Exhibits A to E.xls

XLS spreadsheet 284 KB Posted

Attached to
Roofing IDIQ at Edwards AFB, CA Federal contract opportunity
Solicitation number
FA9301-10-R-0016
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Exhibits A-E

View the file

Other files for this federal contract opportunity

Other files attached to Roofing IDIQ at Edwards AFB, CA, newest first.
File Type Posted
Questions and Responses Roofing Recompete.doc DOC document
Questions and Responses Roofing Recompete.doc DOC document
Questions and Responses Roofing Recompete.doc DOC document
Roofing Sign-in Sheet.pdf PDF
Pre-Proposal Conference 1 July 2010.ppt PPT presentation
Past Performance.pdf PDF
Roofing FY10 Site Visit Notice.pdf PDF
Attachment 2.pdf PDF
Exhibit F.pdf PDF
Attachment 3.pdf PDF
Attachment 1.pdf PDF
Attachment 4.pdf PDF
Exhibits F Attachment 2.xls XLS spreadsheet
Exhibit F Attachment 1.pdf PDF
Exhibit F Attachment 3.pdf PDF
RFP.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

SUMMARY
YEAREST.COST
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
TOTAL$ - 0

&C&"Arial,Bold"EVALUATION MATRIX F04700-02-R-0004

IDIQ ROOF REPAIR

2nd FINAL PROPOSAL REVISION 9/12/02&"Arial,Regular"

&CFOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION--SEE FAR 3.104

1st year Exhibit A

EXHIBIT A
ELIN PRICES EFFECTIVE FOR ONE YEAR AFTER DATE OF CONTRACT AWARD
ELINTOTAL1ST YEARTOTAL 1ST YEAR
ITEMSUPPLIES/SERVICESEST QTYUNITUNIT PRICEEST. AMOUNT
Shingle Roof
A001Remove existing shingle roofing and under layment, and install new shingle roofing system complete.6,000SF$ - 0
A002Remove existing shingle roofing and under layment, and install new architectural shingle roofing system complete.6,000SF$ - 0
Built-Up Roof ( Insulated Deck )
A003Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
A004Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF20,000SF$ - 0
A005Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
A006Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
Built-Up Roof ( Non-Insulated Deck )
A007Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
A008Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
A009Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
A00ARemove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
EDPM Roof Membrane
A00BRemove existing roofing and under layment, and install new EDPM roofing system complete (no ballast).10,000SF$ - 0
Single Ply (PVC)
A00CInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Under 1000 sq.ft.2,000SF$ - 0
A00DInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Under 1000 sq.ft2,000SF$ - 0
A00EInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Over 1000 sq. ft.400,000SF$ - 0
A00FInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Over 1000 sq. ft.100,000SF$ - 0
Modified Bitumen ( Insulated Deck )
A00GRemove existing Roofing System and install a Modified Bitumen Roofing System. Under 1000 SF1,000SF$ - 0
A00HRemove existing Roofing System and install a Modified Bitumen Roofing System. Over 1000 SF15,000SF$ - 0
Structural Standing Seam Metal Roof System (Pre-Finished Color)
A00JInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system up to 4 in 12 slope.15,000SF$ - 0
A00KInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system from >4 in 12 to 6 in 12 slope.3,000SF$ - 0
A00LInstall standing seam metal roof system on existing concrete, metal, or nailable roof deck, supports, fasteneners, clips and blocking, insulation, complete system up to 4 in 12 slope.5,000SF$ - 0
A00MInstall standing seam metal roof system on existing concrete, metal, or nailable roof deck, supports, fasteneners, clips and blocking, insulation, complete system up to >4 in 12 to 6 in 12 slope.2,000SF$ - 0
$ - 0
Pre-formed Metal Roofing System$ - 0
A00NInstall Pre-formed Metal Roofing System, including pre-finished color, fasteners, clips, screws, blocking, etc., on an existing metal, concrete, or nailable deck.5,000SF$ - 0
A00PInstall Pre-formed Metal Roofing System, galvanized, fasteners, clips, screws, blocking, etc., on an existing metal, concrete, or nailable deck.5,000SF$ - 0
Roof Coating Systems
A00QInstall Elastomeric Roofing System with embedded polyester fabric, 2 coats, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).25,000SF$ - 0
A00RInstall elastomeric acrylic latex coating system, 2 coats, including surface prep (power washing, ect.)(IAW Mfrs. Spec.).25,000SF$ - 0
A00SInstall polyurea coating system, 45-mils, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).10,000SF$ - 0
A00TInstall colored (alephatic) polyurea coating system consisting of 1 component urea impregnated with UV protective elements, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).3,000SF$ - 0
$ - 0
Roof Insulation$ - 0
A00UInstall 3/4" Expanded Perlite Insulation Board on Metal or Wood Deck with mechanical fasteners.10,000SF$ - 0
A00VInstall 3/4" Expanded Perlite Insulation Board on Concrete, Gypsum Concrete, or Light Weight Concrete Deck with mechanical fasteners.10,000SF$ - 0
A00WInstall 3/4" Expanded Perlite Insulation Board with hot mopped bitumen on new or existing roof insulation.10,000SF$ - 0
A00XInstall tapered insulation, 1/4" to 1/2" in 12" slope.8,000SF$ - 0
A00YInstall 1" Polyisocyanurate Insulation.100,000SF$ - 0
A00ZInstall 2" Polyisocyanurate Insulation.200,000SF$ - 0
A010Install 3" Polyisocyanurate Insulation.100,000SF$ - 0
A011Install 2" two component sprayed in place polyurethane foam insulation.10,000SF$ - 0
A012Install fiberboard insulation (high density), 1/2".10,000SF$ - 0
A013Install fiberglass insulation board, 1-5/16".10,000SF$ - 0
A014Install R-19 Fiberglass Batt Insulation on Metal Roofing Systems.5,000SF$ - 0
A015Prodex Total insulation50,000SF$ - 0
A016Install 1/4" siliconized gypsum compatible with single ply roof (PVC) system.400,000SF$ - 0
A017Install 1/2" siliconized gypsum compatible with single ply roof (PVC) system.100,000SF$ - 0
Roof Flashing and Accessories
A018Install “Vapor Retarder” ( when specified in the SOW ).2,000SF$ - 0
A019Install Composite Base Flashing on Built-up Roofing Systems, including cant strips.1,600SF$ - 0
A01AInstall new Parapet cap (pre-finished), including treated wood nailer, coverplates, cleats, and fasteners.800SF$ - 0
A01BInstall Eave / Rake Flashing on Built-up Roofing Systems.800LF$ - 0
A01CInstall Composite Parapet Flashing on Built-up Roofing Systems, including parapet cap. (to 24").800LF$ - 0
A01DInstall Composite Parapet Flashing on Built-up Roofing Systems, including parapet cap. (to 40").800LF$ - 0
A01EInstall Composite Flashing at Concrete Masonry Unit Wall.200LF$ - 0
A01FInstall Pipe and Support Flashing membrane for Single Ply (PVC) Roofing Systems ( to 4" dia.).200EA$ - 0
A01GInstall Curb Flashing membrane on Single Ply (PVC) Roofing Systems.3,000LF$ - 0
A01HInstall new curb and flashing complete on BUR and Single Ply roofing systems100SF$ - 0
A01JInstall Curb Flashing on Built-up Roofing Systems.3,000LF$ - 0
A01KInstall Pipe and Support Flashing for Built-up Roofing Systems ( to 4" dia.).1,600EA$ - 0
Roof Fixtures and Systems
A01LInstall new Insulating Concrete Deck including waterproofing and underlayment felts.2,000SF$ - 0
A01MInstall new Cast-in-place Concrete Deck.200SF$ - 0
A01NRemove and dispose of roof gravel or ballast.20,000SF$ - 0
A01PRemove and dispose of built up roof system (when not included in other line items).50,000SF$ - 0
A01QProvide all labor and materials required to install new pre-finished metal gutters and downspouts.4,000LF$ - 0
A01RProvide all labor and materials required to install new metal gutters and downspouts.2,000LF$ - 0
A01SInstall New Concrete Splash Block.40EA$ - 0
A01TInstall new Expansion Joints.2,000LF$ - 0
A01UInstall new Replace Metal Pitch Pans.100EA$ - 0
A01VInstall new Scuppers in Parapets.60EA$ - 0
A01WReplace Metal Drain Strainers and Clamp Rings.60EA$ - 0
A01XInstall new roof drains to existing drain pipes compatible with roof system.100EA$ - 0
A01YInstall roof vent for BUR.20EA$ - 0
A01ZInstall new turbine ventilator for metal roof system (18" dia.).10EA$ - 0
A020Extend (weld) pipe vents when roof surface is raised by installation of new roofing system.20EA$ - 0
A021Provide all labor and materials required to install new "air terminals".50EA$ - 0
A022Provide all labor and materials required to install new steel vertical ladder without retaining cage.40LF$ - 0
A023Provide all labor and materials required to install new steel vertical ladders with retaining cage.200LF$ - 0
A024Provide all labor and materials required to install steel catwalks, safety railing and equipment supports.10,000SF$ - 0
A025Provide all labor and materials required to replace existing roof access Hatch.20EA$ - 0
A026Install 3 rail, 1 1/4" dia. galv. Steel Safety Railing (complies with OSHA).500LF$ - 0
A027Provide all labor and materials required to provide Rubber Chip Walk-Treads.1,000SF$ - 0
A028Install roof walkpads (non-slip) compatible with Single Ply roof (PVC) system.20,000SF$ - 0
A029Install concrete walk paver200EA$ - 0
A02AInstall Modified Bitumen Membrane Roof Walk Pad.1,000SF$ - 0
A02BRemove and reinstall equipment requiring use of crane. Roofs up to 50 ft.high5EA$ - 0
A02CRemove and dispose of equipment from roof requiring use of crane. Roofs up to 50 ft.high50EA$ - 0
A02DRemove and reinstall equipment from roof.5EA$ - 0
A02ERemove equipment from roof and dispose.150EA$ - 0
A02FInstall permanent fall protection100EA$ - 0
Repair and Maintenance
A02GInspect, tighten, seal, and replace as necessary, fasteners in metal roof systems.30,000SF$ - 0
A02HProvide all labor and materials required to remove damaged and install new pre-finished metal membrane panels to match existing standing seam metal roof, up to 6 in 12 slope.2,000SF$ - 0
A02JRepair of metal roof leaks requiring metal fabrication.400SF$ - 0
A02KProvide all labor and materials required for installing 6" strip of elastomeric seam repair at metal seams. Under 100 LF250LF$ - 0
A02LProvide all labor and materials required for installing 6" strip of elastomeric seam repair at metal seams. Over 100 LF1,000LF$ - 0
A02MRemove and Replace Joint Sealant in existing joints up to 1/2" wide X 1/2" deep.2,000LF$ - 0
A02NProvide labor and materials required to remove old sealant and reseal existing roof penetrations of 4" dia or less.200EA$ - 0
A02PProvide labor and materials required to remove old sealant and reseal roof flashing or penetrations greater than 4" dia.2,000LF$ - 0
A02QProvide all labor and materials required to provide repairs to built-up roofing using asphalt mastic and fiberglass mesh.1,000SF$ - 0
A02RPowerwash Existing Roof (1500-2500 psi.)50,000SF$ - 0
A02SProvide all labor and materials required to waterproof masonry parapet walls.1,600SF$ - 0
A02TPerform maintenance including but not limmited to minor repair (less than 10 sq. ft. per 1000 sq. ft. area), remove debris, clean rain gutters/downspouts, new sealant, tighten screws, repair erosion of granular capsheet, ect.100,000SF$ - 0
A02UProvide labor and materials to remove debris from roof and sweep clean.100,000SF$ - 0
A02VPhysically remove and dispose of debris in horizontal gutters and flush or otherwise remove debris from vertical downspouts.5,000LF$ - 0
Carpentry
A02WRemove and Replace plywood roof sheathing 1/2"100SH$ - 0
A02XRemove and Replace plywood roof sheathing 5/8"100SH$ - 0
A02YRemove and Replace plywood roof sheathing 3/4"1,000SH$ - 0
A02ZRemove and Replace plywood roof sheathing 1 "100SH$ - 0
A030Remove and Replace Treated Wood Nailers25,000BF$ - 0
A031Remove and Replace Treated Wood Fascia5,000BF$ - 0
A032Remove and Replace Untreated Lumber5,000BF$ - 0
Sheetmetal
A033Provide fabricated galvanized sheet metal (i.e. copias, drip edge, counterflashing, gravel stops, fascia, pan covers, etc.).8,000SF$ - 0
A034Provide pre-finished fabricated sheet metal (copias, drip edge, counterflashing, gravel stops, fascia, etc.).20,000SF$ - 0
A035Remove and replace metal roof decking.100SF$ - 0
A036Provide pre-finished (preferred) or primed and painted fabricated clad metal for single ply roof system.20,000SF$ - 0
A037Provide pre-finished metal siding.25,000SF$ - 0
A038Provide galvanized metal siding25,000SF$ - 0
$ - 0
Painting$ - 0
A039Provide all labor and materials required to paint roof vents, equipment, etc.10,000SF$ - 0
A03AProvide all labor and materials required to paint wood/metal fascia and soffit.10,000SF$ - 0
Sampling, Testing, and Abatement
A03BProvide all labor and materials required to provide roof core sampling.40EA$ - 0
A03CProvide all labor and materials required for removal of asbestos roofing mastic only (IAW Section 02080) add if roofing materials are not asbestos.5,000SF$ - 0
A03DProvide all labor and materials required for removal of asbestos roofing material (IAW Section 02080) add to roof removal cost included in other line items, includes roof mastic if roofing materials are asbestos.20,000SF$ - 0
A03EProvide all labor and materials required for removal of lead paint (IAW Section 2090).5,000SF$ - 0
Inspections and Evaluations
A03FPerform roof inspection and document on an inspection checklist, sketch (include measurements and Sq, Ft.), pictures and report (on CD) as recommended by the RIEI Membrane Roof Maintenance Manual (do not take core samples). Include repair / maintenance recommendations, roof life expectancy.9000000SF$ - 0
A03GPerform roof inspection (ELIN A03F) and maintenance (ELIN A02T).9000000SF$ - 0
TOTAL EXHIBIT A$ - 0

&CFA9301-10-R-0016

IDIQ ROOF REPAIR

EXHIBIT PRICE SCHEDULE

&R21 JUN 2010

&RExhibit A Page &P of &N DESCRIPTION OF WORK: The contractor shall provide, as specified in Task Orders issued hereunder, roofing of various facilities at Edwards AFB, in accordance with the specifications listed in Section J.

MINIMUM QUANTITIES: (Reference Section I, Clause I-178) The minimum quantity the Government will order is a combination of quantities from any of the CLINs 0001-070 equaling a total of $74,000.00.

VARIOUS BASE FACILITIES (Wage Decision CA960032)

TOTAL PERFORMANCE PERIOD IS FIVE (5) YEARS FROM DATE OF CONTRACT AWARD. TOTAL ESTIMATED QUANTITY REFLECTS CUMULATIVE AMOUNT FOR THE FIVE (5) YEAR PERIOD.

WORKMANSHIP SHALL MEET OR EXCEED CURRENT RECOMMENDATIONS OF NRCA MANUAL, RIEI MANUAL, AND ROOFING MATERIAL MANUFACTURERS.

D

2nd year Exhibit B

EXHIBIT B
ELIN PRICES EFFECTIVE FOR ONE YEAR AFTER DATE OF CONTRACT AWARD
ELINTOTAL2ND YEARTOTAL 2ND YEAR
ITEMSUPPLIES/SERVICESEST QTYUNITUNIT PRICEEST. AMOUNT
Shingle Roof
B001Remove existing shingle roofing and under layment, and install new shingle roofing system complete.6,000SF$ - 0
B002Remove existing shingle roofing and under layment, and install new architectural shingle roofing system complete.6,000SF$ - 0
Built-Up Roof ( Insulated Deck )
B003Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
B004Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF20,000SF$ - 0
B005Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
B006Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
Built-Up Roof ( Non-Insulated Deck )
B007Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
B008Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
B009Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
B00ARemove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
EDPM Roof Membrane
B00BRemove existing roofing and under layment, and install new EDPM roofing system complete (no ballast).10,000SF$ - 0
Single Ply (PVC)
B00CInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Under 1000 sq.ft.2,000SF$ - 0
B00DInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Under 1000 sq.ft2,000SF$ - 0
B00EInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Over 1000 sq. ft.400,000SF$ - 0
B00FInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Over 1000 sq. ft.100,000SF$ - 0
Modified Bitumen ( Insulated Deck )
B00GRemove existing Roofing System and install a Modified Bitumen Roofing System. Under 1000 SF1,000SF$ - 0
B00HRemove existing Roofing System and install a Modified Bitumen Roofing System. Over 1000 SF15,000SF$ - 0
Structural Standing Seam Metal Roof System (Pre-Finished Color)
B00JInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system up to 4 in 12 slope.15,000SF$ - 0
B00KInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system from >4 in 12 to 6 in 12 slope.3,000SF$ - 0
B00LInstall standing seam metal roof system on existing concrete, metal, or nailable roof deck, supports, fasteneners, clips and blocking, insulation, complete system up to 4 in 12 slope.5,000SF$ - 0
B00MInstall standing seam metal roof system on existing concrete, metal, or nailable roof deck, supports, fasteneners, clips and blocking, insulation, complete system up to >4 in 12 to 6 in 12 slope.2,000SF$ - 0
Pre-formed Metal Roofing System
B00NInstall Pre-formed Metal Roofing System, including pre-finished color, fasteners, clips, screws, blocking, etc., on an existing metal, concrete, or nailable deck.5,000SF$ - 0
B00PInstall Pre-formed Metal Roofing System, galvanized, fasteners, clips, screws, blocking, etc., on an existing metal, concrete, or nailable deck.5,000SF$ - 0
Roof Coating Systems
B00QInstall Elastomeric Roofing System with embedded polyester fabric, 2 coats, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).25,000SF$ - 0
B00RInstall elastomeric acrylic latex coating system, 2 coats, including surface prep (power washing, ect.)(IAW Mfrs. Spec.).25,000SF$ - 0
B00SInstall polyurea coating system, 45-mils, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).10,000SF$ - 0
B00TInstall colored (alephatic) polyurea coating system consisting of 1 component urea impregnated with UV protective elements, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).3,000SF$ - 0
Roof Insulation
B00UInstall 3/4" Expanded Perlite Insulation Board on Metal or Wood Deck with mechanical fasteners.10,000SF$ - 0
B00VInstall 3/4" Expanded Perlite Insulation Board on Concrete, Gypsum Concrete, or Light Weight Concrete Deck with mechanical fasteners.10,000SF$ - 0
B00WInstall 3/4" Expanded Perlite Insulation Board with hot mopped bitumen on new or existing roof insulation.10,000SF$ - 0
B00XInstall tapered insulation, 1/4" to 1/2" in 12" slope.8,000SF$ - 0
B00YInstall 1" Polyisocyanurate Insulation.100,000SF$ - 0
B00ZInstall 2" Polyisocyanurate Insulation.200,000SF$ - 0
B010Install 3" Polyisocyanurate Insulation.100,000SF$ - 0
B011Install 2" two component sprayed in place polyurethane foam insulation.10,000SF$ - 0
B012Install fiberboard insulation (high density), 1/2".10,000SF$ - 0
B013Install fiberglass insulation board, 1-5/16".10,000SF$ - 0
B014Install R-19 Fiberglass Batt Insulation on Metal Roofing Systems.5,000SF$ - 0
B015Prodex Total insulation50,000SF$ - 0
B016Install 1/4" siliconized gypsum compatible with single ply roof (PVC) system.400,000SF$ - 0
B017Install 1/2" siliconized gypsum compatible with single ply roof (PVC) system.100,000SF$ - 0
Roof Flashing and Accessories
B018Install “Vapor Retarder” ( when specified in the SOW ).2,000SF$ - 0
B019Install Composite Base Flashing on Built-up Roofing Systems, including cant strips.1,600SF$ - 0
B01AInstall new Parapet cap (pre-finished), including treated wood nailer, coverplates, cleats, and fasteners.800SF$ - 0
B01BInstall Eave / Rake Flashing on Built-up Roofing Systems.800LF$ - 0
B01CInstall Composite Parapet Flashing on Built-up Roofing Systems, including parapet cap. (to 24").800LF$ - 0
B01DInstall Composite Parapet Flashing on Built-up Roofing Systems, including parapet cap. (to 40").800LF$ - 0
B01EInstall Composite Flashing at Concrete Masonry Unit Wall.200LF$ - 0
B01FInstall Pipe and Support Flashing membrane for Single Ply (PVC) Roofing Systems ( to 4" dia.).200EA$ - 0
B01GInstall Curb Flashing membrane on Single Ply (PVC) Roofing Systems.3,000LF$ - 0
B01HInstall new curb and flashing complete on BUR and Single Ply roofing systems100SF$ - 0
B01JInstall Curb Flashing on Built-up Roofing Systems.3,000LF$ - 0
B01KInstall Pipe and Support Flashing for Built-up Roofing Systems ( to 4" dia.).1,600EA$ - 0
Roof Fixtures and Systems
B01LInstall new Insulating Concrete Deck including waterproofing and underlayment felts.2,000SF$ - 0
B01MInstall new Cast-in-place Concrete Deck.200SF$ - 0
B01NRemove and dispose of roof gravel or ballast.20,000SF$ - 0
B01PRemove and dispose of built up roof system (when not included in other line items).50,000SF$ - 0
B01QProvide all labor and materials required to install new pre-finished metal gutters and downspouts.4,000LF$ - 0
B01RProvide all labor and materials required to install new metal gutters and downspouts.2,000LF$ - 0
B01SInstall New Concrete Splash Block.40EA$ - 0
B01TInstall new Expansion Joints.2,000LF$ - 0
B01UInstall new Replace Metal Pitch Pans.100EA$ - 0
B01VInstall new Scuppers in Parapets.60EA$ - 0
B01WReplace Metal Drain Strainers and Clamp Rings.60EA$ - 0
B01XInstall new roof drains to existing drain pipes compatible with roof system.100EA$ - 0
B01YInstall roof vent for BUR.20EA$ - 0
B01ZInstall new turbine ventilator for metal roof system (18" dia.).10EA$ - 0
B020Extend (weld) pipe vents when roof surface is raised by installation of new roofing system.20EA$ - 0
B021Provide all labor and materials required to install new "air terminals".50EA$ - 0
B022Provide all labor and materials required to install new steel vertical ladder without retaining cage.40LF$ - 0
B023Provide all labor and materials required to install new steel vertical ladders with retaining cage.200LF$ - 0
B024Provide all labor and materials required to install steel catwalks, safety railing and equipment supports.10,000SF$ - 0
B025Provide all labor and materials required to replace existing roof access Hatch.20EA$ - 0
B026Install 3 rail, 1 1/4" dia. galv. Steel Safety Railing (complies with OSHA).500LF$ - 0
B027Provide all labor and materials required to provide Rubber Chip Walk-Treads.1,000SF$ - 0
B028Install roof walkpads (non-slip) compatible with Single Ply roof (PVC) system.20,000SF$ - 0
B029Install concrete walk paver200EA$ - 0
B02AInstall Modified Bitumen Membrane Roof Walk Pad.1,000SF$ - 0
B02BRemove and reinstall equipment requiring use of crane. Roofs up to 50 ft.high5EA$ - 0
B02CRemove and dispose of equipment from roof requiring use of crane. Roofs up to 50 ft.high50EA$ - 0
B02DRemove and reinstall equipment from roof.5EA$ - 0
B02ERemove equipment from roof and dispose.150EA$ - 0
B02FInstall permanent fall protection100EA$ - 0
Repair and Maintenance
B02GInspect, tighten, seal, and replace as necessary, fasteners in metal roof systems.30,000SF$ - 0
B02HProvide all labor and materials required to remove damaged and install new pre-finished metal membrane panels to match existing standing seam metal roof, up to 6 in 12 slope.2,000SF$ - 0
B02JRepair of metal roof leaks requiring metal fabrication.400SF$ - 0
B02KProvide all labor and materials required for installing 6" strip of elastomeric seam repair at metal seams. Under 100 LF250LF$ - 0
B02LProvide all labor and materials required for installing 6" strip of elastomeric seam repair at metal seams. Over 100 LF1,000LF$ - 0
B02MRemove and Replace Joint Sealant in existing joints up to 1/2" wide X 1/2" deep.2,000LF$ - 0
B02NProvide labor and materials required to remove old sealant and reseal existing roof penetrations of 4" dia or less.200EA$ - 0
B02PProvide labor and materials required to remove old sealant and reseal roof flashing or penetrations greater than 4" dia.2,000LF$ - 0
B02QProvide all labor and materials required to provide repairs to built-up roofing using asphalt mastic and fiberglass mesh.1,000SF$ - 0
B02RPowerwash Existing Roof (1500-2500 psi.)50,000SF$ - 0
B02SProvide all labor and materials required to waterproof masonry parapet walls.1,600SF$ - 0
B02TPerform maintenance including but not limmited to minor repair (less than 10 sq. ft. per 1000 sq. ft. area), remove debris, clean rain gutters/downspouts, new sealant, tighten screws, repair erosion of granular capsheet, ect.100,000SF$ - 0
B02UProvide labor and materials to remove debris from roof and sweep clean.100,000SF$ - 0
B02VPhysically remove and dispose of debris in horizontal gutters and flush or otherwise remove debris from vertical downspouts.5,000LF$ - 0
Carpentry
B02WRemove and Replace plywood roof sheathing 1/2"100SH$ - 0
B02XRemove and Replace plywood roof sheathing 5/8"100SH$ - 0
B02YRemove and Replace plywood roof sheathing 3/4"1,000SH$ - 0
B02ZRemove and Replace plywood roof sheathing 1 "100SH$ - 0
B030Remove and Replace Treated Wood Nailers25,000BF$ - 0
B031Remove and Replace Treated Wood Fascia5,000BF$ - 0
B032Remove and Replace Untreated Lumber5,000BF$ - 0
Sheetmetal
B033Provide fabricated galvanized sheet metal (i.e. copias, drip edge, counterflashing, gravel stops, fascia, pan covers, etc.).8,000SF$ - 0
B034Provide pre-finished fabricated sheet metal (copias, drip edge, counterflashing, gravel stops, fascia, etc.).20,000SF$ - 0
B035Remove and replace metal roof decking.100SF$ - 0
B036Provide pre-finished (preferred) or primed and painted fabricated clad metal for single ply roof system.20,000SF$ - 0
B037Provide pre-finished metal siding.25,000SF$ - 0
B038Provide galvanized metal siding25,000SF$ - 0
Painting
B039Provide all labor and materials required to paint roof vents, equipment, etc.10,000SF$ - 0
B03AProvide all labor and materials required to paint wood/metal fascia and soffit.10,000SF$ - 0
Sampling, Testing, and Abatement
B03BProvide all labor and materials required to provide roof core sampling.40EA$ - 0
B03CProvide all labor and materials required for removal of asbestos roofing mastic only (IAW Section 02080) add if roofing materials are not asbestos.5,000SF$ - 0
B03DProvide all labor and materials required for removal of asbestos roofing material (IAW Section 02080) add to roof removal cost included in other line items, includes roof mastic if roofing materials are asbestos.20,000SF$ - 0
B03EProvide all labor and materials required for removal of lead paint (IAW Section 2090).5,000SF$ - 0
Inspections and Evaluations
B03FPerform roof inspection and document on an inspection checklist, sketch (include measurements and Sq, Ft.), pictures and report (on CD) as recommended by the RIEI Membrane Roof Maintenance Manual (do not take core samples). Include repair / maintenance recommendations, roof life expectancy.9000000SF$ - 0
B03GPerform roof inspection (ELIN B03F) and maintenance (ELIN B02T).9000000SF$ - 0
$ - 0
TOTAL EXHIBIT A

&CFA9301-10-R-0016

IDIQ ROOF REPAIR

EXHIBIT PRICE SCHEDULE

&R21 JUN 2010

&RExhibit B Page &P of &N DESCRIPTION OF WORK: The contractor shall provide, as specified in Task Orders issued hereunder, roofing of various facilities at Edwards AFB, in accordance with the specifications listed in Section J.

MINIMUM QUANTITIES: (Reference Section I, Clause I-178) The minimum quantity the Government will order is a combination of quantities from any of the CLINs 0001-070 equaling a total of $74,000.00.

VARIOUS BASE FACILITIES (Wage Decision CA960032)

TOTAL PERFORMANCE PERIOD IS FIVE (5) YEARS FROM DATE OF CONTRACT AWARD. TOTAL ESTIMATED QUANTITY REFLECTS CUMULATIVE AMOUNT FOR THE FIVE (5) YEAR PERIOD.

WORKMANSHIP SHALL MEET OR EXCEED CURRENT RECOMMENDATIONS OF NRCA MANUAL, RIEI MANUAL, AND ROOFING MATERIAL MANUFACTURERS.

D DESCRIPTION OF WORK: The contractor shall provide, as specified in Task Orders issued hereunder, roofing of various facilities at Edwards AFB, in accordance with the specifications listed in Section J.

MINIMUM QUANTITIES: (Reference Section I, Clause I-178) The minimum quantity the Government will order is a combination of quantities from any of the CLINs 0001-070 equaling a total of $74,000.00.

VARIOUS BASE FACILITIES (Wage Decision CA960032)

TOTAL PERFORMANCE PERIOD IS FIVE (5) YEARS FROM DATE OF CONTRACT AWARD. TOTAL ESTIMATED QUANTITY REFLECTS CUMULATIVE AMOUNT FOR THE FIVE (5) YEAR PERIOD.

WORKMANSHIP SHALL MEET OR EXCEED CURRENT RECOMMENDATIONS OF NRCA MANUAL, RIEI MANUAL, AND ROOFING MATERIAL MANUFACTURERS.

D DESCRIPTION OF WORK: The contractor shall provide, as specified in Task Orders issued hereunder, roofing of various facilities at Edwards AFB, in accordance with the specifications listed in Section J.

MINIMUM QUANTITIES: (Reference Section I, Clause I-178) The minimum quantity the Government will order is a combination of quantities from any of the CLINs 0001-070 equaling a total of $74,000.00.

VARIOUS BASE FACILITIES (Wage Decision CA960032)

TOTAL PERFORMANCE PERIOD IS FIVE (5) YEARS FROM DATE OF CONTRACT AWARD. TOTAL ESTIMATED QUANTITY REFLECTS CUMULATIVE AMOUNT FOR THE FIVE (5) YEAR PERIOD.

WORKMANSHIP SHALL MEET OR EXCEED CURRENT RECOMMENDATIONS OF NRCA MANUAL, RIEI MANUAL, AND ROOFING MATERIAL MANUFACTURERS.

D

3rd year Exhibit C

EXHIBIT C
ELIN PRICES EFFECTIVE FOR ONE YEAR AFTER DATE OF CONTRACT AWARD
ELINTOTAL3RD YEARTOTAL 3RD YEAR
ITEMSUPPLIES/SERVICESEST QTYUNITUNIT PRICEEST. AMOUNT
Shingle Roof
C001Remove existing shingle roofing and under layment, and install new shingle roofing system complete.6,000SF$ - 0
C002Remove existing shingle roofing and under layment, and install new architectural shingle roofing system complete.6,000SF$ - 0
Built-Up Roof ( Insulated Deck )
C003Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
C004Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF20,000SF$ - 0
C005Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
C006Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
Built-Up Roof ( Non-Insulated Deck )
C007Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
C008Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
C009Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
C00ARemove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
EDPM Roof Membrane
C00BRemove existing roofing and under layment, and install new EDPM roofing system complete (no ballast).10,000SF$ - 0
Single Ply (PVC)
C00CInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Under 1000 sq.ft.2,000SF$ - 0
C00DInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Under 1000 sq.ft2,000SF$ - 0
C00EInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Over 1000 sq. ft.400,000SF$ - 0
C00FInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Over 1000 sq. ft.100,000SF$ - 0
Modified Bitumen ( Insulated Deck )
C00GRemove existing Roofing System and install a Modified Bitumen Roofing System. Under 1000 SF1,000SF$ - 0
C00HRemove existing Roofing System and install a Modified Bitumen Roofing System. Over 1000 SF15,000SF$ - 0
Structural Standing Seam Metal Roof System (Pre-Finished Color)
C00JInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system up to 4 in 12 slope.15,000SF$ - 0
C00KInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system from >4 in 12 to 6 in 12 slope.3,000SF$ - 0
C00LInstall standing seam metal roof system on existing concrete, metal, or nailable roof deck, supports, fasteneners, clips and blocking, insulation, complete system up to 4 in 12 slope.5,000SF$ - 0
C00MInstall standing seam metal roof system on existing concrete, metal, or nailable roof deck, supports, fasteneners, clips and blocking, insulation, complete system up to >4 in 12 to 6 in 12 slope.2,000SF$ - 0
Pre-formed Metal Roofing System
C00NInstall Pre-formed Metal Roofing System, including pre-finished color, fasteners, clips, screws, blocking, etc., on an existing metal, concrete, or nailable deck.5,000SF$ - 0
C00PInstall Pre-formed Metal Roofing System, galvanized, fasteners, clips, screws, blocking, etc., on an existing metal, concrete, or nailable deck.5,000SF$ - 0
$ - 0
Roof Coating Systems$ - 0
C00QInstall Elastomeric Roofing System with embedded polyester fabric, 2 coats, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).25,000SF$ - 0
C00RInstall elastomeric acrylic latex coating system, 2 coats, including surface prep (power washing, ect.)(IAW Mfrs. Spec.).25,000SF$ - 0
C00SInstall polyurea coating system, 45-mils, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).10,000SF$ - 0
C00TInstall colored (alephatic) polyurea coating system consisting of 1 component urea impregnated with UV protective elements, including surface prep (power washing, ect.) (IAW Mfrs. Spec.).3,000SF$ - 0
Roof Insulation
C00UInstall 3/4" Expanded Perlite Insulation Board on Metal or Wood Deck with mechanical fasteners.10,000SF$ - 0
C00VInstall 3/4" Expanded Perlite Insulation Board on Concrete, Gypsum Concrete, or Light Weight Concrete Deck with mechanical fasteners.10,000SF$ - 0
C00WInstall 3/4" Expanded Perlite Insulation Board with hot mopped bitumen on new or existing roof insulation.10,000SF$ - 0
C00XInstall tapered insulation, 1/4" to 1/2" in 12" slope.8,000SF$ - 0
C00YInstall 1" Polyisocyanurate Insulation.100,000SF$ - 0
C00ZInstall 2" Polyisocyanurate Insulation.200,000SF$ - 0
C010Install 3" Polyisocyanurate Insulation.100,000SF$ - 0
C011Install 2" two component sprayed in place polyurethane foam insulation.10,000SF$ - 0
C012Install fiberboard insulation (high density), 1/2".10,000SF$ - 0
C013Install fiberglass insulation board, 1-5/16".10,000SF$ - 0
C014Install R-19 Fiberglass Batt Insulation on Metal Roofing Systems.5,000SF$ - 0
C015Prodex Total insulation50,000SF$ - 0
C016Install 1/4" siliconized gypsum compatible with single ply roof (PVC) system.400,000SF$ - 0
C017Install 1/2" siliconized gypsum compatible with single ply roof (PVC) system.100,000SF$ - 0
Roof Flashing and Accessories
C018Install “Vapor Retarder” ( when specified in the SOW ).2,000SF$ - 0
C019Install Composite Base Flashing on Built-up Roofing Systems, including cant strips.1,600SF$ - 0
C01AInstall new Parapet cap (pre-finished), including treated wood nailer, coverplates, cleats, and fasteners.800SF$ - 0
C01BInstall Eave / Rake Flashing on Built-up Roofing Systems.800LF$ - 0
C01CInstall Composite Parapet Flashing on Built-up Roofing Systems, including parapet cap. (to 24").800LF$ - 0
C01DInstall Composite Parapet Flashing on Built-up Roofing Systems, including parapet cap. (to 40").800LF$ - 0
C01EInstall Composite Flashing at Concrete Masonry Unit Wall.200LF$ - 0
C01FInstall Pipe and Support Flashing membrane for Single Ply (PVC) Roofing Systems ( to 4" dia.).200EA$ - 0
C01GInstall Curb Flashing membrane on Single Ply (PVC) Roofing Systems.3,000LF$ - 0
C01HInstall new curb and flashing complete on BUR and Single Ply roofing systems100SF$ - 0
C01JInstall Curb Flashing on Built-up Roofing Systems.3,000LF$ - 0
C01KInstall Pipe and Support Flashing for Built-up Roofing Systems ( to 4" dia.).1,600EA$ - 0
Roof Fixtures and Systems
C01LInstall new Insulating Concrete Deck including waterproofing and underlayment felts.2,000SF$ - 0
C01MInstall new Cast-in-place Concrete Deck.200SF$ - 0
C01NRemove and dispose of roof gravel or ballast.20,000SF$ - 0
C01PRemove and dispose of built up roof system (when not included in other line items).50,000SF$ - 0
C01QProvide all labor and materials required to install new pre-finished metal gutters and downspouts.4,000LF$ - 0
C01RProvide all labor and materials required to install new metal gutters and downspouts.2,000LF$ - 0
C01SInstall New Concrete Splash Block.40EA$ - 0
C01TInstall new Expansion Joints.2,000LF$ - 0
C01UInstall new Replace Metal Pitch Pans.100EA$ - 0
C01VInstall new Scuppers in Parapets.60EA$ - 0
C01WReplace Metal Drain Strainers and Clamp Rings.60EA$ - 0
C01XInstall new roof drains to existing drain pipes compatible with roof system.100EA$ - 0
C01YInstall roof vent for BUR.20EA$ - 0
C01ZInstall new turbine ventilator for metal roof system (18" dia.).10EA$ - 0
C020Extend (weld) pipe vents when roof surface is raised by installation of new roofing system.20EA$ - 0
C021Provide all labor and materials required to install new "air terminals".50EA$ - 0
C022Provide all labor and materials required to install new steel vertical ladder without retaining cage.40LF$ - 0
C023Provide all labor and materials required to install new steel vertical ladders with retaining cage.200LF$ - 0
C024Provide all labor and materials required to install steel catwalks, safety railing and equipment supports.10,000SF$ - 0
C025Provide all labor and materials required to replace existing roof access Hatch.20EA$ - 0
C026Install 3 rail, 1 1/4" dia. galv. Steel Safety Railing (complies with OSHA).500LF$ - 0
C027Provide all labor and materials required to provide Rubber Chip Walk-Treads.1,000SF$ - 0
C028Install roof walkpads (non-slip) compatible with Single Ply roof (PVC) system.20,000SF$ - 0
C029Install concrete walk paver200EA$ - 0
C02AInstall Modified Bitumen Membrane Roof Walk Pad.1,000SF$ - 0
C02BRemove and reinstall equipment requiring use of crane. Roofs up to 50 ft.high5EA$ - 0
C02CRemove and dispose of equipment from roof requiring use of crane. Roofs up to 50 ft.high50EA$ - 0
C02DRemove and reinstall equipment from roof.5EA$ - 0
C02ERemove equipment from roof and dispose.150EA$ - 0
C02FInstall permanent fall protection100EA$ - 0
Repair and Maintenance
C02GInspect, tighten, seal, and replace as necessary, fasteners in metal roof systems.30,000SF$ - 0
C02HProvide all labor and materials required to remove damaged and install new pre-finished metal membrane panels to match existing standing seam metal roof, up to 6 in 12 slope.2,000SF$ - 0
C02JRepair of metal roof leaks requiring metal fabrication.400SF$ - 0
C02KProvide all labor and materials required for installing 6" strip of elastomeric seam repair at metal seams. Under 100 LF250LF$ - 0
C02LProvide all labor and materials required for installing 6" strip of elastomeric seam repair at metal seams. Over 100 LF1,000LF$ - 0
C02MRemove and Replace Joint Sealant in existing joints up to 1/2" wide X 1/2" deep.2,000LF$ - 0
C02NProvide labor and materials required to remove old sealant and reseal existing roof penetrations of 4" dia or less.200EA$ - 0
C02PProvide labor and materials required to remove old sealant and reseal roof flashing or penetrations greater than 4" dia.2,000LF$ - 0
C02QProvide all labor and materials required to provide repairs to built-up roofing using asphalt mastic and fiberglass mesh.1,000SF$ - 0
C02RPowerwash Existing Roof (1500-2500 psi.)50,000SF$ - 0
C02SProvide all labor and materials required to waterproof masonry parapet walls.1,600SF$ - 0
C02TPerform maintenance including but not limmited to minor repair (less than 10 sq. ft. per 1000 sq. ft. area), remove debris, clean rain gutters/downspouts, new sealant, tighten screws, repair erosion of granular capsheet, ect.100,000SF$ - 0
C02UProvide labor and materials to remove debris from roof and sweep clean.100,000SF$ - 0
C02VPhysically remove and dispose of debris in horizontal gutters and flush or otherwise remove debris from vertical downspouts.5,000LF$ - 0
Carpentry
C02WRemove and Replace plywood roof sheathing 1/2"100SH$ - 0
C02XRemove and Replace plywood roof sheathing 5/8"100SH$ - 0
C02YRemove and Replace plywood roof sheathing 3/4"1,000SH$ - 0
C02ZRemove and Replace plywood roof sheathing 1 "100SH$ - 0
C030Remove and Replace Treated Wood Nailers25,000BF$ - 0
C031Remove and Replace Treated Wood Fascia5,000BF$ - 0
C032Remove and Replace Untreated Lumber5,000BF$ - 0
Sheetmetal
C033Provide fabricated galvanized sheet metal (i.e. copias, drip edge, counterflashing, gravel stops, fascia, pan covers, etc.).8,000SF$ - 0
C034Provide pre-finished fabricated sheet metal (copias, drip edge, counterflashing, gravel stops, fascia, etc.).20,000SF$ - 0
C035Remove and replace metal roof decking.100SF$ - 0
C036Provide pre-finished (preferred) or primed and painted fabricated clad metal for single ply roof system.20,000SF$ - 0
C037Provide pre-finished metal siding.25,000SF$ - 0
C038Provide galvanized metal siding25,000SF$ - 0
Painting
C039Provide all labor and materials required to paint roof vents, equipment, etc.10,000SF$ - 0
C03AProvide all labor and materials required to paint wood/metal fascia and soffit.10,000SF$ - 0
Sampling, Testing, and Abatement
C03BProvide all labor and materials required to provide roof core sampling.40EA$ - 0
C03CProvide all labor and materials required for removal of asbestos roofing mastic only (IAW Section 02080) add if roofing materials are not asbestos.5,000SF$ - 0
C03DProvide all labor and materials required for removal of asbestos roofing material (IAW Section 02080) add to roof removal cost included in other line items, includes roof mastic if roofing materials are asbestos.20,000SF$ - 0
C03EProvide all labor and materials required for removal of lead paint (IAW Section 2090).5,000SF$ - 0
Inspections and Evaluations
C03FPerform roof inspection and document on an inspection checklist, sketch (include measurements and Sq, Ft.), pictures and report (on CD) as recommended by the RIEI Membrane Roof Maintenance Manual (do not take core samples). Include repair / maintenance recommendations, roof life expectancy.9000000SF$ - 0
C03GPerform roof inspection (ELIN C03F) and maintenance (ELIN C02T).9000000SF$ - 0
TOTAL EXHIBIT A$ - 0

&CFA9301-10-R-0016

IDIQ ROOF REPAIR

EXHIBIT PRICE SCHEDULE&R21 JUN 2010

&RExhibit C Page &P of &N DESCRIPTION OF WORK: The contractor shall provide, as specified in Task Orders issued hereunder, roofing of various facilities at Edwards AFB, in accordance with the specifications listed in Section J.

MINIMUM QUANTITIES: (Reference Section I, Clause I-178) The minimum quantity the Government will order is a combination of quantities from any of the CLINs 0001-070 equaling a total of $74,000.00.

VARIOUS BASE FACILITIES (Wage Decision CA960032)

TOTAL PERFORMANCE PERIOD IS FIVE (5) YEARS FROM DATE OF CONTRACT AWARD. TOTAL ESTIMATED QUANTITY REFLECTS CUMULATIVE AMOUNT FOR THE FIVE (5) YEAR PERIOD.

WORKMANSHIP SHALL MEET OR EXCEED CURRENT RECOMMENDATIONS OF NRCA MANUAL, RIEI MANUAL, AND ROOFING MATERIAL MANUFACTURERS.

D DESCRIPTION OF WORK: The contractor shall provide, as specified in Task Orders issued hereunder, roofing of various facilities at Edwards AFB, in accordance with the specifications listed in Section J.

MINIMUM QUANTITIES: (Reference Section I, Clause I-178) The minimum quantity the Government will order is a combination of quantities from any of the CLINs 0001-070 equaling a total of $74,000.00.

VARIOUS BASE FACILITIES (Wage Decision CA960032)

TOTAL PERFORMANCE PERIOD IS FIVE (5) YEARS FROM DATE OF CONTRACT AWARD. TOTAL ESTIMATED QUANTITY REFLECTS CUMULATIVE AMOUNT FOR THE FIVE (5) YEAR PERIOD.

WORKMANSHIP SHALL MEET OR EXCEED CURRENT RECOMMENDATIONS OF NRCA MANUAL, RIEI MANUAL, AND ROOFING MATERIAL MANUFACTURERS.

D DESCRIPTION OF WORK: The contractor shall provide, as specified in Task Orders issued hereunder, roofing of various facilities at Edwards AFB, in accordance with the specifications listed in Section J.

MINIMUM QUANTITIES: (Reference Section I, Clause I-178) The minimum quantity the Government will order is a combination of quantities from any of the CLINs 0001-070 equaling a total of $74,000.00.

VARIOUS BASE FACILITIES (Wage Decision CA960032)

TOTAL PERFORMANCE PERIOD IS FIVE (5) YEARS FROM DATE OF CONTRACT AWARD. TOTAL ESTIMATED QUANTITY REFLECTS CUMULATIVE AMOUNT FOR THE FIVE (5) YEAR PERIOD.

WORKMANSHIP SHALL MEET OR EXCEED CURRENT RECOMMENDATIONS OF NRCA MANUAL, RIEI MANUAL, AND ROOFING MATERIAL MANUFACTURERS.

D

4th year Exhibit D

EXHIBIT D
ELIN PRICES EFFECTIVE FOR ONE YEAR AFTER DATE OF CONTRACT AWARD
ELINTOTAL4TH YEARTOTAL 4TH YEAR
ITEMSUPPLIES/SERVICESEST QTYUNITUNIT PRICEEST. AMOUNT
Shingle Roof
D001Remove existing shingle roofing and under layment, and install new shingle roofing system complete.6,000SF$ - 0
D002Remove existing shingle roofing and under layment, and install new architectural shingle roofing system complete.6,000SF$ - 0
Built-Up Roof ( Insulated Deck )
D003Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
D004Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF20,000SF$ - 0
D005Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
D006Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
Built-Up Roof ( Non-Insulated Deck )
D007Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
D008Remove existing Roofing System and install new 4-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
D009Remove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Under 1000 SF5,000SF$ - 0
D00ARemove existing Roofing System and install new 3-ply Built-up Roofing System with granule cap sheet. Over 1000 SF5,000SF$ - 0
$ - 0
EDPM Roof Membrane$ - 0
D00BRemove existing roofing and under layment, and install new EDPM roofing system complete (no ballast).10,000SF$ - 0
Single Ply (PVC)
D00CInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Under 1000 sq.ft.2,000SF$ - 0
D00DInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Under 1000 sq.ft2,000SF$ - 0
D00EInstall new 60 mil or greater single ply roof (PVC) system, mechanically attached. Over 1000 sq. ft.400,000SF$ - 0
D00FInstall new 60 mil or greater single ply roof (PVC) system, fully adhered. Over 1000 sq. ft.100,000SF$ - 0
Modified Bitumen ( Insulated Deck )
D00GRemove existing Roofing System and install a Modified Bitumen Roofing System. Under 1000 SF1,000SF$ - 0
D00HRemove existing Roofing System and install a Modified Bitumen Roofing System. Over 1000 SF15,000SF$ - 0
Structural Standing Seam Metal Roof System (Pre-Finished Color)
D00JInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system up to 4 in 12 slope.15,000SF$ - 0
D00KInstall structural standing seam metal roof system on existing concrete, metal, or nailable roof deck, including framing trusses, supports, fasteneners, clips and blocking, insulation, complete system from >4 in 12 to 6 in 12 slope.3,000SF$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .