J-7_SF_1408_Checklist_171229.doc

DOC document 88 KB Posted

Attached to
UEWTEP II
Solicitation number
H92222-18-R-0001
Issued by

About this file

Attachment J-7 Standard Form 1408

View the file

Other files

File Type Posted
H92222-18-R-0001_AMD_03_Conformed_RFP_180126.pdf PDF
QA_Set_3_-_180126.xlsx XLSX spreadsheet
AMD_03_Summary_of_Changes_180126.pdf PDF
H92222-18-R-0001-0002_Conformed__180119.doc DOC document
Amendment_02_-_Summary_of_Changes_180119.pdf PDF
Questions_Set__2_180119.xlsx XLSX spreadsheet
J-2_Position_Qualifications,_LCATs,_FTEs,_and_Pricing_Sheets_180119.xlsx XLSX spreadsheet
Summary_of_Changes_180110.pdf PDF
Questions_Set_1.xlsx XLSX spreadsheet
UEWTEP_II_Solicitation_Notice_180109.doc DOC document
J-1_SOW_180109.docx DOCX document
H92222-18-R-0001-0001_Conformed.doc DOC document
J-3_DD_Form_254_180109.docx DOCX document
J-2_Position_Qualifications,_LCATs,_FTEs,_and_Pricing_Sheets_180109.xlsx XLSX spreadsheet
H92222-18-R-0001_171229.doc DOC document
J-2_Position_Qualifications,_LCATs,_FTEs,_and_Pricing_Sheets_171229.xlsx XLSX spreadsheet
J-4_dd1423-2_A005_Training_Completion_Survey_171229.pdf PDF
J-6_TBC_171229.docx DOCX document
J-4_dd1423-2_A008_Transition_Out_Plan_171229.pdf PDF
J-3_DD_Form_254_171229.docx DOCX document
J-4_dd1423-2_A003_JMET-JMSEL_Cross-Walk_171229.pdf PDF
J-4_dd1423-2_A002_QCP_171229.pdf PDF
J-4_dd1423-2_A004_Observation_Plan_171229.pdf PDF
J-4_dd1423-2_A006_JTT_SOP_Manual_171229.pdf PDF
J-4_dd1423-2_A001_Reports-Deliverables_171229.pdf PDF
UEWTEP_II_Solicitation_Notice_171229.doc DOC document
J-8_Transition_Events_171229.xlsx XLSX spreadsheet
J-4_dd1423-2_A007_Kick_Off_171229.pdf PDF
J-5_ITAR_Country_List_171229.pdf PDF
J-1_SOW_171229.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preaward Survey of Prospective Contractor Accounting System Checklist H92222-18-R-0001

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2 provide a narrative describing how the current accounting system supports your response to each item.

Yes
No
N/A
Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) Do you currently have existing contracts with the U.S. Government?

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note
Narrative

File details come from the government source that posted it.