Horizon_West_Trail_Phase_I_Boardwalk-_Structures_Design_Calculations.pdf

PDF 4 MB Posted

Attached to
Horizon West Trail - Phase 1A
Solicitation number
Y26-754
Issued by
Orange County, Orlando City, Florida

About this file

This is a structural design calculations document prepared by DRMP, Inc. for Orange County, Florida regarding the Horizon West Trail Phase 1 boardwalk project under Contract No. Y21-806. The document provides geotechnical data and pile design specifications for the boardwalk structures, detailing the engineering analysis performed by licensed professional engineers Candy A. Bundy (PE License No. 53984) and Jocelyn M. Haisch-Linn (PE License No. 60103). The project encompasses approximately 8,737 linear feet of boardwalk from Station 2012+76.51 to Station 2021+50.00, requiring a total of 122 fourteen-inch square prestressed concrete piles (20 production piles for the section from Sta. 2013+10.25 to Sta. 2014+40 and 102 production piles for the section from Sta. 2014+40 to Sta. 2021+50), with an additional 6 test piles. Pile lengths vary from 25 to 49 feet depending on location, with embedment depths ranging from 20.4 to 31 feet based on geotechnical boring data across seven boring locations (B-1 through B-7).

The design calculations establish a nominal bearing resistance of 29 tons per pile based on load combinations including dead loads, pedestrian loads, and H10 design vehicle loads with appropriate AASHTO LRFD load factors. A resistance factor of 0.65 is applied based on pile dynamic analysis (PDA). The pile design specifies that all piles must be driven to minimum tip elevations ranging from 88 to 97 feet, with pile tips varying by boring location. Installation requirements include dynamic monitoring per specification 455, set checks and re-drives to achieve required nominal bearing resistance, and dynamic load testing on at least one test pile per bent. The contractor is responsible for utility verification, protection of existing structures during pile driving, jetting approval, and submission of shop drawings signed and sealed by a licensed Florida professional engineer prior to fabrication.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizon West Trail Phase 1 Orange County, Florida | Contract No. Y21-806

HORIZON WEST TRAIL

PHASE 1

Horizon West Trail Boardwalk

Structures Design Calculations

SEPTEMBER 2025

Prepared For:

Orange County, Florida Contract No. Y21-806

Engineer of Record:

DRMP, Inc.

941 Lake Baldwin Lane

Orlando, FL 32814 Phone: 407-896-0594

FAX: 407-896-4836

Candy A. Bundy, PE License No.: 53984

APRIL 2026

Jocelyn M. Haisch-Linn, PE

60103

Horizon West Trail Boardwalk | Structures Design Calculations

Table of Contents

Horizon West Trail Boardwalk

Section 1 – Geotechnical Data

Section 2 – Pile Design

Section 1 - Geotechnical Data

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.0

110.0

115.0

120.0

0 10 20 30 40 50 60 70 80 90 100

A

PP

R O

X

IM

AT

E

P

IL

E T

IP

E

L E

VA

T

IO

N

(F E

E T

ESTIMATED DAVISSON CAPACITY (TONS)

AXIAL CAPACITY DESIGN CURVE

HORIZON WEST TRAIL- BOARDWALK

14-INCH PRECAST PRESTRESSED CONCRETE PILES (PCP)

B-1

B-2

B-3

B-4

B-5

B-6

B-7

PILE CAPACITY CURVES HORIZON

WEST TRAIL

ORANGE COUNTY, FLORIDA

NADIC ENGINEERING SERVICES, INC.

CIVIL, ENVIRONMENTAL & GEOTECHNICAL

CONSULTANTS

DRAWN: MB

SCALE: NOTED PROJECT. No:

PR.GEO-RD21034

CHKD: GNN DATE: 04/11/2023 PLATE: 1

LEGEND

NOTES:

1) THE ESTIMATED DAVISSON CAPACITY REPRESENTS THE THEORETICAL

FAILURE CAPACITY OF A DRIVEN PILE. TO OBTAIN THE PILE TIP ELEVATIONS,

ONE SHOULD ENTER THE RECOMMENDED DAVISSON DESIGN CAPACITY CURVE

USING A NOMINAL BEARING RESISTANCE VALUE. THE NOMINAL BEARING

RESISTANCE IS COMPUTED BY DIVIDING THE SUM OF THE FACTORED DESIGN

LOAD, SCOUR RESISTANCE, AND DOWNDRAG BY THE APPROPIATE

PERFORMANCE FACTOR Ø BELOW WITH > 5% DYNAMIC TESTING.

Ø = 0.75 BASED ON DYNAMIC TESTING AND ANALYSIS & STATIC LOAD TEST

Ø = 0.65 BASED ON PILE DYNAMIC TESTING AND ITS ANALYSIS

Section 2 - Pile Design

DEPARTMENT OF PUBLIC WORKS

ENGINEERING DIVISION

4200 SOUTH JOHN YOUNG PARKWAY

ORLANDO, FLORIDA 32839

(407) 836-7900

ORANGE COUNTY

T H

E

O F

F I

C I

A L

R

C O

D

T

I

S

E E

T

T

E C

T R

O N

C

G I

T A

L

Y

G N

A N

A L

U N

D

L E

G

A

C

ORLANDO, FL 32814

941 LAKE BALDWIN LANE

DRMP, INC.

P.E. LICENSE NUMBER 60103

JOCELYN M. HAISCH-LINN, P.E.

PILE DATA TABLE AND NOTES

B1-11

PILE DATA TABLE

DESIGN CRITERIAINSTALLATION CRITERIA

(TONS)

RESISTANCE

BEARING

NOMINAL

(FT)

ELEVATION

TIP

MINIMUM

(TONS)

DRAG

DOWN

(TONS)

RESISTANCE

SCOUR

TOTAL

(TONS)

RESISTANCE

SCOUR

NET

(TONS)

LOAD

UPLIFT

DESIGN

FACTORED

Ø

C

M P

R E

S S I O

N

TABLE DATE 01/01/16

(TONS)

RESISTANCE

UPLIFT

NOMINAL

Ø

P

L I F

T

(IN)

SIZE

PILE

(FT)

LENGTH

PILE

TEST

(FT)

ELEVATION

JET

REQUIRED

(FT)

ELEVATION

PREFORM

REQUIRED

(FT)

ELEVATION

SCOUR

100-YEAR

(TONS)

LOAD

DESIGN

FACTORED

STATIONING

BENT

14 29 N/A 49 N/A N/A N/A N/A N/A N/A N/A N/A

NOTES

Ø

FACTORED DESIGN LOAD + NET SCOUR RESISTANCE + DOWN DRAG ≤ NOMINAL BEARING RESISTANCE

0.65

14 29 N/A 40 N/A N/A N/A N/A N/A N/A N/A N/A0.65

STA. 2021+50.00

STA. 2014+40.00 TO

STA. 2014+40.00

STA. 2013+10.25 TO

BCS 02-24

CAB 02-24

CAB 02-24

JMHL 02-24

FOR DETAILS REGARDING DRAINAGE, SEE ROADWAY PLANS. 15.

FOR DETAILS REGARDING UTILITIES, SEE ROADWAY PLANS.14.

PILES AND NO ADDITIONAL PAYMENT WILL BE PROVIDED.

ALL COSTS ASSOCIATED WITH ALTERNATE DESIGNS, FABRICATION, AND INSTALLATION, SHALL BE INCIDENTAL TO THE COST OF THE PILES AND TEST 13.

DRAWINGS SHALL INCLUDE AN UPDATED FOUNDATION LAYOUT.

PROFESSIONAL ENGINEER FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. IF PILE LOCATIONS OR SPACING ARE CHANGED, THE SHOP

ALTERNATIVE CONCRETE PILING DESIGNS ARE ALLOWED. SUBMIT CALCULATIONS AND SHOP DRAWINGS SIGNED AND SEALED BY A LICENSED FLORIDA12.

ENSURE THAT ACTIVE UTILITIES ARE PROPERLY MAINTAINED DURING CONSTRUCTION.

CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION TO AVOID DAMAGE. THE CONTRACTOR IS TO

THE CONTRACTOR IS TO VERIFY ALL UTILITIES AND NOTIFY ALL INVOLVED UTILITY COMPANIES PRIOR TO EXCAVATION, PILE DRIVING OR11.

FOR DETAILS REGARDING SPT SOIL BORINGS, SEE "REPORT OF BOARDWALK BORINGS" SHEETS. 10.

NO JETTING WILL BE ALLOWED WITHOUT APPROVAL FROM THE ENGINEER.9.

MONITORING IS TO BE INCLUDED IN THE CONTRACT UNIT COST FOR PAY ITEM 999-3, BOARDWALK LUMP SUM.

SPECIFICATIONS SECTION 108. THE COST OF ALL MATERIAL, LABOR, EQUIPMENT AND TIME ASSOCIATED WITH SUCH PROTECTION AND

DURING PILE DRIVING ACTIVITIES, THE CONTRACTOR IS TO PROTECT AND MONITOR EXISTING STRUCTURES IN ACCORDANCE WITH 8.

7. ALL PILES SHALL BE DYNAMICALLY MONITORED PER SPECIFICATION 455.

RESISTANCE. SET CHECK AND RE-DRIVES ARE TO BE CONDUCTED IN ACCORDANCE WITH SPECIFICATIONS SECTION 455-5.11.4.

THE CONTRACTOR IS TO ANTICIPATE SET CHECKS AND RE-DRIVES WILL BE REQUIRED TO ACHIEVE THE REQUIRED NOMINAL BEARING 6.

ELEVATIONS, AND INCLUDE PILE CUT-OFF ELEVATIONS IN SHOP DRAWINGS.

SUPERSTRUCTURE DEPTHS VARY BASED ON PROPRIETARY BOARDWALK SYSTEM USED. CONTRACTOR TO CALCULATE PILE CUT-OFF 5.

PERFORMED ON ALL PILES PER SPECIFICATIONS SECTION 455-5.14.

DRIVE TEST PILES IN THE POSITION OF A PERMANENT PILE OR AS DIRECTED BY THE ENGINEER. A DYNAMIC LOAD TEST IS TO BE 4.

3. DRIVE PILES TO THE MINIMUM TIP ELEVATION.

DRIVE PILES TO THE NOMINAL BEARING RESISTANCE IN ACCORDANCE WITH SPECIFICATIONS SECTION 455 AND AS FOLLOWS:2.

ALL PILES ARE TO BE 14" SQUARE PRESTRESSED CONCRETE IN ACCORDANCE WITH STANDARD PLANS INDEXES 455-001, 455-002 AND 455-014.1.

REF. DWG. NO.

SHEET NO.

SHEET TITLE:

PROJECT NAME:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

CHECKED BY:

REVISIONS

DATE BY DESCRIPTION DATE BY DESCRIPTION

Plotted By: showlader 4/29/2026 7:53:24 AM P:\Projects21\21-0021.000_Horizon_West_Trail_Phase_1\Struct\B1-PileData01.dgn

HORIZON WEST TRAIL PHASE 1

Project: Horizon West Trail Phase 1 Boardwalk

DRMP Job No.: 21-0021.000

Description: Pile Loading and Quantities

Designed: CAB 02/21/24

Checked: JMHL 02/27/24.

BackChecked: CAB 02/28/24.

14.5' Spans (Conservative) - Sta. 2013+11.01 to Sta. 2021+49.26

Dead Loads Dimension Load/Pile (lb) Load/Pile (ton)

Bridge Picket Railing (Steel - Index 851) (plf) (SDG Table 2.2-1) 30 435

Deck Width out-to-out (ft) 15.50

Deck Thickness used for loading (in) 7.5 10535.16

Beam Area (Assumed) (SF) (considers Pile Cap load)* 2.5 5437.5

Assume 2 piles per bent

Pile Spacing (ft) (Conservative, max. spacing = 14.224') 14.5

Total per Pile 16407.66 8.2

Live Loads

Clear deck width (ft) 14

Pedestrian load (psf) 90 9135 4.6

4,000 lb front axle and 16,000 lb Rear axle of H10 design vehicle (14' apart) 20000 8068.97 4

Load Combinations

DL Load Factor (AASHTO LRFD Table 3.4.1-2) 1.25

LL Load Factor 1.75

Dead Load + Ped fully loaded (tons/pile) 18.3

Dead Load + 16,000 lb vehicle (tons/pile) 17.3

Resistance Factor from SDG Table 3.5.7-1 for PDA 0.65

Dead Load + Ped fully loaded (tons/pile) 28.2

Dead Load + 16,000 lb vehicle (tons/pile) 26.5

USE 29 Tons for Concrete Piles - 2 piles

Boring No. Ground El. Tip El Depth

B-1 119.00 88.00 31

B-2 118.70 97.00 21.7

B-3 117.40 97.00 20.4

B-4 117.70 97.00 20.7

B-5 118.20 97.00 21.2

B-6 117.80 97.00 20.8

B-7 118.30 97.00 21.3

Sta. 2013+10.25 to Sta. 2014+40 Max Embedment Depth (ft) = 31

Sta. 2014+40 to Sta. 2021+50 Max Embedment Depth (ft) = 21.7

Sta. 2013+10.25 to Sta. 2014+40 Sta. 2014+40 to Sta. 2021+50

Number of Total Piles = 20 102

Number of Test Piles = 1 5

Proposed Boardwalk Profile El. (ft.) = 121.38 121.17

Approximate Pile Cutoff El. (Conservative) (ft.) = 121.38 121.17

Individual Pile Length (ft.) = 34.00 25.00

Individual Test Pile Length (ft.) = 49.00 40.00

Production Pile Length for Quantities = 646 2425

Test Pile Length for Quantities = 49 200

Overall Production Pile Length for Quantities = 3071

Overall Test Pile Length for Quantities = 249

14" concrete piles

Pile Quantities

1 - \\EgnyteDrive\Projects\Projects21\21-0021.000_Horizon_West_Trail_Phase_1\Struct\32-08-

B1\02_Substructure\B1_Pile_Loading.xlsx

Project: Horizon West Trail Phase 1 Boardwalk

DRMP Job No.: 21-0021.000

Description: Pile Loading and Quantities

Designed: CAB 02/21/24

Checked: JMHL 02/27/24

Backchecked: CAB 02/27/24

PT Sta. 2012+76.51 121.44

PC Sta. 2021+50.00 119.98

Grade -0.00167

Sta. PGL El. (ft.) Exist. El (ft.) Diff (ft.)

2012+76.51 121.439 118.802 2.637

EB1 2013+11.51 121.381 119.139 2.242

IB 10 2014+35.07 121.174 117.805 3.370

2014+92.00 121.079 116.504 4.576

IB 16 2015+19.07 121.034 116.959 4.075

IB 17 2015+33.07 121.011 114.213 6.798

Canal 2015+37.00 121.004 113.917 7.087

IB 18 2015+47.07 120.988 115.402 5.585

2015+70.50 120.948 115.851 5.098

0.000

EB 61 2021+48.76 119.983 117.729 2.254

2021+50.00 119.981 117.768 2.213

Approximate Heights Above Existing Grade at Pile Locations

P:\Projects21\21-0021.000_Horizon_West_Trail_Phase_1\Struct\32-08-

B1\02_Substructure\B1_Pile_Loading.xlsx

Cover
Table of Contents
Section 1 - Geotechnical Data
Section 2 - Pile Design

File details come from the government source that posted it. Updated .