Encl4_qasp.docx

DOCX document 34 KB Posted

Attached to
Heat Exchanger Federal contract opportunity
Solicitation number
HC102821R0048
Issued by
Defense Information Systems Agency

View the file

Other files for this federal contract opportunity

Other files attached to Heat Exchanger, newest first.
File Type Posted
Appendix G DISA Systems Equipment and Components SEC Inventory Spreadsheet.xlsx XLSX spreadsheet
Attachment 1 QA AMD0001.pdf PDF
HC102821R0048 Conform copy through AMD0001.docx DOCX document
HC102821R0048 AMD0001.docx DOCX document
Site Photos July 8 2021.pdf PDF
HC102821R0048 AMD0001.docx DOCX document
Attachment 1 QA AMD0001.pdf PDF
SCA WD 2015-4226.pdf PDF
Appendix C.pdf PDF
Appendix D.pdf PDF
Appendix E.pdf PDF
Appendix F.pdf PDF
Appendix A.pdf PDF
Heat Exchanger Solicitation HC102821R0048.pdf PDF
Appendix B.pdf PDF
CLIN Amount Spreadsheet.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title: Rear Door Cooling Project

2. Purpose:

This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

3. Roles and Responsibilities:

The following personnel shall oversee and coordinate surveillance activities.

Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.

Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.

Other Key Government Personnel- Joe Mercik (717) 918-6181 will be the primary and alternate site POC who will provide information that helps the COR monitor contractor performance.

4. Primary Method of Surveillance: There will be 100% Inspection.

· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.

Surveillance Matrix

The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.

5. Performance Standards:

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance
6.1 - Detailed project schedule, investigate existing conditions, conduct weekly project status meetings, and prepare and submit installation drawings/product data
100% schedule with complete phasing plan showing no planned data center operational interruptions.
100% review of schedule, meeting minutes and submittals
6.2 – Rear Door Heat Exchangers
Installed materials meet technical requirements 100% of the time. Deficient work is corrected in a timely manner prior to contract completion.
100% Inspection
6.4.9 - Clean underfloor area
Underfloor area free of debris and dust through use of HEPA vacuum.
100% Inspection
6.3.6 - Operations & Maintenance (O&M) Binder
Material submissions, Installation drawings, Operation & Maintenance Manuals, require only minor modifications to comply with technical requirements. Revisions that occur are minor and resolved to meet contract requirement.
100% completion inspection prior to acceptance for technical compliance review by the Government facility management personnel.

6. Documenting Performance:

Acceptable Performance.

The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.

Unacceptable performance.

Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the KO.

When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).

The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.

Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.

7. Mandatory or regulatory compliance items:

The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.

8. Acceptable Quality Level (AQL):

· 100% equipment provided and functioning as required.

· No major deficiencies noted.

· On time

9. Evaluation Method:

There will be a 100% review of the submittals by Technical POC, as defined by PWS. Once the package has been approved of and all comments have been addressed, the contractor can proceed onto the installation phase.

At the close-out of the project a walkthrough will be conducted to verify that the installation was properly done and that there are no deficiencies. Any existing deficiencies shall be added to a punch list and will be addressed in a timely manner.

10. Performance Rating

In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).

Performance Rating Criteria

Exceptional
Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Appendix 1 - Surveillance Matrix

Performance Standards Acceptable Quality Levels Methods of Calculation

Surveillance
Results/Ratings

Information Technology (IT) Service Integration and Delivery Performance Management

High level of (xyz) satisfaction with Contractor delivery management of IT Services (includes the Service Desk services and the SITEC).

Target Criteria:

90% of all survey respondents are Satisfied, More Than Satisfied, or very Satisfied

Minimum Acceptable:

> 85% of all survey respondents are Satisfied, More Than Satisfied, or Very Satisfied with Contractor delivery management of all SITEC IT Services Calculation:

The number of users who were Satisfied, More Than Satisfied, or Very Satisfied divided by the total number of completed surveys returned.

At least XX(insert number) Government personnel must complete and return surveys for the results to have at least a 90% confidence factor with a 5% error rate.

Measurement Interval – The Measurement Interval is three (3) months for the first year and then every six (6) months thereafter.

Measurement Period – The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00on the last day of the month.

Source of Measurement Data – Data will be collected from management surveys containing satisfaction criteria specified by (xyz) that are either developed internally by (xyz) personnel or by a (xyz) selected impartial 3rd party.

Method of Surveillance – Customer feedback. The Government will issue customer satisfaction surveys to designated Government SITEC management representatives from (xyz) (Contractors cannot participate), , and survey responses will be tabulated to determine overall satisfaction with Contractor delivery management of IT Services using a five (5) category scale. The scale is: Dissatisfied, Less than Satisfied, Satisfied, More than Satisfied, Very Satisfied.

Timing of Measurement – Measurements are taken within five (5) days of the end of the Measurement Period.

Reporting Frequency: - Reporting to commence upon Contract Award and continue throughout the Period of Performance.

Monthly reporting of Service Level Agreement (SLA) and / or QASP attainment to periods survey. Quarterly survey reporting from (xyz) during the first year, semi-annual thereafter.

(Exceptional Very Good Satisfactory Marginal Unsatisfactory)

(A rollup of assessment of the Surveillance Inspection Results to develop an overall rating for this objective)

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE

5. COR PHONE
6. SUSPENSE DATE

I. PERFORMANCE

7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)

|_| NEW

|_| REPEAT

|_| NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

6. CONTRACTOR REPRESENTATIVE REMARKS

Appendix 2 – Performance Assessment Report

Appendix 3 – Customer Complaint Record

CUSTOMER COMPLAINT RECORD

DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

Appendix 4 – Corrective Action Report

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY |_| MAJOR |_| MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

|_| ACCEPTED |_| REJECTED

12. CLOSE DATE

Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2

Encl 4, QASP 23Jun2017/v3

File details come from the government source that posted it. Updated .