Draft RFP Q&A

View the file

Other files

File Type Posted
Amendment_0004_Changes_Sections_L&M.pdf PDF
Conformed__Copy__HQ003417R00890004.pdf PDF
Amendment_0003_Proposal_Extension.pdf PDF
Conformed_Copy_HQ003417R00890002.pdf PDF
Revised_20170713_PWS_Electrical_PM_TaskOrder0001.pdf PDF
Site_Visit_Attendees_List_20170712.pdf PDF
Revised_20170711_Past_Performance_Questionnaire_Electrical.docx DOCX document
Subcontracting_Plan_Format_Electrical_PM_Revised_20170711.docx DOCX document
Q&A_(HQ003417R0089)_Revised_20170713.pdf PDF
Amendment_0002.pdf PDF
Revised_20170713_Attachment_Price_Schedule_Electrical_PM.xlsx XLSX spreadsheet
HQ003417R0089_Amendment_0001.pdf PDF
Subcontracting_Plan_Format_Electrical_PM_Recompete.docx DOCX document
PWS_Electrical_PM_IDIQ_20170509.pdf PDF
Attachment_Price_Schedule_Electrical_PM.xlsx XLSX spreadsheet
Attachment_Past_Performance_Questionnaire_Electrical.docx DOCX document
Attachment_J-1_Equipment_List.xlsx XLSX spreadsheet
PWS_Electrical_PM_20170509_TaskOrder0001.pdf PDF
Attachment_Non-Disclosure_Agreement.doc DOC document
HQ003417R0089_Solicitation.pdf PDF
PWS_Electrical_PM_20170509_TaskOrder0001.pdf PDF
Attachment_Non-Disclosure_Agreement.doc DOC document
Attachment_Past_Performance_Questionnaire_Electrical.docx DOCX document
Attachment_J-1_Equipment_List.xlsx XLSX spreadsheet
PWS_Electrical_PM_IDIQ_20170509.pdf PDF
Attachment_Price_Schedule_Electrical_PM.xlsx XLSX spreadsheet
HQ003417R0089_Solicitation.pdf PDF
Attachment_Draft_RFP_Q_A_Electrical_PM.pdf PDF
Subcontracting_Plan_Format_Electrical_PM_Recompete.docx DOCX document
DRAFT_RFP_HQ003417R0089.pdf PDF
PWS_Electrical_PM_IDIQ_20170509.pdf PDF
PWS_Electrical_PM_20170509_TaskOrder0001.pdf PDF
HQ003417R0089_Solicitation.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industry Questions from Draft RFP (HQ003417R0089)

Question # Answer

1. The proposal submission chart for Volume III states

“Factor 1 – Technical Approach/Capability.”

Please confirm that this should read Factor 2 –

Technical Approach/Capability.

Yes Confirmed, Volume III should read Factor 2- Technical Approach/Capability

2. The proposal submission chart for Volume IV states “Factor 2 – Past Performance.”

Please confirm that this should read Factor 3 – Past Performance.

Yes Confirmed, Volume IV should read Factor 3- Past Performance

3. The proposal submission chart for Volume V states “Factor 3 – Price.”

Please confirm that this should read Factor 4 – Price.

Yes Confirmed, Volume V should read Factor 4- Price

4. The Instructions for Proposal Submittal states “Text

– Text shall be single-spaced, with a minimum one-inch margin all around. Pages shall be numbered consecutively. Pages submitted in excess of the page limitations stated throughout this document will be removed and not evaluated. (This does not include cover pages, tables of contents, tables, or attachments.) Text and graphics portions of the electronic copies shall be in a format readable by Adobe (PDF) or MS Word 2010.”

Please define what “tables, or attachments” are for page count purposes.

Tables: Facts or information displayed in a table/chart format Attachments: An additional form of information

5. The Instructions for Proposal Submittal states “Pages shall be numbered consecutively.”

Please confirm that each Volume should have independent, consecutive page numbering.

Yes each volume should have independent consecutive page numbering

6. When does the Government anticipate the release of the final RFP?

Please continue to monitor FBO.GOV for any updates

7. Is the Amount for Item 0001 (Electrical Preventative Maintenance) to be the sum of items 0001AA, 0001AB, and 0001AC? If not, please clarify what value is needed for 0001.

0001 is an informative CLIN it does NOT represent the sum of 0001AA, 0001B, 0001AC.

8. Is the Amount for Item 1001 (Electrical Preventative Maintenance) to be the sum of items 1001AA, 1001AB, and 1001AC? If not, please clarify what value is needed for 0001.

1001 is an informative CLIN it does NOT represent the sum of 1001AA, 1001AB, 1001AC

9. Is the Amount for Item 2001 (Electrical Preventative Maintenance) to be the sum of items 2001AA, 2001AB, and 2001AC? If not, please clarify what value is needed for 2001.

2001 is an informative CLIN it does NOT represent the sum of 2001AA, 2001AB, 2001AC

10. Is the Amount for Item 3001 (Electrical Preventative Maintenance) to be the sum of items 3001AA, 3001AB, and 3001AC? If not, please clarify what value is needed for 3001.

3001 is an informative CLIN it does NOT represent the sum of 3001AA, 3001AB, 3001AC

Industry Questions from Draft RFP (HQ003417R0089)

11. Is the Amount for Item 4001 (Electrical Preventative Maintenance) to be the sum of items 4001AA, 4001AB, and 4001AC? If not, please clarify what value is needed for 4001.

4001 is an informative CLIN it does NOT represent the sum of 4001AA, 4001AB, 4001AC

12. The contractor has confirmed that local generator and switchgear rental companies do not have 25MW standby power on hand at any given moment and that response time will be dependent upon availability of the equipment. This will make it very unlikely to be able to guarantee contingency support for 25MW power production within 96 hours without reserving and paying an equipment fee on a monthly basis to maintain fleet for the Government.

Is it the intent of the Government to pay a reserve fee for rental equipment to guarantee the 96 hour response time from any local rental company?

As an alternative to the Government paying the reserve fee, the offeror proposes an additional CLIN item for each contractual year to pay the reserve fee for rental equipment, in addition to the CLIN items for Contingency Support if exercised by the Government (0002, 1002, 2002, 3002, and 4002).

It is not the Governments intent to pay a reserve fee for rental equipment to guarantee the 96 hour response time from any local rental company.

However, the Government will consider the extra CLIN for reserve fee.

13. Section 5.5 Contingency Support states, “Within 30 days of contract award, the contractor shall provide Contingency Support Plan demonstrating their capability to support the requirements identified in para 3.4.”

Para 3.4 does not appear to be provided in the solicitation. Please clarify.

Please see PWSs for the revision in this section.

14. Section M, Past Performance defines a relevant project as “The total contract value is between

$5,000,000 to $15,000,000 during a 5-year period or $1,000,000 to $3,000,000 annually.”

Will the Government please consider removing the cap of $15M over a 5-year period and $3M annually?

The offeror holds very relevant past performance for

DoD and Intelligence Community (IC) clients with highly relevant scope and systems but can only be utilize for past performance if this threshold is removed.

We have no issues with raising the cap to $25M.

However, we will not allow reduction or repeal of the cap.

Revise the wording to reflect:

“The total contract value is between $5,000,000 to $25,000,000 during a 5-year period or $1,000,000 to $5,000,000 annually”