DRAFT SOO Enclosure 5 Acronyms and Definitions dated 2 Aug 2012

View the file

Other files

File Type Posted
NM-AZ_PBR_Q As_03-27-13.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_26_Mar_13.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_20_Mar_13.doc DOC document
RFP_FA8903-12-R-0050_Sched_B_-_Word_Doc.doc DOC document
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure_NM-AZ_PBR_19_Mar_13.doc DOC document
NM-AZ_PBR_Final_SECTION_M_Evaluation_Criteria_11_Mar_13.doc DOC document
Attachment_L-4_Subcontractor_Consent_Letter_Sample.doc DOC document
NM-AZ_PBR_Draft_RFP_w_atch_-_19_Mar_2013.pdf PDF
Attachment_L-5_Client_Authorization_Letter_Sample_NM-AZ.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_19_Mar_13.doc DOC document
Attachment_L-1_MilestonePaymentSchedule_without_price.xls XLS spreadsheet
Attachment_L-3_Past_Performance_Questionnaire.doc DOC document
NM-AZ_PBR_Additional_Questions_and_Answers_19_Mar_2013.doc DOC document
Attachment_L-2_MilestonePaymentSchedule_with_price_19_Mar_13.xls XLS spreadsheet
NM-AZ_PBR_Draft_RFP_Questions_Responses_cont_Q269-285_6_Mar_2013.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_7_Mar_13.doc DOC document
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure.doc DOC document
Attachment_L-4_Subcontractor_Consent_Letter_Sample.doc DOC document
NM-AZ_PBR_Draft_RFP_Additional_Questions_and_Responses_12_Mar_13.pdf PDF
NM-AZ_PBR_Final_SECTION_M_Evaluation_Criteria_11_Mar_13.doc DOC document
Attachment_L-2_MilestonePaymentSchedule_with_price.xls XLS spreadsheet
Attachment_L-3_Past_Performance_Questionnaire.doc DOC document
Attachment_L-1_MilestonePaymentSchedule_without_price.xls XLS spreadsheet
Attachment_L-5_Client_Authorization_Letter_Sample.doc DOC document
NM-AZ_PBR_Final_SECTION_M_Evaluation_Criteria_25_Feb_13.doc DOC document
NM-AZ_PBR_Site_Visit_Questions_Responses_011613.doc DOC document
NM-AZ_PBR_Draft_RFP_Questions_Responses_26_Feb_13.doc DOC document
NM-AZ_PBR_Atch_1_SOO_Final_20_Feb_13.doc DOC document
Additional_Site_Visit_QAs_26_Feb_13.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_25_Feb_13.doc DOC document
Atch_3_-_DBA_WDs_NM-AZ_PBR.pdf PDF
NM-Az-DraftSectionM(10_Jan_13).doc DOC document
NM-AZ_Encl_1_Site_Listing_r1_11_Jan_13.xls XLS spreadsheet
DRAFT_RFP_NM-AZ_FBO_21_DEC_2012.pdf PDF
NM-AZ_PBR_Bonding_Stream.pdf PDF
NM-AZ_PBR_SOO_FA8903-12-R-0050.doc DOC document
NM-AZ_PBR_SOO_Enc_2_-_FA8903-12-R-0050.xls XLS spreadsheet
NM-AZ_PBR_SOO_Enc_1_-_FA8903-12-R-0050.xls XLS spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- Former Plattsburgh AFB PBR RFI -

SOO Enclosure 5

Acronyms and Definitions

SOO Enclosure 5

Acronyms & Definitions

FA8903-12-R-0050

02 Aug 2012

Acronyms

ACOE
Army Corps of Engineers
ADEQ
Arizona Department of Environmental Quality
ADWR
Arizona Department of Water Resources
AF
Air Force
AFB
Air Force Base
AFCEE
Air Force Center for Engineering and the Environment
API
American Petroleum Institute
AAR
Army Air Field
BCE
Base Civil Engineer
CAB
Citizen Advisory Board
CAC
Common Access Card
CADD
Computer-aided Design and Drafting
CDUT
Contract Deliverables Upload Tool
CERCLA
Comprehensive Environmental Response, Compensation, and Liability Act
CFR
Code of Federal Regulations
CLIN
Contract Line Item Number
CO
Contracting Officer
COR
Contracting Officer Representative
CPSMR
Contractor’s Progress, Status, and Management Report
CQP
Construction Quality Plan
CSM
Conceptual Site Model
DD
Decision Document
DLH
Data Loading Handbook
DoD
Department of Defense
DQO
Data Quality Objectives
EDITT
Environmental Decision Information Tracking Tool
ELAP
Environmental Laboratory Accreditation Program
EO
Executive Order
EOD
Explosive Ordnance Disposal
EPCRA
Emergency Planning and Community Right-to-Know Act
ERPIMS
Environmental Resources Program Information Management System
ESD
Explanation of Significant Difference
FAR
Federal Acquisition Regulation
FFA
Federal Facility Agreement
GFE
Government-Furnished Equipment
GFI
Government-Furnished Information
GFP
Government-Furnished Property
GIO
Geospatial Integration Office
GIS
Geographic Information System
GSR
Green and Sustainable Remediation
HAFB
Holloman Air Force Base
HSP
Health and Safety Plan
HWB
Hazardous Waste Board
IBC
International Building Code
IMS
Integrated Master Schedule
IRP
Installation Restoration Program
LCC
Life-cycle Cost or Lowest Life Cycle
LUC/IC
Land Use Control/Institutional Control
LTM
Long Term Management
MCL
Maximum Contaminant Level
MDL
Master Document List
MC
Munitions Constituents
MEC
Munitions and Explosives of Concern
MMRP
Military Munitions Response Program
MPS
Milestone Payment Schedule
NACE
National Association of Corrosion Engineers
NCRMP
Natural and Cultural Resource Management Plan
NEC
National Electrical Code
NFA
No Further Action
NFPA
National Fire Protection Agency
NFRAP
No Further Remedial Action Planned
NMED
New Mexico Environment Department
NOV
Notice of Violation
NPL
National Priorities List
NTP
Notice to Proceed
OES
Optimized Exit Strategy
O&M
Operations and Maintenance
OSHA
Occupational Safety and Health Administration
OU
Operable Unit
PA/SI
Preliminary Assessment/Site Inspection
PAO
Public Affairs Officer
PBR
Performance-Based Remediation
.pdf
Portable Document File
PI
Performance Indicator
PMP
Project Management Plan
PMR
Project Management Review
POC
Point of Contact
POP
Period of Performance
QAPP
Quality Assurance Project Plan
QA/QC
Quality Assurance/Quality Control
QPP
Quality Program Plan
RAB
Restoration Advisory Board
RAO
Remedial Action Objective(s)
RA-O
Remedial Action – Operation
RC
Response Complete
RCRA
Resource Conservation and Recovery Act
RFP
Request for Proposal
RIP
Remedy in Place
ROD
Record of Decision
RPO
Remedial Process Optimization
SAP
Sampling and Analysis Plan
SARA
Superfund Amendments and Reauthorization Act
SC
Site Closeout
SDSFIE
Spatial Data Standard for Infrastructure and Environment
SOO
Statement of Objectives
SVE
Soil Vapor Extraction
SWMU
Solid Waste Management Unit
TBD
To Be Determined
TO
Task Order
TRC
Technical Review Committee
UFC
Uniform Fire Code
UFP-QAPP
Uniform Federal Policy - Quality Assurance Project Plan
USC
United States Code
USEPA
United States Environmental Protection Agency
UXO
Unexploded Ordnance
WP
Work Plan

Definitions

Emerging contaminant
Chemicals and materials that have pathways to enter the environment and present real or perceived unacceptable human health or environmental risks and either do not have regulatory peer-reviewed human health standards or the regulatory standards are evolving due to new science, detection capabilities, or pathways. *Note that emerging contaminants may be site-specific given state-led regulatory standards and site-specific conditions.
Long-term Management (LTM)
Environmental monitoring, review of site conditions, and/or maintenance of a remedial action to ensure continued protection as designed once a site achieves RC. LTM includes O&M, which are the measures required to maintain the effectiveness of response actions. LTM should not be used until no further environmental restoration response actions are appropriate or anticipated. LTM should not be used to refer to monitoring after Remedy in Place (this includes sites for which the selected response action is natural attenuation). Examples of LTM include landfill cap maintenance, leachate disposal, fence monitoring and repair, management of performance of five-year review execution, and LUC maintenance.
Remedial Action (RA)
Actions consistent with a permanent remedy taken instead of, or in addition to, a removal action in the event of a release or threatened release of a hazardous substance into the environment, to prevent or minimize the release of hazardous substances so that they do not migrate to cause substantial danger to present or future public health or welfare or the environment.
Remedial Action -Construction (RA-C)
A DoD term to define the period of time that a response action is being implemented, but is not yet operating as designed. At the end of this phase of work, a remedy is in place.
Remedial Action Objectives (RAO)
Remedial Action Objectives define the end goal of remedial activities such as the regulatory standard to be achieved, risk management approach implemented, or land use controls utilized. RAO should not be confused with Remedial Action-Operation.
Remedial Action -Operation (RA-O)
A DoD term to define the period of time that a selected remedy must operate before achieving remedial action objectives. It is the activity or process of implementing a selected remedy following RIP and preceding Response Complete (RC). At the end of this phase of work, the response is complete. The processes and monitoring in this phase of work are primary targets of optimization.
Remedy in Place (RIP)
Designation that a final remedial action has been constructed and implemented and is operating as planned in the remedial design. An example of a remedy in place is a pump-and-treat system that is installed, operating as designed, and will continue to operate until cleanup levels have been attained. Because operation of the remedy is ongoing, the site cannot be considered RC. For some sites, achieving RIP may not require any active remediation activities but would require USAF approval that the remedy is operating properly (e.g. MNA).
Response Complete (RC)
A milestone reached when the selected remedy has achieved remedial action objectives specified in the decision document. Signifies that DoD has completed the RIP and the required RA-O have achieved the cleanup objectives. If there is no RA-O phase, then the RA-C end date will also be the RC date. LTM may only occur after RC is achieved.
Site Closeout (SC)
Site Closeout signifies when the USAF has completed all active management and monitoring at an environmental cleanup site, no additional environmental cleanup funds will be expended at the site and the USAF has obtained regulatory concurrence. For practical purposes, Site Closeout occurs when cleanup goals have been achieved that allow unrestricted use of the property (i.e., no further LTM, including institutional controls, is required) and that all site decommissioning has been completed. Achieving Site Closeout may include, but not be limited to, the dismantling, removal, recycling, reclamation and/or disposal of all remedial activity systems and ancillary equipment above and underground to return the site to its natural state, well abandonment, and site restoration in accordance with Base and regulatory requirements. Note: Regulatory concurrence may include “no further action” (NFA) but does not include variations such as “no further active remediation”, “regulatory closure with restrictions”, “conditional site closure” or functional equivalents. These variations would involve requirements for LTM and would therefore not allow for unrestricted use.
Optimized Exit Strategy
A logical approach and plan to achieve SC or advance sites as close to SC as practicable while maximizing effectiveness and efficiency and minimizing LCCs. An OES identifies a series of actions, some of which may occur beyond the POP
Life-Cycle Cost
An estimate of POP and post POP costs based on proposed activities, activity duration, and assumptions from task order award through Contractor’s projected Site Closeout date (or FY41 for sites with indefinite closeout dates).
Post-POP Life-Cycle Cost
An estimate of post-POP costs based on proposed activities, activity duration, and assumptions from completion of the final performance objective or task order completion (whichever comes first) through Contractor’s projected Site Closeout date (or FY41 for sites with indefinite closeout dates).
Sustainability
As defined by the UN World Summit in 2005 recognized the key elements of sustainability to include environmental, social, and economic considerations. The USAF defines sustainability, in so far as the ERA program to be the practice of considering all environmental effects of remedy implementation and operation, incorporating options to minimize the environmental footprint of a cleanup. The key elements of green and sustainable remediation include energy use for treatment systems; water use/impacts on water resources; material consumption/waste generation; impacts on land and ecosystem; and air emissions.
Draft Documents
Internal documents that are submitted for Air Force review and approval. In all respects, draft documents shall be complete; substantively correct and consistent with applicable laws, regulations, Department of Defense/Air Force policies; in proper format; and free of grammatical and typographical errors. In general, draft documents are the initial version of documents that will be reviewed by the Air Force. Draft copy documents shall not be submitted to regulatory agencies for review.
Draft Final Document
Document incorporating Air Force comments and submitted for regulatory agency review may also be required prior to Final document preparation. Note that some documents may initially be submitted to the regulatory agencies as Final with any comments being incorporated into subsequent documents as appropriate (e.g., system status reports, monitoring reports, “data dumps”).
Final Document
The version of the document that has received Air Force and regulatory, where applicable, concurrence. At least one electronic copy of the final document consisting of original productivity software files and all quality control data, drawings, and GIS-type information, shall be provided to the Air Force. Electronic copies should be compatible with the current Air Force Microsoft™ Office Suite and GIS software versions. All figures shall be delivered in original application files GIS format as described in Section 4.7. In addition, an electronic version of the final document shall be submitted in a single portable document file (.pdf) format approved by the Air Force complete with electronic bookmarks.