impact achievement of contract requirements.
Excellent There are no delays and the contractor has exceeded the agreed upon time schedule.
Outstanding The contractor has demonstrated an outstanding performance level that justifies adding a point to the score. It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".
0 = Unsatisfactory 1 = Poor 2 = Fair 3 = Good 4 = Excellent 5 = Outstanding Unsatisfactory Response to inquiries and/or technical, service, administrative issues is not effective. If not substantially mitigated or corrected it should constitute a significant impediment in considerations for future awards.
Poor Response to inquiries and/or technical, service, administrative issues is marginally effective.
Fair Response to inquiries and/or technical, service, administrative issues is somewhat
Good Response to inquiries and/or technical, service, administrative issues is consistently
Excellent Response to inquiries and/or technical, service, administrative issues exceeds Government expectation.
Outstanding The contractor has demonstrated an outstanding performance level that justifies adding a point to the score. It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".
Tab 3: Nonconforming Deliverables (Fixed-Price)
NONCONFORMING PERFORMANCE
MINOR NONCONFORMANCE
If Then Consideration Consideration would be less than the cost of modifying the contract
Accept as is (once)
None
Consideration would be greater than the cost of modifying the contract
Consideration comparable to the value of the loss sustained by the Government
SUBSTANTIVE NONCONFORMANCE
The contractor agrees to correct the re-perform service within the delivery schedule
Withhold acceptance until receipt of the corrected service
Cost to re-inspect or retest
The contractor agrees to correct the deliverable (or re-perform the service) but needs an extension of the delivery date
Appropriate consideration for the delay
Acceptance:
• Would not affect safety or performance, and
• Is justified on the basis of economy or urgency
Accept as is
The contractor refuses to perform or reperform service or provide appropriate consideration.
Either:
• Correct the service through other means (contract or in-house), or
• Terminate for default and re-procure.
Contractor to pay all costs for the correction or re-procurement.
Tab 4: Nonconforming Deliverables Cost Reimbursement
NONCONFORMING PERFORMANCE
MINOR NONCONFORMANCE
Consideration would be less than the cost of modifying the contract
None
Consideration would be greater than the cost of modifying the contract
SUBSTANTIVE NONCONFORMANCE
The contractor agrees to correct the re-perform
No additional fee.
The contractor managerial personal are aware an employee is habitually careless or unqualified (fails to meet contractual requirements)
Withhold acceptance until
Corrected work is done at no cost.
The contractor refuses to perform or re-perform service or provide appropriate consideration.
Either:
• Correct the service through other means (contract or in-house), or
• Terminate for default and re-procure.
Contractor to pay all costs for the correction or re-procurement.
Tab 5: Incentive fee structure
Incentive Fees
This contract includes multiple incentive fees that emphasize Operational Performance (aircraft launch rates, mission completion, and Depot management. Because the Government considers Operational Performance to be more important than Depot management, the target incentive fee pool will be divided as follows: 60% Operational Performance/40% Depot management. The overall target fees available will be 3% of the six- month contract cost for meeting the target and up to 5% of the six-month contract cost for exceeding the target. The minimum fee available in both categories is zero percent. Fees will be awarded semiannually and based upon the calculation of fees described below.
Operational Performance Incentive
The target fee of 3% available in this category is based upon attaining a 90% launch rate and a 90% mission completion rate. The minimum fee available is zero percent. Fee related to Operational Performance is impacted by the following two variables:
1. Launch rate
2. Mission completion
The primary calculation is a ratio obtained by multiplying percentage launch rate by percentage mission completion. For example a launch rate of 90 percent and a mission completion rate of 90 percent equals a performance ratio of 81 percent (see chart below). Attaining the 81 percent performance ration would equate meeting the target of 3 percent. Exceeding the 81 percent target ratio would increase the incentive fee for this category up to a maximum of 5 percent (of the 60%). If either figure is less than 90 percent, there is zero operational performance fee.
Launch rate. The percentage of operational requests that are responded to with the numbers, types, and properly configured aircraft. This is not an operational readiness rate. Launch rates are not calculated based upon the status of each aircraft in the fleet. It is a measurement of the ability of the contractor to provide an aircraft in response to a specific operational request. On a quarterly basis, the Government will determine the number of requests that were properly responded to as a percentage of aircraft requested. All support sites will be rolled into one percentage.
Mission Completion. The percentage of missions that were fully completed versus the number flown.
To be considered a completed mission, all systems under the control of the contractor must have functioned properly and not contributed to the inability of the crew to complete its assigned mission. If systems malfunction, the contractor will not be held accountable for this Incentive Fee metric if all three of the following are true:
1. The inoperative equipment was not the fault of the contractor. Unless for example, there was a failure to perform a scheduled maintenance, failure to perform a required test, or failure to repair or replace equipment the Government had noted was inoperative or not fully functional.
2. The problem was not readily foreseeable by the contractor.
3. The problem was beyond the contractor’s control to have avoided.
On a quarterly basis, the Government will determine the number of missions as a percentage of missions flown that were not completed due to contractor performance or failure to perform contractual requirements. All support sites will be rolled into one percentage.
The launch rate and mission completion rate percentages will then be multiplied together to obtain a fee related to operational performance. There will be zero incentive fee if either percentage is below 90 percent as shown in the Operational Performance Incentive Fee Matrix below.
The statistics will be calculated by the contractor and verified by the Government.
Incentive Fee Matrix for Operational Performance Launch Rate Percentage
1.00 0.99 0.98 0.97 0.96 0.95 0.94 0.93 0.92 0.91 0.90 0.89 0.88 0.87 0.86 0.85
1.00 1.00 0.99 0.98 0.97 0.96 0.95 0.94 0.93 0.92 0.91 0.90
0.99 0.99 0.98 0.97 0.96 0.95 0.94 0.93 0.92 0.91 0.90 0.89
0.98 0.98 0.97 0.96 0.95 0.94 0.93 0.92 0.91 0.90 0.89 0.88
0.97 0.97 0.96 0.95 0.94 0.93 0.92 0.91 0.90 0.89 0.88 0.87
0.96 0.96 0.95 0.94 0.93 0.92 0.91 0.90 0.89 0.88 0.87 0.86
0.95 0.95 0.94 0.93 0.92 0.91 0.90 0.89 0.88 0.87 0.86 0.86
0.94 0.94 0.93 0.92 0.91 0.90 0.89 0.88 0.87 0.86 0.86 0.85
0.93 0.93 0.92 0.91 0.90 0.89 0.88 0.87 0.86 0.86 0.85 0.84
0.92 0.92 0.91 0.90 0.89 0.88 0.87 0.86 0.86 0.85 0.84 0.83
0.91 0.91 0.90 0.89 0.88 0.87 0.86 0.86 0.85 0.84 0.83 0.82
0.90 0.90 0.89 0.88 0.87 0.86 0.86 0.85 0.84 0.83 0.82 0.81 0.89 0.88
0.87 AREA OF ZERO INCENTIVE FEE
0.86 M
is si on C om pl et io n R at e
Pe rc en ta ge
0.85
Depot Management Incentive Fee
The Depot management factor is a negative incentive. This category will utilize the maximum incentive fee of 5 percent of the six-month contract cost (of 40%) and be reduced by the following detractors:
In any given quarter, each aircraft that fails to meet scheduled delivery dates within a 30-day window, identify all major over-and-above repairs within 90 days of induction, or mismanages long-lead time material requirements that could lead to a stop work, would result in the loss of 33 percent of the Depot management fee. Further, if three failures to meet the Depot factors in any given quarter, there will also be zero Depot management fee.
Example Rating
Example maximum incentive fee available as: $1,000,000.00
Target Operational Performance fee: $300,000.00
Maximum Operational Performance fee: $600,000.00 Maximum Depot Management fee: $400,000.00
Example Launch rate percentage of .95 and Mission Completion percentage rate of .90 equal 85% Operational Performance or $ 510,000.00
One aircraft fails to meet one major factor: $400,000 less 33% (-$132.000) equals $268,000.00
Total Incentive fee for the six-month be reviewed = $778,000.00
Tab 6: Key FAR Clauses
52.246-5 Inspection of Services—Cost-Reimbursement.
As prescribed in 46.305, insert the following clause in solicitations and contracts for services, or supplies that involve the furnishing of services, when a cost-reimbursement contract is contemplated:
(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or used in performing services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all places and times during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If any of the services performed do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, for no additional fee. When the defects in services cannot be corrected by reperformance, the Government may—
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce any fee payable under the contract to reflect the reduced value of the services performed.
(e) If the Contractor fails to promptly perform the services again or take the action necessary to ensure future performance in conformity with contract requirements, the Government may—
(1) By contract or otherwise, perform the services and reduce any fee payable by an amount that is equitable under the circumstances; or
(2) Terminate the contract for default.
(End of clause)
52.216-10 Incentive Fee.
As prescribed in 16.307(d), insert the following clause:
INCENTIVE FEE (MAR 1997)
(a) General. The Government shall pay the Contractor for performing this contract a fee determined as provided in this contract.
(b) Target cost and target fee. The target cost and target fee specified in the Schedule are subject to adjustment if the contract is modified in accordance with paragraph (d) of this clause.
(1) “Target cost,” as used in this contract, means the estimated cost of this contract as initially negotiated, adjusted in accordance with paragraph (d) of this clause.
(2) “Target fee,” as used in this contract, means the fee initially negotiated on the assumption that this contract would be performed for a cost equal to the estimated cost initially negotiated, adjusted in accordance with paragraph (d) of this clause.
(c) Withholding of payment. Normally, the Government shall pay the fee to the Contractor as specified in the Schedule. However, when the Contracting Officer considers that performance or cost indicates that the Contractor will not achieve target, the Government shall pay on the basis of an appropriate lesser fee. When the Contractor demonstrates that performance or cost clearly indicates that the Contractor will earn a fee significantly above the target fee, the Government may, at the sole discretion of the Contracting Officer, pay on the basis of an appropriate higher fee. After payment of 85 percent of the applicable fee, the Contracting Officer may withhold further payment of fee until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government’s interest. This reserve shall not exceed 15 percent of the applicable fee or $100,000, whichever is less.
The Contracting Officer shall release 75 percent of all fee withholds under this contract after receipt of the certified final indirect cost rate proposal covering the year of physical completion of this contract, provided the Contractor has satisfied all other contract terms and conditions, including the submission of the final patent and royalty reports, and is not delinquent in submitting final vouchers on prior years’ settlements. The Contracting Officer may release up to 90 percent of the fee withholds under this contract based on the Contractor’s past performance related to the submission and settlement of final indirect cost rate proposals.
(d) Equitable adjustments. When the work under this contract is increased or decreased by a modification to this contract or when any equitable adjustment in the target cost is authorized under any other clause, equitable adjustments in the target cost, target fee, minimum fee, and maximum fee, as appropriate, shall be stated in a supplemental agreement to this contract.
(e) Fee payable. (1) The fee payable under this contract shall be the target fee increased by _____ [Contracting Officer insert Contractor’s participation] cents for every dollar that the total allowable cost is less than the target cost or decreased by ______ [Contracting Officer insert Contractor’s participation] cents for every dollar that the total allowable cost exceeds the target cost. In no event shall the fee be greater than ____________ [Contracting Officer insert percentage] percent or less than _________________ [Contracting Officer insert percentage] percent of the target cost.
(2) The fee shall be subject to adjustment, to the extent provided in paragraph (d) of this clause, and within the minimum and maximum fee limitations in paragraph (e)(1) of this clause, when the total allowable cost is increased or decreased as a consequence of—
(i) Payments made under assignments; or
(ii) Claims excepted from the release as required by paragraph (h)(2) of the Allowable Cost and Payment clause.
(3) If this contract is terminated in its entirety, the portion of the target fee payable shall not be subject to an increase or decrease as provided in this paragraph. The termination shall be accomplished in accordance with other applicable clauses of this contract.
(4) For the purpose of fee adjustment, “total allowable cost” shall not include allowable costs arising out of—
(i) Any of the causes covered by the Excusable Delays clause to the extent that they are beyond the control and without the fault or negligence of the Contractor or any subcontractor;
(ii) The taking effect, after negotiating the target cost, of a statute, court decision, written ruling, or regulation that results in the Contractor’s being required to pay or bear the burden of any tax or duty or rate increase in a tax or duty;
(iii) Any direct cost attributed to the Contractor’s involvement in litigation as required by the Contracting Officer pursuant to a clause of this contract, including furnishing evidence and information requested pursuant to the Notice and Assistance Regarding Patent and Copyright Infringement clause;
(iv) The purchase and maintenance of additional insurance not in the target cost and required by the Contracting Officer, or claims for reimbursement for liabilities to third persons pursuant to the Insurance Liability to Third Persons clause;
(v) Any claim, loss, or damage resulting from a risk for which the Contractor has been relieved of liability by the Government Property clause; or
(vi) Any claim, loss, or damage resulting from a risk defined in the contract as unusually hazardous or as a nuclear risk and against which the Government has expressly agreed to indemnify the Contractor.
(5) All other allowable costs are included in “total allowable cost” for fee adjustment in accordance with this paragraph (e), unless otherwise specifically provided in this contract.
(f) Contract modification. The total allowable cost and the adjusted fee determined as provided in this clause shall be evidenced by a modification to this contract signed by the Contractor and Contracting Officer.
(g) Inconsistencies. In the event of any language inconsistencies between this clause and provisioning documents or Government options under this contract, compensation for spare parts or other supplies and services ordered under such documents shall be determined in accordance with this clause.
52.246-1 Contractor Inspection Requirements.
As prescribed in 46.301, insert the following clause:
CONTRACTOR INSPECTION REQUIREMENTS (APR 1984)
The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the supplies or services furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. This clause takes precedence over any Government inspection and testing required in the contract’s specifications, except for specialized inspections or tests specified to be performed solely by the Government.
(End of clause)
52.246-4 Inspection of Services—Fixed-Price.
As prescribed in 46.304, insert the following clause:
INSPECTION OF SERVICES—FIXED-PRICE (AUG 1996)
(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or (2) Terminate the contract for default.
(End of clause)
Tab 7: COTR Monthly Evaluation Report
COTR Monthly Evaluation Report
Contract Number: XXXXXXXX Evaluation Date: September 10, 2007 Evaluation Location: CBP P-3 Operations Center, Corpus Christi
Applicable Contract Paragraph Number: AA.aa Requirement Evaluated: Aircraft Launch Rate Evaluation Results / Summary: Program-wide CBP aircraft launch rate for the month of August 2007 was 92.2% as substantiated by cumulative branch data. This rate has exceeded the 90% launch rate established by the contract as satisfactory.
Applicable Contract Paragraph Number: BB.bb Requirement Evaluated: Aircraft Mission Completion Rate Evaluation Results / Summary: Program wide CBP aircraft mission completion rate for the month of August 2007 was 86.4% as substantiated by cumulative branch data. This rate has not met the 90% mission completion rate established by the contract as satisfactory.
Applicable Contract Paragraph Number: CC.cc Requirement Evaluated: Depot Management Evaluation Results / Summary: CBP Technical Teams report two major factors failed to meet established targets resulting in a 66% reduction for this period.
Evaluator Signature:
File details come from the government source that posted it. Updated .