GRTE Groundwater Monitoring 2021 - Attachment 2.pdf
PDF 140 KB Posted
- Attached to
- GRTE GROUNDWATER MONITORING 2021
- Solicitation number
- 140P1421Q0049
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1: Known Well Data and Minimum Sampling Schedule for Task 1 Name of
Associated Leach field
Well Name Location in the Park
Ground Elevation
TOC
Elevation
HOC
above GE
Well Depth
(ft)
Casing Diameter
(in)
Spring Samplin g
Fall Sampling
BC-1 6629.9 6630.92 1.02 37.3 6 May September BC-2 6628.78 6631.16 2.38 39.3 6 May September
MW2012-3
(BC-5) 6628.96 6631.34 2.38 50 6 May September
Well BC-1
(LFSE
Corner)
6631.38 6634.52 3.14 81.2 2 May September
Well BC-2
(LFNE
Corner)
6631.98 6635.17 3.19 80.8 2 May September
Well BC-3
(LFNW
Corner)
6634.27 6637.54 3.27 85.5 2 May September
Well BC-4
(LFSW
Corner)
6632.57 6635.52 2.95 85.3 2 May September
Well MW- GV6 6574.5 6576.74 2.24 35 6 May September
Well MW- GV9 6575.4 6577.9 2.5 39.5 2 May September
GV-10 6564.25 6566.78 2.53 39.1 2 May September Well MW- GV11 * 6559.81 6562.52 2.71 37.3 2 May September
Well MW- GV12 * 6560.99 6563.04 2.05 36.7 2 May September
Well MW-1 (LM-SE) 6765.38 6767.47 2.09 58.4 2 May September
Well MW-2 (LM-W) 6765.89 6767.6 1.71 55.8 2 May September
Well MW-3 (LM-NE) 6765.89 6767.65 1.76 49.4 2 May September
Well Monitor Well-1
6466.88 6469.67 2.79 49.5 6 May September
Well Monitor Well-2
6464.85 6467.23 2.38 43 6 May September
MV-3 6459.35 6460.57 1.22 48.2 6 May September MW-4 May September MW-5 47.5 May September
Moran Junction MW-1 Moran 30 2 May September MW-1 81 2 May September MW-2 75 2 May September MW-3 70 2 May September
AMK
Ranch
AMK Ranch
South Jenny Lake
Fire dorm
Employee Housing (Entrance)
Beaver Creek
Lupine Meadows (west side of river and south of buildings)
Moose
Gros Ventre
Grand Teton NP Gros Ventre Campground (leach fields adjacent to RV station and on office side of entrance road)
Lupine Meadows
Moose Treatment Plant (North side of Chapel Rd.)
S. Jenny Lake
FR-3 6842.53 35.5 3 N/A September FR-5 6844.83 6845.53 0.7 47 4 N/A September FR-6 6851.67 6852.37 0.7 46.6 4 N/A September FR-8s 6840.87 6843.73 2.86 36.4 2 N/A September FR-9 6850.28 6852.99 2.71 41 2 N/A September CB-1 6824.92 6825.88 0.96 33.7 2 N/A September CB-5s 6815.36 6817.01 1.65 13.2 2 N/A September CB-7 6815.86 6817.38 1.52 12.3 2 N/A September SM-1 6841.79 6843.12 1.33 117.9 4 N/A September SM-2 6894.65 6896.02 1.37 116.3 4 N/A September SM-5 6894.72 6896.53 1.81 115.8 N/A September
Notes:
Bold Names are the names on the GEM Report.
Remaining elevation data will be surveyed and provided by park staff.
Table 2: Colter Bay Landfill Well Data (Task 2) Name of
Associated Leach field
Well Name Location in the Park
TOC
Elevation
Well Depth (ft)
Casing Diameter
(in)
MW-1 6841.86 30 2
MW-2 6849.69 85 2
MW-3 45 2
MW-4 6841.89 35 2
MW-5 6841.47 45 2
MW-6 6845.17 40 2
MW-7 6842.52 45 2
Notes:
Remaining elevation data will be surveyed and provided by park staff.
Colter Bay
Flagg Ranch
Colter Bay Landfill
Colter Bay Pit
Flagg Ranch Lagoons
Signal Mountain
Signal Mountain Lagoons
Colter Bay Lagoons
Well Data
File details come from the government source that posted it. Updated .