Appendix A.pdf

PDF 2 MB Posted

Attached to
Heat Exchanger Federal contract opportunity
Solicitation number
HC102821R0048
Issued by
Defense Information Systems Agency

View the file

Other files for this federal contract opportunity

Other files attached to Heat Exchanger, newest first.
File Type Posted
Encl4_qasp.docx DOCX document
Appendix G DISA Systems Equipment and Components SEC Inventory Spreadsheet.xlsx XLSX spreadsheet
HC102821R0048 AMD0001.docx DOCX document
Attachment 1 QA AMD0001.pdf PDF
HC102821R0048 Conform copy through AMD0001.docx DOCX document
Site Photos July 8 2021.pdf PDF
Attachment 1 QA AMD0001.pdf PDF
HC102821R0048 AMD0001.docx DOCX document
Appendix F.pdf PDF
Heat Exchanger Solicitation HC102821R0048.pdf PDF
Appendix B.pdf PDF
SCA WD 2015-4226.pdf PDF
Appendix C.pdf PDF
Appendix D.pdf PDF
Appendix E.pdf PDF
CLIN Amount Spreadsheet.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A

COVER SHEET

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R

EA

R D

O O

R C

O O

LI

N

G P

R O

JE

C

T

M

AC

AA N

/A

AS

S

H O

W N

M

SS 4/

8/

M

EC

-G -1

C O

VE

R

S H

EE

T

N /A

N /A

N /A

/1

0/

G-001

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

C O

VE

R

S H

EE

T

C O

N C

EP

T

D

ES

IG

N

D R

AW

IN

G S

DEFENSE INFORMATION SYSTEMS AGENCY

DATA CENTER - MECHANICSBURG

REAR DOOR COOLING PROJECT

BUILDING 308

SHEET LIST TABLE

Sheet Number Sheet Title

GENERAL

G-001 COVER SHEET

ARCHITECTURAL

A-101 RAISED FLOOR AREA OF WORK

MECHANICAL

M-101 COOLANT PUMPING UNIT AND PIPING

M-500 SCHEDULE AND DETAILS

ELECTRICAL

E-101 ELECTRICAL POWER PLAN

E-500 PANEL SCHEDULES

COLD

COLD

COLD

COLD

COLD COLD

PDU-B-13

"PDU 2-13B"

CRAH_2-C-38

30 TONS

"CRAC L-38"

CRAH_2-C-50

30 TONS

"CRAC L-50"

CRAH_2-C-39

30 TONS

"CRAC L-39"

CRAH_2-C-28

30 TONS

"CRAC L-28"

CRAH_2-C-29

30 TONS

"CRAC L-29"

CRAH_2-C-30

30 TONS

"CRAC L-30"

CRAH_2-C-35

30 TONS

"CRAC L-35"

CRAH_2-C-33

30 TONS

"CRAC L-33"

CRAH_2-C-32

30 TONS

"CRAC L-32"

PDU-A-13

"PDU 2-13A"

PD

U-

A-

"P

DU

2-

A"

PDU-A-33

"PDU 2-33A"

PDU-B-33

"PDU 2-33B"

PDU-A-05

"PDU 2-05A"

PDU-B-05

"PDU 2-05B"

PDU-B-10

"PDU 2-10B" PDU-A-09

"PDU 2-09A"

PDU-A-11

"PDU 2-11A"

PDU-B-11

"PDU 2-11B"

PDU-B-08

"PDU 2-08B"

PDU-A-08

"PDU 2-08A"

PD

U

-B -0

"P

DU

-0

1B

UDP-B-3

UDP-A-4

EPO-4

HOT

HOT

HOT

HOT

HOT

HOT

HOT

HOT

HOT

HOT

HOT

HOT

HOT

HOT

SIPR COMPUTING SPACE

NIPR COMPUTING

SPACE

214 ELECTRICAL

ROOM

200B

30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

AA N

/A

AS

S

H O

W N

M

SS

4/ 7/

M

EC

_A -1

N /A

N /A

N /A

/1

0/

A-101

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

R

AI

SE

D

F

LO

O R

A R

EA

O

F W

O R

K C

O N

C

EP

T D

ES

IG

N D

R

AW

IN

G

S R

EA

R

D O

O R

C O

O

LI

N G

P R

O

JE

C T

RAISED FLOOR AREA OF WORK

SCALE : 3/16" = 1'-0" 0 4' 8' 12'

KEY NOTES:

1. REMOVE AND RE-INSTALL RAISED FLOOR TILES AS NEEDED TO INSTALL ALL

ITEMS NECESSARY TO EXECUTE THE PROJECT. SEE MECHANICAL DRAWING

M-101.

AREA

OF WORK

FUTURE LOCATION

OF CRAH 2-C-32

COOLANT PUMPING

UNIT LOCATION

FUTURE RELOCATION

OF CRAH 2-C-32

TEST SERVER RACKS,HEATERS

AND RDHX COMPONENTS

N B

KEY PLAN 2nd FLOOR

SCALE: NONE

CRAH_2-C-50

CHWS

CHWR

C

H W

S

C H

W R

C H

W S

C H

W R

CHWR

CHWS

C H

W R

C H

W S

2" ø

6"℄

6"℄

12"℄

12"℄

12"℄

12"℄

6"℄

12"℄

12"℄

6"℄

12"℄

12"℄

6"℄

6"℄

PDU-B-13

"PDU 2-13B"

CRAH_2-C-39

30 TONS

"CRAC L-39"

CRAH_2-C-32

30 TONS

"CRAC L-32"

PDU-A-13

"PDU 2-13A"

PDU-A-09

"PDU 2-09A"

PDU-A-11

"PDU 2-11A"

PDU-B-11

"PDU 2-11B"

PDU-B-08

"PDU 2-08B"

PDU-A-08

"PDU 2-08A"

C R

AH

_1

-D -6

H

U M

_2 -C

-1

UDP-B-3

UDP-A-4

EPO-4

DROP INTO

FLOOR DRAIN

2"

2"

4" CHWS&R FROM FIRST FLOOR

2"

3"

2"

4"

2"

2"

2"

DROPS INTO FLOOR DRAIN

2"

4"

3"

3" 2"

2"

DROPS INTO FLOOR DRAIN

2"

2"

DROPS INTO

FLOOR DRAIN

2"

4"

2.

5"

C H

W S

2.5" CHWR

2.5" CHWS

1" CHWR

1" CHWS

1" CHWS

1" CHWR

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

AA N

/A

AS

S

H O

W N

M

SS

/0

8/

M

EC

_M -1

.D

W

GN

/A

N /A

N /A

/1

0/

M-101

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

C O

O

LA

N T

PU

M

PI

N

G U

N

IT

A N

D P

IP

IN

G C

O N

C

EP

T D

ES

IG

N D

R

AW

IN

G

S R

EA

R

D O

O R

C O

O

LI

N G

P R

O

JE

C T

COOLANT PUMPING UNIT AND PIPING

SCALE : 1/4" = 1'-0" 0 2' 4' 8'

GENERAL NOTES:

KEY NOTES:

1. ALL EXISTING WORK TO REMAIN.

2. THE DRAWING IS SCHEMATIC IN NATURE. THE FINAL LOCATION

OF THE REAR DOOR HEAT EXCHANGERS WILL BE DETERMINED

AFTER CONTRACT AWARD. LOCATION SHALL BE VERIFIED WITH

DISA DENVER AND THE SITE STAFF.

3. THIS PROJECT WILL IMPLEMENT A PROOF OF CONCEPT FOR

REAR DOOR HEAT EXCHANGERS.

4. INSTALL AIR BLEEDERS AT EACH HIGH POINT IN THE PIPING

CIRCUIT.

1. PROVIDE AND INSTALL A COOLANT PUMPING UNIT .

2. PROVIDE AND INSTALL ONE (1) ACTIVE REAR DOOR HEAT

EXCHANGER, TO INCLUDE ALL PIPING, INSULATION AND VALVES

ASSOCIATED WITH CONNECTING THE REAR DOOR TO THE COOLANT

PUMPING UNIT. ELECTRICAL CONNECTIONS, TEST SERVER RACK, (2)

HEATERS, TESTING AND BALANCING, AND COMMISSIONING SHALL

ALSO BE INCLUDED. SEE ELECTRICAL DRAWING FOR ALL

ELECTRICAL WORK. REFER TO DRAWING M-500 FOR A SCHEDULE

OF EQUIPMENT, OR GOVERNMENT APPROVED EQUIVALENT,

REQUIRED FOR THIS PROJECT. PROVIDE A BALANCING VALVE ON

THE RETURN LINE TO BALANCE THE CHILLED WATER FLOW ON THE

CHILLED WATER RETURN.

3. PROVIDE AND INSTALL ONE (1) PASSIVE REAR DOOR HEAT

EXCHANGER, TO INCLUDE ALL PIPING, INSULATION AND VALVES

ASSOCIATED WITH CONNECTING THE REAR DOOR TO THE COOLANT

PUMPING UNIT. ELECTRICAL CONNECTIONS, TEST SERVER RACK, (2)

HEATERS, TESTING AND BALANCING, AND COMMISSIONING SHALL

ALSO BE INCLUDED. SEE ELECTRICAL DRAWING FOR ALL

ELECTRICAL WORK. REFER TO DRAWING M-500 FOR A SCHEDULE OF

EQUIPMENT, OR GOVERNMENT APPROVED EQUIVALENT, REQUIRED

FOR THIS PROJECT. PROVIDE A BALANCING VALVE ON THE RETURN

LINE TO BALANCE THE CHILLED WATER FLOW ON THE CHILLED

WATER RETURN.

4. INSTALL A 20-40 MESH STRAINER ON THE CHILLED WATER SUPPLY

TO THE COOLANT PUMPING UNIT TO PREVENT PARTICLES FROM

ENTERING THE COOLING PUMPING UNIT'S HEAT EXCHANGER.

AREA

OF WORK

COOLANT

PUMPING UNIT

LOCATION

FUTURE RELOCATION

OF CRAH 2-C-32

TEST SERVER RACKS, HEATERS

AND RDHX COMPONENTS

TIE IN AT

TILE AC15

TIE IN AT

TILE AI16

N B

KEY PLAN 2nd FLOOR

SCALE: NONE

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

AE

N

N /A

AS

S

H O

W N

M

SS

/1

1/

M

EC

_M -5

.D

W

GN

/A

N /A

N /A

/1

0/

M-500

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SC

H

ED

U

LE

A

N D

D

ET

AI

LS

C O

N C

EP

T

D

ES

IG

N

D R

AW

IN

G S

R

EA

R D

O O

R C

O O

LI

N

G P

R O

JE

C

T

KEY NOTES:

1. ACTIVE REAR DOOR HEAT EXCHANGER. SEE M-101 TO CONNECT TO THE

COOLANT PUMPING UNIT.

2. PASSIVE REAR DOOR HEAT EXCHANGER. SEE M-101 TO CONNECT TO THE

COOLANT PUMPING UNIT.

3. REMOVE THE REAR THAT COMES WITH THE I.T. RACK AND ATTACH THE

REAR DOOR HEAT EXCHANGER PER THE MANUFACTURERS INSTRUCTIONS.

4. ARTIFICIAL HEAT SOURCE. ATTACH THE HEATERS TO THE RACK PER THE

MANUFACTURER'S DETAILS.

5. SUPPLY AND RETURN TO COOLANT PUMPING UNIT. CONNECT THE

COOLANT PUMPING UNIT TO EACH RDHX VIA 1 INCH COPPER OR PEX HOSE.

6. EXISTING RAISED FLOOR. MOUNT ALL EQUIPMENT ON THE RAISED FLOOR.

REWORK/REPAIR THE RAISED FLOOR AS NEEDED TO MOUNT THE NEW

EQUIPMENT. CONTRACTOR SHALL PROVIDE BRUSHED GROMMETS AND

INSTALL AT ALL CUTOUTS IN ACCESS FLOOR PANELS.

7. SPACE THE ARTIFICIAL HEATERS EQUALLY SO THE HEAT IS

DISTRIBUTED EVENLY. ADD BLANKING PANELS BETWEEN THE

ARTIFICIAL HEATERS.

8. NEW TEST SERVER RACK.

9. STANDALONE TEMPERATURE SENSORS. ATTACH ONE ON THE INLET OF A

HEATER AND ONE ON THE OUTLET OF EACH TEST RACK, TO MONITOR

TEMPERATURES ACROSS A RANGE OF HEATER LOADS AND OPERATING

CONDITIONS. THE TEMPERATURE SENSORS SHALL NOT HAVE WIRELESS

CAPABILITY.

10. NEW FLOOR SUPPORT, SEE DETAIL A3 ON THIS SHEET. MOUNT FLOOR

SUPPORT AS CLOSE TO THE ELBOW AS POSSIBLE FOR VERTICAL RISERS.

FLOOR SUPPORTS SHALL BE MOUNTED AT A 20' SPACING IN THE RAISED

FLOOR ON ALL NEW CHILLER WATER PIPING.

ACTIVE REAR DOOR HEAT EXCHANGER

SCALE: N/A A1M-500

PASSIVE REAR DOOR HEAT EXCHANGER

SCALE: N/A A2M-500

7 78 8

SCHEDULE AND DETAILS

SCALE : NONE

RAISED FLOOR PIPE SUPPORT DETAIL

SCALE: N/A A3M-500

* THE CONTRACTOR SHALL PROVIDE THIS SPECIFIED EQUIPMENT OR GOVERNMENT APPROVED ALTERNATIVE

AutoCAD SHX Text

NUT AND WASHER

AutoCAD SHX Text

INSULATION, SEE SPECIFICATIONS FOR INSULATION THICKNESS.

AutoCAD SHX Text

ANCHOR TO FLOOR

AutoCAD SHX Text

SECURE CHILLED PIPING TO SUPPORTS WITH "UNISTRUT" PIPE CLAMP OR EQUAL.

AutoCAD SHX Text

RUN INSULATION OF CHILLED LINE THRU CLAMP ASSEMBLY

AutoCAD SHX Text ADD HIGH DENSITY INSERTS ON THE UPPER AND LOWER PART OF THE INSULATION AT THE PIPE CLAMPS.

6 7 8 9 10 11

E

D

C

B

A

D N

PDU-A-13

PDU-B-13

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

AA N

/A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_E -1

.D

W

GN

/A

N /A

N /A

/1

0/

E-101

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

EL

EC

TR

IC

AL

P

O W

ER

P

LA

N

C O

N C

EP

T

D

ES

IG

N

D R

AW

IN

G S

R

EA

R D

O O

R C

O O

LI

N

G P

R O

JE

C

T

ELECTRICAL POWER PLAN

SCALE : 1/8" = 1'-0" 0 4' 8' 16'

INSTALLATION NOTES:

1. CONNECT TO CKTS 32, 34, 36 ON PANEL EDP_2-D-13 FOR

POWER TO HEATER. REPLACE BREAKER WITH 3P-30A

BREAKER TO MATCH EXISTING BREAKERS.

2. CONNECT TO CKTS 38, 40, 42 ON PANEL EDP_2-D-13 FOR

POWER TO HEATER. REPLACE BREAKER WITH 3P-30A

BREAKER TO MATCH EXISTING BREAKERS.

3. CONNECT TO CKTS 1, 3, 5 ON PANEL EDP_2-D-13 FOR

POWER TO COOLING PUMPING UNIT. REPLACE BREAKER

WITH 3P-15A BREAKER TO MATCH EXISTING BREAKERS.

4. NEW 4-#10, 3/4" SEALTIGHT CONDUIT OR GOVERNMENT

APPROVED EQUIVALENT.

5. NEW 4-#12, 3/4" SEALTIGHT CONDUIT OR GOVERNMENT

APPROVED EQUIVALENT.

6. CONNECT TO CKTS 8, 10, 12 ON PANEL EDP_2-C-14 FOR

POWER TO HEATER. REPLACE BREAKER WITH 3P-30A

BREAKER TO MATCH EXISTING BREAKERS.

7. CONNECT TO CKTS 14, 16, 18 ON PANEL EDP_2-C-14 FOR

POWER TO HEATER. REPLACE BREAKER WITH 3P-30A

BREAKER TO MATCH EXISTING BREAKERS.

8. PANEL EDP_2-D-13

9. PANEL EDP_2-C-14

10. NEW RACKS EACH TWO (2) 20kW HEATERS (SEE

DRAWINGS M-101 AND M-500).

11. NEW COOLANT PUMPING UNIT (SEE

DRAWINGS M-101 AND M-500).

FUTURE RELOCATION

OF CRAH 2-C-32

TEST SERVER RACKS,HEATERS

AND RDHX COMPONENTS

9 8

N B

KEY PLAN 2nd FLOOR

SCALE: NONE

GENERAL NOTES:

1. ALL POWER SHALL BE RUN UNDER THE RAISED ACCESS

FLOOR.

2. CONDUITS SHALL BE PLENUM-RATED LFMC FOR ALL

POWER WHIPS.

PANEL SCHEDULES

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

SE

L

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

R

EA

R D

O O

R C

O O

LI

N

G P

R O

JE

C

T

M

AC

AA N

/A

AS

S

H O

W N

M

SS 4/

8/

M

EC

-E -5

PA

N

EL

S

C H

ED

U

LE

N /A

N /A

N /A

/1

0/

E-500

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

PA

N

EL

S

C H

ED

U

LE

S

C O

N C

EP

T

D

ES

IG

N

D R

AW

IN

G S

POWER PANEL IDENTIFICATION EDP_2-D-13 "PDP C-3"

POWER PANEL LOCATION 2ND FLOOR MAIN, NORTH CLOSET

SOURCE SWGR-C-1 CUBICLE 10B

PANEL VOLTAGE 480V, 65 KAIC

LAST UPDATE 1/5/2018

MANUFACTURER SQUARE D

MODEL NF442

DATE OF MANUFACTURE

BREAKER TYPE EJB

MAX AMPS 225

TRANSFORMER MODEL N/A

TRANSFORMER KVA N/A

POWER PANEL IDENTIFICATION EDP_2-C-14 "PDP C-4"

POWER PANEL LOCATION 2ND FLOOR MAIN, NORTH CLOSET

SOURCE SWGR-C-1 CUBICLE 10A

PANEL VOLTAGE 480V, 50 KAIC

LAST UPDATE 1/5/2018

MANUFACTURER SQUARE D

MODEL WEHB42CKT

DATE OF MANUFACTURE

BREAKER TYPE EHB

MAX AMPS 225

TRANSFORMER MODEL N/A

TRANSFORMER KVA N/A

TOTAL CONNECTED LOAD PHASE A (AMPS) 0

PHASE B (AMPS) 0

PHASE C (AMPS) 0

AVERAGE AMPS PER PHASE 0

TOTAL kVA LOAD 0

PERCENT FROM AVERAGE, PHASE A #DIV/0!

PERCENT FROM AVERAGE, PHASE B #DIV/0!

PERCENT FROM AVERAGE, PHASE C #DIV/0!

MAXIMUM ALLOWABLE THRESHOLD: ± 7.500

PERCENT FROM AVERAGE, PHASE A #DIV/0!

PERCENT FROM AVERAGE, PHASE B #DIV/0!

PERCENT FROM AVERAGE, PHASE C #DIV/0!

MAXIMUM ALLOWABLE THRESHOLD: ± 7.500

POWER PANEL SCHEDULES

KEY NOTES:

1. REPLACE EXISTING BREAKERS AT LOCATIONS SHOWN WITH NEW BREAKERS

AND UPDATE THE PANEL SCHEDULE(S) TO REFLECT THESE CHANGES.

TOTAL CONNECTED LOAD PHASE A (AMPS) 0

PHASE B (AMPS) 0

PHASE C (AMPS) 0

AVERAGE AMPS PER PHASE 0

TOTAL kVA LOAD 0

File details come from the government source that posted it. Updated .