HR001117S0011_6_Attachment_1_Attachments_Checklist_V2.docx

DOCX document 30 KB Posted

Attached to
OFFensive Swarm Enabled Tactics (OFFSET) Sprint 5
Solicitation number
HR001117S0011-06
Issued by

About this file

Not Listed

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HR001117S0011_5

HR001117S0011-6 OFFSET BAA

Attachment 1 Proposal Attachments Checklist This checklist is intended to aid the proposer in ensuring key information and supporting documentation in the OFFSET BAA attachments are appropriately completed and submitted, to include specific files and formats to be included in the proposal package.

Attachment 2: Cover Sheet[SUBMIT COMPLETED PDF]
All fields on the form are populated in the provided template and spelled correctly
The Proposer Organization field only lists the Prime Organization
The Swarm Sprint Topic Title aligns with the technical area being proposed to
The proposal does not include multiple Swarm Sprint Topics; only one topic per proposal is permitted
The dropdown is utilized for Organization Type
Name, Address, Email and Phone of Technical POC is completed
Name, Address, Email and Phone of Administrative POC is completed
Award instrument requested is populated using dropdown menu
Place(s) of Performance are listed and include Prime Organization (i.e., one or more locations where work being performed) and subcontractor locations
Period(s) of Performance is complete in “x” months format and breaks out performance durations for Base period and each Option with a total number of months
Other Team Members fields are completed, including Technical POC, Organization Name, Address, and Type. If subcontractors or independent consultants are listed, information is complete for each.
Total Proposed Cost include costs for Base Period and Options broken out
Total Proposed Cost totals are rounded to the nearest dollar and are an exact match to the Total Proposed Cost computed in the Attachment 4, Cost Summary Spreadsheet (Table 1)
DUNS number is populated
Taxpayer Identification Number is populated
Cage Code is populated or N/A placed in the field if there is not an applicable code
Date Proposal Prepared is formatted in mm/dd/yyyy
Proposal Validity Period is formatted in # of days
Attachment 3: Summary Slides[SUBMIT COMPLETED PPTX]
Check Proposal Name, Organization and Technical POCs are listed in the header
Describe clearly what you intend to accomplish, including the main objective of the proposed effort

Include supporting graphics, conceptual designs, or process flows to assist in relaying the approach

Articulate the overall vision and approach, free from jargon with a graphic included
Include impact statements with quantitative explanation of how success will be measured

Detail the proposal highlights include: Objectives, Risk and Payoffs

Complete Context section with table inclusive of costs for all prime and subs
List all team members with their % contribution to the overall effort indicated. Team members include all subcontractors and/or independent contractors.
Attachment 4: Cost Summary Spreadsheet[SUBMIT COMPLETED XLSX]
Complete Cost Summary (Table 1, Tab 1) and submit as a supplement to the Cost Volume
Complete Level-of-Effort summary (Table 2, Tab 2) and submit as a supplement to the Cost Volume
Complete Bill of Materials listing (Table 3, Tab 3) and submit as a supplement to the Cost Volume
Complete Travel listing (Table 4, Tab 4) and submit as a supplement to the Cost Volume
Submit file in .xlsx format, even if screenshots are included in the body of the Cost Volume
Confirm that Total Program Costs auto calculated in Table 1 match the entries in the Cover Sheet (Attachment 1)
Ensure all Prime and Subcontractor costs are represented in Cost Summary Table (Table 1)
Populate all cells for each Base and Option period(s) being proposed
Ensure that Prime and subcontractor/consultant costs are not combined on lines in the Cost Summary Table
Ensure that G&A/Fee costs are also included in the Cost Summary Table
Populate all fields colored blue (inputs) in both the Cost Summary and the LOE Tables
Confirm listing and numbering of all tasks and subtasks in Table 2 are consistent with the Statement of Work
Ensure that each Total Hours row should only sum the task lines, since lines roll-up subtask numbers
Confirm that the Materials Table (Table 3) includes BOM line number, part number (if not available, indicate), Part description, Manufacturer, Quantity, Unit Price, and Total Cost. Total costs as listed should directly match the material costs outlined in the Cost Volume.
Ensure that the Materials Table does not contain generic non-descriptive text, e.g., line items do not include “Miscellaneous” or “Some” as their descriptions.

Attachment 5: Administrative and National Policy Requirements [SUBMIT COMPLETED PDF]

Organizational Conflicts of Interest have been identified (Y/N). If Yes, the contract number, DARPA Office, and Mitigation Plan are listed.
Identification of Government entity or FFRDC has been made (Y/N). If Yes, Proof of Eligibility to propose has been included with contractual authority, sponsor agreements, and statements of unique capability.
Identification of the involvement of animals has been made (Y/N). If Yes, the Institutional Animal Care and Use Committee (IACUC) review and approval, in accordance with BAA Section IV.B.4.a is included.
Intellectual Property has been identified and assertions of IP restrictions are made utilizing the fields in the table
Intellectual Property/IP restrictions tables are complete for Noncommercial and/or Commercial technical data and software
Identification of use of Patents has been made (Y/N). If Yes, documentation of licensing rights is included.
Identification of the involvement of Human Use has been made (Y/N). If Yes, evidence of or a plan for review by an institutional review board (IRB), in accordance with BAA Section IV.B.4.a is provided.

Attachment 6: Technical and Management Proposal Guidance and Template

Pages are formatted for printing on 8-1/2 by 11 inch paper with 1-inch margins and font size not smaller than 12-point font (except charts/tables, accepted in 8- or 10-point font)
Volumes are in .pdf, .odx, .doc, or .docx formats
Page limitations cited in the BAA have not been exceeded
The Prime Organization’s logo included on the technical volume
The proposal does not include multiple Swarm Sprint Topics, i.e., only one topic per proposal is permitted

Attachment 7: Cost Proposal Guidance and Template

Pages are formatted for printing on 8-1/2 by 11 inch paper with 1-inch margins and font size not smaller than 12-point font (except charts/tables, accepted in 8- or 10-point font)
Volumes are in .pdf, .odx, .doc, or .docx formats

Attachment 8: Transition Accelerator Tasks Guidance and Template

Proposed tasks are clearly identified as Accelerator tasks
Funding for the Accelerator option is clearly indicated and does not exceed ½ FTE
An employee is clearly identified having the skills, experience, and availability for carrying out the activities, including business experience within the target industries of interest, experience commercializing technology, and the ability to effectively interact with technical and non-technical stakeholders
Clear explanation is provided for how Milestones A, B and C will be accomplished
Costs proposed for the Accelerator option are included in Attachment 2, Cost Summary Spreadsheet

BAA# HR001117S0011-6 OFFensive Swarm-Enabled Tactics (OFFSET) Page 3

File details come from the government source that posted it.