Text version

Questions and Answers for Solicitation Amendment 0002

Q1: Plan Sheet E-102 lists a symbol for a 2’x2’ Recessed LED Light Fixture. According to the A3 New

Lighting Plan for Phase 2, there are a total of (21) of these units to be installed. No other detail is provided in the drawings or with the SOW that indicate what type of light is to be furnished and installed in these (21) locations. More information is needed to clarify the product to be used at these locations.

Page 76 of the SOW has Item 10. Submittal Requirements listed and under 10.11 it specifies that LED

Lighting & bulbs to match Phase #1. What lights were used in Phase I?

A1: Phase 1 used an economical LED 2'x2' center basket troffer (SEE "APPROVED - LED SWISH2X2-

29N_D10") and used T5 replacement LED bulbs in existing lighting (see "APPROVED - LED T5HO Lamp

Data Sheet").

Q2: SOW page 73, Items 16 & 17 both reference providing and installing paper towel dispenser and soap dispenser that shall comply with GSA, Ron Mazzoli requirements. What are those requirements?

A2: See attachments (APPROVED Cut Sheet - Tork Matic® Hand Towel Roll Dispenser _ Tork US) &

(APPROVED Cut Sheet - Tork Foam Skincare Manual Dispenser _ Tork US).

Q3: SOW and Plan Sheet I-401 specify use of Construction Specialties Acrovyn Corner Guards, SM

Series. No other detail is specified. The SM Series is offered as the SM-20N, a 3” corner guard with a ¼” radius or the SM-10N, a 3” corner guard with a 1” radius. Can you specify which of these units is to be furnished and installed?

A3: See attachments (APPROVED - Corner Guard CS SM-20N Acrovyn 4000).

Q4: Sow page 72, Item 11, specifies the need for Contractor to provide and install rubber cove base.

The Contract Price Form for Division 09 Finishes shows an entry for the demo cost of the existing cove base but has no entry for the cost to furnish and install the cove base specified. Where is that entry to be provided?

A4: There is a blank space at the bottom of page 7 of 32 of the Agreement. Please place your proposal price there and reference the Division it will go against.

Q5: Core drilling will be necessary in at least two (2) locations for drains in the kitchenette area. No break out for that cost is detailed in the Contract Form for Division 22 Plumbing. Is that to be merged with rough in cost or detailed separately?

A5: Detailed separately is fine There is a blank space at the bottom of page 7 of 32 of the Agreement.

Please place your proposal price there and reference the Division it will go against.

Q6: Plan Sheet I-401 has illegible print in the Interior Color Schedule and Interior Signage Schedule. The page was printed from the original solicitation. The scan apparently was not performed well for this page prior to issuance. Please reissue a readable copy. Information is needed from these sections to generate vendor (material) costs.

A6: Please see attachments Titled “TAB02 – Clean Drawings”