GEI 2017.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Environmental Consulting Services
- Contract number
- 407412
- Issued by
- Wisconsin
About this file
This document is a contract cost package (Attachment K) for GEI Consultants, Inc., detailing hourly rates and pricing structures for environmental consulting services. The document appears to be part of a state-level contract vehicle, likely with a Wisconsin state agency based on references to Milwaukee, Wisconsin regions, and state reimbursement rates for travel expenses.
The contract covers specialized asbestos-related services including bridge structure inspections with regional pricing tiers ranging from $700-$900 per structure depending on quantity and geographic region (Northeast, North Central, Northwest, Southeast, Southwest). Building and bridge tender house asbestos inspections are priced at $27.80 per hour for inspectors. The agreement includes various professional staff categories with hourly rates ranging from $23.17 for administrative support to $51.56 for hydrogeologists. The pricing structure incorporates a 200.31% overhead rate on direct labor costs and a 7% profit margin. Additional services include asbestos abatement work, equipment and supplies at direct cost with no markup, and standard state reimbursement rates for travel expenses including $0.51 per mile for vehicle use and lodging rates of $70-$80 per night depending on location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3191_5.PDF | ||
| 3191_2.PDF | ||
| 3191_3.DOCX | DOCX document | |
| 3191_4.DOCX | DOCX document | |
| 3191_6.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab 1 Hourly Rates and Costs
| ATTACHMENT K Contract Cost Package | |
| Fill in only those cells highlighted in blue. Cells in green are calculated. | |
| FIRM NAME: | GEI Consultants, Inc. |
| Asbestos Inspections - Bridges | Terms: Lump Sum |
| 1 structure | 2-4 structures | 5 or more structures | ||
| Asbestos inspection, per bridge structure, Northeast region | $ 850.00 | $ 750.00 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, North Central region | $ 900.00 | $ 750.00 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, Northwest region | $ 900.00 | $ 750.00 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, Southeast region | $ 900.00 | $ 750.00 | $ 700.00 | cost per structure |
| Asbestos inspection, per bridge structure, Southwest region | $ 900.00 | $ 750.00 | $ 700.00 | cost per structure |
| NOTE: Prices for long, multiple-section structures such as the Hoan Bridge in Milwaukee will be negotiated separately at the time of request. | ||||
| Asbestos inspection, buildings, bridge tender houses, other structures | Terms: direct hourly rate | |||
| Asbestos Inspector | $ 27.80 | Average Hourly Rate | ||
| Asbestos Inspector | $21.88 to $ 37.04 | Hourly Wage Range | ||
| Asbestos abatement | Terms: direct hourly rate | |||
| Exterior Abatement Worker | Average Hourly Rate | |||
| Exterior Asbestos Supervisor | Average Hourly Rate | |||
| Asbestos Worker | Average Hourly Rate | |||
| Asbestos Supervisor | Average Hourly Rate | |||
| Asbestos Project Designer | Average Hourly Rate | |||
| Asbestos Management Planner | Average Hourly Rate | |||
| Equipment and supplies | Terms: direct expense, no markup | |||
| Subcontractor Costs | Terms: actual cost, no markup | |||
| Overhead rate | 200.31% | Percentage of Direct Labor | ||
| Mileage | Terms: current state reimbursement rate | |||
| Per mile, personal vehicle rate | $0.51/mile | |||
| Meals | Terms: current state reimbursement rate | |||
| Breakfast | $ 8.00 | |||
| Lunch | $ 10.00 | |||
| Dinner | $ 20.00 | |||
| Lodging | Terms: current state reimbursement rate, excluding taxes | |||
| Per night | $70.00 | |||
| Per night, Milwaukee, Racine and Kenosha counties | $80.00 | |||
| Project Staff | Terms: direct hourly rate | |||
| Contract Manager | $ 46.28 | Average Hourly Rate | ||
| Project Supervisor | $ 50.52 | Average Hourly Rate | ||
| Engineer | $ 27.98 | Average Hourly Rate | ||
| Hydrogeologist | $ 51.56 | Average Hourly Rate | ||
| Scientist | $ 29.92 | Average Hourly Rate | ||
| Field Technician | $ 24.17 | Average Hourly Rate | ||
| CADD, GIS | $ 25.98 | Average Hourly Rate | ||
| Accounting | $ 27.97 | Average Hourly Rate | ||
| Administrative Support | $ 23.17 | Average Hourly Rate | ||
| Profit | Terms: percentage of labor and overhead | |||
| Rate | 7% | Percentage of Direct Labor + Labor Overhead |