DRAFT_-_HC1047-17-R-0001_-_SETI.pdf
PDF 939 KB Posted
- Attached to
- Systems Engineering Technology and Innovation (SETI) Federal contract opportunity
- Solicitation number
- HC1047-17-R-0001
- Issued by
- Defense Information Systems Agency
About this file
This sources sought notice announces a requirement for the Systems Engineering Technology and Innovation (SETI) contract. DISA seeks engineering support services across eight task areas including systems engineering, design analysis, architecture, software development, integration, testing, deployment and special requirements. The goals are to streamline acquisition, provide developmental expertise, and foster innovation.
The multiple award IDIQ contract will have a five year base and one five year option. Task orders will be competed set-aside for small business where possible. SETI will complement ENCORE III which provides sustainment services. The NAICS code is 541512 with a $27.5M size standard.
DISA requests feedback on the revised performance work statement and an "innovation" evaluation factor by July 12th. An industry day may be scheduled after the draft RFP posts in early FY17 with awards anticipated in late FY17. The notice is not a solicitation and responses are for information gathering only regarding industry interest and capabilities.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
X C
D
EX
X
G
F 112 - 121
122 - 143 X H 144 - 152 carlen.l.capenos.civ@mail.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 152
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
HC1047 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
CARLEN L. CAPENOS 301-225-4508
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 9
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
10 - 36 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
38 - 39 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 40 - 54 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 55 - 57 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
58 - 110
PART II - CONTRACT CLAUSES
DISA/CONTRACTS-NCR
6914 COOPER AVE
FORT MEADE MD 20755-7090
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
HC1047-17-R-0001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Lot
SETI - FFP
FFP
Fixed Price (FP). All Variations. This CLIN applies to all variations of contract types under fixed price.
Period of Performance is five year base period (Contract Years 1 through 5).
FOB: Destination
NET AMT
0002 Lot SETI - Cost Reimbursable
COST
Cost Reimbursurable (CR). All Variations. This CLIN applies to all variations of contract types of Cost Reimbursable.
ESTIMATED COST
0003 Lot Other Direct Costs (ODC)
COST
Other Direct Costs. Cost Reimbursable.
ODCs must be purchased in accordance with the Contractor's approved Purchasing System, as applicable; ODCs may be purchased from General Service Administration (GSA) Schedules or Enterprise Software Initiative (ESI), if available and authorized by the Contracting Officer; ODCs must be incidental to the work being performed under this contract; The Contractor will provide ODCs on a cost reimbursement basis only. All ODCs must be pre-approved by the COR prior to the Contractor incurring the cost. The Contractor shall be authorized to invoice on a monthly basis and in accordance with FAR Part 31;
0004 Lot Travel
COST
Travel in support of PWS. No profit shall be paid on purchases or on travel made under this CLIN; however, DCAA approved burden rates are authorized; Travel must be incidental to the work being performed under this contract; All travel must be pre-approved by the COR prior to the Contractor incurring the cost.
Travel shall be in accordance with FAR Subpart 31.205-46.
External Agency Ordering Fee
FFP
1% Fee. See Section G, Ordering Procedures for External Agencies.
0006 1 Each Minimum Guarantee
FFP
The minimum may be invoiced for and paid after the attendance of the Kick-Off meeting and the delivery and acceptance of the SCRM and the Cyber Security Threat Plan.
1001 Lot
OPTION SETI - FFP
FFP
Fixed Price (FP). All Variations. This CLIN applies to all variations of contract types under fixed price.
Period of Performance is five year option period (Contract Years 6 through 10).
1002 Lot OPTION SETI - Cost Reimbursable
COST
Cost Reimbursurable (CR). All Variations. This CLIN applies to all variations of contract types of Cost Reimbursable.
1003 Lot OPTION Other Direct Costs (ODC)
COST
Other Direct Costs. Cost Reimbursable.
ODCs must be purchased in accordance with the Contractor's approved Purchasing System, as applicable; ODCs may be purchased from General Service Administration (GSA) Schedules or Enterprise Software Initiative (ESI), if available and authorized by the Contracting Officer; ODCs must be incidental to the work being performed under this contract; The Contractor will provide ODCs on a cost reimbursement basis only. All ODCs must be pre-approved by the COR prior to the Contractor incurring the cost. The Contractor shall be authorized to invoice on a monthly basis and in accordance with FAR Part 31;
1004 Lot OPTION Travel
COST
Travel in support of PWS. No profit shall be paid on purchases or on travel made under this CLIN; however, DCAA approved burden rates are authorized; Travel must be incidental to the work being performed under this contract; All travel must be pre-approved by the COR prior to the Contractor incurring the cost.
Travel shall be in accordance with FAR Subpart 31.205-46.
OPTION External Agency Ordering Fee
FFP
1% Fee. See Section G, Ordering Procedures for External Agencies.
9999 Lot Surge
COST
The Government may require surge support of task orders during the base or any option period and surge modifications will be in-scope to provide increased support for the defined task areas of the PWS. Surge support is OPTIONAL and is not a guarantee. If the Government determines that an increased quantity of support is required for the task areas defined in the PWS, the Government reserves the right to exercise the Surge Option unilaterally.
The Contracting Officer will provide written notice to the Contractor at least 30 calendar days prior to any unilateral exercise of the Surge Option. In the event the Government does elect to exercise the Surge Option, surge support will be realigned under new or existing CLINs for the relevant task areas identified in the PWS, and an equal amount will be deducted from the Surge CLIN not-to-exceed amount. Surge support will be provided at the same labor rates proposed and found fair and reasonable at time of contract/task order award for the applicable period of performance.
This Surge Option will not be used to increase the ceiling of the SETI base contracts, but the Surge Option may be included in task orders issued under the SETI base contracts at the discretion of the Ordering Contracting Officer.
Period of Performance is Contract Years 1 though 10.
SECTION B
B1. MAXIMUM CONTRACT CEILING AND MINIMUM CONTRACT GUARANTEE
(a) Maximum. The maximum contract ceiling value of all contracts in this multiple award procurement is established at $7.5 Billion dollars.
(b) Minimum. The minimum guaranteed award amount for this Indefinite-Delivery, Indefinite-Quantity (ID/IQ) contract is $500 dollars per Contractor for the full term of the contract. The exercise of the option period does not re-establish the contract minimum.
(c) The Government has no obligation to issue Task Orders to the Contractor beyond the amount specified in paragraph (b). Once the conditions of paragraph (b) have been met, the Contractor continues to be afforded fair opportunity, as per FAR 16.505(b)(1), to compete for Task Orders issued through the expiration of the Base Contract or termination of the Contractor’s Base Contract, whichever occurs first.
B2. SERVICE CONTRACT LABOR STANDARDS (SCLS) GENERAL EXEMPTION
The Base Contract labor categories are considered bona fide executive, administrative, professional labor and are generally exempt from the SCLS if used to perform professional IT services. The Base Contract does not include wage determinations or all applicable clauses for labor categories subject to the SCLS. Each Task Order must be tailored to include the appropriate clauses and wage determinations, if applicable.
To the extent that any labor is subject to the SCLS and within scope of a Task Order and the Base Contract, the Ordering Contracting Officer (OCO) must identify such work under a separate CLIN on the Task Order and incorporate wage determination in accordance with FAR 22.10, Service Contract Labor Standards.
B3. TASK ORDER CONTRACT TYPES
SETI is a Multiple Award Task Order Contract (MATOC). It is an ID/IQ Contract for Department of Defense Systems, Engineering, Technology and Innovation technology service-based requirements that allows the use of most contract types in Task Orders. Task Order contract types permitted include FAR 16.2 Fixed-price Contracts;
FAR 16.3 Cost-Reimbursement Contracts; FAR 16.4 Incentive Contracts; and FAR 16.601 Time-and-materials.
Task orders may also incorporate FAR 17.1 Multi-year Contracting and FAR 17.2 Option periods procuring Commercial-items or Non-commercial items. These contract types can be used individually or in combination within a single Task Order comprising multiple Contract Line Item Numbers (CLINs).
B4. FIXED PRICE (FP) LABOR RATES
The Fixed Price Labor Rates proposed represent the offeror’s fully-burdened fixed price hourly labor rates for each skill classification for work performed at Government sites and work performed at Contractor sites. These rates provided in the pricing template will be used as ceiling labor rates for pricing of all labor proposed under future fixed priced task orders issued under this ID/IQ contract. At time of award, the contractor’s FP labor rates will be incorporated into the contract.
B5. TRAVEL PRICING (ALL ORDER TYPES)
Contractor personnel may be required to travel to support the requirements of this contract as stated in individual Task Orders (TOs). Local travel and travel outside of the local area may be required both in the Contiguous United States (CONUS) and Outside the Contiguous United States (OCONUS). For those TOs requiring travel, the Contractor shall include estimated travel requirements in the proposal as required by the OCO. Travel should not commence without written consent in accordance with instructions in the TO.
If authorized in the task order, travel will be reimbursed at actual cost in accordance with the limitations set forth in FAR Subpart 31.205-46, Travel Costs. Profit shall not be applied to travel costs. To the extent authorized by the task order, contractors may apply indirect costs to travel in accordance with the Contractor’s usual accounting practices consistent with FAR 31.2. The OCO must identify a not-to-exceed travel ceiling under a separate CLIN on the Task Order.
B6. OTHER DIRECT COSTS (ODCS) (ALL ORDER TYPES)
ODCs may consist of software, materials, and task order-related items that are incidental to the services being performed. The cost of general-purpose items required for the conduct of the contractor’s normal business operations will not be considered an allowable ODC in the performance of this contract. Profit is not allowed on ODCs for any task order; however applicable burdens are allowed in accordance with contractor’s accounting practices. If applicable, the OCO must identify a not-to-exceed ODC ceiling under a separate CLIN on the Task Order.
B7. WORK OUTSIDE THE CONTIGUOUS UNITED STATES (OCONUS)
Task orders may be issued under this ID/IQ may require performance outside the Contiguous United States (CONUS). CONUS means the 48 contiguous States and the District of Columbia.
OCONUS includes:
1. OCONUS. Outside of the contiguous United States
2. NON-FOREIGN OCONUS AREA. The states of Alaska and Hawaii, the Commonwealths of Puerto Rico and the Northern Mariana Islands, Guam, and U.S. territories and possessions. It is anticipated that there may be Task Orders under this contract for work outside the United States. The Contractor will be compensated for work performed OCONUS pursuant to the Task Order. Standard references for OCONUS pricing include:
The U.S. Department of State’s Bureau of Administration, Office of Allowances, (https://aoprals.state.gov/) publishes quarterly report indexes of living costs abroad, per-diem rate maximums, quarter’s allowances, hardship differentials, and danger pay allowances for Contractors to follow when proposing on OCONUS efforts. No allowances, other than those listed by the U. S. Department of State, shall be allowed on Task Orders.
The Department of State Standardized Regulations (DSSR) are the controlling regulations for allowances and benefits available to all U.S. Government civilians assigned to foreign areas; however, for Task Orders issued under the Base Contract, Contractor civilians assigned to foreign areas shall not exceed the allowances and benefits in the DSSR as well.
For OCONUS Task Orders where costs are not specifically addressed in the DSSR, the Government will reimburse the Contractor for all reasonable, allowable, and allocable costs in accordance with FAR 31, Contract Cost Principles and Procedures.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
as of December 23, 2016
Contract Number:
Task Order Number:
Tracking Number:
1. Contracting Officer’s Representative (COR).
a. Primary COR. (To be filled in at award)
Name:
Organization:
DODAAC:
Address:
Phone Number:
E-Mail Address:
b. Alternate COR. (To be filled in at award)
Name:
Organization:
DODAAC:
Address:
Phone Number:
E-Mail Address:
2. Contract Title. Systems Engineering, Technology, & Innovation (SETI)
3. Background. The Systems Engineering, Technology, and Innovation (SETI) contract vehicle will provide a suite of information technology (IT) engineering services, expertise, and support in the planning, research, development, integration, and implementation activities for future, proposed, current, and legacy Department of Defense (DoD) and Defense Information Systems Agency (DISA) IT capabilities, services, and systems. It will deliver complex IT engineering support services throughout the entire acquisition lifecycles of DoD and DISA solutions, systems, and system components.
DISA serves as DoD’s combat support Agency responsible for delivering, operating, and assuring a critical array of technical capabilities and enterprise systems and services to the Warfigher, among which include command and control (C2), information sharing, and global net-centric enterprise information infrastructure. DISA’s primary vision is to establish information dominance for our DoD and mission partners in order to secure and defend the nation.
DISA’s first strategic objective is to successfully evolve the Joint Information Environment (JIE). It involves developing and offering innovative systems and capabilities that collaboratively and securely facilitate information sharing and interdependent enterprise services to address joint and coalition Warfigher needs. These systems and capabilities need to be efficient, responsive, interoperable, and must seamlessly interface with services and capabilities across the Department. The result is for DISA to provide valuable, dependable, robust capabilities and services for authorized users to connect with any device, anytime, from anywhere on the globe.
The second strategic objective is for DISA to effectively deliver Joint Command and Control (JC2) and leadership support; involving copiously developing a gamut of JC2 capabilities that are essential for planning and implementing joint, interagency, and multinational operations such as the Future Mission Network (FMN). DISA delivers C2 and information sharing capabilities and leverages them as a force-multiplier to our nation’s leaders both within and outside the Department.
DISA’s third strategic objective is to operate and assure the enterprise. This involves delivering and operating efficient, responsive, innovative, and resilient cyber and network systems, capabilities, and processes that are capable of handling dynamic situations in response to shifts in DoD’s defense posture and augmenting Warfighers’ needs.
DISA’s final strategic objective involves optimizing its investments within a resource-constrained environment. This involves taking full advantage of resources to deliver cost-effective services and capabilities without compromising quality, and promoting established processes and policies that facilitate the agile adoption and integration of future technology. DISA is also synchronizing its efforts to support the dynamic nature of DoD’s defense posture to achieve information dominance within an evolving environment.
4. Objectives. The objective of the SETI contract vehicle is to provide quality engineering and technical support, services, and products globally under a multiple award, Indefinite-Delivery/Indefinite-Quantity (ID/IQ) task order contract for DoD, DISA, and DISA mission partners. SETI provides an overarching streamlined process for ordering a wide variety of critical IT engineering performance-based services while ensuring consistency and maximum opportunity for competition. It is a crucial vehicle for enabling the Agency to address the growing and dynamic engineering and technical needs of today and tomorrow’s Warfigher in a more streamlined and cost-effective approach. SETI promotes the delivery of innovative systems and capabilities using mature and emerging technologies and standards in order to achieve and improve towards a collaborative, adaptive, secure, expeditious, and interoperable enterprise information environment.
5. Scope. SETI offers an array of research and development, and critical technical disciplines core to engineering, delivering and maintaining DoD and DISA IT products and capabilities. It encompasses legacy, current, and future DoD and DISA capabilities, services, systems, and systems-of systems (SoS) throughout the acquisition and system engineering lifecycle. SETI spans the entire spectrum of DISA mission areas supported by the various Combatant Commands, Services, Agencies (CC/S/As) and DISA Directorates and Offices. SETI is available for use by all DoD mission partners. Where applicable, the term ‘system’ can refer to a single system, collection of systems, sub-systems, and systems-of-systems (SoS), together within its environment.
SETI extends the services of this contract to support customers of DISA services in the innovation, adoption, interoperability, integration, enhancement, augmentation and delivery of DoD and DISA products, services, and capabilities. The services covered under this contract shall be global in reach and all SETI contract holders shall be prepared to provide services and deliverables worldwide.
With the pace of change, fully anticipating how technical requirements and individual programs will evolve over the life of the contract vehicle is impossible. SETI intends to remain current and continue to provide the full range of engineering support and services to deliver innovative capabilities, systems, solutions; to insert and sustain emerging technologies and approaches throughout its lifespan; and to address the evolving needs of the DISA mission space.
The work under SETI will be authorized and more specifically defined in individual Task Orders (TO) and executed by the Ordering Contracting Officer (OCO).
The Government may require surge support during the base or any option period of any task order issued against SETI, and surge modifications will be within the scope of the contract and provide increased support for the defined task areas of the task order PWS. Task Area 1 – Systems Engineering
• Task Area 2 – Design Analysis Engineering
• Task Area 3 – Systems Architecture
• Task Area 4 – Software Systems Design and Development
• Task Area 5 – Systems Integration
• Task Area 6 – Systems Test and Evaluation
• Task Area 7 – Systems Deployment and Life-cycle Engineering
• Task Area 8 – Special Systems Engineering Requirements
5B. Overall Contract and Task Order Management. The Contractor shall identify a Program Manager and provide contract level program management to ensure successful completion of the overall contract effort. The Contractor shall oversee all contract level activities and provide the leadership and controls necessary to meet deliverable targets, maintain staffing at levels required to satisfy customer requirements, interface directly with Government leads for all supported areas, and exercise control over all assigned task personnel. The Contractor’s program management staff and all program management functions shall be provided at no additional cost to the contract and task orders.
5B.1 Contract Status Report. The Contractor shall submit a quarterly Contract Status Report unless otherwise specified by the Procuring Contracting Officer or Contracting Officer Representative. This report shall convey the status of all TOs awarded as of contract inception as well as cumulative contract performance. All relevant billing information shall be included in this report.
5B.2 Required Skills, Disciplines, and Technical Background. Contractor staff shall onboard with the requisite education, training, skills, and experience necessary to provide support at the TO level. The Contactor shall take active measures to always remain current in staff relevancy in order to provide the full range of technical and engineering expertise, support, and knowledge throughout the SETI contract duration.
5B.3 Personnel Manpower Report. The Contractor shall provide a Personnel Report, on an annual basis listing all personnel under each TO. As personnel changes occur, a revised report is required only for the individual TO affected for Security Background Investigations.
5B.4 Task Order Management. The Contractor shall provide TO level management support to ensure successful completion of each TO. The Contractor shall oversee all task level activities and provide the leadership and controls necessary to meet deliverable targets, maintain staffing at levels required to satisfy customer requirements, interface directly with Government leads for all supported areas, and exercise control over all assigned task personnel.
5B.5 Concept of Operations. The Contractor shall provide a CONOPS document for Government review and approval. The CONOPS lay out the plan for the services to achieve the solution; which addresses all TO functional and administrative activities, roles, and responsibilities. This plan includes deliverables that will result from this work.
5B.6 Task Order Status and Progress Report. The Contractor shall establish, implement, and maintain a TO management system that provides timely, reliable, and verifiable information to the Government. The Contractor’s TO management system shall track the status of each TO from planning to completion, estimate time to complete activities, provide associated milestones, reflect associated risk, record projected and actual resources (cost and personnel), and summarize technical activities expended on each TO. This information shall be presented in Monthly Status Reports developed by the Contractor and accepted by the DISA PCO. This information should be presented to the OCO and the COR individually for each task order.
5B.7 Subcontracts Management Plan (SMP). The Contractor shall be responsible for the management and execution of their subcontractors to include monitoring and assessing subcontractor performance. The Contractor shall implement a Subcontracts Management Plan to include a balanced scorecard approach that provides detailed guidance for subcontract management, including organization, roles, responsibilities, authorities, reporting and evaluation, methods and processes for teammate performance management, and incentive criteria and measurement.
5B.8 Technical Kickoff Meeting. The Contractor shall hold a kickoff meeting at the TO level within 15 days after TO award or unless otherwise specified in the order. At a minimum, the Contractor shall present, for review and approval by the Government, the details of the intended approach, work plan, and project schedule for each effort.
Dates, locations (can be virtual), and agenda shall be specified at least five (5) calendar days prior to the meeting.
The OCO, COR, and Government Program Manager, shall be invited at a minimum.
5B.9 Quarterly Program Reviews. Quarterly Program Review Meetings shall be conducted with the Government Program Management Representative, designated COR, or OCO for each Task Order, or unless otherwise specified in the TO. The review shall address overall program status and provide details regarding technical, programmatic, scheduling, service implementation, completion, operation, administration and management issues dates, locations, agenda, and attendance requirements shall be specified by the appropriate Government representative, at least five
(5) calendar days prior to the meeting.
5B.10 Post Award Task Order Meetings / Conferences. Technical meetings, post award orientation conferences, may be necessary to resolve problems and to facilitate understanding of the requirements of the contract and/or of each awarded TO. Records of these meetings/conferences shall be made by the Contractor and submitted to the Government within five business days after conclusion of the meetings/conferences. All costs associated with the attendance at these meetings/conferences shall be at no direct charge to the contract, unless otherwise directed by the Government.
5B.11 Periodic Government Inspections and Quality Control. As applicable to each SETI TO, the Government has the authority to perform inspections and reviews to assure compliance and adherence to DoD and Federal policy, standards, guidelines, and established Industry best practices throughout the TO performance period. The Contractor shall be responsible for taking corrective action based upon the impact and severity of identified risks and weaknesses.
5B.12 Configuration Management of Engineering Artifacts and Documentation. The Contractor shall collect, categorize and maintain all artifacts or work product created by the contractor or their sub-contractors in a manner consistent with DoD and DISA standards for knowledge management.
6. Performance Requirements.
6.1 Task 1 – Systems Engineering.
The objective of the Systems Engineering (SE) task area is to establish the technical framework for delivering materiel capabilities to the Warfigher. SE ensures the effective development and delivery of capability through the implementation of a balanced approach with respect to cost, schedule, performance, and risk using an integrated, disciplined, and consistent process. The scope will include system of systems to the fullest extent possible and wherever applicable.
6.1.1 Subtask 1 – Technical Planning. In support of this area, the Contractor shall perform activities including, but not limited to:
• Develop, maintain and execute the program’s Systems Engineering Plan (SEP)
• Provide key technical inputs and ensure SEP alignment to other program plans
• Define the scope and objectives of the technical effort
• Identify constraints and risks.
• Establish roles and responsibilities. Define roles and what each role is responsible for.
• Divide the program scope and objective into discrete elements
• Identify technical reviews and audits as well as their timing.
• Establish and maintain schedules and costs
• Prepare and update planning documentation
• Scale SE processes based on the scope and complexity of the program/system
• Identify areas for potential tailoring of artifacts and reviews
6.1.2 Subtask 2 – Decision Analysis. In support of this area, the Contractor shall perform activities including, but not limited to:
• Review requirements and assumptions to establish the overall decision context.
• Frame/structure the decision in terms of supporting program/project objectives
• Identify methods and tools to be used in the analyses
• Develop decision criteria (objectives and measures), criteria weight, and associated rationale.
• Identify and track assumptions.
• Develop prototypes and proofs of concept to demonstrate the feasibility of various alternative
• Identify and define alternatives to be evaluated
• Analyze and assess alternatives against the service or program criteria
• Synthesize results determining the suitability of solutions/courses of action
• Analyze sensitivities, outside influences to the program or service
• Develop decision briefing with action/implementation plan(s)
• Make appropriate recommendation(s) to decision maker as expected/requested
6.1.3 Subtask 3 – Technical Assessment. In support of this area, the Contractor shall perform activities including, but not limited to:
• Establish event-driven technical plans
• Identify appropriate measures and metrics, including how, when and where the data will be gathered.
• Identify performance measures to assess program health, technical progress and end to end performance
• Conduct analyses to determine risk and to develop risk mitigation strategies
• Conduct assessments of technical maturity, process health and stability, and risk
• Propose changes in the technical approach to address risk mitigation activities
• Advise the Government Program Manager regarding the technical readiness of the program
• Provide independent subject matter experts (SMEs) for reviews and audits
6.1.4 Subtask 4 – Requirements Management. In support of this area, the Contractor shall perform activities including, but not limited to:
• Establish and maintain a Requirements Traceability Matrix (RTM)
• Prepare Business Case Analyses (BCAs) that support IT investment decisions
• Prepare and/or support the development of Initial Capabilities Documents (ICDs) and non-material solutions in Doctrine, Organization, Training, Materiel, Leadership and Education, Personnel, Facilities, and Policy (DOTMLPF-P) Change Recommendations (DCR)
• Prepare and/or support the development of an Analysis of Alternatives (AOAs)
• Support Initial Technical Reviews (ITRs) and Alternative System Reviews (ASRs)
• Prepare and/or support the development of Capabilities Development Documents (CDDs) and Capability Production Documents (CPDs)
6.1.5 Subtask 5 – Risk Management Process. In support of this area, the Contractor shall perform activities including, but not limited to:
• Risk Identification
• Risk Analysis
• Risk Mitigation Planning
• Implement Risk Mitigation Plan
• Risk Tracking
6.1.6 Subtask 6 – Configuration Management (CM). In support of this area, the Contractor shall perform activities including, but not limited to:
• Configuration Management Planning and Management
• Configuration Identification.
• Configuration Change Management
• Configuration Status Accounting
• Configuration Verification and Audit
6.1.7 Subtask 7 – Technical Data Management. In support of this area, the Contractor shall perform activities including, but not limited to:
• Identify data requirements
• Acquire data
• Receive, verify, and accept data
• Use and exchange data
6.1.8 Subtask 8 – Interface Management. The Contractor shall assess impact of the originally defined capabilities and interfaces, performance parameter thresholds and objectives, and the overall system when defining and modifying interfaces. The Contractor shall develop the program’s interface management plan that:
• Documents the system's internal and external interfaces and their requirement specifications
• Identifies preferred and discretionary interface standards and their profiles
• Provides justification for selection and procedure for upgrading interface standards
• Describes the certifications and tests applicable to each interface or standard
• Interfaces are consistent with the program’s configuration management plan
The Contractor shall be responsible for interface management including, but not limited to, the following key tasks throughout the life cycle:
• Define and establish interface specifications
• Asses compliance of interfaces among configuration items composing systems or System of Systems (SoS)
• Monitor the viability and integrity of interfaces within a system
• Establish an interface management plan
6.1.9 Subtask 9 – Requirements Analysis. In support of this area, the Contractor shall perform activities including, but not limited to:
• Define a capability that links the needs of the users to the system to be designed and developed
• Define a system that meets users’ mission requirements within specified cost and schedule constraints
• Provide insight into the interactions among various functions to achieve a set of balanced requirements based on user objectives
• Analyze user requirements and translate user needs into basic functions
• Develop a quantifiable set of performance requirements
• Define each function that the system is required to perform
• Define implementation constraints (stakeholder requirements or solution limitations)
• Translate performance requirements into specific system technical design requirements and functions
6.1.10 Subtask 10 – Implementation Support. In support of this area, the Contractor shall perform activities including, but not limited to:
• Identify and analyze constraints imposed on the design solution
• Develop, design and implement prototypes and solutions
• Analyze candidate system element design and implementation solutions
• Identify fabrication and quality procedures
• Obtain or acquire access to materials and tools required to build system elements
• Obtain external system elements as applicable
• Build system elements
• Determine system elements’ functionality against specified product quality characteristics
• Document fabrication and production issues and associated corrective actions
• Deliver implemented system elements for integration and subsequent verification
6.1.11 Subtask 11 – Verification Process. The Contractor shall manage and execute verification activities and methods as defined in the functional and allocated baselines, and review the results of verification.
In support of this area, the Contractor shall perform activities including, but not limited to:
• Demonstration
• Examination
• Analysis
• Test
6.1.12 Subtask 12 – Validation Process. In support of this area, the Contractor shall perform activities including, but not limited to:
• Support the validation process throughout the lifecycle
• Develop and perform early program-validation activities
• Validate the initial product baseline
• Conduct validation operational testing on a production-representative system in an operationally realistic environment
6.1.13 Subtask 13 – Transition Process. The Contractor shall oversee all transition plans and activities required to install or deploy the end-item system and enable system elements to perform in their operational environment. The Contractor shall conduct and lead all engineering efforts to correct deficiencies found during transition. Transition activities vary based on life-cycle phase, program scale, and system complexity. The end-item system may need to be integrated with other systems in the operational environment based on the defined external interfaces. In this case, the Transition process is performed in conjunction with the Integration and Interface Management processes for a smooth transition.
6.2 Task 2 – Design Analysis Engineering.
The objective of the Design Analysis Engineering task area is to analyze and refine requirements using various methodologies throughout the life-cycle of the system. Focus areas within the Design Analysis Engineering task area include engineering assessment, pilots and initiatives, modeling and simulation, and systems analysis and investigation.
6.2.1 Subtask 1 – Engineering Assessment. The Contractor shall assess the systems engineering activity or problem in the context and operational environment in which the solution will be embedded. This comprehensive viewpoint enables the ability to develop and apply solutions that consider all aspects of a problem, their relationships, and interactions with other project or services. The assessment includes current and future needs of the user, customer, and sponsor as well as doctrine, organization, training, materiel, leadership and education, personnel and facilities (DOTMLPF) and technical issues. This task area requires a very high-level of skill and breadth and depth of senior expertise to assess the technical domain and solution space, designs, and architecture.
In support of this area, the Contractor shall perform activities including, but not limited to:
• Identify the nature and sources of uncertainty, lack of effective control, and complexity in their environment and then select and apply appropriate strategies for managing or mitigating their impacts
• Analyze and understand a customer’s enterprise or cross-agency environment in the context of customer and stakeholder needs and challenges, formulate and adjust plans and steps needed in effectively providing unique and effective perspectives, enhance enterprise integration, identify challenges, recognize mission/operational gaps, mitigate risks, and ensure delivery
• Recommend the use of mature and advanced technologies and methodologies to assess the soundness of technical requirements and/or solutions; review compatibility among new and legacy systems; and determine extensibility and scalability for future changes in scope and requirements
• Provide recommendations in the areas of technical planning and evolution management or modernization of Government enterprises
• Provide knowledge on emerging technologies, along with concept and approaches from academia and industry, to ensure that all aspects of the problem are considered
• Provide recommendations regarding the transformation and adoption of services and products
6.2.2 Subtask 2 – Pilots and Initiatives. The Contractor shall research and develop systems, system elements, methods, and constructs to support investigations of systems engineering activities on a limited scale in a similar environment. Pilots/initiatives need evaluation criteria to incorporate future design considerations and determine success and that are made at the end of the pilot/initiative.
The Contractor shall support and/or participate in designing, developing, planning, implementing, running, analyzing, assessing, and terminating pilots/initiatives with their Government partners and other staff as assigned on a wide range of systems during the performance of this contract.
In support of this area, the Contractor shall perform activities including, but not limited to:
• Plan and prepare pilots/initiatives
• Conduct pilots/initiatives
• Test and evaluate pilots/initiatives
• Analyze results and provide recommendations
• Research, use and leverage best technology already available within Government, commercial and academic sources
6.2.3 Subtask 3 – Modeling and Simulation. The Contractor shall conduct Modeling and Simulation (M&S) activities to support decision-making processes used in delivering materiel capabilities to the Warfigher.
In support of this area, the Contractor shall perform activities including, but not limited to:
• Develop, maintain and execute M&S strategies
• Define the scope and objectives of the technical effort
• Identify constraints and risks
• Establish schedules and costs
• Scale systems engineering processes to the scope and complexity of the system
• Identify methods and tools to be used in the analyses, to include recurring technology assessment
• Develop, deliver, validate and verify, maintain and execute various classes of models
• Develop, deploy, host, maintain, deliver and train users for complex models used as decision support tools
• Develop decision criteria (objectives and measures), criteria weight, and associated rationale
• Identify and develop metrics to quantify measures of effectiveness for given M&S studies
• Develop and present information and decision briefings with action/implementation plans based on the results of M&S studies
6.2.4 Subtask 4 – System Analysis and Investigation. The Contractor shall analyze and investigate existing systems potentially available to meet requirements.
In support of this area, the Contractor shall perform activities including, but not limited to:
• Analyze proposed and existing systems and services to identify problems and concerns
• Predict the impacts of proposed changes
• Identify and document dependencies, functionality, interoperability and performance of systems
• Investigate problems or potential problems, and recommend possible solutions
• Employ specialized tools to analyze system performance data for specific system domains
• Develop, provide, support and maintain testing artifacts
• Develop custom tools, analytics, or configurations for performance monitoring and analysis tools
• Coordinate root cause assessments and develop proposals to solve problems
• Develop plans and proposals for selecting, acquiring or building, and deploying system instrumentation tools
• Perform system instrumentation activities
• Review, document and assess the effectiveness of the security model of a system under investigation
• Assess system compliance with relevant system security policies, procedures, guidance, and best practices
• Propose system mitigations, fixes, and enhancements to address security concerns Unless explicitly stated in the task order award, the Government will retain unlimited usage rights to analysis tools, algorithms, and all other intellectual property developed as part of work on this and all other PWS task areas.
6.3 Task 3 – Systems Architecture.
The objective for the Systems Architecture task area is to develop integrated enterprise architecture from the enterprise level down through the solution level and across solution level architectures. The scope of the task includes, but is not limited to, the development of the architecture, ensuring conformance to standards, and performing audits/assessments of the architectures and associated systems. The Contractor shall use the Department of Defense Architecture Framework (DoDAF), and/or other framework(s), as specified by the Government.
6.3.1 Subtask 1 – Develop Architectures. In support of this area, the Contractor shall perform activities including, but not limited to:
• Develop reference, enterprise and solution level architectures
• Adhere to Government-specified style guides and approved taxonomies
• Develop and document the design of critical links in the DODAF architecture model formats, to include the linkage between models and related architectures. The Contractor shall reuse existing architecture data/views to minimize development cost and schedule, and maintain configuration control of architectural artifacts and the underlying models.
6.3.2 Subtask 2 – Research Documentation. The Contractor shall iteratively review and research published guidance and other sources of information on architectures.
6.3.3 Subtask 3 – Conduct Interviews. The Contractor shall iteratively conduct interviews with subject matter experts, sponsors, and participating organizations prior to and during architecture development.
6.3.4 Subtask 4 – Identify Primitives. The Contractor shall review primitives (e.g., performers, systems, system functions, activities, information exchanges) identified while researching documentation and conducting interviews to determine whether or not these primitives exist within the Government designated enterprise architecture tool environment. If the primitives do not exist, the Contractor shall propose the primitives to the Government for approval.
6.3.5 Subtask 5 – Scope and Assemble Primitives into Architecture Views. In support of this area, the Contractor shall perform activities including, but not limited to:
• Collect, organize, correlate, and store the architecture data required for architecture development and document the architectural results
• Support primitive registration, architecture model construction, architecture markup/coordination, and MBSE automation
• Mature the architecture views throughout the review and approval process
6.3.6 Subtask 6 – Resolve Discrepancies. The Contractor shall resolve/adjudicate all architecture discrepancies during architecture model development and review processes. The Contractor shall document the actions taken to resolve and adjudicate the discrepancies and provide a report to the Government.
6.3.7 Subtask 7 – Develop Reference Models. The Contractor shall review existing reference models and suggest modifications to the Government. Upon approval of suggested changes by the Government, the Contractor shall implement changes.
6.3.8 Subtask 8 – Maintain Architectures. In support of this area, the Contractor shall perform activities including, but not limited to:
• Maintain and update architecture baselines for enterprise-level and solution architectures
• Establish and/or maintain configuration control of all architecture artifacts
• Create an Architecture Standardization SOP for creating/maintaining enterprise and solution architectures
• Load all architecture baselines, artifacts, data, and documentation into the architecture repository
• Update enterprise architecture entries in the applicable architecture repositories
6.3.9 Subtask 9 – Review Architectures. The Contractor shall conduct architecture reviews for externally developed architectures as required by the Government. The Contractor shall record all concerns identified during the architecture review.
6.3.10 Subtask 10 – Analyze Architectures. In support of this area, the Contractor shall perform activities including, but not limited to:
• Perform analysis of architecture projects by using graphical, statistical, document, and model-based techniques
• Support a team approach that uses the enterprise architecture to evaluate functional, performance, technical, and operational requirements for gaps and redundancies
• Develop and support development of use cases
6.3.11 Subtask 11 – Architecture Governance. The Contractor shall have an understanding of the DoD and the organization (structure, missions, strategies, governance) and the Common Approach to Federal Enterprise Architecture (FEA). The Contractor shall participate in the Government's enterprise configuration control and governance processes to develop and maintain the Enterprise Architecture.
6.3.12 Subtask 12 – Enterprise Engineering Support. In support of this area, the Contractor shall perform activities including, but not limited to:
• Provide specialized technical analysis, and engineering and implementation support for enterprise and sub-enterprise engineering efforts
• Provide technical expertise in transitioning key technologies and initiatives from solution architectures to implementation and develop implementation/transition plans
• Utilize DoD strategies and guidance to translate capability objectives and design solutions into an enterprise design
• Use established architectures and systems engineering processes
• Provide engineering and technical expertise and support for the needs of business processes
• Deliver detailed design specifications, technical papers, reports, analyses, recommendations, and other documentation required to describe and implement enterprise services
6.3.13 Subtask 13 – Business Process Support. In support of this area, the Contractor shall perform activities
• Review architectures from a process or operations perspective
• Assess IT operations challenges, recommend new business rules, and enable resource allocation decisions
• Apply knowledge of applicable standards and best practices
• Provide operational architecture artifacts to support requirements proposals
6.3.14 Subtask 14 – Capabilities and Services Mapping. The Contractor shall document enterprise systems and services from a capabilities engineering perspective. The Contractor shall document and model the capabilities and services delivered by C2, networking, security, cloud computing, data center/virtualization, network operations, mobility, unified communications, and other domain systems utilizing MBSE and other architectural modeling and documentation techniques approved by the Government.
6.3.15 Subtask 15 – Training. The Contractor shall provide training in general on MBSE processes to include requirements engineering, modeling and simulation using tools such as; SysML/UPDM, designing and architecture development, and ITSM Service Design, in order to develop/build models representing organizational and DoD IT capabilities.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .