Appendix A.pdf
PDF 2 MB Posted
- Attached to
- Heat Exchanger Federal contract opportunity
- Solicitation number
- HC102821R0048
- Issued by
- Defense Information Systems Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Encl4_qasp.docx | DOCX document | |
| Appendix G DISA Systems Equipment and Components SEC Inventory Spreadsheet.xlsx | XLSX spreadsheet | |
| HC102821R0048 AMD0001.docx | DOCX document | |
| Attachment 1 QA AMD0001.pdf | ||
| HC102821R0048 Conform copy through AMD0001.docx | DOCX document | |
| Site Photos July 8 2021.pdf | ||
| Attachment 1 QA AMD0001.pdf | ||
| HC102821R0048 AMD0001.docx | DOCX document | |
| Appendix F.pdf | ||
| Heat Exchanger Solicitation HC102821R0048.pdf | ||
| Appendix B.pdf | ||
| SCA WD 2015-4226.pdf | ||
| Appendix C.pdf | ||
| Appendix D.pdf | ||
| Appendix E.pdf | ||
| CLIN Amount Spreadsheet.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A
COVER SHEET
SHEET
IDENTIFICATION
D
ES
IG
N
B Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
SI
ZE
AN
SI
D
C H
EC
KE
D B
Y:
PL
O
T D
AT
E:
FI
LE
N
AM
E:
SU
BM
IT
TA
L D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
:M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
B
C
D
1 2 3 4 5
1 2 3 4 5
Defense Information Systems Agency A Combat Support Agency
A
B
D
C
P.
O
.B O
X
G
R
EE
N W
O O
D V
IL
LA
G E
SE
L
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
.8
* FOR OFFICIAL USE ONLY *
* FOR OFFICIAL USE ONLY *
A
R
EA
R D
O O
R C
O O
LI
N
G P
R O
JE
C
T
M
AC
AA N
/A
AS
S
H O
W N
M
SS 4/
8/
M
EC
-G -1
C O
VE
R
S H
EE
T
N /A
N /A
N /A
/1
0/
G-001
D
AT
A C
EN
TE
R M
EC
H
AN
IC
SB
U
R G
C O
VE
R
S H
EE
T
C O
N C
EP
T
D
ES
IG
N
D R
AW
IN
G S
DEFENSE INFORMATION SYSTEMS AGENCY
DATA CENTER - MECHANICSBURG
REAR DOOR COOLING PROJECT
BUILDING 308
SHEET LIST TABLE
Sheet Number Sheet Title
GENERAL
G-001 COVER SHEET
ARCHITECTURAL
A-101 RAISED FLOOR AREA OF WORK
MECHANICAL
M-101 COOLANT PUMPING UNIT AND PIPING
M-500 SCHEDULE AND DETAILS
ELECTRICAL
E-101 ELECTRICAL POWER PLAN
E-500 PANEL SCHEDULES
COLD
COLD
COLD
COLD
COLD COLD
PDU-B-13
"PDU 2-13B"
CRAH_2-C-38
30 TONS
"CRAC L-38"
CRAH_2-C-50
30 TONS
"CRAC L-50"
CRAH_2-C-39
30 TONS
"CRAC L-39"
CRAH_2-C-28
30 TONS
"CRAC L-28"
CRAH_2-C-29
30 TONS
"CRAC L-29"
CRAH_2-C-30
30 TONS
"CRAC L-30"
CRAH_2-C-35
30 TONS
"CRAC L-35"
CRAH_2-C-33
30 TONS
"CRAC L-33"
CRAH_2-C-32
30 TONS
"CRAC L-32"
PDU-A-13
"PDU 2-13A"
PD
U-
A-
"P
DU
2-
A"
PDU-A-33
"PDU 2-33A"
PDU-B-33
"PDU 2-33B"
PDU-A-05
"PDU 2-05A"
PDU-B-05
"PDU 2-05B"
PDU-B-10
"PDU 2-10B" PDU-A-09
"PDU 2-09A"
PDU-A-11
"PDU 2-11A"
PDU-B-11
"PDU 2-11B"
PDU-B-08
"PDU 2-08B"
PDU-A-08
"PDU 2-08A"
PD
U
-B -0
"P
DU
-0
1B
UDP-B-3
UDP-A-4
EPO-4
HOT
HOT
HOT
HOT
HOT
HOT
HOT
HOT
HOT
HOT
HOT
HOT
HOT
HOT
SIPR COMPUTING SPACE
NIPR COMPUTING
SPACE
214 ELECTRICAL
ROOM
200B
30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6
SHEET
IDENTIFICATION
D
ES
IG
N
B Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
SI
ZE
AN
SI
D
C H
EC
KE
D B
Y:
PL
O
T D
AT
E:
FI
LE
N
AM
E:
SU
BM
IT
TA
L D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E:
AP
PR
B
C
D
1 2 3 4 5
1 2 3 4 5
Defense Information Systems Agency A Combat Support Agency
A
B
D
C
P.
O
.B O
X
G
R
EE
N W
O O
D V
IL
LA
G E
SE
L
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
.8
* FOR OFFICIAL USE ONLY *
* FOR OFFICIAL USE ONLY *
A
N /A
AA N
/A
AS
S
H O
W N
M
SS
4/ 7/
M
EC
_A -1
N /A
N /A
N /A
/1
0/
A-101
D
AT
A C
EN
TE
R M
EC
H
AN
IC
SB
U
R G
R
AI
SE
D
F
LO
O R
A R
EA
O
F W
O R
K C
O N
C
EP
T D
ES
IG
N D
R
AW
IN
G
S R
EA
R
D O
O R
C O
O
LI
N G
P R
O
JE
C T
RAISED FLOOR AREA OF WORK
SCALE : 3/16" = 1'-0" 0 4' 8' 12'
KEY NOTES:
1. REMOVE AND RE-INSTALL RAISED FLOOR TILES AS NEEDED TO INSTALL ALL
ITEMS NECESSARY TO EXECUTE THE PROJECT. SEE MECHANICAL DRAWING
M-101.
AREA
OF WORK
FUTURE LOCATION
OF CRAH 2-C-32
COOLANT PUMPING
UNIT LOCATION
FUTURE RELOCATION
OF CRAH 2-C-32
TEST SERVER RACKS,HEATERS
AND RDHX COMPONENTS
N B
KEY PLAN 2nd FLOOR
SCALE: NONE
CRAH_2-C-50
CHWS
CHWR
C
H W
S
C H
W R
C H
W S
C H
W R
CHWR
CHWS
C H
W R
C H
W S
2" ø
6"℄
6"℄
12"℄
12"℄
12"℄
12"℄
6"℄
12"℄
12"℄
6"℄
12"℄
12"℄
6"℄
6"℄
PDU-B-13
"PDU 2-13B"
CRAH_2-C-39
30 TONS
"CRAC L-39"
CRAH_2-C-32
30 TONS
"CRAC L-32"
PDU-A-13
"PDU 2-13A"
PDU-A-09
"PDU 2-09A"
PDU-A-11
"PDU 2-11A"
PDU-B-11
"PDU 2-11B"
PDU-B-08
"PDU 2-08B"
PDU-A-08
"PDU 2-08A"
C R
AH
_1
-D -6
H
U M
_2 -C
-1
UDP-B-3
UDP-A-4
EPO-4
DROP INTO
FLOOR DRAIN
2"
2"
4" CHWS&R FROM FIRST FLOOR
2"
3"
2"
4"
2"
2"
2"
DROPS INTO FLOOR DRAIN
2"
4"
3"
3" 2"
2"
DROPS INTO FLOOR DRAIN
2"
2"
DROPS INTO
FLOOR DRAIN
2"
4"
2.
5"
C H
W S
2.5" CHWR
2.5" CHWS
1" CHWR
1" CHWS
1" CHWS
1" CHWR
SHEET
IDENTIFICATION
D
ES
IG
N
B Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
SI
ZE
AN
SI
D
C H
EC
KE
D B
Y:
PL
O
T D
AT
E:
FI
LE
N
AM
E:
SU
BM
IT
TA
L D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E:
AP
PR
B
C
D
1 2 3 4 5
1 2 3 4 5
Defense Information Systems Agency A Combat Support Agency
A
B
D
C
P.
O
.B O
X
G
R
EE
N W
O O
D V
IL
LA
G E
SE
L
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
.8
* FOR OFFICIAL USE ONLY *
* FOR OFFICIAL USE ONLY *
A
N /A
AA N
/A
AS
S
H O
W N
M
SS
/0
8/
M
EC
_M -1
.D
W
GN
/A
N /A
N /A
/1
0/
M-101
D
AT
A C
EN
TE
R M
EC
H
AN
IC
SB
U
R G
C O
O
LA
N T
PU
M
PI
N
G U
N
IT
A N
D P
IP
IN
G C
O N
C
EP
T D
ES
IG
N D
R
AW
IN
G
S R
EA
R
D O
O R
C O
O
LI
N G
P R
O
JE
C T
COOLANT PUMPING UNIT AND PIPING
SCALE : 1/4" = 1'-0" 0 2' 4' 8'
GENERAL NOTES:
KEY NOTES:
1. ALL EXISTING WORK TO REMAIN.
2. THE DRAWING IS SCHEMATIC IN NATURE. THE FINAL LOCATION
OF THE REAR DOOR HEAT EXCHANGERS WILL BE DETERMINED
AFTER CONTRACT AWARD. LOCATION SHALL BE VERIFIED WITH
DISA DENVER AND THE SITE STAFF.
3. THIS PROJECT WILL IMPLEMENT A PROOF OF CONCEPT FOR
REAR DOOR HEAT EXCHANGERS.
4. INSTALL AIR BLEEDERS AT EACH HIGH POINT IN THE PIPING
CIRCUIT.
1. PROVIDE AND INSTALL A COOLANT PUMPING UNIT .
2. PROVIDE AND INSTALL ONE (1) ACTIVE REAR DOOR HEAT
EXCHANGER, TO INCLUDE ALL PIPING, INSULATION AND VALVES
ASSOCIATED WITH CONNECTING THE REAR DOOR TO THE COOLANT
PUMPING UNIT. ELECTRICAL CONNECTIONS, TEST SERVER RACK, (2)
HEATERS, TESTING AND BALANCING, AND COMMISSIONING SHALL
ALSO BE INCLUDED. SEE ELECTRICAL DRAWING FOR ALL
ELECTRICAL WORK. REFER TO DRAWING M-500 FOR A SCHEDULE
OF EQUIPMENT, OR GOVERNMENT APPROVED EQUIVALENT,
REQUIRED FOR THIS PROJECT. PROVIDE A BALANCING VALVE ON
THE RETURN LINE TO BALANCE THE CHILLED WATER FLOW ON THE
CHILLED WATER RETURN.
3. PROVIDE AND INSTALL ONE (1) PASSIVE REAR DOOR HEAT
EXCHANGER, TO INCLUDE ALL PIPING, INSULATION AND VALVES
ASSOCIATED WITH CONNECTING THE REAR DOOR TO THE COOLANT
PUMPING UNIT. ELECTRICAL CONNECTIONS, TEST SERVER RACK, (2)
HEATERS, TESTING AND BALANCING, AND COMMISSIONING SHALL
ALSO BE INCLUDED. SEE ELECTRICAL DRAWING FOR ALL
ELECTRICAL WORK. REFER TO DRAWING M-500 FOR A SCHEDULE OF
EQUIPMENT, OR GOVERNMENT APPROVED EQUIVALENT, REQUIRED
FOR THIS PROJECT. PROVIDE A BALANCING VALVE ON THE RETURN
LINE TO BALANCE THE CHILLED WATER FLOW ON THE CHILLED
WATER RETURN.
4. INSTALL A 20-40 MESH STRAINER ON THE CHILLED WATER SUPPLY
TO THE COOLANT PUMPING UNIT TO PREVENT PARTICLES FROM
ENTERING THE COOLING PUMPING UNIT'S HEAT EXCHANGER.
AREA
OF WORK
COOLANT
PUMPING UNIT
LOCATION
FUTURE RELOCATION
OF CRAH 2-C-32
TEST SERVER RACKS, HEATERS
AND RDHX COMPONENTS
TIE IN AT
TILE AC15
TIE IN AT
TILE AI16
N B
KEY PLAN 2nd FLOOR
SCALE: NONE
IDENTIFICATION
D
ES
IG
N
B Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
SI
ZE
AN
SI
D
C H
EC
KE
D B
Y:
PL
O
T D
AT
E:
FI
LE
N
AM
E:
SU
BM
IT
TA
L D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E:
AP
PR
B
C
D
1 2 3 4 5
1 2 3 4 5
Defense Information Systems Agency A Combat Support Agency
A
B
D
C
P.
O
.B O
X
G
R
EE
N W
O O
D V
IL
LA
G E
SE
L
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
.8
* FOR OFFICIAL USE ONLY *
* FOR OFFICIAL USE ONLY *
A
N /A
AE
N
N /A
AS
S
H O
W N
M
SS
/1
1/
M
EC
_M -5
.D
W
GN
/A
N /A
N /A
/1
0/
M-500
D
AT
A C
EN
TE
R M
EC
H
AN
IC
SB
U
R G
SC
H
ED
U
LE
A
N D
D
ET
AI
LS
C O
N C
EP
T
D
ES
IG
N
D R
AW
IN
G S
R
EA
R D
O O
R C
O O
LI
N
G P
R O
JE
C
T
KEY NOTES:
1. ACTIVE REAR DOOR HEAT EXCHANGER. SEE M-101 TO CONNECT TO THE
COOLANT PUMPING UNIT.
2. PASSIVE REAR DOOR HEAT EXCHANGER. SEE M-101 TO CONNECT TO THE
COOLANT PUMPING UNIT.
3. REMOVE THE REAR THAT COMES WITH THE I.T. RACK AND ATTACH THE
REAR DOOR HEAT EXCHANGER PER THE MANUFACTURERS INSTRUCTIONS.
4. ARTIFICIAL HEAT SOURCE. ATTACH THE HEATERS TO THE RACK PER THE
MANUFACTURER'S DETAILS.
5. SUPPLY AND RETURN TO COOLANT PUMPING UNIT. CONNECT THE
COOLANT PUMPING UNIT TO EACH RDHX VIA 1 INCH COPPER OR PEX HOSE.
6. EXISTING RAISED FLOOR. MOUNT ALL EQUIPMENT ON THE RAISED FLOOR.
REWORK/REPAIR THE RAISED FLOOR AS NEEDED TO MOUNT THE NEW
EQUIPMENT. CONTRACTOR SHALL PROVIDE BRUSHED GROMMETS AND
INSTALL AT ALL CUTOUTS IN ACCESS FLOOR PANELS.
7. SPACE THE ARTIFICIAL HEATERS EQUALLY SO THE HEAT IS
DISTRIBUTED EVENLY. ADD BLANKING PANELS BETWEEN THE
ARTIFICIAL HEATERS.
8. NEW TEST SERVER RACK.
9. STANDALONE TEMPERATURE SENSORS. ATTACH ONE ON THE INLET OF A
HEATER AND ONE ON THE OUTLET OF EACH TEST RACK, TO MONITOR
TEMPERATURES ACROSS A RANGE OF HEATER LOADS AND OPERATING
CONDITIONS. THE TEMPERATURE SENSORS SHALL NOT HAVE WIRELESS
CAPABILITY.
10. NEW FLOOR SUPPORT, SEE DETAIL A3 ON THIS SHEET. MOUNT FLOOR
SUPPORT AS CLOSE TO THE ELBOW AS POSSIBLE FOR VERTICAL RISERS.
FLOOR SUPPORTS SHALL BE MOUNTED AT A 20' SPACING IN THE RAISED
FLOOR ON ALL NEW CHILLER WATER PIPING.
ACTIVE REAR DOOR HEAT EXCHANGER
SCALE: N/A A1M-500
PASSIVE REAR DOOR HEAT EXCHANGER
SCALE: N/A A2M-500
7 78 8
SCHEDULE AND DETAILS
SCALE : NONE
RAISED FLOOR PIPE SUPPORT DETAIL
SCALE: N/A A3M-500
* THE CONTRACTOR SHALL PROVIDE THIS SPECIFIED EQUIPMENT OR GOVERNMENT APPROVED ALTERNATIVE
AutoCAD SHX Text
NUT AND WASHER
AutoCAD SHX Text
INSULATION, SEE SPECIFICATIONS FOR INSULATION THICKNESS.
AutoCAD SHX Text
ANCHOR TO FLOOR
AutoCAD SHX Text
SECURE CHILLED PIPING TO SUPPORTS WITH "UNISTRUT" PIPE CLAMP OR EQUAL.
AutoCAD SHX Text
RUN INSULATION OF CHILLED LINE THRU CLAMP ASSEMBLY
AutoCAD SHX Text ADD HIGH DENSITY INSERTS ON THE UPPER AND LOWER PART OF THE INSULATION AT THE PIPE CLAMPS.
6 7 8 9 10 11
E
D
C
B
A
D N
PDU-A-13
PDU-B-13
SHEET
IDENTIFICATION
D
ES
IG
N
B Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
SI
ZE
AN
SI
D
C H
EC
KE
D B
Y:
PL
O
T D
AT
E:
FI
LE
N
AM
E:
SU
BM
IT
TA
L D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E:
AP
PR
B
C
D
1 2 3 4 5
1 2 3 4 5
Defense Information Systems Agency A Combat Support Agency
A
B
D
C
P.
O
.B O
X
G
R
EE
N W
O O
D V
IL
LA
G E
M
PE
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
.8
* FOR OFFICIAL USE ONLY *
* FOR OFFICIAL USE ONLY *
A
N /A
AA N
/A
AS
S
H O
W N
JE
S
/2
9/
M
EC
_E -1
.D
W
GN
/A
N /A
N /A
/1
0/
E-101
D
AT
A C
EN
TE
R M
EC
H
AN
IC
SB
U
R G
EL
EC
TR
IC
AL
P
O W
ER
P
LA
N
C O
N C
EP
T
D
ES
IG
N
D R
AW
IN
G S
R
EA
R D
O O
R C
O O
LI
N
G P
R O
JE
C
T
ELECTRICAL POWER PLAN
SCALE : 1/8" = 1'-0" 0 4' 8' 16'
INSTALLATION NOTES:
1. CONNECT TO CKTS 32, 34, 36 ON PANEL EDP_2-D-13 FOR
POWER TO HEATER. REPLACE BREAKER WITH 3P-30A
BREAKER TO MATCH EXISTING BREAKERS.
2. CONNECT TO CKTS 38, 40, 42 ON PANEL EDP_2-D-13 FOR
POWER TO HEATER. REPLACE BREAKER WITH 3P-30A
BREAKER TO MATCH EXISTING BREAKERS.
3. CONNECT TO CKTS 1, 3, 5 ON PANEL EDP_2-D-13 FOR
POWER TO COOLING PUMPING UNIT. REPLACE BREAKER
WITH 3P-15A BREAKER TO MATCH EXISTING BREAKERS.
4. NEW 4-#10, 3/4" SEALTIGHT CONDUIT OR GOVERNMENT
APPROVED EQUIVALENT.
5. NEW 4-#12, 3/4" SEALTIGHT CONDUIT OR GOVERNMENT
APPROVED EQUIVALENT.
6. CONNECT TO CKTS 8, 10, 12 ON PANEL EDP_2-C-14 FOR
POWER TO HEATER. REPLACE BREAKER WITH 3P-30A
BREAKER TO MATCH EXISTING BREAKERS.
7. CONNECT TO CKTS 14, 16, 18 ON PANEL EDP_2-C-14 FOR
POWER TO HEATER. REPLACE BREAKER WITH 3P-30A
BREAKER TO MATCH EXISTING BREAKERS.
8. PANEL EDP_2-D-13
9. PANEL EDP_2-C-14
10. NEW RACKS EACH TWO (2) 20kW HEATERS (SEE
DRAWINGS M-101 AND M-500).
11. NEW COOLANT PUMPING UNIT (SEE
DRAWINGS M-101 AND M-500).
FUTURE RELOCATION
OF CRAH 2-C-32
TEST SERVER RACKS,HEATERS
AND RDHX COMPONENTS
9 8
N B
KEY PLAN 2nd FLOOR
SCALE: NONE
GENERAL NOTES:
1. ALL POWER SHALL BE RUN UNDER THE RAISED ACCESS
FLOOR.
2. CONDUITS SHALL BE PLENUM-RATED LFMC FOR ALL
POWER WHIPS.
PANEL SCHEDULES
IDENTIFICATION
D
ES
IG
N
B Y:
D R
AW
N
B Y:
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
SI
ZE
AN
SI
D
C H
EC
KE
D B
Y:
PL
O
T D
AT
E:
FI
LE
N
AM
E:
SU
BM
IT
TA
L D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
:M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E:
AP
PR
B
C
D
1 2 3 4 5
1 2 3 4 5
Defense Information Systems Agency A Combat Support Agency
A
B
D
C
P.
O
.B O
X
G
R
EE
N W
O O
D V
IL
LA
G E
SE
L
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
.8
* FOR OFFICIAL USE ONLY *
* FOR OFFICIAL USE ONLY *
A
R
EA
R D
O O
R C
O O
LI
N
G P
R O
JE
C
T
M
AC
AA N
/A
AS
S
H O
W N
M
SS 4/
8/
M
EC
-E -5
PA
N
EL
S
C H
ED
U
LE
N /A
N /A
N /A
/1
0/
E-500
D
AT
A C
EN
TE
R M
EC
H
AN
IC
SB
U
R G
PA
N
EL
S
C H
ED
U
LE
S
C O
N C
EP
T
D
ES
IG
N
D R
AW
IN
G S
POWER PANEL IDENTIFICATION EDP_2-D-13 "PDP C-3"
POWER PANEL LOCATION 2ND FLOOR MAIN, NORTH CLOSET
SOURCE SWGR-C-1 CUBICLE 10B
PANEL VOLTAGE 480V, 65 KAIC
LAST UPDATE 1/5/2018
MANUFACTURER SQUARE D
MODEL NF442
DATE OF MANUFACTURE
BREAKER TYPE EJB
MAX AMPS 225
TRANSFORMER MODEL N/A
TRANSFORMER KVA N/A
POWER PANEL IDENTIFICATION EDP_2-C-14 "PDP C-4"
POWER PANEL LOCATION 2ND FLOOR MAIN, NORTH CLOSET
SOURCE SWGR-C-1 CUBICLE 10A
PANEL VOLTAGE 480V, 50 KAIC
LAST UPDATE 1/5/2018
MANUFACTURER SQUARE D
MODEL WEHB42CKT
DATE OF MANUFACTURE
BREAKER TYPE EHB
MAX AMPS 225
TRANSFORMER MODEL N/A
TRANSFORMER KVA N/A
TOTAL CONNECTED LOAD PHASE A (AMPS) 0
PHASE B (AMPS) 0
PHASE C (AMPS) 0
AVERAGE AMPS PER PHASE 0
TOTAL kVA LOAD 0
PERCENT FROM AVERAGE, PHASE A #DIV/0!
PERCENT FROM AVERAGE, PHASE B #DIV/0!
PERCENT FROM AVERAGE, PHASE C #DIV/0!
MAXIMUM ALLOWABLE THRESHOLD: ± 7.500
PERCENT FROM AVERAGE, PHASE A #DIV/0!
PERCENT FROM AVERAGE, PHASE B #DIV/0!
PERCENT FROM AVERAGE, PHASE C #DIV/0!
MAXIMUM ALLOWABLE THRESHOLD: ± 7.500
POWER PANEL SCHEDULES
KEY NOTES:
1. REPLACE EXISTING BREAKERS AT LOCATIONS SHOWN WITH NEW BREAKERS
AND UPDATE THE PANEL SCHEDULE(S) TO REFLECT THESE CHANGES.
TOTAL CONNECTED LOAD PHASE A (AMPS) 0
PHASE B (AMPS) 0
PHASE C (AMPS) 0
AVERAGE AMPS PER PHASE 0
TOTAL kVA LOAD 0
File details come from the government source that posted it. Updated .