Providing ECP 161 drawing Since this contract is for maintenance and not reproducing the boat this drawing Is given with the stipulation THIS DRAWING CANNOT BE USED FOR REPRODUCTION I.E BUILDING THE BOAT.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For:
Contract No. USZA22-03-D-0003
Submitted by:
UNITED STATES MARINE, INC.
10011 Lorraine Road Gulfport, MS 39503
(228) 679-1005
Submitted On:
October 14, 2008
Presented to:
US SPECIAL OPERATIONS COMMAND
SOAL-NS-C (Bldg 506C) 7701 Tampa Point Blvd.
MacDill AFB, FL 33621-5323
CDRL DI-022
ECP 161
Bilge System Vented Loop Install
United States Marine, Inc.
Contract #USZA22-03-D-0003 2 ECP 161
USMI NSWRIB
ENGINEERING CHANGE PROPOSAL
Originator: D.J Malley
10011 Lorraine Rd Gulfport MS 39503
Submittal Date: 10-14-2008
Contract Number: USZA22-03-D-0003
Procuring Contracting Officer: Sandra Smith
ECP Number: ECP 161
Title: Bilge System Vented Loop Installation
Description of Change: A vented loop with silencer (consisting of a vent barb with breather vent) will be installed on each of the two aft electric bilge system discharge lines at the top of the loop prior to exiting the transom.
Reason for Change: The electric bilge pumps can become air locked, preventing them from functioning properly. A detailed review of the manufacturer's specifications for the Rule 16A (24V) 3700 bilge pump revealed that the use of a check valve in the discharge piping requires the installation of a vented loop.
CAGE Code: 0NNZ7
Specifications Affected: None
Drawings Affected: A-2, Sheet 1; A-2, Sheet 4; P-4, Sheet 3 DDP/Interim Spare Item Change: Yes
Effect on Production Schedule: None. ECP can be incorporated on production craft with no negative effect. All other craft will require the retrofit.
Contract #USZA22-03-D-0003 3 ECP 161
MODIFICATION JUSTIFICATION:
The current electric bilge pump system air locks sporadically and will not function properly. The current piping configuration allows water to remain trapped near the transom check valve which, consequentially, keeps the bilge pump from priming itself due to air trapped between. The manufacturer’s specification for the electric bilge pump states that a vented loop is required when a check valve is used in the system. A check valve is located on the discharge hose of each electric pump at the transom. Testing of the pumps with a vented loop eliminated the air lock;
however, “whistling” from the vented loop occurred when the bilge pumps were turned off. After a vent barb (USMI# 506-7010) with breather vent (USMI# 506-7009) was applied to the vent opening in the top of the vented loop, testing showed that the “whistling” was successfully eliminated. The vent barb (USMI# 506-7010) and breather vent (USMI# 506-7009) are shown on page 6 under Attachment 1 “Modification Description”.
MODIFICATION DESCRIPTION
See Attachment (1) for a detailed description.
SCHEDULE:
The ECP will be incorporated on future production craft. There is no negative effect on the production schedule. The NSWRIB production schedule will remain 14 weeks and 1 day. (This includes approved ECP's from 010 to 161). All other craft will require retrofit and each craft will take one day to complete when made available to USMI. Retrofit kits can be made available from USMI 60 days after approval of delivery order.
WEIGHT AND MOMENT IMPACT:
LCG/VCG Change with Vented Loop Components Added:
Note: * Positive value indicates a shift forward or upwards.
USMI # or OEM# DESCRIPTION QTY
UNIT
WEIGHT
TOTAL
WEIGHT
505-9008
LOOP, VENTED, MF 840, 1-1/2" BARB, 5-1/4" H X
7-3/4" W
2 0.4 0.8
506-7010 ASSEMBLY, VENT BARB, MF-846 2 0.02 0.04
506-7009 BREATHER-VENT, 1/4" NPT MALE, 3 MAX CFM, 1/2"
HEIGHT 2 0.02 0.04
634-7003 4” INSPECTION PORT 2 0.4 0.8
505-7198 CLAMP, WORM, SS #24, 1-4/16" - 2" (10/PK) 8 0.04 0.32
Total Weight Change 2 lbs
Vessel Configuration
Weight Change
(lbs)
LCG
Change* (inches)
VCG
Change* (inches)
Light Load 2.00 -0.01 0.00 Full Load 2.00 -0.01 0.00
Contract #USZA22-03-D-0003 4 ECP 161
LOGISTICS AND SPARING:
The following parts will be added to the MEL:
The following part will be deleted from the MEL:
(None)
The following list details recommended additions to the PIO list:
The following parts will be added to the DDP:
USMI# VENDOR/OEM VENDOR#/OEM# DESCRIPTION QTY U/I
505-9008 Forespar Marelon 903000
LOOP, VENTED, MF 840, 1-1/2" BARB, 5-
1/4" H X 7-3/4" W
2 EA
506-7010 Forespar Marelon 903004 ASSEMBLY, VENT BARB, MF-846 2 EA
506-7009 McMaster Carr 4471K12
BREATHER-VENT, 1/4" NPT MALE, 3 MAX
CFM, 1/2" HEIGHT
2 EA
634-7003 Lewis Marine 5063-1054 4” INSPECTION PORT 2 EA
505-7198 Gulf Belt & Die &
Gasket Co. CL-WORM-SS-24 CLAMP, WORM, SS #24, 1-4/16" - 2" (10/PK)
8 EA
The following parts list details the components that make up this ECP:
USMI# VENDOR/OEM VENDOR#/OEM# DESCRIPTION QTY U/I
505-9008 Forespar Marelon 903000
LOOP, VENTED, MF 840, 1-1/2" BARB, 5-
1/4" H X 7-3/4" W
2 EA
506-7010 Forespar Marelon 903004 ASSEMBLY, VENT BARB, MF-846 2 EA
506-7009 McMaster Carr 4471K12
BREATHER-VENT, 1/4" NPT MALE, 3 MAX
CFM, 1/2" HEIGHT
2 EA
634-7003 Lewis Marine 5063-1054 4” INSPECTION PORT 2 EA
505-7198 Gulf Belt & Die &
Gasket Co.
CL-WORM-SS-24 CLAMP, WORM, SS #24, 1-4/16" - 2" (10/PK) 8 EA
USMI # VENDOR/OEM VENDOR#/OEM# DESCRIPTION U/I
505-9008 Forespar Marelon
903000
LOOP, VENTED, MF 840, 1-1/2" BARB, 5-1/4" H X 7-
3/4" W
EA
506-7010 Forespar Marelon
903004 ASSEMBLY, VENT BARB, MF-846 EA
506-7009 McMaster Carr 4471K12
BREATHER-VENT, 1/4" NPT MALE, 3 MAX CFM,
1/2" HEIGHT
EA
634-7003 Lewis Marine 5063-1054 4” INSPECTION PORT EA
505-7198 Gulf Belt & Die & Gasket Co.
CL-WORM-SS-24 CLAMP, WORM, SS #24, 1-4/16" - 2" (10/PK) EA
USMI # VENDOR/OEM VENDOR#/OEM# DESCRIPTION U/I
505-9008 Forespar Marelon 903000
LOOP, VENTED, MF 840, 1-1/2" BARB, 5-1/4" H X 7-
3/4" W
EA
506-7010 Forespar Marelon 903004 ASSEMBLY, VENT BARB, MF-846 EA
506-7009 McMaster Carr 4471K12
BREATHER-VENT, 1/4" NPT MALE, 3 MAX CFM,
1/2" HEIGHT EA
634-7003 Lewis Marine 5063-1054 4” INSPECTION PORT EA
505-7198 Gulf Belt & Die &
Gasket Co.
CL-WORM-SS-24 CLAMP, WORM, SS #24, 1-4/16" - 2" (10/PK) EA
Contract #USZA22-03-D-0003 6 ECP 161
Attachment (1)
MODIFICATION DESCRIPTION
The vented loop installation can occur as either a retrofit or during the production sequences of a new craft. The following describes the steps to effectively install the vented loops on the discharge line.
Vented Loop Assembly - Two assemblies required per NSW RIB.
* The Rubber Duckbill Valve must be inserted with the “Duck Bill” facing towards the vented loop (as shown above) for proper operation.
Vent Barb Assembly
USMI P/N 506-7010
Breather-Vent
USMI P/N 506-7009
Hose Clamp #24 SS
USMI P/N 505-7198
Hose Clamp #24 SS
USMI P/N 505-7198
Rubber Duckbill Valve (supplied with Vented
Loop 505-9008)*
(1) Vented Loop
USMI P/N 505-9008
Contract #USZA22-03-D-0003 7 ECP 161
Vented Loop Installation:
Step 1: Remove jet hatches and locate bilge discharge hose anti-siphon loop under the gunwale in the jet room.
Location of anti-siphon loops
Detailed view of anti siphon loops
Contract #USZA22-03-D-0003 8 ECP 161
Step 2: The anti-siphon loops of the aft port and starboard bilge pump discharge line is cut at its highest point and the vented loop (505-9008) is connected to the hose and secured with two hose clamps (505-7198) on each end. The vented loop cap is removed and a vent barb assembly with duck bill valve (506-7010) is installed in place of original cap. The breather vent (506-7009) is screwed into the top of vent barb assembly to muffle whistling sound created when a bilge discharge occurs.
Step 3: Place the small angle of the template on the starboard gunwale, and slide the template against the transom bulkhead. Using the template as a guide, drill three 3/16” pilot holes for the vented loop, and one ¼” pilot hole for the center of the inspection port. Remove the template and use a 4-½” hole-saw to drill the hole for the inspection port. Repeat for the port side.
Vented loop and inspection port template.
Vented Loop Assembly (Installed in Bilge Discharge Hose)
Vented loop mount pilot holes
4-½” hole saw pilot hole for inspection port
STBD
FWD
Contract #USZA22-03-D-0003 9 ECP 161
Step 4: Jam nut three #10X1-½” stainless steel machine screws in the vented loop mounting hole locations, and install the inspection port (use 5200 adhesive to seal the bolts and silicon to seal the port). Once completed, the gunwale should look like the figure below.
Step 5: Mount the vented loop assembly to the gunwale using the three #10 machine screws installed in step 4, fender washers, and #10-24 nylon locknuts.
Vented loop as installed under gunwale
Step 6: Conduct an operational check of the aft electric bilge pumps to ensure proper operation.