Request for Information(3).doc
DOC document 21 KB Posted
- Attached to
- RECOVERY DESIGN BUILD SERVICES NEW CUSTOM HOUSE
- Solicitation number
- GS08P10JBC_0007
About this file
Request for Information (3)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQAmendment2.pdf | ||
| Request for Information(4).doc | DOC document | |
| Request for Information(2).doc | DOC document | |
| Request for Information(1).doc | DOC document | |
| ARRA NEW CUSTOM HOUSE AMENDMENT 001_0001.pdf | ||
| Phase1RFQ | — | |
| SF330NCH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI)
Number 3
Recovery Project
New Custom House Modernization Project
GS-08P-10JBC_0007
November 18, 2009
QUESTION 1: Page 10 Factor 3: If the general contractor and the design team has not worked together on previous projects, does GSA want 3 total projects from the design team and general contractor, 3 total projects from just the design team, or 3 projects from each project team member including the design-builder/general contractor, architect, and the other firms making up the design team?
ANSWER: The Government requires 3 projects from the design builder, 3 projects from the lead designer, and 3 projects from the design team. If the design team has not worked together that is satisfactory. We understand that the team may have never worked together, and may not have a project to submit as one team, but individually does have the experience with projects similar size, scope and complexity, which is an evaluating factor.
QUESTION 2: Can you please clarify the correct solicitation number? Your RFQ document has it as GS-08P-10-JC-C-0006 however FBO has it posted as GS08P10JBC_0007, Amendment 1 has it as GS-08P-10-JB-C-0007, and RFI #1 has it as GS-08P-10JBC_0007.
ANSWER: The solicitation number in FEDBIZZOPPs is GS-08P-10JBC_0007. All information can be found in FEDBIZOPPs under this reference number. The pre-solicitation notice and the RFQ document states GS-08P-10-JB-C-0007. The system entered GS-08P-10JBC_0007 when the solicitation notice was generated. Therefore, all documents that end in 0007 reference the RECOVERY New Custom House Modernization Project. GS-08P-10-JC-C-0006 was the Sources Sought notice and is not referenced in this solicitation and that number is not valid. It was for informational purposes only to determine interest in the project.