Vendor Questionnaire H9227619Q0017
This questionnaire is provided to assist offerors with the development of their offer and to assist with ensuring their offer meets or exceeds the Government’s requirement. Offerors must submit offers in accordance with the Request for Quote and Statement of Requirements in order to ensure offers are inclusive of the entire requirement. This questionnaire does not absolve the offeror from following the Request for Quote or Statement of Requirements.
Instructions: Please explain answers to the following questions.
1) Does the SCIFs meet the accreditation requirements as listed in the Statement of Requirements?
(ref. Statement of Requirements, para. 2.)
a)
2) Are the SCIFs designed and configured as Certified Shielded Enclosures (CSE) required to achieve shielding attenuation?
(ref. Statement of Requirements, para. 3.a.)
a)
3) Does the SCIF have a STC rating of 50 or better?
(ref. Statement of Requirements, para. 3.a.)
a)
4) Are appropriate HVAC units included?
(ref. Statement of Requirements, para. 3.a.)
a)
5) Does the SCIF designs allow the SCIFs to be relocatable?
(ref. Statement of Requirements, para. 3.a.)
a)
6) Are the SCIFs designed to meet the approximate dimensions of a standard 20 foot ISO container?
(ref. Statement of Requirements, para. 3.b.)
a)
7) Does vestibule and door designs meet the requirements for security in depth, including access control and TEMPEST rating, and attenuation?
(ref. Statement of Requirements, para. 3.c.)
a)
8) Are the interior surfaces primed-coated and finished with flat latex paint? Are all steel surfaces sandblasted prior to painting?
(ref. Statement of Requirements, para. 3.d.)
a)
9) If applicable, are the exterior walls continuously welded on all sides or interior wall fully welded? Are there at least ½” solid steel man bars welded in a 6” grid at openings greater than 96 square inches?
(ref. Statement of Requirements, para. 3.e.)
a)
10) Are three workstations and a printer station included? Can the three workstations connect to four separate and secure networks?
(ref. Statement of Requirements, para. 3.d.)
a)
11) Are generators included that meets the specifications of the Statement of Requirements?
(ref. Statement of Requirements, para. 3.g.)
a)
12) Are all power generation requirements listed in the Statement of Requirements met and included in the offer?
(ref. Statement of Requirements, para. 3.g.)
a)
13) Are the SCIFs coded and designed for 4 fiber optic networks?
(ref. Statement of Requirements, para. 3.h.)
a)
14) Is there a panel port feature built into the SCIFs?
(ref. Statement of Requirements, para. 3.h.)
a)
15) Are UL-2050 Intrusion Detection Systems (IDS) included with the designs?
(ref. Statement of Requirements, para. 3.i.)
a)
16) Are the warranty provisions included with the offer? What are they?
(ref. Statement of Requirements, para. 3.d.)
a)