HC102820R0029 SWGR QA 26May20.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Switchgear Repair and upgrade
- Solicitation number
- HC102820R0029
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC102820R0090 amend 0004.docx | DOCX document | |
| Switchgear HC102820R0029- CLIN Pricing Sheet.xlsx | XLSX spreadsheet | |
| HC102820R0029 Switchgear amend 0003.docx | DOCX document | |
| HC102820R0029 solicitation amend 2.docx | DOCX document | |
| HC102820R0029 solicitation amend 1.docx | DOCX document | |
| DC COL Pre Bid VAR Instr 14May20.docx | DOCX document | |
| submittal procedures.docx | DOCX document | |
| Contractor NDA.pdf | ||
| Electrical safety program.pdf | ||
| SOW COL SWGR H9827220MPA0026.docx | DOCX document | |
| Appendix A- Blank submittal.xlsx | XLSX spreadsheet | |
| HC102820R0029 Switchgear solicitation.docx | DOCX document | |
| CLIN pricing worksheet.xlsx | XLSX spreadsheet | |
| 1 elec one lines DC COL.pdf | ||
| Appendix C- Deficiency log.xlsx | XLSX spreadsheet | |
| Sample MOP.docx | DOCX document | |
| encl4_qasp COL SWGR Repair.docx | DOCX document | |
| Appendix B- Transmittal cover.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Interested Vendor Questions | MP response |
| Does the CPU of the HMI’s have the capability to support windows 10? | Please refer to the revised Statement of Work, Paragraph 6.8. |
| What is the software that is currently being utilized? | EasyPower |
| Can we get switchgear nameplate information, to find out if there is room to install new SPD’s? | Ohio Caterpiller, DISA Project #40685, C and D Bus Switchgear, |
| Is there a points list for the HMI to understand what will be involved for commissioning activities? | Please refer to the revised Statement of Work, Paragraph 6.8. |
| Has the system a (redundant) backup that allows us to update and perform the tests without interruptions? | Please refer to the revised Statement of Work, Paragraph 6.8. |
| What is the type of drivers (hardware) used in the SWGR / Generator system? | Please refer to the revised Statement of Work, Paragraph 6.8. |
| Is there already an Easy Power model completed for the studies portion? Can this be made available? | Please refer to the revised Statement of Work, Paragraph 6.5.2 |