Gus Harrison C.F. - Smoke Purge System Repair & Replace - CD Drawings-2.pdf

PDF 16 MB Posted

Attached to
472/24055. DPL; Gus Harrison CF - Replace Smoke Purge System
Solicitation number
RFQ 171 260000000466 1
Issued by
Michigan

About this file

This file contains construction drawings for the Gus Harrison Correctional Facility, a Michigan Department of Corrections (MDOC) facility, detailing the smoke purge system repair and replacement project. The project involves the design and specification of a replacement smoke purge system for the correctional facility, with drawings providing technical details for bidders to understand the scope of work required. The drawings serve as the basis for contractors to develop comprehensive bids for the repair and replacement of the existing smoke purge system infrastructure at the facility.

The document is a set of construction drawings (CD Drawings) that provide the technical specifications and visual representations necessary for contractors to accurately bid on and execute the smoke purge system work. These drawings are essential contract documents that establish the technical requirements, dimensions, materials, and installation details contractors must follow. The drawings ensure consistency in bid preparation and provide the framework for contract award and project execution at the Gus Harrison Correctional Facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .