Amendment 0002 to Solicitation GS-03P-15-AZ-C-5050
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0010.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0009.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0007.pdf | ||
| Text_for_Amendment_0006_(Combined_Doc).pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0001.pdf | ||
| 2014-09-19_Construction_Docs_Full_Set.pdf | ||
| 2014-09-19_Project_Manual_Merged.pdf | ||
| Solication _Except_Specs_and_Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Attachment Page
PAGE 2 OF 2 GS-03P-AZ-C-15-5050/0002
Amendment 0002
VA PITC Uninterruptable Power Supply Replacement Project
1. In paragraph 1.A. (Project Summary) on Page 2 of 33 in Document C101-SB / Jul 2014 R1 (The Agreement), “The Philadelphia Information Technology Center owns and operates two Exide 3100M (100kVA-800KW) Uninterruptible Power Systems (UPS) configured in a split plant parallel redundant design using normally open Hot Tie circuit breaker.” is hereby deleted and replaced by “The Philadelphia Information Technology Center owns and operates two Exide 3100M (1000kVA-800KW) Uninterruptible Power Systems (UPS) configured in a split plant parallel redundant design using normally open Hot Tie circuit breaker.”
2. Note #9G on Drawing #E602, “Disconnect and remove temporary UPS. Contractor shall salvage all temporary cables. However, contractor shall list separately in his proposal the credit that will be provided to the Government for the salvage value of all temporary cable.” is hereby deleted and changed to “Disconnect and remove temporary UPS. Contractor shall salvage all temporary cables.”
3. Note #22 on Drawing #E602, “Contractor shall provide optional pricing for this feed to be all bus duct with bus duct connections at the ATS and at existing Switchboard E2B.” is hereby deleted.
4. The following question and response is hereby incorporated into the solicitation.
Question: I am requesting if the Toshiba G9000 UPS units might be approved as equal offering to Eaton and LIebert they meet and exceed the specs.
The specifications outlined in Section 016000 – Product Requirements Paragraph 2.2 allows the Contractor to request the use of a comparable product that meets the design specifications provided. Contractor must provide documented evidence to the GPI and PITC Review Team for such consideration. Evidence would include equipment specifications, documented drawings illustrating the new equipment will properly fit in the designated location without modifications to existing structure or ventilation and reference clients within the area that use the same equipment.
Additionally, Section 263353 – Static Uninterruptible Power Supply identifies specific requirements that the new UPS System must meet to be considered. Details such as modular unit design, minimum capacity of 825kVA with expandability to 1100kVA and space layout to allow for three total units at present with expandability for a fourth unit with no additional architectural changes required to meet this expansion.
A topical review of the suggested use of the Toshiba G9000 Series UPS System reveals that the largest unit available, the T90S3S75K-S6XSN, is rated at 750kVA. This unit does not meet the requirements for expandability to 1100kVA as detailed in Section 263353 – Static Uninterruptible Power Supply Paragraph 1.2.C. A Comparable Product review (per Section 016000 – Product Requirements Paragraph 2.2 ) could not be performed at this time since equipment specifications, detailed space layout drawings and reference clients within the area was not provided.
5. The proposal due date and time remain the same, 11/12/14 at 2:00 PM ET. Offerors are reminded that late proposals will not be accepted.
6. Offerors must acknowledge this amendment by number in the SF 1442 submitted with the proposal.
7. All else remains the same.
Descript: VA PITC Uninterruptable Power Supply Replacement Project, Philadelphia, PA.
See attached.
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 2 |
| DocNo: 0002 |
| EffDate: OCT 22, 2014 |
| ReqNo: 3PQ-14-0013 |
| ProjNo: |
| IssuedByCode: 3PQCP |
| IssuedBy: GSA CONTRACTS OPS BRANCH - PA NJ & DE SECTION |
THE STRAWBRIDGE BLDG -3PQCP
20 NORTH 8TH ST
PHILADELPHIA PA 19107-3191
| AdminByCode: |
| AdminBy: |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: GS-03P-AZ-C-15-5050 |
| SolDate: OCT 07, 2014 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .