HR001117S0011_6_Attachment_7_Cost_Proposal_Template.docx

DOCX document 29 KB Posted

Attached to
OFFensive Swarm Enabled Tactics (OFFSET) Sprint 5
Solicitation number
HR001117S0011-06
Issued by

About this file

Not Listed

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information – See FAR 2.101 and 3.104

HR001117S0011-6 OFFSET BAA

Attachment 7 Cost Volume Guidance and Template All pages shall be formatted for printing on 8-1/2 by 11 inch paper with 1-inch margins and font size not smaller than 12-point. Font sizes of 8- or 10-point may be used for figures, tables, and charts. Submissions must be written in English. The Cost Volume must be in .pdf, .odx, .doc, or .docx formats.

Proposers are encouraged to submit a concise, but descriptive, Cost Volume. Information incorporated into the Cost Volume that is not related to cost will not be considered.

Table of Contents

Cost Details:3
1.Direct Labor:3
2.Indirect Costs:3
3.Materials:3
4.Travel:3
5.Subcontractor/Consultant Costs:3
6.Other Direct Costs:3

Below is an outline to assist in building your proposal. For more detail on each section and the information required to be contained in each section, refer to BAA HR001117S0011 Amendment 6 (Volume II Cost Proposal).

Cost Details:

The proposer should include supporting cost and pricing information in sufficient detail (e.g., cost for each task by month) to substantiate the summary cost estimates and should include a description of the method used to estimate costs and supporting documentation.

Direct Labor:

Provide labor categories, rates, and hours. Reference Attachment 4, Table 2.

Indirect Costs:

Identify all indirect cost rates (such as fringe benefits, labor overhead, material overhead, G&A, etc.) and the basis for each.

Materials:

Provide an itemized list of all proposed materials, equipment and supplies for each year, including quantities, unit prices, proposed vendors (if known), and the basis of estimate (e.g., quotes, prior purchases, catalog price lists, etc.). Reference Attachment 4, Table 3.

Travel:

Provide a breakout of travel costs, including the purpose and number of trips, origin and destination(s), duration, and number of travelers per trip. Reference Attachment 4, Table 4.

Subcontractor/Consultant Costs:

Provide the above information for each proposed subcontractor/consultant. If the proposer has conducted a cost or price analysis to determine reasonableness, submit a copy of this along with the subcontractor proposal.

The proposer is responsible for the compilation and submission of all subcontractor/consultant cost proposals. Proposal submissions will not be considered complete until the Government has received all subcontractor/consultant cost proposals.

Other Direct Costs:

Provide an itemized breakout and explanation of all other anticipated direct costs.

BAA# HR001117S0011-6 OFFensive Swarm-Enabled Tactics (OFFSET) Page 3

File details come from the government source that posted it.