Request for Information(3).doc

DOC document 21 KB Posted

Attached to
RECOVERY DESIGN BUILD SERVICES NEW CUSTOM HOUSE
Solicitation number
GS08P10JBC_0007
Issued by

About this file

Request for Information (3)

View the file

Other files

File Type Posted
RFQAmendment2.pdf PDF
Request for Information(4).doc DOC document
Request for Information(2).doc DOC document
Request for Information(1).doc DOC document
ARRA NEW CUSTOM HOUSE AMENDMENT 001_0001.pdf PDF
Phase1RFQ —
SF330NCH.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI)

Number 3

Recovery Project

New Custom House Modernization Project

GS-08P-10JBC_0007

November 18, 2009

QUESTION 1: Page 10 Factor 3: If the general contractor and the design team has not worked together on previous projects, does GSA want 3 total projects from the design team and general contractor, 3 total projects from just the design team, or 3 projects from each project team member including the design-builder/general contractor, architect, and the other firms making up the design team?

ANSWER: The Government requires 3 projects from the design builder, 3 projects from the lead designer, and 3 projects from the design team. If the design team has not worked together that is satisfactory. We understand that the team may have never worked together, and may not have a project to submit as one team, but individually does have the experience with projects similar size, scope and complexity, which is an evaluating factor.

QUESTION 2: Can you please clarify the correct solicitation number? Your RFQ document has it as GS-08P-10-JC-C-0006 however FBO has it posted as GS08P10JBC_0007, Amendment 1 has it as GS-08P-10-JB-C-0007, and RFI #1 has it as GS-08P-10JBC_0007.

ANSWER: The solicitation number in FEDBIZZOPPs is GS-08P-10JBC_0007. All information can be found in FEDBIZOPPs under this reference number. The pre-solicitation notice and the RFQ document states GS-08P-10-JB-C-0007. The system entered GS-08P-10JBC_0007 when the solicitation notice was generated. Therefore, all documents that end in 0007 reference the RECOVERY New Custom House Modernization Project. GS-08P-10-JC-C-0006 was the Sources Sought notice and is not referenced in this solicitation and that number is not valid. It was for informational purposes only to determine interest in the project.