Gus Harrison C.F. - Smoke Purge System Repair & Replace - CD Drawings-1.pdf
PDF 23 MB Posted
- Solicitation number
- RFQ 171 260000000466 1
- Issued by
- Michigan
About this file
This is a Construction Document Drawings file for the Michigan Department of Licensing and Regulatory Affairs (DLRA), specifically for the Gus Harrison Correctional Facility's Smoke Purge System Repair and Replacement project (Contract 472/24055). The document provides detailed Construction Development (CD) level drawings for the smoke purge system renovation work at the facility. The drawings serve as the technical specification basis for contractors bidding on this correctional facility infrastructure improvement project. These engineering documents detail the system design, component specifications, and installation requirements necessary for contractors to prepare accurate bids and execute the work in compliance with the facility's operational and safety standards.
The CD drawings represent a critical component of the contract opportunity package, establishing the technical scope and performance requirements for the smoke purge system replacement. The drawings enable potential bidders to assess project complexity, material requirements, labor demands, and scheduling considerations for cost estimation purposes. As Construction Development level documents, these drawings have progressed beyond preliminary design stages and provide sufficient detail for construction planning and execution. The technical specifications contained within these drawings will govern contractor performance and quality standards throughout the project execution phase, ensuring the replaced system meets Michigan's building codes and the correctional facility's operational requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .