This document contains a request for proposal for repair work on the wood elements of the cupola at Hampton National Historic Site in Towson, Maryland. The solicitation number is 140P4220R0014 and it seeks a construction firm to provide all labor, equipment, materials, and supervision necessary to complete repairs in accordance with the specifications. The work is estimated to cost between $1 million and $5 million and will be performed under wage determination MD 20200030 in Baltimore County. The contract type will be firm-fixed price. The proposal evaluation will consider technical factors and price. Experience working on historic structures is required. The submission deadline for questions is August 7th and a site visit will be held on August 4th. The award will be made to the responsible contractor providing the best value to the government. This is a 100% small business set-aside solicited under FAR Parts 15 and 36.

View the file

Other files

File Type Posted
Sol_140P4220R0014_Amd_0004.pdf PDF
General References_0004.doc DOC document
Hazardous Materials Form_0004.doc DOC document
Sol_140P4220R0014_Amd_0002.pdf PDF
HAMP Cupola Price Sheet_0003.xlsx XLSX spreadsheet
Sol_140P4220R0014_Amd_0003.pdf PDF
Sol_140P4220R0014_Amd_0001.pdf PDF
Hampton Mansion CD.pdf PDF
Wage Determination MD20200030.pdf PDF
Experience Questionnaire.docx DOCX document
E54 COVID-19 Guidance OSHA.pdf PDF
B08 Price Schedule.docx DOCX document
Hampton Specifications.pdf PDF
Sol_140P4220R0014.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hampton Cupola RFI’s: Solicitation No. 140P4220R0014

1. Is there a maximum number of PPQ that we can submit? In the solicitation it states to submit the past 3 years.

a. There is no set maximum number of PPQ allowed. All PPQ submitted shall be recent (3 years) and relevant. If an offeror has no recent construction work older projects will be accepted.

2. Will CPARs be acceptable in lieu of PPQ?

a. CPARs are not acceptable in lieu of PPQ.

3. Due to COVID-19 a lot of customers aren’t in office and a PPQ is hard to obtain, are we allowed to submit previously filled out PPQ forms?

a. No, PPQ forms shall be sent to previous customers and submitted directly to the Contracting Officer.

4. Key personnel do you want to see multiple resume for each key personnel or just one for each?

a. One resume for each key personnel

5. For Section K representation and certification. If we are registered in SAM. Would you still need us to submit the attached form as well?

a. If an offeror is registered in SAM the attached form does not need to be submitted.

6. Is there a page limit for the rest of the proposal or just the Technical evaluation Factor 1 only?

a. There is no page limit for the proposal in its entirety. Offerors should only submit the information in which they wish to be evaluated on and meets the solicitation requirements.

7. For Section K if paragraph d applies, do we still need to submit all of the pages in Section K or just the first page?

a. If paragraph d applies, then the first page will be sufficient.

8. Is there Hazardous material test result?

a. There is no hazardous material test results.

9. Are resumes for subcontractor require? If so, will it be for only major subcontractor or all?

a. Resumes for all major subcontractors and key trades are required.

10. What should the date be for the NTP for the schedule?

a. For the proposal the NTP can be estimated as it will be determined after the award.

11. Can a superintendent be a QCM as well?

a. Yes

12. Can you provide us the following forms: Hazardous material, General References, and Equals?

a. There are no specific forms for these items.

13. There is an active beehive internal to the columns that require restoration. How is the active beehive to be addressed and by whom? In the past the government has hired a beekeeper to remove the hive.

a. Contractor will need to address the beehive in an appropriate way. We cannot access it.

File details come from the government source that posted it. Updated .