Final Amend01 SF30.doc

DOC document 75 KB Posted

Attached to
Construct the New National Dwight D. Eisenhower Memorial in Washington, DC
Solicitation number
GS11P12MKC0005
Issued by

About this file

Amendment No. One - SF30

View the file

Other files

File Type Posted
Amend03 SF30.doc DOC document
Amend02 SF30.doc DOC document
EMC RFQ amendment 2 changes _r1.docx DOCX document
PreProp Conf Sign In Sheets.pdf PDF
PreProp Site map.pdf PDF
Amend 01 Revised RFQ.docx DOCX document
PreProposal Conference Notification.docx DOCX document
EMC KEY PERSONNEL PERFORMANCE QUESTIONNAIRE.docx DOCX document
RFQ Eisenhower Memorial.docx DOCX document
RFQ Reps Certs Eisenhower Memorial.docx DOCX document
Agreement Eisenhower Memorial.docx DOCX document
EMC Firm Performance Questionaire.docx DOCX document
PreProposal Conference Notification.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION OF SF 30: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

GS11P10MMC0010, RECOVERY

Amendment No. 1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE

GS11P12MKC0005

PAGE OF

PAGES

2. AMENDMENT/MODIFICATION NO.

Amendment 01 (RFQ)

3. EFFECTIVE DATE

03/19/2012

REQUISITION/PURCHASE REQ. NO.

PROJECT NO. (If applicable)

6. ISSUED BY
CODE
MK000
7. ADMINISTERED BY (If other than Item 6)
CODE
MK000

GSA, NCR, PBS,

Office of Project Delivery (WPC) 301 7th Street, SW Room 2002 Washington, DC 20407

GSA, NCR, PBS,

Office of Project Delivery (WPC)

301 7th Street, SW Room 2002

Washington, DC 20407

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9.A. AMENDMENT OF SOLICITATION NO.

(X)
GS11P12MKC0005

To All Prospective Offerors

9B. DATED (SEE ITEM 11)

03/06/2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.

(x)
A.

THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

c.

THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D.

OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not FORMCHECKBOX is required to sign this document and return ________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).

The solicitation is hereby amended as follows:

The following changes, clarifications, additions and supplements are hereby incorporated into this SOLICITATION in their entirety as submitted. Continued on Page 2 of this Amendment

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Bonnie Echoles, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED
16B. UNITED STATES OF AMERICA

BY

Bonnie Echoles .

(Signature of Contracting Officer)

16C. DATE SIGNED

03/19/2012

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

GSA Contract No. GS-11P-12-MK-C-0005

Construction Contract for Construction of Dwight D Eisenhower Memorial, Washington, DC

ITEM A:

THE QUALIFICATIONS PROPOSAL RECEIPT is UNCHANGED as follows:

WEDNESDAY, April 4, 2012, by 3:00 PM, EDT. Place of receipt as follows:

GSA, NCR, ROB – Bid Room 301 7th Street, SW, Room 1065 Washington, DC 20407 Phone: (202)708-5961

Due to renovations, the BID ROOM is scheduled to operate on Wednesdays and Fridays, 9:00 AM, EDT to 3:00 PM, EDT. Please be mindful when arranging for the delivery of packages.

ITEM B:

For additional information about the Eisenhower Memorial, please visit the Eisenhower Memorial Commission website. Please do not direct any procurement questions to the Eisenhower Memorial Commission.

Dwight D Eisenhower Memorial Commission 1629 K Street, NW, Suite 801 Washington, DC 20006 Phone: (202) 296-0004

Web address: http://www.eisenhowermemorial.org/

ITEM C:

Information relayed at the Pre-Proposal Conference held on Tuesday, 03/13/2012, at 12:30 PM, EDT.

1. Dwight D Eisenhower Memorial Project Team

GSA Office of Project Delivery

· Len Weiser – Project Executive

· Christian Prescott – Project Manager

· Bonnie Echoles – Contracting Officer Eisenhower Memorial Commission

· Victoria Tigwell – Deputy Executive Director

· Dan Feil, FAIA- Executive Architect

Construction Manager – Gilbane Building Co.

· Carol Moore, Tom Stokes, Fred Clements

Architect/Engineer – Gehry Partners – AECOM JV

· Jon Miller, AIA, representing AECOM

2. Procurement Specifics

· The solicitation (Phase 1 – RFQ) was issued electronically on March 6, 2012 on the FEDBIZOPPS website. The Government will not be issuing the solicitation in hard copy format. Although not mandatory, the Government strongly encourages firms and companies to add their names to the Interested Vendors Listing at this site to ensure notifications of uploads of amendments and relevant information.

· This is a two-stage solicitation. Stage 1 consists of a Request for Qualifications (RFQ). The Government will evaluate the responses to the RFQ and will then advise each respondent either that it will be invited to participate in Stage 2, the Request for Proposals (RFP), of the acquisition, or it is not likely to be a viable competitor. Construction documents will be available to participants in Stage 2.

· This is a best-value procurement using FAR part 15, Source Selection.

3. Project Specifics

A. Traditional Project Delivery Method (Design-Bid-Build)

B. Multiple Phases:

a. Base contract – site and underground work, currently funded;

b. Option 1 for above-ground construction, with funding anticipated in FY 2013;

c. Option 2 for additional above-ground construction, with funding anticipated in FY 2014.

4. Schedule

· Announcement of viable competitors – target early June 2012

· Target contract award – January 2013

· Construction period of 2 years

REMINDER:

All questions are to be addressed in writing (preferably by email) to the attention of the Contracting Officer, Bonnie Echoles, bonnie.echoles@gsa.gov, no later than 5:00 PM, EDT, March 20, 2012. The Government will endeavor to respond no later than March 26, 2012.

ITEM D:

DELETE the Construction Contract Volume of the RFQ, as issued, in its entirety and INSERT the attached, revised Construction Contract Volume in lieu thereof, (NOTE: Changes to the original document are highlighted in yellow.)

ITEM E:

Offerors must acknowledge receipt of all Amendments, giving number and date, on Company Letterhead. This letterhead is not to be included in the not –to-exceed numbered page count of the Technical Proposal (Volume II).

END OF AMENDMENT NO. ONE (1)

Attachments:

Pre-Proposal Site Map

Pre-Proposal Conference Sign In Sheets

Revised RFQ, 03/16/2012

File details come from the government source that posted it. Updated .