This directive describes Goddard Space Flight Center's process for receiving inspection and test of incoming products. It applies to all products covered by the GSFC Management System, excluding in-process and final inspections covered elsewhere. Central Receiving is responsible for kind, count, and condition inspections using Form 20-2 to document results. They shall inspect for damage and nonconformance, test certain electrical, electronic, and electromechanical parts and fasteners, and process static sensitive items per other directives. Bypassing Central Receiving requires organizations to inspect and document on Form 20-2 or their own form. Nonconforming MS products shall be tagged and documented in the problem reporting database. Hazardous materials require special handling procedures.

This special notice represents the electronic library for the NASA Sounding Rocket Operations Contract (NSROC) IV solicitation. It likely contains documents such as the request for proposal, instructions to offerors, proposal preparation instructions, past performance questionnaires, and other attachments to assist interested parties in responding to the solicitation. The library would not include any pricing, award, or response date information, as that would be contained within the solicitation document itself.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary, newest first.
File Type Posted
SRPO Cryogenic Safety Users Guide Revision A Final.pdf PDF
NSROC III NNG16WA70C Attachment M - Contract Historical Data 19-20.pdf PDF
SRPO Technology Roadmap June 2021.pdf PDF
NSROC III List of Ongoing Work - October 2021.pdf PDF
SRPO Annual Report 2016.pdf PDF
Rocket_Report_4th_quarter_2019.pdf PDF
SR User Handbook Final_July 2015.pdf PDF
SRPO Annual Report 2019.pdf PDF
Doing Business with Wallops.pdf PDF
Sounding Rockets_NASA_fact_sheet.pdf PDF
NASA-STD-8719.12A Safety Standard for Explosives, Propellants, and Pyrotechnics.pdf PDF
803-GS-ESP-ES-F10-01 F-10 Explosive Site Plan.pdf PDF
803-PG-8730 1 WFF Met and Cal Lab Quality Manual.pdf PDF
GPR 8710.2.pdf PDF
NPR 8715.3.pdf PDF
NPR 4200.2.pdf PDF
GPD 7150.0.pdf PDF
GPR 1840.1.pdf PDF
GPR 8715.8.pdf PDF
GPR 8715.1.pdf PDF
GPR 8710.7.pdf PDF
GPR 7120.11.pdf PDF
200-PG-8812.1.1 Wallops Facilities Review Committee.pdf PDF
800-PG-8715.5.1A Range Safety Process for Programs and Projects.pdf PDF
GPR 8500.1.pdf PDF
NPR 1040.1 Updated.pdf PDF
NPD 8730.5.pdf PDF
GPR 1820.2.pdf PDF
GPR 1840.2.pdf PDF
GPR 1600.2.pdf PDF
GPR 8800.1.pdf PDF
GPR 8715.12.pdf PDF
GPR 4100.2.pdf PDF
NPD 8700.1 Updated.pdf PDF
800-PG-8715.0.4C_Certification Procedures for OSS at WFF.pdf PDF
NPD 2800.1.pdf PDF
NPR 6000.1.pdf PDF
NPD 2025.1.pdf PDF
800-PG-8710.0.2D Operations in Cold Weather Environments.pdf PDF
GPD 1800.0.pdf PDF
800-PG-7120.4.1 Risk Mgmt.pdf PDF
NPR 5200.1.pdf PDF
SR Risk Management Plan Official Release - 2010-04-15 signed and scanned.PDF PDF
NSROC III Selection Statement.pdf PDF
SRPO Annual Report 2018.pdf PDF
Wallops Range Users Handbook.pdf PDF
Rocket Report 3rd quarter 2020.pdf PDF
Rocket Report 2nd quarter 2020.pdf PDF
SRPO Annual Report 2020.pdf PDF
SRPO Missions Bluebook September 2021.pdf PDF
Show all 50

NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTIVE NO. GPR 4520.2I APPROVED BY Signature: Original Signed By

EFFECTIVE DATE: August 3, 2020 NAME: David A. Reth

EXPIRATION DATE: August 3, 2025 TITLE: Director Of Management Operations

CHECK THE GSFC DIRECTIVES MANAGEMENT SYSTEM AT

http://gdms.gsfc.nasa.gov TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE.

08/16

Goddard Procedural Requirements (GPR)

COMPLIANCE IS MANDATORY

Responsible Office: 270/Information and Logistics Management Division

Title: Receiving Inspection and Test

PREFACE

P.1 PURPOSE

This directive describes the verification process that will be used to ensure incoming products meet

GSFC requirements. The directive describes the performance of and documentation requirements for receiving inspection and test of products delivered to Goddard Space Flight Center (GSFC).

P.2 APPLICABILITY

a. This directive applies to all incoming products including those products covered by the scope of the

GSFC Management System (MS). This GPR isn’t applicable to in-process, final inspections and tests described in GPR 5330.1.

b. In this directive, all document citations are assumed to be the latest version unless otherwise noted.

c. In this directive, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.” The terms “may” or “can” denote discretionary privilege or permission; “must” denotes an obligation; “should” denotes a good practice and is recommended but not required; “will” denotes expected outcome; and “are/is” denotes descriptive material.

P.3 AUTHORITY

NPD 1280.1, NASA Integrated Management System Policy

P.4 APPLICABLE DOCUMENTS AND FORMS

a. NPR4100.1, NASA Supply Support and Material Management

b. NPR 4200.1, NASA Equipment Management Procedural Requirements

c. GPR 1280.1, GSFC Management System Manual

d. GPR 4100.1, Management of Shelf-Life Items http://gdms.gsfc.nasa.gov/ http://nodis3.gsfc.nasa.gov/library/lib_docs.cfm?range=4___

DIRECTIVE NO. GPR 4520.2I Page 2 of 10

EFFECTIVE DATE: August 3, 2020

EXPIRATION DATE: August 3, 2025

e. GPR 4520.3, Control of Customer-Supplied Product

f. GPR 5340.4, Problem Reporting and Problem Failure Reporting

g. GPR 5330.1, Work Order Authorization (WOA) Process

h. 300-PG-8730.6, GSFC Electrostatic Discharge (ESD) Control Plan

i. 500-PG-4520.2, Electrical, Electronic and Electromechanical (EEE) Counterfeit Parts Avoidance

Plan (CPAP)

j. 541-PG-8072.1, Goddard Space Flight Center Fastener Integrity Requirements

k. GSFC Form 4-33, Non-conformance Tag

l. GSFC Form 20-2, GSFC Receiving Inspection & Test Form (RITF)

m. 270-Form-0068, Receiving Discrepancy Materiel inspection and receiving documentation (e.g., DD

Form 250 Materiel Inspection and Receiving Report or Advanced Materiels Management System

(AMMS) Receipt Traveler, SAP Receipt Documentation)

P.5 CANCELLATION

GPR 4520.2H, Receiving Inspection and Test

P.6 SAFETY

Any special requirements for support or safety considerations (e.g., warning statements or notes, support equipment, or qualifications/licenses) associated with performing the receiving inspection and test events must be determined by the organization performing the incoming receiving inspection and test.

P.7 TRAINING

Specific training requirements for Information and Logistics Management Division Receiving must be identified in the applicable work instruction. Other organizations receiving MS products should determine applicable organization training requirements.

P.8 RECORDS

Record Title Record Custodian Retention

GSFC Form 20-2 Receiving

Inspection & Test Form or equivalent

Supply Team Lead or

Receiving Organization

*NRRS 8/101 - Cut off records at close of program/project or in 3-year blocks for long-term programs/projects. Transfer to national archives 7years after cutoff.

Materiel inspection and receiving documentation (e.g., DD Form 250, SAP receipt

Supply Team Lead or

Receiving Organization

*NRRS 8/101 - Cut off records at close of program/project or in 3-year

DIRECTIVE NO. GPR 4520.2I Page 3 of 10 documentation and AMMS

Receipt Traveler) blocks for long-term programs/projects.

Problem Reporting/Problem

Failure Reporting (PR/PFR) database

Institutional Support

Office, Code 370

*NRRS 5/30A - Retire to FRC 2 years after contract final payment. 5 years after final payment.

*NRRS 1441.1 – NASA Records Retention Schedules

P.9 MEASUREMENT/VERIFICATION

Internal, external, and third party audits and evaluations should be used to assess the effectiveness of this procedure.

PROCEDURES

1. OVERVIEW

All deliveries of incoming products covered by the scope of the GSFC Management System (MS) shall be processed through GSFC’s (Greenbelt and Wallops) Central Receiving area to ensure appropriate receiving and inspection processes are completed. Organizations and projects must follow the established guideline in Section 2.2 in the event Central Receiving is bypassed

2. ROLES AND RESPONSIBILITIES

The Information and Logistics Management Division (ILMD), Supply and Equipment Branch Supply

Team Lead is responsible for the overall operation of Receiving at GSFC Greenbelt and Wallops locations. .

2.1 ILMD Receiving Personnel shall:

a. Record all receipts on appropriate receiving log to reflect the date received, purchase order number, number of pieces, delivering carrier, vendor and legible name and signature of the person in receiving taking custody of the packages.

b. X-ray, inspect and document kind, count, and condition inspection for all incoming materiel designated for stock or issue to customer. Use GSFC Form 20-2, Receiving Inspection and Test to document receiving inspection and test events for products within the scope of the GSFC

Management System (MS), as defined in GPR 1280.1. Test Electrical, Electronic and

Electromechanical (EEE) parts purchased by ILMD in accordance with 500-PG-4520.2. Fasteners

DIRECTIVE NO. GPR 4520.2I Page 4 of 10 designated by the requesting organization as controlled or critical and purchased by ILMD is tested in accordance with 541-PG-8072.1.2. Process static sensitive materiel in accordance with 300-PG-

8730.6 and any applicable WIs.

c. Conduct a visual inspection of Customer Supplied Product (CSP) in addition to performing a kind, count and condition inspection in accordance with GPR 4520.3. Document incoming receiving inspection on a GSFC Form 20-2, Receiving Inspection and Test. Segregate damaged and nonconforming CSP and obtain disposition instructions from Product Design Lead (PDL) or receiving organization.

d. Stage incoming property for delivery or storage.

e. Document materiel not under the MS as a supply discrepancy on a 270-Form-0068, Receiving

Discrepancy Form. Reject and segregate discrepant or damaged materiel and work with procurement buyer or contracting officer to resolve supply discrepancies for products not governed by the MS.

f. Products that fall under the MS (including CSP) that do not meet the purchase order, shipping documentation or contract specifications should be designated as nonconforming. Tag MS products deemed nonconforming with a GSFC 4-33 Nonconforming Product Tag in addition to segregating the materiel. Document MS nonconforming products in the PR/PFR database in accordance with

GPR 5340.4. The resulting PR/PFR number must be entered on the appropriate GSFC Form 20-2 block associated with the event. Work with the customer and cognizant procurement buyer/Contracting Officer to determine disposition of nonconforming products. Customers who waive the incoming inspection process performed by ILMD Receiving must do so in writing.

Customers that waive the incoming receiving process should be responsible for completing the nonconformance process for MS products identified as a nonconformance.

g. Ensure hazardous material are processed on a spill containment pallet; Safety Data Sheets are available with the product. Storage containers or cabinets housing hazardous material is secured and housed in appropriate cabinets to prevent disbursement, or accidental spills until product is delivered to intended customer or designated warehouse location.

h. Ensure controlled equipment is tagged with property tag if practicable. Prepare a load sheet for equipment tagged in Central Receiving. If incoming controlled equipment items are not tagged in

Central Receiving, then receiving personnel must notify Equipment Management that the item was not tagged in receiving and Equipment Management should be responsible for tagging the item.

i. Ensure all materiel in the custody of Receiving is secured from theft. Submit Reports of Survey when incoming government property is lost, damaged or stolen in accordance with NPR 4200. 1.

j. Security personnel and Code 360 Safety Division will be alerted within one (1) hour of receipt of explosives, weapons, ammunition and radioactive materials. The explosive or radioactive materials

DIRECTIVE NO. GPR 4520.2I Page 5 of 10 will be isolated, secured and held while security personnel receives the materials and is authorized to sign for them.

k. Inspect incoming materiel’s shelf-life to ensure the age on delivery is in accordance with GPR

4100.1.

l. Document receipt for conforming product dispositioned in SAP, AMMS or on a DD Form 250 as applicable.

m. Ensure incoming bids are stamped with time and date of receipt. Secure bids until delivered or picked up by procurement. Ensure bids are accessed only by personnel designated by Code 210

Procurement.

2.2 GSFC Greenbelt and Wallops Organizations shall:

a. Inspect and document kind, count, condition and traceability for incoming materiel that bypasses

ILMD Receiving. Organizations and projects who receive deliverable products through task order contracts or any other method may document their incoming inspection on a GSFC Form 20-2 or develop their own organizational process for documenting incoming inspection for products that fall under the GSFC Management System (MS). Organizations or projects who choose to accept nonconforming, damaged or discrepant materiel are responsible for any actions regarding the materiel after issue.

b. Waive the incoming inspection process performed by ILMD Receiving in writing or via email using the process specified in 500-PG-4520.2 for EEE parts.

c. Use internal nonconformance process for MS items not processed through ILMD Receiving.

DIRECTIVE NO. GPR 4520.2I Page 6 of 10

APPENDIX A - DEFINITIONS

A.1 Acquisition – The activity of acquiring products. This activity includes, but is not limited to, the following methods of obtaining products: contracts, purchase orders, credit card buys, blanket purchase agreements, memorandums of agreement, property transfers from organizations outside GSFC, and

Customer Supplied Product (CSP).

A.2 AMMS – The Advanced Materiels Management System. A government database used by the

Information and Logistics Management Division support contractor to purchase, receive, and inventory

ILMD purchased materiels. Central Receiving personnel have access to the Receiving module of

AMMS in order to document the receipt of incoming materiels.

A.3 Controlled Equipment – All equipment with an acquisition cost of $5,000 or more, that has an estimated service life of 2 years or more, which will not be consumed or expended in an experiment, and selected items of equipment with an acquisition cost less than $5,000 that are designated as sensitive by the Center Supply and Equipment Management Officer. (See NPR 4200.1)

A.4 Customer-Supplied Product (CSP) – Any hardware, materiels, components, or equipment supplied by a customer external to GSFC, for which GSFC personnel accept custody and responsibility for purposes of fabrication; testing; storage; Electrical, Electronic, and Electromagnetic (EEE) parts screening; analysis; and/or refurbishment, that is provided to GSFC for use or incorporation into the product, or is to be returned to the customer upon completion of services at GSFC. Also, CSP may be any item that is to be placed under the control of an onsite GSFC contractor or civil servant (other than the customer/owner) for the purpose of receiving a service (e.g., testing, analysis, and refurbishment) and/or that requires a GSFC certification or acceptance document.

Note 1: CSP may also include personal data or intellectual property.

Note 2: Products that arrive accompanied by and totally controlled by customer/owner personnel (e.g., technical or quality assurance personnel) while they are using GSFC facilities are not CSP.

A.5 Kind, count, and condition inspection – Describes the basic inspection that is performed by

Central Receiving personnel on all incoming GSFC and ILMD purchased materiels. These terms have the following meaning:

a. Kind – ensures that the part number and description match what was purchased.

b. Count – confirms that the quantity received matches the quantity purchased in the purchasing documentation.

c. Condition – visual inspection to determine if materiel damage is present.

A.6 Receipt Documentation – The paperwork generated by SAP and AMMS for Government and

Contractor purchased materiels, respectively. This documentation contains at a minimum the item name, quantity, supplier name, purchase order number, and deliver to address for the materiel purchased and received.

DIRECTIVE NO. GPR 4520.2I Page 7 of 10

A.7 Receiving Inspection – The inspection performed on a product during initial receipt after it has been acquired to verify that specified requirements for the product have been met. As a minimum, a kind, count, and condition inspection is performed (see definition A.5). Additional inspections and tests

(e.g., dimensional testing) may also be performed as part of the receiving inspection process if requested by the acquisition initiator/customer/owning organization upon submittal of the purchase request. These additional inspection/acceptance requirements should be placed on a GSFC FORM 20-2. Receiving inspection is not required for subsequent receipts of the product when it has been performed previously.

For example, receiving inspection is not required for returning products that were temporarily located at off-site locations.

A.8 Receiving Inspection Instructions – Documented instructions describing who performs receiving inspection and test activities, what these activities should be, where they should be performed, and what should be considered acceptable. The instructions should include any special handling or storage requirements applicable to the product. Receiving inspection instructions must be documented

(or referenced) on GSFC Form 20-2, or equivalent for application to software products.

A.9 SAP – Software product capable of integrating multiple business applications, with each application representing a specific business area. SAP is categorized into three core functional areas:

Logistics, Finance, and Human Resources.

DIRECTIVE NO. GPR 4520.2I Page 8 of 10

Appendix B - Acronyms

AMMS Advanced Materiels Management System

CSP

EEE

Customer Supplied Product

Electrical, Electronic and Electromechanical

GDMS Goddard Directives Management System

GSFC Goddard Space Flight Center

ILMD Information and Logistics Management Division

MS

PDL

Management System

Product Design Lead

PR/PFR

SAP

WIs

Problem Reporting/Problem Failure Reporting

Systems Applications and Products

Work Instructions

DIRECTIVE NO. GPR 4520.2I Page 9 of 10

CHANGE HISTORY LOG

Revision Effective Date Description of Changes

A 10/6/98 • Header and footer format changes.

• P.8 – Identified maintenance responsibility for quality records.

• 2.10 – Included requirement for further processing after receiving.

B 05/07/99 • General revision to incorporate RITS.

• Incorporated format changes to comply with GPG 1410.1.

C 08/05/02 • Changed directive title.

• General revision to replace references to RITS GSFC FORM 20-2 with

GSFC Form 4-30 to reflect the new process which does not make RITS mandatory for creating GSFC FORM 20-2 s for receiving inspection and test activities.

• Incorporated format changes to comply with GPG 1410.1 (P.6 – Safety, P.7 – Training, and P.9 – Metrics).

• P.8 – Added the “Inspection and Receiving Acceptance Document” as a record and changed the retention period for the “RITS database supplier performance records.”

• P.9 – Added “percent of products accepted” and “percent of products delivered on time” as metrics.

• P.10 – Added definitions for “controlled equipment” and “receiving inspection.”

• 1.1 – Stated that all products covered by the scope of the GSFC QMS are required to be processed through GSFC’s Central Receiving operation.

• 1.2 – Stated that inspection and test requirements for software products are determined in accordance with GPG 8700.5.

• 1.3 – Stated that using RITS is not required for subsequent receipts of the product.

• 2.1 – Included information on how to obtain a GSFC Form 20-2.

• 2.5 – Stated that processing of incoming product will be delayed in

Central Receiving if the GSFC FORM 20-2 is not available and needs to be created.

• 2.10 – Stated that receipt and acceptance for products shall also be documented with the appropriate Inspection and Receiving Acceptance

Document in accordance with GPG 5100.1.

D 03/31/05 • General revision to update directive names/numbers.

• General revision to clarify requirements and remove ambiguity as part of the “GSFC Internal Rules Review.”

• General revision to remove references to NCR’s and the NCR/CAS system.

• P.9 – Included metrics.

• P.10b – Updated controlled equipment threshold from $1,000 to $5,000.

DIRECTIVE NO. GPR 4520.2I Page 10 of 10

• P.10d, 2.1, 2.2a, 2.3 – Included requirements for customer-supplied product.

• 2.1d – Added option for using locally generated GSFC FORM 20-2 s.

E

03/05/10 • Administrative change: Change Code 230 Logistics Management

Division to Code 270 Information and Logistics Management Division.

• Administratively extended for 1 year from original expiration date.

F 03/08/11 • Administratively extended for 1 year.

G 12/13/11 • Change all references from the Quality Management System to the

Management System.

• General update to all references and applicable documents.

• Identifies roles and responsibilities.

• Assigns responsibility for notifying Central Receiving personnel that incoming product requires a GSFC FORM 20-2.

H 07/10/15 • Changed applicability and noted exceptions.

• General update to all references and applicable documents.

• Identified and redefined roles and responsibilities.

• Deleted references to WOA and RITS System

• Added requirement to use GSFC Form 20-2 to document incoming receiving inspection.

• Allowed organizations receiving MS products to determine own method of documenting incoming inspection or give option to use GSFC FORM

20-2.

• Defined process for Receiving processing of non-conformances

• Deleted flow chart.

• P.9 – Removed metrics.

H 07/01/20 • Administratively extended for 1 year.

I 08/03/20

• Updated P.2, to ensure one “Shall” per paragraph.

• Updated P.4, Applicable Documents.

• Change Procedures 1 Overview replacing “should” with “shall.”

• Changed Procedures 2.2.G to remove, the statement: Store and prohibit access to hazardous materiel by unauthorized personnel.

• Changed Procedures 2.2.J to reflect the procedures followed for receiving explosives, weapons, etc.

• Updated P.8 with 370

• Updated Overview section

• Updated 2.1J and 2.2a

• Updated A7

File details come from the government source that posted it. Updated .