3191_4.DOCX

DOCX document 23 KB Posted

Attached to
Environmental Consulting Services
Contract number
407412
Issued by
Wisconsin

About this file

This document is a scope of services template or proposal form for a Wisconsin Department of Transportation (WisDOT) project. The document appears to be a standardized template used by vendors to submit proposals for environmental or consulting services to WisDOT, with reporting requirements that include both the WisDOT Environmental Services Section (ESS) and Region Environmental Coordinator as recipients.

The template outlines a comprehensive cost structure for professional services including vendor labor broken down by task, rate, title, hours and associated costs, along with direct expenses, overhead, profit margins, and subcontractor costs. The document requires vendors to include a Site Health and Safety Plan and provide detailed assumptions for their proposed scope of work. Cost reporting is structured as both lump sum items and detailed labor breakdowns with unit pricing, though specific dollar amounts, timeframes, and project details are not populated in this template version. The standardized format suggests this is part of WisDOT's procurement process for environmental consulting or project management services.

View the file

Other files

File Type Posted
GEI 2017.xlsx XLSX spreadsheet
3191_5.PDF PDF
3191_2.PDF PDF
3191_3.DOCX DOCX document
3191_6.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WisDOT Project ID:

Site(s):

City:

County:

Highway and Termini (when applicable):

Total Estimated Cost:

Report recipients and report format (electronic or paper):

Recipient
Number of Copies
Preferred format
WisDOT ESS
2
1 bound/stapled paper

1 electronic (PDF)

Region Environmental Coordinator
1

Paper Electronic

Timetable for completion:

Project Element
Completion date

Scope of Services:

Include Site Health and Safety Plan:

Assumptions:

Estimated Cost:

Lump Sum Items: Total: $ List items

Vendor Labor: Total: $

Task
Rate Title
Hours
Rate
Cost

Direct Expenses: Total: $

Item
Quantity
Unit
Unit Price
Total

Overhead: $ Profit: $

Subcontractor costs: Total: $

Subcontractor
Subcontracted Services
Cost basis /Unit Price
Cost

File details come from the government source that posted it. Updated .