Appendix G DISA Systems Equipment and Components SEC Inventory Spreadsheet.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
Heat Exchanger Federal contract opportunity
Solicitation number
HC102821R0048
Issued by
Defense Information Systems Agency

View the file

Other files for this federal contract opportunity

Other files attached to Heat Exchanger, newest first.
File Type Posted
Encl4_qasp.docx DOCX document
Attachment 1 QA AMD0001.pdf PDF
HC102821R0048 AMD0001.docx DOCX document
HC102821R0048 Conform copy through AMD0001.docx DOCX document
Site Photos July 8 2021.pdf PDF
HC102821R0048 AMD0001.docx DOCX document
Attachment 1 QA AMD0001.pdf PDF
CLIN Amount Spreadsheet.xlsx XLSX spreadsheet
SCA WD 2015-4226.pdf PDF
Appendix C.pdf PDF
Appendix F.pdf PDF
Appendix A.pdf PDF
Heat Exchanger Solicitation HC102821R0048.pdf PDF
Appendix B.pdf PDF
Appendix D.pdf PDF
Appendix E.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Process Diagram Labeling Process Diagram

Project Lead Review and approve UID Submission Form columns A-L. Send to BOS-SEL41 and include associated Project Drawings.

TIM Contractor Work with BOS-SEL41 and Project Transition team to Complete UID Submission Form columns P, Proposed UID. Return to BOS-SEL41 for Review.

Reference Documents 01-02 - Identification Labeling and Marking Spec - 2020-04-28.docx, SEC Designator List Tab, and SEC Sys Designator List Tab Project Lead Review and Approve UID Submission Form column Q. Send to Project Contractor.

TIM Contractor Implement changes to SEC & CMMS, PDU Schedules, Metrics, and upload to DEPS.

Project Lead Upon project completion, verfiy As-Built Drawings and EasyPower Updates. Provide both to Project Transition/CAD team for record drawing implementation. Verify modifications to Building Automation Services (BAS) to reflect changes.

Project Transition/CAD Implement changes to As-Built Drawings and EasyPower data.

Project Contractor Complete UID Submission Form columns A-L Send to Project Lead for review.

BOS - SEL41

Review data recieved from Project Lead. Send to TIM Contractor and BAS Contractor for completion. Review returned completed data and send to Project Lead for final approval.

BAS Contractor Work with BOS-SEL41 and Project Transition team to Complete UID Submission Form columns O, Proposed Valve UID. Return to BOS-SEL41 for Review.

Project Contractor Update Design Drawings. Apply new labels to physical equipment in the field. Update SEC List.

Design Project Lead Send approval with SEC List/CMMS update to BOS-SEL41 and Project Transition team. Site walk to verify labels on physical equipment.

BOS - SEL41

Send project completion data to TIM Contractor to reflect changes to SEC and CMMS. Modify Service Contracts.

Project Transition Implementation

UID Submission Form

Project ContractorBAS ContractorTIM Contracter InputProject Lead Input
Design LabelNotesBus Change from UPS to Essential, C to D, A to B etc.DescriptionRoom DesignatorManufactureModel NoSerial NoGrid DesignatorCapacityCapacity Units"FED FROM"/CKT # or "Parent ID"Proposed Valve UIDProposed UID (Excluding Valves)UID Reviewed and Approved?
Green Highlight Columns Required for Intial SubmissiondescriptionInterior: Room Number; Exterior: Name of Location (Ex: MechYard)text 20 chartext 40 char; If no Model , use Configuration # or CO#Alphanumeric grid locationCapacity of the SEC (Number)n/a, Gal, kW, kVA, A, BTU, Ton, GPM, CFM, RPM, PSItext 20 char; If no Serial#, then leave blankY/N
CRU-1Removed equipmentFusion Center316
EF-6Replaces existing equipmentJanitor Room492AReplacement for Existing Equip.EF_4-CD-02
ATU-11Replaces existing equipmentStorage110AReplacement for Existing Equip.VAV_1-C-11-AHU01
AHU-OA2-3Replaces existing equipmentData Area422Replacement for Existing Equip.VAV_4-BL-03-AHU08
IRC-1New equipmentData Center101LiebertCR040RC1A2X86140kwIRC_1-CD-01
IRC-2New equipmentData Center101LiebertCR040RC1A2X86140kWIRC_1-CD-2
IRC-3New equipmentData Center101LiebertCR040RC1A2X86140kWIRC_1-CD-3
IRC-4New equipmentData Center101LiebertCR040RC1A2X86140kWIRC_1-CD-04
VLV_1-CHW-01-ZN0102SNew valveData Center101BelimoF6150HD+PRBUP-3-T6"VLV_1-CHW-27
VLV_1-CHWR-01-ZN0102RNew valveData Center101BelimoF6150HD+PRBUP-3-T6"VLV_1-CHWR-22
VLV_1-CHW-02-ZN0103SNew valveData Center101BelimoF6150HD+PRBUP-3-T2.5"VLV_1-CHW-28
VLV_1-CHWR-02-ZN0103RNew valveData Center101BelimoF6150HD+PRBUP-3-T2.5"VLV_1-CHWR-23
6"CWR Valve-ManualNew valveStorage Room110AMuellerA-23616"
6" CWS Valve-ManualNew valveStorage Room110AMuellerA-23616"
VLV_2-CHWR-1-ZN1112RNew valveSecure Equipment401BelimoF6150HD+PRBUP-3-T2.5"VLV_4-CHWR-05
VLV_2-CHW-2-ZN1113SNew valveSecure Equipment401BelimoF6150HD+PRBUP-3-T2.5"VLV_4-CHW-06
VLV_2-CHWR-2-ZN1113RNew valveSecure Equipment401BelimoF6150HD+PRBUP-3-T2.5"VLV_4-CHWR-06
VLV_2-CHW-3-ZN1214SNew valveSecure Equipment401BelimoF6150HD+PRBUP-3-T2.5"VLV_4-CHW-07
Clean Agent Tk-1New tankAir Handler Room106CAT_1-FP-01
Clean Agent Tk-3New tankAir Handler Room106CAT_1-FP-03
Clean Agent Control PanelNew Control panelData Center101CACP_1-FP-1
Cold Aisle Containmt Pod-1New CAC podData Center101CACPD_1-BL-01
Cold Aisle Containmt Pod-3New CAC podData Center101CACPD_1-BL-03
VESDA Control Panel-1New Control panelData Center101CTLR_1-FP-11
VESDA Control Panel-2New Control panelSecure Equipment401CTLR_4-FP-12
FA Duct Smoke Detector-1New detectorCorridor195AFASD_1-FP-01
FA Duct Smoke Detector-2New detectorCorridor195AFASD_1-FP-02
EDP_1-CD-05Relocated panelNo ChangeDistribution Panel (essential)192ARefeed from sameEDP_1-CD-05
EDP_1-CD-09Relocated panelNo ChangeDistribution Panel (essential)117Refeed from sameEDP_1-CD-09
EDP_1-CD-11Replaces existingNo ChangeDistribution Panel (essential)101EDP_1-CD-15 / CKT XXEDP_1-CD-11
EDP_1-CD-14Replaces existingNo ChangeDistribution Panel (essential)5EDP_1-CD-11 / CKT ##EDP_1-CD-14
EDP_1-CD-19Replaces existingNo ChangeDistribution Panel (essential)190AEDP_1-CD-11 / CKT ##EDP_1-CD-19
UDISC_3-A-01Existing - new feedsFrom UPS to EssentialDisconnect (essential)333EDP_3-CD-XX / CKT #EDISC_3-CD-01
UXFMR_3-A-01Existing - new feedsFrom UPS to EssentialTransformer (essential)333EXFMR_3-CD-01
UDP_3-A-01Existing - new feedsFrom UPS to EssentialDistribution Panel (essential)333EDP_3-CD-08
UDP_3-A-02Existing - new feedsFrom UPS to EssentialDistribution Panel (essential)333EDP_3-CD-09
UDISC_3-A-02Existing - new feedsFrom UPS to EssentialDisconnect (essential)333EDP_3-CD-XX / CKT #EDISC_3-CD-02
UXFMR_3-A-02Existing - new feedsFrom UPS to EssentialTransformer (essential)333EXFMR_3-CD-02
UDP_3-A-03Existing - new feedsFrom UPS to EssentialDistribution Panel (essential)333EDP_3-CD-10
UDP_3-A-04Existing - new feedsFrom UPS to EssentialDistribution Panel (essential)333EDP_3-CD-11
UDISC_3-AB-14Existing - new feedsFrom UPS to EssentialDisconnect (essential)334EDP_3-CD-XX / CKT #EDISC_3-CD-03
UT_AB-14 - ?Existing - new feedsFrom UPS to EssentialTransformer (essential)334EXFMR_3-CD-03
UPP_AB-14 -?Existing - new feedsFrom UPS to EssentialDistribution Panel (essential)334EDP_3-CD-12
EDP_3-CD-04Existing - new feedsFrom UPS to EssentialDistribution Panel (essential)334Duplicate to Line 156
UDP_3-CD-01Existing - new feedsFrom UPS to EssentialEDP_3-CD-13
MTS_4M1New equipmentManual transfer switch138400AmpESWBD_1-D-01 / CKT # & ESWBD_1-C-01 / CKT#MTS_1-DC-01
4M1ANew equipmentDistribution Panel (essential)101400AmpMTS_1-DC-XXEDP_1-DC-1
4M1BNew equipmentDistribution Panel (essential)101400AmpEDP_1-D-XXEDP_1-DC-2
USWBD_1-A-03New equipmentSwitchboard (critical)1012000AmpUSWGR_1-A-01 / CKT #USWBD_1-A-03
USWBD_1-B-03New equipmentSwitchboard (critical)1012000AmpUSWGR_1-B-01 / CKT#USWBD_1-B-03
XRFMR_1-A-1New equipmentTransformer (critical)101225KVAUSWBD_1-A-XX / CKT#UXFMR_1-A-05
XRFMR_1-A-2New equipmentTransformer (critical)101225KVAUSWBD_1-A-XX / CKT#UXFMR_1-A-06
XRFMR_1-A-3New equipmentTransformer (critical)101225KVAUSWBD_1-A-XX / CKT#UXFMR_1-A-07
CB-BW_1-A-1New equipmentEnclosed Breaker (critical)101UXFMR_1-A-XXBRKR_1-A-01
CB-BW_1-A-2New equipmentEnclosed Breaker (critical)101UXFMR_1-A-XXBRKR_1-A-02
BW_1-A-1ANew equipmentOverhead Bus Bar (critical)101StarLineUSWBD_1-A-XX / CKT 1OBB_1-A-1A
BW_1-A-1BNew equipmentOverhead Bus Bar (critical)101StarLineUSWBD_1-A-XX / CKT 1OBB_1-A-1B
BW_1-A-2ANew equipmentOverhead Bus Bar (critical)101StarLineUSWBD_1-A-XX / CKT 2OBB_1-A-2A
EDP_1-CD-29-1New EquipmentDistribution Panel (essential)333EDP_1-CD-29 / CKT XXEDP_3-CD-07
EDP_4-CD-07-1New equipmentDistribution Panel (essential)401EDP_4-CD-07 /CKT XXEDP_4-CD-13
CB-4-A-11New equipmentEnclosed Breaker (critical)401USBD_1-A-01 / CKT XXBRKR_4-A-11
CB-4-B-11New equipmentEnclosed Breaker (critical)401USBD_1-B-01 / CKT XXBRKR_4-B-11
PDU_4-A-11New equipmentPower Distribution Unit401BRKR_4-A-XXPDU_4-A-11
PDU_4-B-11New equipmentPower Distribution Unit401BRKR_4-B-XXPDU_4-B-11

SEC Designator List

ACSPAccess Control System Panel
ACTActuator
ACAir Compressor
ACUAir Conditioning Unit
ACAAir Cooled Aftercooler
ADAir Dryer
AHUAir Handler Unit
ASAir Separator
ATAir Tank (Captive)
AITAnalytical Transmitter (includes humidity, pH, conductivity)
AEDAutomated External Defibrillator (AED)
ATSAutomatic Transfer Switch
BFPBack-Flow Preventer
BHBasin Heater
BCBattery Charger
BCCBattery Charger Controller
BDSBattery Disconnect Switch (UPS System)
BMSBattery Monitoring System (UPS System)
BATBattery String (UPS System)
BTBelly Tank
BLRBoiler
BRKRBreaker
BFTBuffer Tank
BASMBuilding Automation System Monitor
BASPBuilding Automation System Panel
CAPCapacitor
CVSCentral Vacuum System
CFSCChemical Feed Sys Controller
CFSPChemical Feed Sys Pump
CSFChemical Shock Feeder
CHWPChilled Water Pump
CHWRPChilled Water Return Pump
CHWSPChilled Water Supply Pump
CHChiller (generic, including water, air, & DX)
CHCSChiller Compressor Starter
CABPClean Agent Booster Panel
CACPClean Agent Control Panel
CAEFClean Agent Exhaust Fan
CAIAFClean Agent Intake Air Fan
CANGClean Agent Nitrogen Generator
CANTClean Agent Nitrogen Test
CATClean Agent Tank
CACPDCold Aisle Containment Pod
CRACComputer Room Air Conditioner
CRAHComputer Room Air Handler
CRFLRComputer Room Floor
CWPCondenser (Cooling Tower) Water Pump
CRPCondensate Return Pump
CRTCondensate Return Tank
CRUCondensate Return Unit
CTCContactor
CPControl Panel
ECPEssential Control Panel
UCPCritical Control Panel
CTLRController
CTCooling Tower
CTBHCooling Tower Basin Heater
CTPCooling Tower Pump
CUBCubical Furniture
DTDay Tank
DISCDisconnect
EDISCEssential Disconnect
UDISCCritical Disconnect
DPDistribution Panel
EDPEssential Distribution Panel
UDPCritical Distribution Panel
DHWRPDomestic Hot Water Return Pump
DHWSPDomestic Hot Water Supply Pump
ELMTRElectric Meter
EFORKElectric Forklift
ELJElectric Pallet Jack
EMIFElectromagnetic Interference Filter
ELEVElevator
EGENEmergency Generator
EMLEmergency Light
EPOSEmergency Power Off System
ESHREmergency Shower
ENCLEnclosures
ENGEngine Fire Pump
EQLTEquipment Lift
EFExhaust Fan
ESExit Signs
ETExpansion Tank
EWASHEyewash
FCUFan Coil Unit
FILFilter
FABPFire Alarm Booster Panel
FACPFire Alarm Control Panel
FASDFire Alarm Smoke Detector
FXFire Extinguisher
FPFire Pump
FAKFirst Aid Kit
FITFlow Transmitter
FCFluid Cooler
FRKForklift
FMSFuel Monitoring System
FOPFuel Oil Pump
FPOLFuel Polisher
FTFuel Tank
FTPFuel Transfer Pump
FFurnace
GMTRGas Meter
GATEGate, Electric
GNDBRGround Bar/Rods
GNDSYSGrounding System
SHRDHDHard Drive Shredder
HBHeat Box
HXHeat Exchanger (all types)
HPHeat Pump
HTHeat Trace
HTCSHeat Trace Control System
HCHeating Coil
HTIEHot Tie
HWPHot Water Pump
HUMHumidifier
HUMCUHumidifier Control Unit
HDSHydrogen Detection System
HDSCHydrogen Detection Sys Controller
HDSDHydrogen Detection System Detector
IDIce Dispenser
IMIce Maker
IRCIn Row Cooler
IDSPIntrusion Detection System Panel
JBOXJunction Box
LDSDLeak Detection System Detector
LDSMLeak Detection System Monitor
LITLevel Transmitter
LPLighting Panelboard
ELPEssential Panelboard
ULPCritical Panelboard
LPSLightning Protection System
LBLoad Bank
LIFTLoading Dock Lift
LVRLouver
MTSManual Transfer Switch
MNGMasking Noise Generator
MTRMeter
MCCMotor Control Center
EMCCEssential Motor Control Center
UMCCCritical Motor Control Center
MTRSTRMotor Starter
OAIOutside Air Intake
OHDROverhead Door
OTBOverhead Track Bus
PDUPower Distribution Unit
PRVPressure Reduction Valve
PDITPressure Transmitter, Differential
PITPressure Transmitter
PPump (Generic)
RWRaceway
RECTRectifier
RDSDRefrigerant Detection System Detector
RDSMRefrigerant Detection System Monitor
REFERRefrigerator
RVPRelief Valve Pressure
RDCRemote Distribution Cabinet
RMSPRemote Monitoring System Panel
RFReturn Fan
ROSReverse Osmosis System
RTURoof Top Unit
RMRoom
SSDSecurity System Detector
SSPSecurity System Panel
SRGSignal Reference Grid
SIMSimulator
SPKSpill Kit
SPCSSpill Kit Containment Shed
SBPStandby Booster Pump
SBMStatic Bypass Module (UPS system)
STSStatic Transfer Switch
STRNRStrainer
STRTRStarter
SUBSubstation
SUMPSump/Ejector Pump
SFSupply Fan
SPDSurge Protective Device
SWBDSwitchboard
ESWBDEssential Switchboard
USWBDCritial Switchboard
SWGRSwitchgear (generic, includes utility switchgear)
ESWGREssential Switchgear (generic, includes untility switchgear)
USWGRCritical Switchgear (generic, includes untility switchgear)
TITTemperature Transmitter
TGENTemporary Generator
TUPSTemporary UPS
XFMRTransformer
EXFMREssential Transformer
UXFMRCritical Transformer
ULTSNCUltra Sonic
USFSIUltra Sonic Flow Sensor Inlet
USFSOUltra Sonic Flow Sensor Outlet
UPSUninterruptible Power Supply
USTSUninterruptible Static Transfer Switch
UHUnit Heater
UTILUtility
UTILXFMRUtility Transformer
VLVValve (generic)
VAVVariable Air Volume
VFDVariable Frequency Drive
VRVVariable Refrigerant Volume
VESDAVery Early Smoke Detection (VESDA)
WDUWater Distribution Unit
WTSWater (Softener) Treatment System
WFWater Fountain
WHWater Heater
WMTRWater Meter
WTWater Tank (generic)
WNAWhite Noise AMP
WNEWhite Noise Equalizer
WNGWhite Noise Generator

SEC Sys Designator List

System DesignatorsAbbreviationNormal FeedField Color &Text Color
A BusAAWhiteBlack
B BusBBBlueWhite
BoilerBOBOOrangeBlack
BuildingBLBLTanWhite
Building Automated SystemBASBASGreenBlack
C BusCCBlackWhite
Chilled WaterCHCHBlueWhite
Chilled Water ReturnCHRCHRLight BlueWhite
Compressed AirCACADark RedWhite
Condenser WaterCWCWGreenWhite
Condenser Water ReturnCWRCWRLight GreenWhite
D BusDDGrayBlack
Direct CurrentDCDCDark BlueWhite
Domestic WaterDWDWLight BlueBlack
Dual Bus (A & B)ABABrownWhite
Dual Bus (B & A)BABBrownWhite
Dual Bus (C & D)CDCBrownWhite
Dual Bus (D & C)DCDBrownWhite
Emergency GeneratorEGEGBlackWhite
Emergency LightingELELColor Not Determined
Fire ProtectionFPFPRedWhite
Fuel OilFOFOYellowBlack
GroundGDGDDark GreenBlack
Natural GasNGNGDark GrayWhite
Not InstalledXXLight PurpleDark Grey
PGS1 (B Bus)EEGoldWhite
PGS2 (A Bus)FFSilverBlack
RemovedREMREMLight PurpleDark Grey
SecurityPurpleWhite
Steam DistributionSTSTPinkBlack
Ultra SonicULTSNCULTSNCColor Not Determined

File details come from the government source that posted it. Updated .