H92240-14-R-0005-0003.pdf
PDF 25 KB Posted
- Attached to
- NSW Tactical Driving Course of Instruction
- Solicitation number
- H92240-14-R-0005
- Issued by
-
United States Special Operations Command
About this file
This Amendment posts questions and answers recieved to date. Question submission deadline is extended to 27 FEB 2014 by 11 00AM (PST).
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment posts questions and answ ers received to date. It extends the Questions submission deadline to 27 FEB 2014 at 11:00 AM (PST). This should allow the Government adequate time to prepare answ ers. Questions submitted after this deadline may not be answ ered. Another amendment is expected shortly to provide the remaining answ ers to submitted questions appearing on the list w ith "Answ er Pending."
No version 3 of the Pricing Spreadsheet has been issued or attached to Amendment 02, that w as a typo on page 1 of Amendment 02. The most current version of the Pricing Spreadsheet, Attachment G, remains Verison 2, 19 FEB 2014.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Feb-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X H92240-14-R-0005
X 9B. DATED (SEE ITEM 11)
07-Feb-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2014
CODE
NAVAL SPECIAL WARFARE COMMAND
ATTN: LAURA PATTERSON
2000 TRIDENT WAY BLDG 624
SAN DIEGO CA 92155-5583
H92240 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
H92240-14-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 03 Q&A
Question Number
Question Answer
16 Since the solicitation response deadline has now been extended, will there be an opportunity to submit further RFI's? And if so, please confirm deadline if the case.
All remaining questions are due by 27 FEB 2014 by 11:00 AM (PST).
17 Under Volume 2 - Past Performance are the four POC form Attachment D Past Performance Worksheets sent to the "Contract Specialist" for each company if there is a joint venture or a subcontractor is present, or would the subcontractor supply their own four Attachment D Past Performance Worksheets?
No more than four (4) Past Performance references should be submitted by each offeror.
If the offeror is using the past performance of a subcontractor, joint venture partner, affiliated company, or operating divisions within the parent company for one or more of its 4 references those references must be submitted in accordance with the submission requirements on Page 56 the SF1449, Sect b.
Volume 2 – Past Performance.
18 On Feb 21 you posted an amended Pricing Sheet. We require clarification as to the extent you need pricing details. Are you asking for labor rates primarily or do you require what portion of our price is due to fuel cost, advertizing, tire purchases, insurance cost, etc...or do you just want to see labor cost to us and the remainder as "Operating Expenses"? If we were to provide full costing details, it would be a massive and detailed file.
We of course cannot provide detail on exact costs to operate a training that has not yet been developed fully and accepted.
We, as most small business must, charge a fee to cover cost within certain parameters, and leave enough to allow for operating costs and keeping a business in the positive cash flow category. Can you please give some guidelines as to what cost you want and if the remainder may be categorized as operating costs and profits?
Provide the amount of detail that shows how you arrived at your pricing. Labels are up to the offeror.
If the Government requires additional information or has specific questions regarding the pricing, it will be requested.
19 Technical Proposal Length: We read a The Technical Proposal is limited to 30 pages, limit of 30 pages for this. To double check does this include the The Experience Information Sheet (Attachment A)s and if so does it also include the subcontractor's four sheets? We see the font for some sections needs to be 12 and Times New Roman.
However what of the rest? Basically we are having a very difficult time reducing our technical proposal that includes curriculum rational, explanations, sample schedules, vehicle breakdown, quality control, safety plan, experience sheets, letters of commitments, etc all within a 30 page document covering 10 days training on 3 distinct vehicles platforms. Can you please clarify what should compose these 30 pages so we do not include aspects not to be included in the Technical Proposal.
this is exclusive of the Resumes/Certificates that are required to be submitted.
Only 4 Experience Information Sheets are allowed. They are to be submitted within the Technical Proposal.
In accordance with 52.212-1 ADDENDUM, Proposal Preparation Format and Structure, #5: “The narrative material in the proposal shall be typed or printed in Times New Roman font with the type no smaller than 12 point.” If there is a form, agreement, or some other non-narrative item that already has a font size, you do not have to change that to 12 point font.
The Government has identified submission requirements and evaluation criteria. It is up to each offeror to format submission packages appropriately.
20 Does a pre, 2000 year right hand drive, state compliant Land Cruiser meet the stated requirement per PSW H92240-14-R-0005
Answer Pending
21 Does a pre, 2000 year state compliant FourTrac, Nissan Pathfinder or Toyota Tacoma meet the stated requirement per PSW H92240-14-R-0005
Answer Pending
22 Will time extension be granted to import non us compliant vehicles as described in the solicitation?
Answer Pending
23 Are there minimum and maximum vehicle dimensions, cargo capacities, seating area, and electrical power requirements?
Answer Pending
24 Are there a minimum ground clearance and/ or wheel travel requirement for the NSCV training vehicle?
Answer Pending
25 How many training vehicles require electric winches? Does the winching system require a remote controlling device?
Answer Pending
26 Does the training vehicle have a requirement for Infrared lighting?
Answer Pending
27 Does the training vehicle have a requirement for “black out” conditions (brake lights, back up lights, running lights, etc…?)
Answer Pending
28 Is there a requirement for minimum / maximum wheel and tire size?
Answer Pending
29 Is there a requirement for upgraded and bolstered driver and navigator seats to
Answer Pending accommodate the 4 point restraint system?
If so, would the requirement include the rear seating area?
(End of Summary of Changes)
File details come from the government source that posted it. Updated .