Attachment_6_PNR_Validation_Worksheet_October_2017_v2.docx
DOCX document 134 KB Posted
- Attached to
- DoD Travel Management Support Services Federal contract opportunity
- Solicitation number
- H9821017R0033
- Issued by
- Defense Human Resources Activity
About this file
Attachment 6 PNR Validation
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Travel Management Company Passenger Name Record Validation (TMC PNR Validation)
Requirement:
A Travel Management Company (TMC) submitting a proposal for the TMC acquisition must complete a TMC PNR Validation configuration worksheet to be eligible for contract award. However, it is not necessary to participate in a PNR Validation if the TMC is using a Pseudo City Code (PCC) that is currently connected to the Online Booking Tool (OBT). Under a joint venture, if all parties have different PCCs, Airline Reporting Corporation (ARC)/International Air Transport Association (IATA) numbers and contact information, a worksheet would be required for each TMC and participation in the PNR validation would be required if one or both TMCs PCC isn’t currently connected to OBT.
Background:
The PNR validation is a process that confirms the DoD OBT’s ability to exchange a Passenger Name Record (PNR) with the TMC and provides the TMC an example of an actual PNR that will be delivered from OBT. Additionally, it assures OBT can send a PNR to the TMC on a specified queue and then sweep the PNR from the TMC outbound queue back into OBT.
This process validates the technical aspects of TMC connectivity and provides the TMC the experience transmitting data with OBT.
TMC PNR VALIDATION PROCEDURE
| 1. | Contact dodhra.mc-alex.dtmo.list.contracting@mail.mil to request the configuration worksheet. The worksheet lists the technical requirements for OBT to deliver a PNR to the TMC. The worksheet will be sent directly to the person requesting the validation. |
| 2. | Complete the configuration worksheet, making sure to specify the preferred Global Distribution System (GDS), Pseudo City Code, four queues, two terminal addresses, and the company profile as listed in the GDS. |
3. Return the configuration worksheet to: dodhra.mc-alex.dtmo.list.contracting@mail.mil
4. If you have questions regarding the worksheet, contact DTMO Movement Management Branch (MMB) at 571-372-1300.
| 5. | Email DTMO contracting to schedule the validation test (This request may be included with Step 3). It may take two to three weeks to set up the validation and less than a day to complete it. |
| 6. | Set up branch access within the agreed GDS. |
| 7. | Receive a OBT PNR in your requested queue. |
| 8. | Place the observed OBT PNR on the specified outbound queue for OBT to sweep. |
9. Verify with OBT that the PNR was received.
10. Print the validated PNR, saving a copy for your records.
Deadline: Offerors shall complete this procedure no later than thirty (30) days prior to the proposal due date.
Offerors shall be deemed to have satisfied this requirement when the Government receives confirmation that the PNR validation has occurred in accordance with the above procedure.
DEFENSE TRAVEL
MANAGEMENT OFFICE
TMC OBT PNR Configuration Worksheet
This worksheet contains the necessary information to begin your OBT connectivity process that will allow OBT to automate applicable data with your PCC. Your cooperation in accurately providing this to us is greatly appreciated.
October 2017 v2
TMC: Name: Address: Address:
ARC Number:
Military Installation TMC will support:
TMC POC: Telephone
Alternate POC: Telephone:
Authorizer Name and Title
Signature
Date
1. GDS used to support this contract (check all that apply)
Sabre
Worldspan
2. Pseudo City Codes (PCC) and GDS Queues
| Include minimum of one PCC/OFFICE ID for each GDS identified above. |
| Identify the five queues for each PCC/OFFICE ID. (PNR, Polling, Cancellations, Ticketing, Urgent) |
| If more than one PCC/OFFICE ID is identified for a GDS, identify the queues associated with each PCC/OFFICE ID and the DoD locations. |
PCC/
OFFICE ID
Ticketing Queue Cancellation Queue PNR/Inbound Queue Polling/Outbound Queue Urgent/Change Queue
Explanation of Queues Used in OBT
| Ticketing queue – Approved OBT PNRs will be placed onto this queue 3 business days before travel to be ticketed. |
| Cancellation queue – Authorizations cancelled in OBt by a routing official will be placed on this queue. |
| PNR/Inbound queue – Any new/changed PNR will be placed on this queue, to include reservations cancelled by the user/traveler. |
| Polling/Outbound queue – Outbound queue for TMC’s to return PNRs to OBT. |
| Urgent/Change queue – Any new/changed PNR within 3 business days of travel will be placed on this queue. |
3. Company Profile set up to support OBT Each PCC/OFFICE ID listed in Item #3 above, must be associated with a Company Profile, as identified below: (Sabre – Profile; Worldspan – 2nd level Worldfile)
| PCC/OFFICE ID |
| User File /Company Profile Name |
TMC OBT PNR Configuration Worksheet October 3, 2017 2009
Defense Travel Management Office
4. Quality Control Applications NO quality control applications are to be attached to a OBt profile or PCC/Office ID that require a mandatory field prior to ending a PNR may be activated for OBT PNR’S.
Examples to check if you have mandatory edits turned on
Sabre – Flex edits (W/K*TJRALL) Worldspan – Worldfile edits
5. Required PCC/Office ID Settings for OBT
| Sabre | ||
| Automatic hotel description | Off | (HIP¤AUTOHOD) |
12‐Hour Clock On
Worldspan Worldspan (AIRir Table)
| 12‐Hour Clock | On | (DEF/A) Hotel Property Code turned | On | (H/L) |
| PowerShopper | On |
Note: PNR will require the PI stored
6. Remark Qualifiers The following table identifies the “alpha qualifiers” to be used to identify traveler profile information for air, car, hotel, personal and any additional information.
The “OBT‐to‐TMC Qualifiers” are preset by OBT and cannot be changed.
Remark
Subject
OBT to TMC Qualifier (pre‐set)
TMC to OBT Qualifier
| Air |
| W |
| E |
| Car |
| X |
| D |
| Hotel |
| Y |
| G |
| Personal |
| P |
| P |
| Change |
| A |
GDS BRANCH ACCESS PROCEDURES
Worldspan KYApsuedo
Template appears, tab and change N to Y in the following fields: Access PNR’s Access Queues Allow QEP/QEM Access Profiles Emulation Enter
Display Branches KY* Emulation format: 4@Epsuedo End Emulation: 4@EOFF Sabre
SI9
W/TAACTOPCC#ADTSPCC W/TAACTOPCC#BDTSPCC
Delete Branch Access
Worldspan:
KY* ‐ lists all branched PCCs
KYDpsuedo being deleted
Sabre:
SI*9
W/TADour pcc#B pcc to be deleted
W/TADour pcc#A pcc to be deleted image1.png
File details come from the government source that posted it.