This is a Geotechnical Trail Soil Survey Report prepared by Nadic Engineering Services, Inc. for WBQ Design & Engineering, Inc. and the Orange County Public Works Department in Florida for the Horizon West Trail Phase I project. The report documents subsurface soil and groundwater conditions along the proposed 1.95-mile multi-use asphalt trail corridor extending from Tiny Road to Winter Garden Vineland Road in Orange County. The exploration program included hand auger borings to 5 feet and Standard Penetration Test (SPT) borings to 20 feet, with samples collected for laboratory analysis including grain size analysis, Atterberg limits testing, and organic content determination. Five generalized soil strata were identified along the project alignment, ranging from fine sand and silty sand (Strata 1-2, classified as A-3 and A-2-4) to sandy silt, sandy clay, and clayey sand (Strata 3-5, classified as A-4 through A-2-6). Groundwater levels were measured during boring operations, with seasonal high groundwater tables varying between +97 and +137 feet NAVD-88.
The report provides comprehensive geotechnical recommendations for trail design and construction, including site preparation, pavement subgrade preparation, excavation, and temporary dewatering procedures. Limerock Bearing Ratio (LBR) testing on seven representative samples yielded design values of 34 using the FDOT Mean Method and 33 using the FDOT 90 Percent Method, with a recommended design LBR of 40 for filled sections. The report specifies minimum 24-inch separation between pavement base course and seasonal high groundwater table, with soil-cement base course or underdrains required if separation is less than 12 inches. All construction work must comply with FDOT Standard Specifications including Index Nos. 120-001 and 120-002, with subgrade compaction requirements of 95 percent ASTM D-1557 modified proctor maximum dry density and fill placement in 12-inch lifts at optimum moisture content. The report notes that subsurface conditions may vary between boring locations and recommends re-evaluation if variations become evident during construction.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared for:
WBQ Design & Engineering, Inc.
201 N Magnolia Ave, Suite 200
Orlando, FL 32801
Prepared by:
Nadic Engineering Services, Inc.
601 N. Hart Blvd
Orlando, Florida 32818 407-521-4771
Consultants in: Civil ꞏ Environmental ꞏ Geotechnical Engineering Offices in: Orlando ꞏ Miami
Geotechnical Trail Soil Survey Report Horizon West Trail Phase I
From Tiny Road to Winter Garden Vineland Road
Orange County, Florida Orange County Project No.: Y21-806-CH
NADIC Project No. PR.GEO-RD21034
November 30, 2022
WBQ Design & Engineering, Inc.
201 N Magnolia Ave, Suite 200 Orlando FL 32801
Attention: Mr. Troy Vargas, P.E.
Sr. Associate
RE: Geotechnical Trail Soil Survey Report Horizon West Trail Phase I From Tiny Road to Winter Garden Vineland Road Orange County, Florida Orange County Project No.: Y21-806-CH
NADIC Project No.: PR.GEO-RD21034
Dear Mr. Vargas:
Nadic Engineering Services, Inc. (NADIC) is pleased to submit this preliminary Geotechnical Report for Trail Soil Survey for the above referenced project. The purpose of this exploration was to evaluate the soil and groundwater conditions along the proposed Horizon West Trail Phase I from Tiny Road to Winter Garden Vineland Road alignment and to use the data obtained to develop geotechnical recommendations for the trail design and construction. This report describes our field exploration procedures, presents our laboratory test results, and includes our analysis and recommendations regarding design and construction of the Horizon West Trail.
NADIC appreciates the opportunity to be of service to WBQ and Orange County Public Works Department on this project. We look forward to a continued association. Please contact us if you have any questions, or if we may be of further assistance to you as this project proceeds.
Sincerely, NADIC ENGINEERING SERVICES, INC.
Engineering Business No. 8214
Maria Bridges, M.S. Godwin N. Nnadi, Ph.D., P.E.
Engineer Intern Principal Engineer
Florida Registration No. 50637
New Z Drive\...\PR.GEO-RD21034 – Horizon West Trail Phase 1\Project Working File\Report
WBQ
Horizon West Trail Phase I Page i of i
NADIC Project No.: PR.GEO-RD21034 November 30, 2022
NADIC
TABLE OF CONTENTS
1.0 PROJECT DESCRIPTION
2.0 REVIEW OF AVAILABLE PUBLISHED DATA
2.1 USGS Topographic Map
2.2 Orange County USDA/NRCS Soil Survey
2.3 Area Geology
3.0 FIELD EXPLORATION PROGRAM AND METHODS
3.1 Field Exploration Program
3.2 Field Exploration Methods
3.2.1 Hand Auger Borings
3.2.2 Standard Penetration Test Borings
4.0 SUBSURFACE SOIL CONDITIONS
4.1 General
4.2 Trail Boring Results
4.3 Groundwater Conditions
5.0 LABORATORY TESTING
6.0 EVALUATION AND RECOMMENDATIONS
6.1 General
6.2 Trail Construction
6.3 Pavement Consideration
6.4 Pavement Design Considerations
7.0 CONSTRUCTION CONSIDERATIONS
7.1 Site Preparation
7.2 Pavement Subgrade Preparation
7.3 Excavation
7.4 Temporary Dewatering
8.0 REPORT LIMITATIONS
APPENDIX A
Figure 1 Vicinity Map Figure 2 USGS Topographic Map Figure 3 USDA/NRCS Soils Map Figure 4 Boring and LBR Location Map
APPENDIX B
Sheet 1 Trail Soil Survey Sheet 2 Report of Trail Borings
APPENDIX C
Table 2 Summary of Laboratory Test Results Table 3 FDOT Mean Method Design LBR Calculations Table 4 FDOT 90 Percent Method Design LBR Calculations Figure 5 FDOT 90 Percent Graph Plates 1 through 7 LBR Calculations
Horizon West Trail Phase I Page 1 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
1.0 PROJECT DESCRIPTION
The Orange County Public Works Department hired WBQ to provide engineering design and construction plans for the Horizon West Trail Phase I from the existing Tiny Road to the existing Horizon West Trail at Winter Garden Vineland Road in Orange County. The project site is located in Sections 2, 3, 4 and 9 of Township 23 South, Range 27 East of Winter Graden quadrangle in Orange County, Florida. We understand that the project plans include the following elements:
Construction of approximately 1.95 miles of new multi-use trail consisting of a 10- to 14-foot-wide asphalt pavement
Construction of one (1) cantilever sign structure Construction of one boardwalk bridge, approximately 1,100 linear feet long
Specifically, the proposed Horizon West Trail Phase I is shown on Figure 1 in Appendix A.
This report presents an evaluation of the soil and groundwater conditions encountered and provides geotechnical recommendations to guide design and construction of the proposed trail alignment.
2.0 REVIEW OF AVAILABLE PUBLISHED DATA
2.1 USGS Topographic Map
The WINTER GARDEN, Florida" United States Geological Survey (USGS) topographic maps issued in 2021 were reviewed for ground surface features. The maps show the ground surface elevation in the project vicinity to range from approximately +100 to +140 feet, North American Vertical Datum of 1988 (NAVD-88). The project alignment is shown on an excerpt of the USGS Topographic Maps presented on Figure 2 in Appendix A.
2.2 Orange County USDA/NRCS Soil Survey
The “Soil Survey of Orange County, Florida” published by the United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) was reviewed. The following table describes the primary mapping unit(s) within the project vicinity. Refer to Figure 3 in Appendix A for a reproduction of the USDA/NRCS Map for the project area.
Horizon West Trail Phase I Page 2 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
Table 1: USDA/NRCS Soil Survey Summary
Soil Series Depth
(inches) Soil Description AASHTO* USCS**
USDA
SHGWT***
(ft)
Basinger (3)
0-7 7-32
32-47 47-80
Fine sand Sand, fine sand Sand, fine sand Sand, fine sand
A-3 A-3, A-2-4 A-3, A-2-4 A-3, A-2-4
SP
SP, SP-SM
SP, SP-SM
SP, SP-SM
0-1.0
Candler (4)
0-5 5-74
74-80
Fine sand Sand, fine sand Sand, fine sand
A-3 A-3
A-3, A-2-4
SP, SP-SM
SP, SP-SM
SP-SM
>6.0
Candler (5)
0-4 4-61
61-80
Fine sand Sand, fine sand Sand, fine sand
A-3 A-3
A-3, A-2-4
SP, SP-SM
SP, SP-SM
SP-SM
>6.0
Ona (26)
0-6 6-15
15-80
Fine sand Fine sand, sand Fine sand, sand
A-3 A-3, A-2-4
A-3
SP-SM, SP
SP-SM, SM
SP-SM, SP
0-1.0
Pomello (34)
0-40 40-55 55-80
Fine sand Coarse sand, sand, fine sand
Coarse sand, sand, fine sand
A-3 A-3, A-2-4
A-3
SP, SP-SM
SP-SM, SM
SP, SP-SM
2.0-3.5
Samsula 0-34
34-80 Muck
Sand, fine sand, loamy sand
Muck
Fine sand Sand, fine sand Sand, fine sand Sand, fine sand
A-8 A-3, A-2-4
A-8
A-3
A-3, A-2-4 A-3, A-2-4
PT
SP-SM, SM, SP
PT
SP
SP, SP-SM
SP, SP-SM
0-1.0
Hootoon
0-80
Basinger (41)
0-6 6-25
25-35 35-80
Sanibel Muck (42)
0-11 11-15 15-80
Muck Sand, fine sand, mucky fine sand
Sand, fine sand
A-8 A-3 A-3
PT
SP, SP-SM
SP, SP-SM
0-1.0
Smyrna- Smyrna
(44)
0-17 17-27 27-80
Fine sand Sand, fine sand, loamy fine sand
Sand, fine sand
A-3, A-2-4 A-3, A-2-4
A-3
SP, SP-SM
SM, SP-SM
SP, SP-SM
0-1.0
Tavares
Millhopper (47)
0-6 6-80
0-64
64-76 76-80
Sand, fine sand
Loamy sand, loamy fine sand Sandy loam, fine sandy loam, sandy clay loam
A-2-4 A-2-4, A-4
SP-SM, SM
SM
SM, SM-SC, SC
3.5-6.0
Zolfo (54)
0-5 5-55
55-80
Fine sand Fine sand, sand Fine sand, sand
A-3, A-2-4 A-3, A-2-4 A-3, A-2-4
SP-SM
SP-SM, SM
SP-SM, SM
2.0-3.5
*AASHTO = American Association of State Highway and Transportation Officials.
** USCS = Unified Soil Classification System.
*** SHGWT = Seasonal High Groundwater Table
Horizon West Trail Phase I Page 3 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
The soils classified as A-3 and A-2-4 are appropriate for use as embankment fill; A-4 and A-8 soils if encountered should be treated in accordance with FDOT Standard Specifications and Index Nos. 120-002 and 120-001.
Information contained in the NRCS Soil Survey is very general and may be outdated due to recent development in the site vicinity. Therefore, it may not reflect the actual soil and groundwater conditions, particularly where developments may have modified soil conditions or surface and near surface drainage.
2.3 Area Geology
The geology of the Central Florida area is characterized by sedimentary strata formed during three distinct geologic periods. The surficial stratum is composed of undifferentiated Holocene/Pleistocene/Pliocene age sands containing varying amounts of silt and clay, which extend typically to depths on the order of 40 to 60 feet below the ground surface. This upper, mostly sandy zone contains the surficial aquifer (water table). A Miocene age deposit, the Hawthorn Formation, frequently underlies the surficial sands and is typically composed of clay, clayey sands and sandy limestone sometimes containing appreciable amounts of phosphate. This stratum extends to typical depths of 80 to 120 feet beneath the existing ground surface and serves as the confining layer for the underlying Florida Aquifer.
The Eocene age Ocala and Avon Park limestone formations are contained in the Florida Aquifer, which is one of the most productive aquifers in the world. The extremely high productivity of this aquifer is directly related to its numerous cavities and interconnected channels. The deepest formation of the Eocene age is the Avon Park limestone. The Avon Park limestone consists mostly of hard brown dolostone and tan, granular limestone. Above the Avon Park limestone is the Ocala limestone.
The Ocala limestone is a loose to moderate well cemented mass of very small to large microfossils with much less dolostone than the Avon Park limestone. Typically, the Ocala limestone contains almost pure limestone with no dolostone, although the lower few feet can be partly dolomitized in some areas.
3.0 FIELD EXPLOARATION PROGRAM AND METHODS
3.1 Field Exploration Program
To evaluate the subsurface conditions along the proposed Horizon West Trail Phase I, Auger borings and Standard Penetration Test (SPT) borings were performed. The subsurface conditions along the project alignment were evaluated by performing a series of 5-foot-deep auger borings and 20-foot deep SPT borings below the existing grade.
The boring locations were determined by using a hand-held Global Positioning Satellite (GPS) unit based on alignment of the trail provided to NADIC by WBQ. The approximate boring locations are shown on Figures 4 in Appendix A. The Soil Survey is presented on Sheet 1 in
...A-3 and A-2-4 are appropriate for use as embankment fill...A-4 and A- 8...should be treated...
Horizon West Trail Phase I Page 4 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
Appendix B. The results of the boring program are presented on Sheet 2 in Appendix B. All borings were backfilled upon completion for safety.
3.2 Field Exploration Methods
3.2.1 Hand Auger Borings
Hand auger borings were performed to a general depth of five (5) feet below the existing grade by manually twisting and advancing a bucket auger into the ground in 4-to-6-inch increments. These borings were performed in general accordance with the American Society of Testing and Materials (ASTM) Test Designation D-1452. As each soil type was revealed, representative samples were placed in air-tight bags and returned to our laboratory for further visual examination and classification by a geotechnical engineer.
Groundwater levels were measured in the borings upon completion and 24 hours later; each borehole was sealed with native soils.
3.2.2 Standard Penetration Test Borings
The SPT borings performed were conducted in general conformance with the American Standard Testing Method (ASTM) test designation D-1586. The borings were advanced by the rotary wash method with bentonite based mud as the circulating fluid to stabilize the borehole. The SPT borings were generally performed continuously from the ground surface to 10.5 feet and at 5-foot depth intervals thereafter. After seating the sampler six inches, the number of successive blows required to drive the sampler 12 inches into the soil constitutes the test result commonly referred to as the “N” value. Adjacent to the SPT boring profiles are the “N” values. The “N” value has been empirically correlated with various soil properties and is considered indicative of the relative density of cohesionless soils and the consistency of cohesive soils. All recovered samples were visually classified in the field with representative portions of the samples placed in airtight bags and transported to our office for review by a Geotechnical Engineer for confirmation of the field classification and laboratory testing.
Groundwater levels were measured in the borings and upon completion, each borehole was sealed with native soils.
4.0 SUBSURFACE SOIL CONDITIONS
4.1 General
The soils encountered along the project alignment are shown on the Report of Trail Borings Sheet 1 in Appendix B. The boring profile is described using the American Association of State Highway and Traffic Officials (AASHTO) symbol (e.g. A-3, A-2-4). ASTM soil description, soil classification, and stratification are based on visual examination and interpretation of the boring log by a geotechnical engineer. The soil survey encountered five (5) generalized soil strata within the project limits to the maximum depth explored in the boring. Stratification lines represent the approximate boundaries between soil types. Actual transition between soils may be gradual.
Horizon West Trail Phase I Page 5 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
The boring profiles indicate subsurface conditions only at the specific boring locations at the time of our field exploration. Subsurface conditions, including groundwater conditions may differ from the conditions we encountered at the boring locations at other locations within the project site. In addition, subsurface conditions at the boring locations can change over time.
4.2 Trail Boring Results
The soil borings along the roadway alignment encountered five (5) generalized soil strata within the project limits to the maximum depth explored in the borings. The soil strata encountered as well as soil descriptions, AASHTO classifications and FDOT 120-001 Embankment Soil Utilization designations are summarized below:
The above subsurface conditions are only general descriptions. For details refer to the boring profiles on Sheet 2 in Appendix B.
4.3 Groundwater Conditions
Groundwater was encountered in all the 20-foot borings and the following 5-foot borings: AB-4, AB-5, AB-13 and AB-14 at elevation range between +97 feet and +137 feet, NAVD-88.
Groundwater was not encountered in the following 5-foot borings: AB-2, AB-6, AB-8, AB-9, AB- 11, AB-12 and AB-16 at the time of our field exploration (August 2022) The encountered and estimated seasonal high groundwater tables are presented on Sheet 2 in Appendix B.
Groundwater levels can vary seasonally and with changes in subsurface conditions between boring locations. Alterations in subsurface and/or subsurface drainage pattern brought about by site development can also affect groundwater levels. In general, the estimated seasonal high groundwater level is not intended to define a limit or ensure future seasonal fluctuations in groundwater levels will not exceed the estimated levels. Post-development groundwater levels could exceed the seasonal high groundwater level estimates as a result of a series of rainfall events, changed conditions at the site which alter surface water drainage characteristics, or variations in the duration, intensity, or total volume of rainfall.
Stratum Soil Description
AASHTO
Soil Classification
FDOT Index 120-001
Classification
Brown to gray to yellow fine SAND to fine SAND with silt/clay, occasionally trace limerock/asphalt fragments A-3 Select (S)
Brown to gray silty SAND, occasionally with roots/organic A-2-4 Select (S)
3 Brown to gray sandy SILT A-4 Plastic (P)
Brown to gray to gray with yellow/red specks sandy
CLAY A-6 Plastic (P)
5 Brown clayey SAND A-2-6 Plastic (P)
Horizon West Trail Phase I Page 6 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
5.0 LABORATORY TESTING
Representative soil samples were retrieved from the borings and returned to NADIC’s laboratory for further visual classification, stratification and selective soil testing. The soil samples were classified in general accordance with the American Association of State Highway and Transportation Officials (AASHTO) Soil Classification System. The borings were described using the ASTM soil description (e.g. sand with silt). Representative soil samples were selected for routine laboratory testing and these tests include grain size analysis, Atterberg limits, organic content and natural moisture content.
The results of these tests are presented on Table 2 in Appendix C and a summary is presented on Sheet 1 in Appendix B.
6.0 EVALUATION AND RECOMMENDATIONS
6.1 General
The evaluation and recommendations contained in this report are based in part on the data obtained from a limited number of soil samples and groundwater measurements obtained from widely spaced borings. The exploration methods used indicate subsurface conditions at specific boring locations only, at the time they were performed and to the depths penetrated. Borings cannot be relied upon to accurately reflect the variations that usually exist between boring locations and these variations may not become evident until construction. If variations from the conditions described in this report become evident during the course of construction, or project characteristics described in this report change, NADIC should be retained to re-evaluate the conclusions and recommendations contained in this report in light of such changes.
6.2 Trail Construction
The results of our geotechnical exploration indicate that the subsurface soils encountered along the trail alignment are generally suitable for support of the proposed trail improvement after proper subgrade preparation. Non-select soils, muck, clays or debris, if encountered within the limits, should be removed and replaced with selected soils in accordance with FDOT Index Nos. 120-002 and 120-001. Site preparation and roadway construction should be in accordance with the latest version of the FDOT Standard Specifications for Road and Bridge Construction and FDOT Standard Specification and Index Nos. 120-002 and 120-001.
The soils encountered in our borings classified as Strata No. 1 and 2 should be treated as Select
(S) materials in accordance with Index No. 120-001. Strata No. 3 through 5 soils are classified as Plastic (P), and can only be used in embankment construction within the limitation as per index 120-001. If plastic and/or organic material is encountered along the project alignment during construction, at locations that were not indicated in this report or where soil borings were not performed, these materials should be removed in accordance with Index Nos. 120-002 and 120- 001.
Horizon West Trail Phase I Page 7 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
Site preparation and construction should be in accordance with the latest FDOT Index No. 120-
001. In-place density tests should be performed on the fill soils to verify the specified degree of compaction. The minimum test frequency should be in accordance with the FDOT Materials, Sampling, Testing, and Reporting Guide.
6.3 Pavement Consideration
The results of our study indicate that the site can be made suitable for conventional flexible or rigid pavement sections. Flexible pavement can incorporate either limerock or soil cement base depending on final grades and groundwater levels.
NADIC recommends that a minimum separation of 24 inches be provided between the bottom of the pavement base course and the estimated seasonal high groundwater table. If this separation is not provided between the naturally occurring normal seasonal high groundwater table, soil-cement base course or underdrain may be utilized to protect the pavement from groundwater related damage. If the bottom of the base course is within 12 inches of the estimated seasonal high groundwater level, underdrains should be installed to protect the pavement from groundwater related damage. NADIC should be provided with the final Horizon West Trail Phase I plans to evaluate the need for soil-cement base and underdrains.
Prepare pavement areas as stated in the Construction Considerations section of this report.
6.4 Pavement Design Considerations
A total of seven (7) LBR tests were performed on representative samples along the project alignment. Locations of the LBR samples can be found in Figure 4 in Appendix A. Presented below is a table of LBR samples, locations, stratums, and LBR values.
The LBR test results were evaluated using the FDOT Mean Method and FDOT 90 Percent Method with the results of our analyses presented on Tables 3 and 4 in Appendix C, respectively. The FDOT Mean Method yielded a design LBR value of 34 and the FDOT 90 Percent Method resulted
Sample ID Approx.
Station
Approx.
Offset (ft) Baseline
Depth
(ft) Stratum
No.
Maximum LBR Value
LBR 1 1005+93 17’ RT BL_TINY1 0 - 1 1 49
LBR 2 2005+36 16’ RT BL_HORIZON1 0 - 1 1 32
LBR 3 2028+26 5’ LT BL_HORIZON1 0 - 1 2 75
LBR 4 2038+06 5’ LT BL_HORIZON1 0 - 1 3 64
LBR 5 2050+77 13’ LT BL_HORIZON1 0 - 1 5 100
LBR 6 2067+41 3’ LT BL_HORIZON1 0 - 1 1 34
LBR 7 2086+13 8’ LT BL_HORIZON1 0 - 1 2 63
Horizon West Trail Phase I Page 8 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022 in a design LBR value of 33. For pavement design of filled trail sections, we recommend an LBR of 40.
7.0 CONSTRUCTION CONSIDERATIONS
7.1 Site Preparation
Prior to construction of the proposed development, the location of any existing underground utility lines within the project area should be established. Provisions should then be made to relocate any interfering utility lines within the construction area to appropriate locations consistent with project specifications.
The ground surface within the limits of construction should be cleared or stripped of all vegetation, roots, topsoil, debris, surficial muck and other deleterious material in accordance with the appropriate sections of the FDOT current edition of the Standard Specifications for Road and Bridge Construction and Orange County Public Works Department requirements. Site preparation and roadway construction should be in accordance with Section 110 of the latest version of the FDOT Standard Specifications for Road and Bridge Construction and FDOT Standard Specifications and Index Nos. 120-002 and 120-001.
After proper subsoil preparation, the pavement subgrade, pavement base and surface courses should be constructed in accordance with current FDOT Standard Specifications for Road and Bridge Construction. Roadway construction should be performed in accordance with the appropriate sections of the FDOT current edition of the Standard Specifications for Road and Bridge Construction. After the clearing\grubbing operations, the stripped areas should be proof rolled. This should be accomplished using a large self-propelled vibratory compactor (e.g., Dynapac CA-25). Proof rolling should be carried out by making repeated overlapping coverage of the subgrade; to attain a degree of densification of at least 95 percent of the material’s ASTM D-1557 modified proctor maximum dry density. Undercut any yielding soils such as loose or soft soils and replace with clean sand fill. Our borings encountered some clayey sand. These materials can be unstable during proofrolling if they contain excess moisture. The contractor should be prepared to manipulate the moisture content of unsuitable subgrade soils as necessary to achieve stability and compaction requirements. Positive control of surface runoff to prevent water ponding should be able to help reduce instability during proofrolling or fill compaction.
Fill should be placed in 12 inch lifts as measured in loose thickness. Each lift should be uniformly compacted to at least 95 percent of the material’s ASTM D-1557 modified proctor maximum dry density, prior to placement of the next lift. The fill should be placed at moisture content within 2 percent of optimum required to attain maximum dry density. Subsequent lifts should be placed and constructed in a similar manner.
Fill material should consist of clean sand, free of organic matter and other deleterious substances with fine content not exceeding 12 percent (i.e. 12 percent by dry weight passing the U.S. Number 200 sieve).
Horizon West Trail Phase I Page 9 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022
In-place density tests should be performed on the fill soils to verify the specified degree of compaction. The minimum test frequency should be in accordance with the FDOT Materials, Sampling, Testing and Reporting Guide.
7.2 Pavement Subgrade Preparation
Prepare pavement areas in accordance with the General Site Preparation provided above. The 12-inch subgrade beneath the base should be compacted to a minimum of 95% of ASTM D-1557 modified proctor maximum dry density. Subgrade beneath a limerock base should be stabilized to a minimum Limerock Bearing Ratio (LBR) of 40. Stabilization is not required beneath a soil-cement base or rigid pavement; however, the lack of subgrade stabilization should be considered in the pavement design.
Excavation should be performed in accordance with Section 120 of the current FDOT Standard Specifications for Road and Bridge Construction.
7.3 Excavation
All excavation and below grade construction activities should be in accordance with the Occupational Safety and Health Administration (OSHA). The side slopes of all excavation greater than four feet deep should be sloped at a maximum of 1.5 horizontal to 1 vertical (1.5H: 1V) as required by OSHA. Steeper slopes can be established by a “competent person” (as defined by OSHA) and supported with a system designed by a registered Professional Engineer.
For a temporary excavation support system, we recommend the following:
Saturated unit weight 120 pcf
Angle of soil friction 30 degrees
Cohesion 0
Surcharge load 250 psf
7.4 Temporary Dewatering
Temporary dewatering may be required at the site, if excavation and construction proceed during the wet season. Depending on groundwater levels at the time of construction and final design grades, temporary dewatering may also be required to facilitate excavating and fill placement and compaction. This can be accomplished by a sanded well point system or by open sumps and pumps. The dewatering method used will depend on the level of the groundwater at the time of excavation and the water flow rate. The groundwater table, however, should be maintained at least 24 inches below all earthwork and compacted surfaces.
All excavations should be sloped as required to prevent slope failures and to allow proper backfilling. The excavations should be constructed in accordance with current OSHA regulations.
Where restrictions do not permit the excavation to be sloped appropriately, the excavation should
Horizon West Trail Phase I Page 10 of 10 NADIC Project No.: PR.GEO-RD21034 November 30, 2022 be shored in accordance with current OSHA requirements. During excavation, material should not be stockpiled at the top of the slope within a horizontal distance equal to the excavation depth.
8.0 REPORT LIMITATIONS
Our professional services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices.
We are not responsible for the conclusions, opinions or recommendations made by others based on this data.
The scope of the exploration was intended to evaluate soil conditions within the influence of trail construction. It does not include any evaluations of deep potential soil problems such as sinkholes.
The analysis and recommendations submitted in this report are based upon the data obtained from the soil borings performed at the locations indicated and does not reflect any variations which may occur among these borings. If any variations become evident during the course of this project, a re-evaluation of the recommendations contained in this report will be necessary after we have had the opportunity to observe the characteristics of the conditions encountered. The applicability of the report should be reviewed in the event significant changes occur in the design, nature or location of the proposed improvements.
The scope of services, included herein, did not include any environmental assessment for the presence or absence of hazardous or toxic materials in the soil, surface water, and groundwater, air on the site, below and around the site. Any statements in this report or on the boring logs regarding odors, colors, unusual or suspicious items and conditions are strictly for the information of the client.
APPENDIX A
Figure 1 Vicinity Map
Figure 2 USGS Topographic Map
Figure 3 USDA/NRCS Soils Map
Figure 4 Boring and LBR Location Map
APPENDIX B
Sheet 1 Trail Soil Survey
Sheet 2 Report of Trail Borings
APPENDIX C
Table 2 Summary of Laboratory Test Results
Table 3 FDOT Mean Method Design LBR Calculations
Table 4 FDOT 90 Percent Method Design LBR Calculations
Figure 5 FDOT 90 Percent Graph
Plates 1 through 7 LBR Calculations
NADIC Project No. PR.GEO-RD21034 November 30, 2022
*AASHTO: American Association of State Highway and Transportation Officials
TABLE 2
SUMMARY OF LABORATORY TEST RESULTS
Boring No.
Approx.
Station &
Offset Baseline
Sample Depth (ft.)
Stratum No.
Moisture Content
Organic Content
Sieve Analysis (Cumulative Percent Passing)
Atterberg Limits
(%) AASHTO*
Classification 3/8” #10 #20 #40 #60 #100 #200
Liquid Limit
Plasticity Index
AB-1
1005+93, 17’ RT
BL_TINY1
1 1 2 - - - - - - - 7 - - A-3 3 1 4 - 100 100 99 95 59 18 1 - - A-3
AB-3
2005+36, 16’ LT
BL_HORIZON1
1 1 1 - - - - - - - 1 - - A-3
AB-4
2010+81, 5’ LT
3 1 19 - 100 100 100 88 41 13 1 - - A-3
AB-12
2067+41, 3’ LT
1 1 1 - - - - - - - 7 - - A-3
AB-5
2023+79, 5’ LT
BL_HORIZON1
1 2 10 - 100 99 99 96 89 53 23 17 3 A-2-4
AB-6
2028+26, 5’ LT
1 2 8 - - - - - - - 16 - - A-2-4
AB-11
2058+76, 6’ LT
4.5 2 17 - 100 100 100 99 94 66 30 - - A-2-4
AB-14
2081+17, 8’ LT
1 2 39 2 100 100 100 98 95 62 24 - - A-2-4
AB-15
2086+13, 8’ LT
1 2 9 - - - - - - - 15 - - A-2-4
AB-8
2038+06, 5’ LT
BL_HORIZON1 1 3 17 - 100 100 100 100 94 70 41 24 9 A-4
AB-9
2043+00, 10’ LT
BL_HORIZON1 3 4 18 - 100 100 100 98 90 69 37 34 16 A-6
AB-10
2050+77, 13’ LT
BL_HORIZON1 1 5 9 - - - - - - - 21 - - A-2-6
NADIC Project No. PR.GEO-RD21034 November 30, 2022
Table 3 FDOT Mean Method Design LBR Calculations
Sample
ID
Approximate Station
Approximate Offset
(ft) Baseline
Depth (ft)
Stratum No.
Maximum
LBR
Value (%)
LBR Value at ±2% of Moisture at Maximum LBR
-2% +2%
LBR-5 2050+77 13' LT BL_HORIZON 1 0-1 5 100 47 40
LBR-3 2028+26 5' LT BL_HORIZON 1 0-1 2 75 51 8
LBR-4 2038+06 5' LT BL_HORIZON 1 0-1 3 64 35 42
LBR-7 2086+13 8' LT BL_HORIZON 1 0-1 2 63 41 55
LBR-1 1005+93 17' RT BL_TINY1 0-1 1 49 30 40
LBR-6 2067+41 3' LT BL_HORIZON 1 0-1 1 34 15 22
LBR-2 2005+36 16' LT BL_HORIZON 1 0-1 1 32 22 23
Mean Value 34 33
±2% LBR Average 34
Table 4
FDOT 90 Percent Method Design LBR Calculations
Sample
ID
Baseline Stratum
No.
Maximum LBR
Value No. values Equal or
Greater Than % of Values Equal to or Greater Than
LBR-2 Horizon West 1 32 7 100
LBR-6 Horizon West 1 34 6 86
LBR-1 Tiny Road 1 49 5 71
LBR-7 Horizon West 2 63 4 57
LBR-4 Horizon West 3 64 3 43
LBR-3 Horizon West 2 75 2 29
LBR-5 Horizon West 5 100 1 14
90 Percent LBR Value = 33
NADIC Project No. PR.GEO-RD21034 November 30, 2022
0 10 20 30 40 50 60 70 80 90 100 110 120 o f v al ue s e qu al to o r g re at er th an
Maximum LBR Value
Figure 5 FDOT 90% Graph
90% LBR
P l a t e | 1
Orlando, FL 32818
Project Information
Project Name: Horizon West trail Phase I
NADIC Project No: PR.GEO-RD21034
Sample Information
Sample No: LBR-1 (AB-1)
Station: 1005+93
Offset: 17’ RT
Baseline: BL_TINY1
Date Tested: 11/23/2022
Material Description: Yellowish brown fine SAND with silt, trace limerock and asphalt fragments, (A-3)
Modified Proctor Test Results
(FM 5-521)
Optimum Moisture (%) = 10.8 Max. Dry Density (pcf)= 112.6
LBR Test Results (FM 5-515)
Max. LBR at Optimum LBR Moisture= 49 LBR at -2% of Optimum LBR Moisture= 30 LBR at +2% of Optimum LBR Moisture= 40
6 7 8 9 10 11 12 13 14 15 16
D ry
D es n si ty p cf
Moisture Content (%)
MC VS. Dry Density (LBR-1)
P l a t e | 2
Phase I
NADIC Project No: PR.GEO-RD21034
Sample Information
Sample No: LBR-2 (AB-3)
Station: 2005+36
Offset: 16’ RT
Baseline: BL_HORIZON1
Date Tested: 11/2/2022
Material Description: Light brown fine SAND, trace silt, (A-3)
Optimum Moisture (%) = 9.45 Max. Dry Density (pcf)= 105.8
Moisture= 32 LBR at -2% of Optimum LBR Moisture= 22
Moisture= 23
104.00
105.00
106.00
107.00
7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0
D ry
D es n si ty p cf
MC VS. Dry Density (LBR-2)
P l a t e | 3
Phase I
NADIC Project No: PR.GEO-RD21034
Sample Information
Sample No: LBR-3 (AB-6)
Station: 2028+26
Offset: 5’ LT
Baseline: BL_HORIZON1
Date Tested: 10/14/2022
Material Description: Brown silty
SAND, (A-2-4)
Optimum Moisture (%) = 11.1 Max. Dry Density (pcf)= 119.9
Moisture= 75 LBR at -2% of Optimum LBR Moisture= 51
Moisture= 8
118.00
119.00
120.00
121.00
8.0 9.0 10.0 11.0 12.0 13.0 14.0
D ry
D es n si ty p cf
MC VS. Dry Density (LBR-3)
P l a t e | 4
Phase I
NADIC Project No: PR.GEO-RD21034
Sample Information
Sample No: LBR-4 (AB-8)
Station: 2038+06
Offset: 5’ LT
Baseline: BL_HORIZON1
Date Tested: 11/23/2022
Material Description: Grayish brown sandy SILT, (A-4)
Optimum Moisture (%) = 11.4 Max. Dry Density (pcf)= 118.9
Moisture= 64 LBR at -2% of Optimum LBR Moisture= 35
Moisture= 42
9 10 11 12 13 14
D ry
D es n si ty p cf
MC VS. Dry Density (LBR-4)
P l a t e | 5
Phase I
NADIC Project No: PR.GEO-RD21034
Sample Information
Sample No: LBR-5 (AB-10)
Station: 2050+77
Offset: 13’ LT
Baseline: BL_HORIZON1
Date Tested: 11/4/2022
Material Description: Brown clayey
SAND, (A-2-6)
Optimum Moisture (%) = 12.1 Max. Dry Density (pcf)= 120.9
Moisture= 100 LBR at -2% of Optimum LBR Moisture= 47
Moisture= 40
118.00
119.00
120.00
121.00
122.00
8.0 9.0 10.0 11.0 12.0 13.0 14.0
D ry
D es n si ty p cf
MC VS. Dry Density (LBR-5)
P l a t e | 6
Phase I
NADIC Project No: PR.GEO-RD21034
Sample Information
Sample No: LBR-6 (AB-12)
Station: 2067+41
Offset: 3’ LT
Baseline: BL_HORIZON1
Date Tested: 11/21/2022
Material Description: Yellowish brown fine SAND with silt, (A-3)
Optimum Moisture (%) = 10.4 Max. Dry Density (pcf)= 110.2
Moisture= 34 LBR at -2% of Optimum LBR Moisture= 15
Moisture= 22
7 8 9 10 11 12 13
D ry
D es n si ty p cf
MC VS. Dry Density (LBR-6)
P l a t e | 7
Phase I
NADIC Project No: PR.GEO-RD21034
Sample Information
Sample No: LBR-7 (AB-15)
Station: 2086+13
Offset: 8’ LT
Baseline: BL_HORIZON1
Date Tested: 11/4/2022
Material Description: Brownish gray silty SAND, trace limerock and roots, (A-2-4)
Optimum Moisture (%) = 12 Max. Dry Density (pcf)= 113.3
Moisture= 63 LBR at -2% of Optimum LBR Moisture= 41
Moisture= 55
111.00
112.00
113.00
114.00
8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0
D ry
D es n si ty p cf
MC VS. Dry Density (LBR-7)