J-7 Wage Determinations.doc
DOC document 108 KB Posted
- Solicitation number
- HQ0034-11-R-0043
- Issued by
-
DOD Washington Headquarters Service
About this file
J-7 Wage Determinations
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HQ0034-11-D-0031.doc | DOC document | |
| HQ0034-11-R-0043-0004.doc | DOC document | |
| HQ0034-11-R-0043-0003.doc | DOC document | |
| Responses to RFIs.doc | DOC document | |
| HQ0034-11-R-0043-0002.doc | DOC document | |
| HQ0034-11-R-0043-0001.doc | DOC document | |
| J-6 WHS Project Standards Manual.doc | DOC document | |
| J-5 Sample Calculations for Price Evaluation.xls | XLS spreadsheet | |
| J-4 Coefficients.xls | XLS spreadsheet | |
| J-2 Past Performance Questionnaire Letter.doc | DOC document | |
| HQ0034-11-R-0043.doc | DOC document | |
| J-1 Annually Estimated Number of Task Orders.doc | DOC document | |
| J-3 Past Performance Questionnaire.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: VA100189 06/03/2011 VA189
State: Virginia
Construction Type: Building
County: Arlington County in Virginia.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 10/08/2010
1 11/05/2010
2 11/12/2010
3 05/06/2011
4 05/27/2011
5 06/03/2011
ASBE0024-012 10/01/2010
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.79 14.68
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-013 10/01/2010
Rates Fringes
ABATEMENT WORKER: ASBESTOS
(Removal from Mechanical
Systems).........................$ 19.86 7.17
BOIL0045-004 10/01/2010
Rates Fringes
BOILERMAKER......................$ 32.91 18.42
BRDC0001-003 05/02/2010
Rates Fringes
BRICKLAYER.......................$ 27.21 7.21
BRDC0001-004 05/01/2011
Rates Fringes
MASON - STONE....................$ 32.88 13.99
BRDC0001-005 05/01/2010
Rates Fringes
TILE FINISHER....................$ 20.48 8.44
BRDC0001-006 05/01/2010
Rates Fringes
TILE SETTER......................$ 25.29 9.59
CARP0388-004 08/01/2010
Rates Fringes
CARPENTER (Including Drywall
Hanging, Form Work, and Metal
Stud Installation)...............$ 26.38 7.06
* ELEC0026-034 06/01/2011
Rates Fringes
ELECTRICIAN......................$ 40.67 13.37
HVAC Temperature Controls, Alarms on New Construction or wherever Alarm System is installed in conduit
ELEC0026-038 03/07/2011
Rates Fringes
SOUND AND COMMUNICATION
TECHNICIAN.......................$ 25.55 7.57+3%
Sound Technician, Low Voltage Wiring for Alarms does not include New Construction or Alarms installed in conduit
ELEV0010-006 01/01/2011
Rates Fringes
ELEVATOR MECHANIC................$ 38.55 21.235+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
ENGI0077-022 05/01/2010
Rates Fringes
Power equipment operators:
(1) Tower cranes and cranes 100 ton and over.....$ 32.09 7.87+a+b
(2) 35 ton cranes & above;
tower & climbing cranes.....$ 31.09 7.87+a+b
(3) Excavator; Cranes (All
Other)......................$ 30.63 7.87+a
(4) Bulldozer...............$ 29.92 7.87+a
(5) Roller..................$ 27.89 7.87+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
b.PREMIUM PAY:
Tower crane and cranes 100-ton and over to receive $1.00 per hour premium over Group One.
IRON0005-008 06/01/2010
Rates Fringes
IRONWORKER (Ornamental &
Structural)......................$ 28.83 13.81
LABO0011-001 06/01/2010
Rates Fringes
LABORER (Mason Tender
Cement/Concrete).................$ 20.71 5.97
PAIN0051-029 06/01/2010
Rates Fringes
GLAZIER
Over $2 million.............$ 27.29 8.31
Under $2 million............$ 24.57 8.31
PAIN0051-030 06/01/2010
Rates Fringes
PAINTER (Drywall
Finishing/Taping, Brush &
Roller, & Spray).................$ 24.10 8.04
PLAS0891-010 05/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.15 9.58
* PLUM0005-013 01/01/2011
Rates Fringes
PIPEFITTER (Including HVAC
Pipe & System Installation)......$ 37.67 14.82+a
PLUMBER..........................$ 37.67 14.82+a a.PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-035 05/01/2010
Rates Fringes
ROOFER...........................$ 27.30 8.28
SFVA0669-005 04/01/2011
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.95 17.00
SHEE0100-042 01/01/2011
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 35.59 13.01
SUVA2010-089 09/20/2010
Rates Fringes
BRICK POINTER/CAULKER/CLEANER....$ 18.52 0.00
LABORER: Common or General......$ 14.30 0.00
LABORER: Landscape..............$ 10.64 0.00
LABORER: Mason Tender - Brick...$ 10.90 2.35
LABORER: Pipelayer..............$ 15.47 2.27
LABORER: Mason Tender -
Pointer, Caulker, Cleaner........$ 12.43 0.00
OPERATOR: Backhoe...............$ 19.20 3.19
OPERATOR: Bobcat/Skid Loader....$ 15.62 2.40
OPERATOR: Forklift..............$ 17.93 7.28
OPERATOR: Loader................$ 20.63 4.80
OPERATOR: Mechanic..............$ 18.23 1.59
TRUCK DRIVER: Dump Truck........$ 13.25 1.80
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of
Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the
Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: VA100186 06/03/2011 VA186
State: Virginia
Construction Type: Building
County: Alexandria* County in Virginia.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 10/08/2010
1 11/05/2010
2 11/12/2010
3 05/06/2011
4 05/27/2011
5 06/03/2011
ASBE0024-012 10/01/2010
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.79 14.68
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-013 10/01/2010
Rates Fringes
ABATEMENT WORKER: ASBESTOS
(Removal from Mechanical
Systems).........................$ 19.86 7.17
BOIL0045-004 10/01/2010
Rates Fringes
BOILERMAKER......................$ 32.91 18.42
BRDC0001-003 05/02/2010
Rates Fringes
BRICKLAYER.......................$ 27.21 7.21
BRDC0001-004 05/01/2011
Rates Fringes
MASON - STONE....................$ 32.88 13.99
BRDC0001-005 05/01/2010
Rates Fringes
TILE FINISHER....................$ 20.48 8.44
BRDC0001-006 05/01/2010
Rates Fringes
TILE SETTER......................$ 25.29 9.59
CARP0388-006 08/01/2010
Rates Fringes
CARPENTER (Drywall Hanging, Form Work, & Metal Stud
Installation)....................$ 26.38 7.06
* ELEC0026-034 06/01/2011
Rates Fringes
ELECTRICIAN......................$ 40.67 13.37
HVAC Temperature Controls, Alarms on New Construction or wherever Alarm System is installed in conduit
ELEC0026-038 03/07/2011
Rates Fringes
SOUND AND COMMUNICATION
TECHNICIAN.......................$ 25.55 7.57+3%
Sound Technician, Low Voltage Wiring for Alarms does not include New Construction or Alarms installed in conduit
ELEV0010-006 01/01/2011
Rates Fringes
ELEVATOR MECHANIC................$ 38.55 21.235+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
ENGI0077-022 05/01/2010
Rates Fringes
Power equipment operators:
(1) Tower cranes and cranes 100 ton and over.....$ 32.09 7.87+a+b
(2) 35 ton cranes & above;
tower & climbing cranes.....$ 31.09 7.87+a+b
(3) Excavator; Cranes (All
Other)......................$ 30.63 7.87+a
(4) Bulldozer...............$ 29.92 7.87+a
(5) Roller..................$ 27.89 7.87+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
b.PREMIUM PAY:
Tower crane and cranes 100-ton and over to receive $1.00 per hour premium over Group One.
IRON0005-008 06/01/2010
Rates Fringes
IRONWORKER (Ornamental &
Structural)......................$ 28.83 13.81
LABO0011-001 06/01/2010
Rates Fringes
LABORER (Mason Tender
Cement/Concrete).................$ 20.71 5.97
PAIN0051-029 06/01/2010
Rates Fringes
GLAZIER
Over $2 million.............$ 27.29 8.31
Under $2 million............$ 24.57 8.31
PAIN0051-030 06/01/2010
Rates Fringes
PAINTER (Drywall
Finishing/Taping, Brush &
Roller, & Spray).................$ 24.10 8.04
* PLUM0005-013 01/01/2011
Rates Fringes
PIPEFITTER (Including HVAC
Pipe & System Installation)......$ 37.67 14.82+a
PLUMBER..........................$ 37.67 14.82+a a.PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-035 05/01/2010
Rates Fringes
ROOFER...........................$ 27.30 8.28
SFVA0669-005 04/01/2011
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.95 17.00
SHEE0100-042 01/01/2011
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 35.59 13.01
SUVA2010-087 09/20/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 18.85 3.78
LABORER: Common or General......$ 12.00 0.00
LABORER: Landscape..............$ 10.64 0.00
LABORER: Mason Tender - Brick...$ 10.90 2.35
LABORER: Pipelayer..............$ 15.47 2.27
LABORER: Mason Tender -
Pointer, Caulker, Cleaner........$ 13.00 0.00
OPERATOR: Backhoe...............$ 19.20 3.19
OPERATOR: Bobcat/Skid Loader....$ 15.62 2.40
OPERATOR: Forklift..............$ 17.93 7.28
OPERATOR: Loader................$ 20.63 4.80
OPERATOR: Mechanic..............$ 18.23 1.59
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.32 0.00
TRUCK DRIVER: Dump Truck........$ 13.25 1.80
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
END OF GENERAL DECISION
General Decision Number: VA100198 06/03/2011 VA198
State: Virginia
Construction Type: Building
Counties: Fairfax, Fairfax* and Falls Church* Counties in
Virginia.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 11/05/2010
1 11/12/2010
2 05/06/2011
3 05/27/2011
4 06/03/2011
ASBE0024-012 10/01/2010
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.79 14.68
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-013 10/01/2010
Rates Fringes
ABATEMENT WORKER: ASBESTOS
(Removal from Mechanical
Systems).........................$ 19.86 7.17
BOIL0045-004 10/01/2010
Rates Fringes
BOILERMAKER......................$ 32.91 18.42
BRDC0001-003 05/02/2010
Rates Fringes
BRICKLAYER.......................$ 27.21 7.21
BRDC0001-004 05/01/2011
Rates Fringes
MASON - STONE....................$ 32.88 13.99
BRDC0001-005 05/01/2010
Rates Fringes
TILE FINISHER....................$ 20.48 8.44
BRDC0001-006 05/01/2010
Rates Fringes
TILE SETTER......................$ 25.29 9.59
CARP0388-004 08/01/2010
Rates Fringes
CARPENTER (Including Drywall
Hanging, Form Work, and Metal
Stud Installation)...............$ 26.38 7.06
* ELEC0026-034 06/01/2011
Rates Fringes
ELECTRICIAN......................$ 40.67 13.37
HVAC Temperature Controls, Alarms on New Construction or wherever Alarm System is installed in conduit
ELEC0026-038 03/07/2011
Rates Fringes
SOUND AND COMMUNICATION
TECHNICIAN.......................$ 25.55 7.57+3%
Sound Technician, Low Voltage Wiring for Alarms does not include New Construction or Alarms installed in conduit
ELEV0010-006 01/01/2011
Rates Fringes
ELEVATOR MECHANIC................$ 38.55 21.235+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
ENGI0077-022 05/01/2010
Rates Fringes
Power equipment operators:
(1) Tower cranes and cranes 100 ton and over.....$ 32.09 7.87+a+b
(2) 35 ton cranes & above;
tower & climbing cranes.....$ 31.09 7.87+a+b
(3) Excavator; Cranes (All
Other)......................$ 30.63 7.87+a
(4) Bulldozer...............$ 29.92 7.87+a
(5) Roller..................$ 27.89 7.87+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
b.PREMIUM PAY:
Tower crane and cranes 100-ton and over to receive $1.00 per hour premium over Group One.
IRON0005-008 06/01/2010
Rates Fringes
IRONWORKER (Ornamental &
Structural)......................$ 28.83 13.81
LABO0011-001 06/01/2010
Rates Fringes
LABORER (Mason Tender
Cement/Concrete).................$ 20.71 5.97
PAIN0051-029 06/01/2010
Rates Fringes
GLAZIER
Over $2 million.............$ 27.29 8.31
Under $2 million............$ 24.57 8.31
PAIN0051-030 06/01/2010
Rates Fringes
PAINTER (Drywall
Finishing/Taping, Brush &
Roller, & Spray).................$ 24.10 8.04
* PLUM0005-013 01/01/2011
Rates Fringes
PIPEFITTER (Including HVAC
Pipe & System Installation)......$ 37.67 14.82+a
PLUMBER..........................$ 37.67 14.82+a a.PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
SFVA0669-005 04/01/2011
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.95 17.00
SHEE0100-042 01/01/2011
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 35.59 13.01
SUVA2010-099 09/20/2010
Rates Fringes
BRICK POINTER/CAULKER/CLEANER....$ 15.69 0.00
CEMENT MASON/CONCRETE FINISHER...$ 18.85 3.78
LABORER: Common or General......$ 13.20 2.00
LABORER: Landscape..............$ 10.64 0.00
LABORER: Mason Tender - Brick...$ 10.90 2.35
LABORER: Pipelayer..............$ 15.47 2.27
LABORER: Mason Tender -
Pointer, Caulker, Cleaner........$ 10.83 0.00
OPERATOR: Backhoe...............$ 19.20 3.19
OPERATOR: Bobcat/Skid Loader....$ 15.62 2.40
OPERATOR: Forklift..............$ 17.93 7.28
OPERATOR: Loader................$ 20.63 4.80
OPERATOR: Mechanic..............$ 18.23 1.59
ROOFER...........................$ 21.55 7.01
TRUCK DRIVER: Dump Truck........$ 13.25 1.80
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
END OF GENERAL DECISION
General Decision Number: DC100004 06/03/2011 DC4
Superseded General Decision Number: DC20080004
State: District of Columbia
Construction Type: Building
County: District of Columbia Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 03/12/2010
1 03/19/2010
2 06/11/2010
3 07/09/2010
4 07/23/2010
5 08/20/2010
6 09/24/2010
7 11/05/2010
8 11/26/2010
9 12/10/2010
10 12/24/2010
11 01/07/2011
12 01/21/2011
13 04/15/2011
14 05/06/2011
15 05/27/2011
16 06/03/2011
ASBE0024-007 10/01/2009
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 30.43 14.43
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-008 10/01/2009
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (REMOVAL
FROM MECHANICAL SYSTEMS,
WHICH WILL NOT BE REPLACED OR
SCRAPPED)........................$ 18.85 7.10
BRDC0001-002 05/03/2010
Rates Fringes
BRICKLAYER.......................$ 27.21 7.21
CARP0132-008 05/01/2010
Rates Fringes
CARPENTER, Includes Drywall
Hanging, Formsetting, and
Soft Floor (Carpet)
Installation.....................$ 26.38 7.00
PILEDRIVERMAN....................$ 24.48 7.80
CARP1831-002 04/01/2010
Rates Fringes
MILLWRIGHT.......................$ 27.91 10.90
* ELEC0026-016 06/01/2011
Rates Fringes
ELECTRICIAN, Including HVAC
Temperature Control
Installation.....................$ 40.67 13.37
ELEC0026-017 09/01/2008
Rates Fringes
ELECTRICIAN: COMMUNICATION
TECHNICIAN.......................$ 24.25 3%+6.87
SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside
Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEV0010-001 01/01/2011
Rates Fringes
ELEVATOR MECHANIC................$ 38.55 21.235+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
* IRON0005-005 06/01/2009
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 28.83 13.295
IRON0201-006 05/01/2009
Rates Fringes
IRONWORKER, REINFORCING..........$ 25.20 14.33
LABO0657-015 06/01/2010
Rates Fringes
LABORER: Skilled................$ 20.71 5.97
FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinnig, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper, structural demolition.
MARB0002-004 05/01/2011
Rates Fringes
MARBLE/STONE MASON...............$ 32.88 13.99
INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement
(restoration work)
MARB0003-006 05/01/2010
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 26.04 9.59
MARB0003-007 05/01/2010
Rates Fringes
TERRAZZO FINISHER................$ 20.48 8.44
MARB0003-008 05/01/2010
Rates Fringes
TILE SETTER......................$ 25.29 9.59
MARB0003-009 05/01/2010
Rates Fringes
TILE FINISHER....................$ 20.48 8.44
PAIN0051-014 06/01/2010
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 24.57 8.31
Glazing Contracts over $2 million.....................$ 27.29 8.31
PAIN0051-015 06/01/2010
Rates Fringes
PAINTER
Brush, Roller, Spray and
Drywall Finisher............$ 24.64 7.86
PLAS0891-005 07/01/2009
Rates Fringes
PLASTERER........................$ 27.00 5.82
PLAS0891-006 05/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.15 9.58
PLAS0891-007 07/01/2009
Rates Fringes
FIREPROOFER
Handler.....................$ 11.50 3.89
Mixer/Pump..................$ 14.00 3.89
Sprayer.....................$ 19.00 3.89
Spraying of all Fireproofing materials. Hand application of
Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.
PLUM0005-008 08/01/2010
Rates Fringes
PLUMBER
Apartment Buildings over 4 stories (except hotels).....$ 22.66 9.36+a
ALL Other Work..............$ 37.67 14.69+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's
Day, Martin Luther King's Birthday, Memorial Day and the
Fourth of July.
PLUM0602-008 11/01/2010
Rates Fringes
PIPEFITTER, Including HVAC
Pipe Installation................$ 36.87 16.72+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-016 05/01/2009
Rates Fringes
ROOFER...........................$ 25.80 8.26
SFDC0669-002 04/01/2011
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.95 17.00
SHEE0100-015 01/01/2011
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 35.59 13.01
SUDC2009-003 05/19/2009
Rates Fringes
LABORER: Common or General......$ 13.04 2.80
LABORER: Mason Tender -
Cement/Concrete..................$ 15.40 2.85
LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures
(restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
END OF GENERAL DECISION
General Decision Number: PA100016 06/03/2011 PA16
Superseded General Decision Number: PA20080016
State: Pennsylvania
Construction Type: Building
Counties: Adams, Bedford, Franklin, Fulton and Huntingdon
Counties in Pennsylvania.
BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories), EXCLUDING
SEWAGE AND WATER TREATMENT PLANT PROJECTS
Modification Number Publication Date
0 03/12/2010
1 03/26/2010
2 05/07/2010
3 06/04/2010
4 06/25/2010
5 07/02/2010
6 07/30/2010
7 08/27/2010
8 09/10/2010
9 10/08/2010
10 10/15/2010
11 01/21/2011
12 01/28/2011
13 04/15/2011
14 06/03/2011
BRPA0005-013 05/01/2010
ADAMS AND FRANKLIN COUNTIES
Rates Fringes
BRICKLAYER.......................$ 29.77 12.92
BRPA0009-001 12/01/2010
BEDFORD, FULTON AND HUNTINGDON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 26.36 14.41
* CARP0287-002 06/01/2011
ADAMS COUNTY
Rates Fringes
CARPENTER (Including Drywall
Hanging).........................$ 27.16 12.22
* CARP0287-003 06/01/2011
ADAMS COUNTY
Rates Fringes
MILLWRIGHT.......................$ 30.27 14.58
* CARP0900-004 06/01/2011
BEDFORD, FRANKLIN, FULTON, AND HUNTINGDON COUNTIES
Rates Fringes
CARPENTER (Including Drywall
Hanging).........................$ 25.85 10.59
* CARP2235-004 06/01/2011
BEDFORD, FRANKLIN, FULTON, AND HUNTINGDON COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 35.29 15.40
ELEC0005-002 12/24/2010
BEDFORD, FULTON AND HUNTINGDON COUNTIES
Rates Fringes
ELECTRICIAN......................$ 35.26 19.36
ELEC0143-008 06/01/2010
FRANKLIN COUNTY
Rates Fringes
ELECTRICIAN......................$ 27.55 3%+15.47
ELEC0229-002 06/07/2010
ADAMS COUNTY
Rates Fringes
ELECTRICIAN......................$ 28.58 12.50
ENGI0066-005 07/01/2008
BEDFORD, FRANKLIN, FULTON, AND HUNTINGDON COUNTIES
Rates Fringes
Power equipment operators:
Cranes, all types; and Hi
Lift........................$ 24.565 12.07
Roller......................$ 21.89 12.07
ENGI0542-024 05/01/2009
ADAMS COUNTY
Rates Fringes
Power equipment operators:
Cranes, all types...........$ 29.42 16.89+A
Hi lift.....................$ 29.13 16.81+A
Roller......................$ 25.08 15.61+A
FOOTNOTE: A. PAID HOLIDAYS: Washington's Birthday, Good
Friday, Memorial Day, Labor Day, Presidential Election Day, Veterans Day, Thanksgiving Day, and Christmas Day.
TOXIC/HAZARDOUS WASTE REMOVAL: Add 20% to basic hourly rate.
IRON0404-009 07/01/2010
ADAMS, FRANKLIN (Except Southwest 1/3), AND HUNTINGDON (Except
Southwest 1/3)
Rates Fringes
IRONWORKER.......................$ 27.77 23.05
IRON0568-002 05/01/2010
BEDFORD, FRANKLIN (Southwest 1/3), FULTON AND HUNTINGDON
(Southwest 1/3) COUNTIES
Rates Fringes
Ironworkers:
Sheeter, Bucker-Up..........$ 26.48 14.05
Structural, Ornamental, Reinforcing; Machinery
Mover; Rigger and
Machinery Erector; and
Fence Erector...............$ 26.23 14.05
LABO0419-004 07/01/2010
BEDFORD, FRANKLIN, FULTON, AND HUNTINGDON COUNTIES
Rates Fringes
Laborers:
Brick Mason Tender..........$ 18.42 10.20
Unskilled...................$ 18.27 10.20
LABO1180-010 05/01/2010
ADAMS COUNTY
Rates Fringes
Laborers:
Brick and Plasterer Tender..$ 22.72 8.68
Unskilled...................$ 20.19 8.68
PAIN0411-004 05/01/2009
Rates Fringes
Painters:........................$ 22.17 8.90
PLUM0354-003 06/01/2010
BEDFORD AND HUNTINGDON COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 30.14 18.73
* PLUM0520-006 05/01/2011
ADAMS, FRANKLIN, AND FULTON COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER...............$ 31.92 20.39
SUPA1999-004 11/29/1999
Rates Fringes
Power equipment operators:
Backhoes....................$ 14.71 4.91
Bulldozers..................$ 14.27 4.80
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .