This document package includes a scope of work for repairs to wood elements of the cupola at Hampton Mansion, a National Historic Site. The scope of work outlines removal and replacement requirements for slate roofing, wood siding, windows, flashing and other elements, as well as repair specifications. Bids are due by August 7, 2020 in response to solicitation number 140P4220R0014. The contract will be awarded as a 100% small business set-aside. On-site work must follow historic preservation standards and is estimated to cost between $1-5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4220R0014_Amd_0004.pdf | ||
| General References_0004.doc | DOC document | |
| Hazardous Materials Form_0004.doc | DOC document | |
| Pre-Bid RFIs_0002.docx | DOCX document | |
| Sol_140P4220R0014_Amd_0002.pdf | ||
| HAMP Cupola Price Sheet_0003.xlsx | XLSX spreadsheet | |
| Sol_140P4220R0014_Amd_0003.pdf | ||
| Sol_140P4220R0014_Amd_0001.pdf | ||
| Wage Determination MD20200030.pdf | ||
| Experience Questionnaire.docx | DOCX document | |
| E54 COVID-19 Guidance OSHA.pdf | ||
| B08 Price Schedule.docx | DOCX document | |
| Hampton Specifications.pdf | ||
| Sol_140P4220R0014.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24 FEB 2021
1.2.3 RUSTICATED WOOD BASE
1. SURVEY THE RUSTICATED WOOD BASE TO DOCUMENT THE CONDITION, PROFILE, AND
DIMENSIONS OF THE COMPONENTS, INCLUDING ANY ELEMENTS SCHEDULED FOR
REMOVAL, PRIOR TO BEGINNING REMOVAL. DOCUMENT THE RESULTS OF THE SURVEY
ON ELEVATIONS AND DETAILS AND SUBMIT TO THE PROJECT TEAM. THESE DOCUMENTS
WILL SERVE AS THE BASIS FOR THE SHOP DRAWING SUBMITTALS.
2. REMOVE AND DISPOSE OF ALL LAYERS OF PAINT FROM THE EXTERIOR OF THE CUPOLA
PER HAZARDOUS ABATEMENT DRAWINGS.
3. CAREFULLY REMOVE ALL WOOD COMPONENTS MAKING UP THE RUSTICATED WOOD
BASE. MARK AND SURVEY THE REMOVED PIECES. THE SURVEY WILL PROVIDE THE
DIMENSIONS AND INFORMATION REQUIRED TO REFABRICATE DAMAGED PIECES.
STORE DAMAGED PIECES IN A PLASTIC BAG AND TURN OVER TO NPS. INCLUDE 320 SQ
FT THE BASE BID. PERFORM ADDITIONAL REPLACEMENT OF THE RUSTICATED WOOD
BASE ON A UNIT PRICE BASIS, UNIT PRICE 4.
1.2.4 ENTABLATURE AND ENGAGED COLUMNS
1. SURVEY AND DOCUMENT THE CONDITION, PROFILE, AND DIMENSIONS OF THE
ENTABLATURE AND THE ENGAGED COLUMNS, INCLUDING ANY ELEMENTS SCHEDULED
FOR REMOVAL, PRIOR TO BEGINNING REMOVAL. DOCUMENT THE RESULTS OF THE
SURVEY ON ELEVATIONS AND DETAILS AND SUBMIT TO THE PROJECT TEAM. THESE
DOCUMENTS WILL SERVE AS THE BASIS FOR THE SHOP DRAWING SUBMITTALS.
2. REMOVE AND DISPOSE OF ALL LAYERS OF PAINT FROM THE EXTERIOR OF THE CUPOLA
PER THE HAZARDOUS ABATEMENT DRAWINGS.
3. MARK LOCATIONS THAT WILL BE REMOVED WITH CHALK OR OTHER NON-PERMANENT
MARKER. REVIEW LOCATIONS WITH ENGINEER AND/OR NPS PRIOR TO REMOVAL.
AFTER APPROVAL BY CONTRACTING OFFICER AND/OR NPS, CUT OUT DETERIORATED
PORTIONS OF THE ENTABLATURE AND ENGAGED COLUMNS AND PREPARE FOR
REPLACEMENT WOOD PATCH OR EPOXY (AS NOTED BY CONTRACTING OFFICER AND
NPS). STORE DAMAGED PIECES IN A PLASTIC BAG AND TURN OVER TO NPS. INCLUDE
60 SQ FT IN THE BASE BID. PERFORM ADDITIONAL REMOVAL AND REPLACEMENT OF
THE ENTABLATURE AND ENGAGED COLUMNS ON A UNIT PRICE BASIS, UNIT PRICE 5.
1.2.6 METAL FLASHING
1. SURVEY ANY METAL ROOFING ELEMENT SCHEDULED FOR REMOVAL TO DOCUMENT
PROFILES AND DIMENSIONS, INCLUDING SEAMS AND/OR JOINTS, PRIOR TO BEGINNING
REMOVAL. DOCUMENT THE RESULTS OF THE SURVEY ON ELEVATIONS AND DETAILS
AND SUBMIT TO THE PROJECT TEAM. THESE DOCUMENTS WILL SERVE AS THE BASIS
FOR THE SHOP DRAWING SUBMITTAL.
2. REMOVE PAINT ON THREE SAMPLE SOLDER JOINTS ON FLAT-SEAM METAL ROOF.
COORDINATE WITH THE CONTRACTING OFFICER TO INSPECT THE SOLDERED JOINTS.
NOTE THAT BOTH SOLDER AND PAINT CONTAIN LEAD. SEE GENERAL NOTES - ITEM 3.
3. SURVEY BLOCKING AT BASE OF CEDAR ROOF TO DOCUMENT PROFILES AND
DIMENSIONS PRIOR TO BEGINNING REMOVAL. DISPOSE OF DAMAGED PORTIONS.
INCLUDE 45 LINEAR FT OF NEW BLOCKING IN THE BASE BID.
1.2.7 CEDAR ROOF
1. SURVEY THE CEDAR ROOF TO DOCUMENT THE GEOMETRY, DIMENSIONS, AND LAYOUT
OF THE CEDAR SHINGLES, INCLUDING ELEMENTS SCHEDULED FOR REMOVAL, PRIOR
TO BEGINNING REMOVAL. DOCUMENT THE RESULTS OF THE SURVEY ON PHOTOS,
ELEVATIONS, AND PLANS AND SUBMIT TO THE PROJECT TEAM. THESE DOCUMENTS
WILL SERVE AS THE BASIS FOR THE SHOP DRAWING SUBMITTALS.
2. REMOVE AND DISPOSE OF CEDAR SHINGLES AND ROOFING UNDERLAYMENT.
3. REMOVE DAMAGED PORTIONS OF THE ROOF DECKING. INCLUDE 135 SQ FT OF
REMOVAL IN THE BASE BID. STORE DAMAGED PIECES IN A PLASTIC BAG AND TURN
OVER TO NPS. PERFORM ADDITIONAL REMOVAL OF WOOD DECKING ON A UNIT PRICE
BASIS, UNIT PRICE 6.
1.2.8 FINIALS (LOWER AND UPPER)
1. SURVEY THE FINIALS (FOUR LOWER AND ONE UPPER) TO DOCUMENT THE CONDITION,
PROFILE, AND DIMENSIONS OF ALL COMPONENTS, INCLUDING ELEMENTS SCHEDULED
FOR REMOVAL, PRIOR TO BEGINNING REMOVAL. DOCUMENT THE RESULTS OF THE
SURVEY ON PHOTOS, ELEVATIONS AND DETAILS AND SUBMIT TO THE PROJECT TEAM.
THESE DOCUMENTS WILL SERVE AS THE BASIS FOR THE SHOP DRAWING SUBMITTAL.
2. REMOVE, STORE, AND PROTECT THE LIGHTNING PROTECTION ON TOP OF THE CUPOLA.
PROVIDE TEMPORARY LIGHTNING PROTECTION AS REQUIRED. SEE GENERAL NOTE -
ITEM 4.
3. REMOVE, STORE, AND PROTECT THE FINIAL AND FINIAL BASE. REMOVE AND DISPOSE
OF ALL LAYERS OF PAINT FROM THE EXTERIOR OF THE CUPOLA FINIALS PER
HAZARDOUS ABATEMENT DRAWINGS.
4. PROTECT THE GOLD LEAF ON THE UPPER FINIAL.
1. SCOPE OF WORK
1.1 GENERAL NOTES
1. SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO WORK DESCRIBED BELOW. REFER
TO DRAWINGS AND SPECIFICATIONS FOR ALL WORK.
2. HAZARDOUS MATERIAL TESTING IS COMPLETE. THE REPORTS ISSUED ON
15 AND 19 MARCH 2019 FOR LEAD AND ASBESTOS, RESPECTIVELY, INDICATE THAT THE
PAINT (BOTH INTERIOR AND EXTERIOR OF WINDOWS, WINDOW SILLS AND WOOD
COMPONENTS - E.G. BASEBOARDS, WINDOW SURROUNDS ETC.) CONTAINS LEAD,
HOWEVER THE INTERIOR WALL PAINT, PLASTER AND PUTTY DO NOT CONTAIN LEAD OR
ASBESTOS (ATTACHMENT C).
3. REMOVE AND DISPOSE OF ALL PAINT IN ACCORDANCE WITH THE HAZARDOUS
ABATEMENT DRAWINGS.
4. EXISTING LIGHTNING PROTECTION FOR ENTIRE BUILDING WILL BE EVALUATED AS A
PART OF CUPOLA RESTORATION PROJECT. CONTRACTOR SHALL, AS PART OF
DELEGATED DESIGN, PROVIDE A UL-CERTIFIED LIGHTNING PROTECTION SYSTEM AND
COORDINATE ALL WORK WITH THE REMOVAL, STORAGE, PROTECTION, DESIGN (OPTION
5 - IF REQUIRED) AND INSTALLATION OR REINSTALLATION OF THE LIGHTNING
PROTECTION ON THE ROOF, CUPOLA, AND FINIAL. CONTRACTOR MUST PROVIDE
TEMPORARY LIGHTNING PROTECTION THROUGHOUT THE DURATION OF THE
CONSTRUCTION. NPS CAN PROVIDE DRAWINGS FROM PAST CERTIFIED LIGHTNING
PROTECTION DESIGN FOR REFERENCE.
5. PROTECT ALL EXISTING ROOF AND BUILDING SURFACES. DO NOT ALLOW ANY CHEMICAL
STRIPPERS OR CLEANING FLUIDS TO CONTACT ROOF SURFACES OR BUILDING WALLS.
PRIOR TO PERFORMING ALL DEMOLITION WORK, CONTRACTOR MUST CONFIRM AND
DOCUMENT THE CONDITION OF ALL COMPONENTS WITHIN AND ADJACENT TO SCOPE.
CONTRACTOR MUST DOCUMENT THE CONDITIONS WITH DIGITAL PHOTOGRAPHS AND
ANNOTATED SKETCHES, PLANS, AND ELEVATIONS AND SUBMIT THEM TO THE PROJECT
TEAM FOR RECORD.
6. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING WATER OUT OF THE BUILDING AT ALL
TIMES. DURING AND AFTER SLATE AND CEDAR ROOF REMOVAL, AND PRIOR TO NEW
WATERPROOFING INSTALLATION, PROVIDE ADEQUATE TEMPORARY PROTECTION TO
PREVENT WATER PENETRATION INTO BUILDING. DO NOT ALLOW WATER FROM PAINT
REMOVAL AND CLEANING OPERATIONS TO ENTER THE BUILDING. COLLECT ALL RUNOFF
FROM PAINT REMOVAL AT THE BASE OF THE CUPOLA AND DISPOSE OF PROPERLY AND
IN ACCORDANCE WITH APPLICABLE ENVIRONMENTAL LAWS AND THE HAZARDOUS
ABATEMENT DRAWINGS.
7. ALL EGRESS PATHS INTO AND OUT OF THE BUILDING MUST REMAIN ACCESSIBLE
THROUGHOUT THE CONSTRUCTION.
8. SCAFFOLDING OR OTHER MEANS OF ACCESS IS NOT PERMITTED TO BE SUPPORTED
DIRECTLY ON THE SLATE ROOF. CONTRACTOR IS RESPONSIBLE FOR DESIGN OF THE
SCAFFOLDING AND NECESSARY SHORING AND TIE-BACKS AS REQUIRED. CONTRACTOR
MUST PROVIDE SIGNED AND SEALED SCAFFOLDING DRAWINGS, PREPARED BY A
PROFESSIONAL ENGINEER, FOR REVIEW AND APPROVAL BY NPS. THE SCAFFOLDING
ENGINEER MUST VERIFY THAT THE 'BUILDING'S ROOF STRUCTURE HAS THE NECESSARY
STRUCTURAL CAPACITY TO SUPPORT THE SCAFFOLDING, INCLUDING GRAVITY AND
LATERAL LOADS.
1.2 REMOVALS - BASE BID
1. PRESERVE INTACT ALL REMOVED MATERIALS ON SITE FOR NPS INSPECTION. DO NOT
DISPOSE OF REMOVED MATERIALS UNTIL AFTER NPS INSPECTION IS COMPLETE.
1.2.1 INTERIOR PLASTER
1. REMOVE LOOSE PORTIONS OF DAMAGED PLASTER ON THE CEILING OF THE FOURTH
FLOOR IN THE CUPOLA AND THE WALL OF THE CUPOLA AS REQUIRED TO REPAIR
PLASTER. STORE A SAMPLE OF EACH AREA OF PLASTER REMOVED IN SEALED PLASTIC
BAGS AND TURN OVER TO THE NPS. THE CONTRACTOR SHOULD ASSUME
APPROXIMATELY 200 SQ FT OF PLASTER REMOVALS FOR BASE BID. PERFORM
ADDITIONAL REMOVAL OF DAMAGED PLASTER ON A UNIT PRICE BASIS, UNIT PRICE 1.
1.2.2 SLATE ROOF
1. SURVEY THE LAYOUT AND GEOMETRY OF THE SLATE ROOF PRIOR TO REMOVAL,
INCLUDING SHEATHING AND PURLINS OBSERVABLE FROM THE INTERIOR. NOTE
ELEMENTS SCHEDULED FOR REMOVAL, AND DOCUMENT THE RESULTS OF THE SURVEY
ON PHOTOS, PLANS, AND ELEVATIONS AND SUBMIT TO THE PROJECT TEAM. THESE
DOCUMENTS WILL SERVE AS THE BASIS FOR THE SHOP DRAWING SUBMITTAL. SUBMIT
SURVEY INCLUDING PHOTOS, PLANS AND ELEVATIONS TO CONTRACTING OFFICER AND
NPS FOR REVIEW AND APPROVAL.
2. REMOVE, STORE AND PROTECT SLATE AT THE PERIMETER OF THE CUPOLA. REMOVE,
STORE, AND DISPOSE OF FLASHING AND ASPHALT FELT UNDERLAYMENT AT THE
PERIMETER OF THE CUPOLA. INCLUDE A MINIMUM OF 600 SQ FT OF REMOVAL OF SLATE,
FLASHING AND ASPHALT UNDERLAYMENT IN THE BASE BID. PERFORM ADDITIONAL
REMOVAL OF SLATE, FLASHING AND ASPHALT UNDERLAYMENT ON A UNIT PRICE BASIS,
UNIT PRICE 2.
3. SURVEY THE CONDITION OF THE WOOD DECK AND EACH RAFTER AND PURLIN BELOW
THE WOOD DECKING AT LOCATIONS SHOWN ON THE DRAWINGS. DOCUMENT THE
RESULTS OF THE SURVEY ON PHOTOS, PLANS, AND ELEVATIONS, AND SUBMIT TO THE
PROJECT TEAM. THESE DOCUMENTS WILL SERVE AS THE BASIS FOR THE SHOP
DRAWING SUBMITTAL. SURVEY SHOULD INCLUDE EXTENT OF DETERIORATION TO WOOD
DECKING, RAFTERS, AND PURLINS. INCLUDE 800 SQ FT OF REMOVAL OF WOOD DECKING
IN THE BASE BID. PERFORM ADDITIONAL REMOVAL OF WOOD DECKING ON A UNIT PRICE
BASIS, UNIT PRICE 3.
1.SCOPE OF WORK, CONTINUED
1.3 INTERIOR PLASTER - BASE BID
1. REPLACE LATH AND PLASTER AT INTERIOR LOCATIONS NOTED ON THE DRAWINGS.
NOTE THIS DOES NOT INCLUDE HAIRLINE CRACKS. REPLACE PLASTER ASSEMBLY IN
KIND. INCLUDE 200 SQ FT OF PLASTER REPLACEMENT IN THE BASE BID. PERFORM
ADDITIONAL REPLACEMENT ON A UNIT PRICE BASIS, UNIT PRICE 7.
2. PAINT ALL EXPOSED PLASTER SURFACES AT INTERIOR OF CUPOLA AS SHOWN ON THE
DRAWINGS - SHEET A101.
1.4 INTERIOR PLASTER - OPTION 1
1. PATCH ALL HAIRLINE CRACKS IN THE PLASTER AT THE PERIMETER OF WINDOWS,
CEILING OF THE CUPOLA AND OTHER LOCATIONS SHOWN ON THE DRAWINGS.
1.5 SLATE ROOF - BASE BID
1. REPLACE ALL WOOD DECKING REMOVED BELOW SLATE ROOF. NOTE WOOD DECKING
REMOVAL WILL NEED TO TERMINATE AT RAFTER LOCATED AT EDGE OF SLATE REMOVAL
OR JUST BEYOND SLATE REMOVAL. INCLUDE 600 SQ FT OF DECK REPLACEMENT IN THE
BASE BID. PERFORM ADDITIONAL DECK REPLACEMENT ON A UNIT PRICE BASIS, UNIT
PRICE 8.
2. PROVIDE NEW WOOD PURLINS AND RAFTERS ADJACENT TO OLD WOOD
PURLINS/RAFTERS AT LOCATIONS NOTED IN CONTRACTOR'S SURVEY IN ITEM 1.2.2.
INCLUDE 100 LINEAR FEET OF REINFORCEMENT WOOD PURLINS/RAFTERS IN THE BASE
BID. PERFORM ADDITONAL REINFORCEMENT OF WOOD PURLINS/RAFTERS ON A UNIT
PRICE BASIS, UNIT PRICE 9. SISTER RAFTERS/PURLINS AS FOLLOWS:
· SISTER MEMBERS SHOULD MATCH EXISTING MEMBERS IN SIZE AND SHAPE. FOR
BASE BID, ASSUME RAFTER DIMENSIONS ARE 3 X 4 AND PURLIN DIMENSIONS ARE
2 X 3. VERIFY IN FIELD.
· SISTER MEMBER SHOULD RUN FULL LENGTH FROM FACE OF WALL/SUPPORT
(MINUS A FOOT TO ALLOW FOR INSTALLATION).
· FASTEN ALONG THE LENGTH OF THE MEMBERS, 2 FASTENERS AT EACH RAFTER
ASSUME 8 FASTENERS PER SISTER MEMBER.
3. PROVIDE SELF-ADHERED MEMBRANE FLASHING AND UNDERLAYMENT ON THE WOOD
DECKING AND AT THE BASE OF THE CUPOLA. INCLUDE 700 SQ FT OF SELF-ADHERED
MEMBRANE IN THE BASE BID. EXTEND THE UNDERLAYMENT UP THE BACKUP WALL
BEHIND THE RUSTICATED WOOD BASE (SEE THE NEXT ITEM) A MINIMUM OF 18 IN.
INTEGRATE THE SELF-ADHERED MEMBRANE WITH THE SLATE ROOF FELT
UNDERLAYMENT. PROVIDE ADDITIONAL SELF-ADHERED MEMBRANE ON A UNIT PRICE
BASIS, UNIT PRICE 10.
4. REINSTALL THE EXISTING SLATE SHINGLES. INCLUDE 120 SQ FT OF REPLAEMENT SLATE
DUE TO BREAKAGE AND OTHER IMPERFECTIONS (E.G., KNURLS) IN THE EXISTING SLATE
IN THE BASE BID. MIX NEW SLATE WITH EXISTING SLATE. PROVIDE ADDITIONAL
REPLACEMENT SLATE ON A UNIT PRICE BASIS, UNIT PRICE 11.
5. PROVIDE COPPER STEP FLASHING, APRON FLASHING, AND COUNTERFLASHING AT THE
BASE OF THE RUSTICATED WOOD BASE AS SHOWN ON THE DRAWINGS.
1.6 RUSTICATED WOOD BASE - BASE BID
1. REPAIR OR REPLACE THE WOOD DEPENDING ON CONDITION. REMOVE AND REPLACE
HEAVILY DAMAGED OR DETERIORATED WOOD. REPAIR WOOD WITH ISOLATED DEFECTS
USING A COMBINATION OF DURABLE WOOD FILLERS, EPOXY CONSOLIDANTS, AND
PARTIAL IN-KIND REPLACEMENT. RESTORE WOOD COMPONENTS SCHEDULED TO
REMAIN TO THEIR ORIGINAL DIMENSIONS AND PROFILES. SECURELY ATTACH LOOSE
COMPONENTS USING NAILS AND SCREWS AS REQUIRED. COUNTERSINK NAIL AND
SCREW HEADS AND COVER COUNTERSUNK AREAS WITH SPECIFIED WOOD FILLER.
MODIFY EXISTING AND NEW WOOD TO ACCOMMODATE NEW ROOF PERIMETER
FLASHING.
1.9 ENTABLATURE AND ENGAGED COLUMNS - BASE BID
1. REPAIR OR REPLACE THE WOOD. REMOVE AND REPLACE HEAVILY DAMAGED OR
DETERIORATED WOOD. REPAIR WOOD WITH ISOLATED DEFECTS USING A COMBINATION
OF DURABLE WOOD FILLERS, EPOXY CONSOLIDANTS, AND PARTIAL IN-KIND
REPLACEMENT. MODIFY NEW AND EXISTING WOOD COMPONENTS TO ACCOMMODATE
THE NEW SHEATHING AND UNDERLAYMENT. RESTORE WOOD COMPONENTS
SCHEDULED TO REMAIN TO THEIR ORIGINAL DIMENSIONS AND PROFILES. SECURELY
ATTACH LOOSE COMPONENTS USING NAILS AND SCREWS AS REQUIRED. COUNTERSINK
NAIL AND SCREW HEADS AND COVER COUNTERSUNK AREAS WITH APPROPRIATE WOOD
FILLER.
1.10 WINDOWS - BASE BID
1. REPAIR THE WINDOWS IN PLACE. THIS WILL INCLUDE REPLACEMENT OF ANY DAMAGED
GLAZING, REMOVAL OF PAINT FROM ALL ACCESSIBLE WOOD COMPONENTS, AND
REPAINTING. REMOVE ANY ROTTING AREAS, FILL CRACKS WITH EPOXY AND WOOD
FILLER AS REQUIRED, AND PERFORM FULL OR PARTIAL-DEPTH REPLACEMENT OF
MISSING WOOD AS REQUIRED. REPLACE ANY MISSING OR DAMAGED HARDWARE WITH
MATCHING (MATERIALS, FINISH, AND APPEARANCE) HISTORICALLY APPROPRIATE
HARDWARE. NPS MUST REVIEW AND APPROVE ALL HARDWARE SELECTION PRIOR TO
PURCHASING MATERIAL.
1.11 WINDOWS - OPTION 4
1. REMOVE, STORE, AND PROTECT WINDOWS (INCLUDING THE FRAME AND SASH) TO
PERFORM OFF-SITE RESTORATION. DOCUMENT ANY PORTIONS OF FENESTRATION
CONCEALED WHILE IN SITU. THIS INCLUDES REMOVAL OF INTERIOR FINISHES AS
REQUIRED TO ACCESS THE FRAME.
2. PROVIDE PLYWOOD AND TEMPORARY WATERPROOFING IN WINDOW OPENINGS
THROUGHOUT CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR KEEPING BUILDING
AIRTIGHT AND WATERTIGHT THROUGHOUT CONSTRUCTION.
3. PERFORM OFF-SITE RESTORATION OF WINDOWS. THIS WILL INCLUDE REPLACEMENT OF
DAMAGED AND LOOSE GLAZING, REMOVAL OF PAINT FROM ALL EXPOSED WOOD
COMPONENTS, AND REPAINTING. REMOVE ANY ROTTING AREAS, FILL CRACKS WITH
EPOXY AND WOOD AS REQUIRED, AND PERFORM FULL OR PARTIAL-DEPTH
REPLACEMENT OF MISSING WOOD AS REQUIRED. REPLACE ANY MISSING OR DAMAGED
HARDWARE WITH MATCHING (MATERIALS, FINISH, AND APPEARANCE) HISTORICALLY
APPROPRIATE HARDWARE. NPS SHOULD REVIEW AND APPROVE ALL HARDWARE
SELECTION PRIOR TO PURCHASING MATERIAL. MODIFY THE WINDOW FRAMES AS
REQUIRED TO ACCOMMODATE THE PERIMETER FLASHING.
4. PROVIDE INTEGRATED COPPER PERIMETER FLASHING CONSISTING OF SILL FLASHING
AND WINDOW HEAD DRIP FLASHING AT ALL WINDOWS.
5. REINSTALL THE OPERABLE SASH AND WINDOW FRAME.
1.12 METAL FLASHING - BASE BID
1. REMOVE AND DISPOSE OF METAL FLASHING AND UNDERLAYMENTS (IF PRESENT) ON
LOWER FLAT-SEAM ROOF AND ON BASE OF CEDAR ROOF, AS DESCRIBED IN 1.2.2.
2. REPLACE DAMAGED WOOD BLOCKING. INCLUDE 45 LINEAR FT IN THE BASE BID.
3. REPLACE DAMAGED WOOD SHEATHING. INCLUDE 45 SQ FT IN THE BASE BID. PERFORM
ADDITIONAL DECK REPLACEMENT ON A UNIT PRICE BASIS, UNIT PRICE 14.
1.6 RUSTICATED WOOD BASE - BASE BID (CONT.)
2. REMOVE /DISPOSE OF EXISTING SURFACE-SEALED METAL FLASHINGS. PROVIDE NEW
BRAKE METAL SEPARATOR. EXTEND SELF-ADHERED WATERPROOFING MEMRBANE AND
FELT SEPARATOR SHEET UP BRAKE METAL SEPARATOR. INSTALL NEW METAL FLASHING
AND REGLET-SET COUNTERFLASHING. COAT WITH FLUID-APPLIED WATEROOFING TO
MATCH EXISTING.
3. PERFORM SPOT REPAIRS TO THE EXPOSED WOOD CLADDING OF THE CUPOLA ABOVE
THE PEDIMENT AS NOTED IN ITEM 1 ABOVE.
4. REPAINT THE WOOD WITH AN EXTERIOR GRADE PAINT SYSTEM. PROVIDE TWO COATS
OF PAINT OVER A PRIMER COAT.
5. SEE SEC. 1.14 FOR SCOPE OF WORK AT LOWER FINIALS.
1.7 RUSTICATED WOOD BASE - OPTION 2
1. AFTER PERFORMING THE SURVEY DESCRIBED IN SEC. 1.2.3 REMOVE, STORE, AND
PROTECT THE WOOD CLADDING AT THE RUSTICATED CUPOLA PEDESTAL BELOW THE
METAL CORNICE ROOF.
2. REPLACE DETERIORATED WOOD SHEATHING (IF PRESENT) BELOW RUSTICATED WOOD
BASE. ASSUME 320 SQ FT REPLACEMENT IN THE BASE BID. PERFORM ADDITIONAL
REPLACEMENT ON A UNIT PRICE BASIS, UNIT PRICE 12.
3. IF SHEATHING IS NOT PRESENT, PROVIDE THIN SHEATHING, SUCH AS BRAKE METAL, TO
SUPPORT THE MEMBRANE UNDERLAYMENT AND A DRAINAGE LAYER UNDER THE WOOD
CLADDING OF THE RUSTICATED WOOD BASE.
4. PROVIDE CONTINUOUS MEMBRANE UNDERLAYMENT AND A DRAINAGE LAYER BELOW
THE WOOD CLADDING. EXTEND THE UNDERLAYMENT UP THE RISING WALL A MINIMUM
OF 18 IN. INTEGRATE THE SELF-ADHERED MEMBRANE WITH THE SLATE ROOF FELT
UNDERLAYMENT.
5. PROVIDE NEW METAL STEP FLASHING RISING MINIMUM 12 IN. UP BRAKE
METAL/SHEATHING. SECURE STEP FLASHING WITH NEW METAL COUNTERFLASHING.
6. REINSTALL THE WOOD CLADDING. MODIFY AS REQUIRED TO FIT NEW SHEATHING AND
UNDERLAYMENT. TERMINATE THE WOOD CLADDING A MINIMUM OF 3 IN. ABOVE THE
SLATE ROOF. INCLUDE 320 SQ FT REMOVAL/REINSTALLATION IN THE BASE BID.
PERFORM ADDITIONAL REPLACEMENT ON A UNIT PRICE BASIS, UNIT PRICE 13. FOR
REPLACEMENT OF WOOD COMPONENTS, ASSUME ACETYLATED WOOD (ACCOYA) WITH
MAHOGANY AS THE ALTERNATE.
7. REPAINT THE PEDESTAL. PROVIDE TWO COATS OF PAINT OVER A PRIMER COAT.
PROVIDE AN EXTERIOR GRADE PAINT. PERFORM SPOT REPAIRS TO THE EXPOSED
WOOD CLADDING OF THE CUPOLA ABOVE THE PEDIMENT. COAT METAL PORTIONS OF
THE PEDESTAL WITH FLUID-APPLIED WATERPROOFING TO MATCH EXISTING.
1.8 RUSTICATED WOOD BASE - OPTION 3
1. SEE OPTION 2. INCLUDE 320 SQ FT OF REPLACEMENT OF THE ENTIRE WOOD CLADDING
WITH A DURABLE AND NATURALLY ROT-RESISTANT WOOD. FOR REPLACEMENT OF WOOD
COMPONENTS, ASSUME ACETYLATED WOOD (ACCOYA) WITH MAHOGANY AS THE
ALTERNATE.
1.12 METAL FLASHING - BASE BID (CONT.)
4. PROVIDE FULLY SOLDERED FLAT-SEAM COPPER FLASHING SYSTEM OVER CONTINUOUS
SELF-ADHERED MEMBRANE UNDERLAYMENT AND SEPARATOR SHEET.
5. PROVIDE METAL CAP FLASHING AT BASE OF CEDAR ROOF. EXTEND FLASHING UNDER
CEDAR ROOF.
6. INSTALL FLUID-APPLIED WATERPROOFING MEMBRANE ON METAL FLASHING
COMPONENTS. PROVIDE CUSTOM MEMBRANE COLOR TO MATCH EXISTING AND AS
APPROVED BY NPS.
1.13 CEDAR ROOF - BASE BID
1. REPLACE DAMAGED PORTIONS OF THE CUPOLA ROOF DECKING. INCLUDE 135 SQ FT OF
REPLACEMENT OF WOOD DECKING IN THE BASE BID. PERFORM ADDITIONAL DECK
REPLACEMENT ON A UNIT PRICE BASIS, UNIT PRICE 15.
2. PROVIDE SELF-ADHERED MEMBRANE FLASHING AND VENTILATING UNDERLAYMENT ON
THE ROOF DECK. INTEGRATE MEMBRANES WITH COPPER FLASHING AT BASE OF DOME.
3. PROVIDE NEW CEDAR SHINGLES.
1.14 FINIALS (LOWER AND UPPER) - BASE BID
1. PERFORM IN SITU REPAIRS TO THE FINALS (E.G. PREPARE SUBSTRATES AND PROVIDE
WOOD FILLER) TO INFILL SMALL AREAS WHERE THE WOOD IS DETERIORATED. APPLY
ADDITIONAL GOLD LEAF TO THE UPPER FINIAL BALL.
2. REPLACE THE FINIAL BASES WITH A DURABLE AND NATURALLY ROT-RESISTANT WOOD.
FOR REPLACEMENT OF WOOD COMPONENTS, ASSUME ACETYLATED WOOD (ACCOYA)
WITH MAHOGANY AS THE ALTERNATE. MATCH THE ORIGINAL GEOMETRY OF THE
DAMAGED WOOD.
3. REPLACE THE FLASHINGS ON THE FINIALS AND FINIAL BASES. INTEGRATE THE
FLASHINGS WITH THE METAL ROOF AND CEDAR ROOF ON THE LOWER AND UPPER
FINIALS, RESPECTIVELY. PROVIDE NEW COPPER CAP FLASHING ON UPPER AND LOWER
FINIALS.
4. INSTALL FLUID-APPLIED WATERPROOFING MEMBRANE ON METAL FLASHING
COMPONENTS. PROVIDE CUSTOM MEMBRANE COLOR TO MATCH EXISTING AND AS
APPROVED BY NPS.
5. REINSTALL THE FINIALS AND FINIAL BASES.
1.15 LIGHTNING PROTECTION - BASE BID
1. PERFORM AN ANALYSIS OF THE EXISTING LIGHTENING PROTECTION SYSTEM TO
CONFIRM IT PROVIDES THE REQUIRED UL CERTIFICATION.
2. REINSTALL ON THE BUILDING IF NPS APPROVES THE DOCUMENTATION FOR THE
LIGHTNING PROTECTION CONFIRMING IT PROVIDES THE REQUIRED UL CERTIFICATION.
1.16 LIGHTNING PROTECTION - OPTION 5
1. IN THE EVENT THAT THE LIGHTENING PROTECTION DOES NOT MEET THE UL
CERTIFICATION REQUIREMENTS. PERFORM THE REQUIRED ANALYSIS, DESIGN AND
INSTALLATION FOR A LIGHTNING PROTECTION SYSTEM FOR THE ENTIRE BUILDING TO
PROVIDE THE REQUIRED UL CERTIFICATION.
| A000 Cover |
| Sheets and Views |
| Layout1 |
| A001 Staging and Site Utilization |
| Sheets and Views |
| Layout1 |
| A002 Scope of Work |
| Sheets and Views |
| Layout1 |
| A003 Scope of Work |
| Sheets and Views |
| Layout1 |
| A100 Partial Roof Plan |
| Sheets and Views |
| Layout1 |
| A101 Reflected Ceiling Plans |
| Sheets and Views |
| Layout1 |
| A200 N-E Elevations |
| Sheets and Views |
| Layout1 |
| A201 S-W Elevations |
| Sheets and Views |
| Layout1 |
| A202 Interior Elevations |
| Sheets and Views |
| Layout1 |
| A400 Slate Roof Details |
| Sheets and Views |
| Layout1 |
| A401 Slate Roof Details |
| Sheets and Views |
| Layout1 |
| A402 Rusticated Base Details |
| Sheets and Views |
| Layout1 |
| A403 Window Details |
| Sheets and Views |
| Layout1 |
| A404 Flat Seam Metal Flashing Details |
| Sheets and Views |
| Layout1 |
| A405 Cedar Roof and Metal Flashing Details |
| Sheets and Views |
| Layout1 |
| A406 Finial Details |
| Sheets and Views |
| Layout1 |
| A405 Cedar Roof and Metal Flashing |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .