NM-AZ_PBR_SOO_Enc_2_-_FA8903-12-R-0050.xls

XLS spreadsheet 547 KB Posted

Attached to
ESG - New Mexico - Arizona Performance-Based Remediation (PBR)
Solicitation number
FA8903-12-R-0050
Issued by

About this file

DRAFT SOO Enclosure 2 Key Documents List dated 2 Aug 2012

View the file

Other files

File Type Posted
NM-AZ_PBR_Q As_03-27-13.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_26_Mar_13.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_20_Mar_13.doc DOC document
RFP_FA8903-12-R-0050_Sched_B_-_Word_Doc.doc DOC document
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure_NM-AZ_PBR_19_Mar_13.doc DOC document
NM-AZ_PBR_Final_SECTION_M_Evaluation_Criteria_11_Mar_13.doc DOC document
Attachment_L-4_Subcontractor_Consent_Letter_Sample.doc DOC document
NM-AZ_PBR_Draft_RFP_w_atch_-_19_Mar_2013.pdf PDF
Attachment_L-5_Client_Authorization_Letter_Sample_NM-AZ.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_19_Mar_13.doc DOC document
Attachment_L-1_MilestonePaymentSchedule_without_price.xls XLS spreadsheet
Attachment_L-3_Past_Performance_Questionnaire.doc DOC document
NM-AZ_PBR_Additional_Questions_and_Answers_19_Mar_2013.doc DOC document
Attachment_L-2_MilestonePaymentSchedule_with_price_19_Mar_13.xls XLS spreadsheet
NM-AZ_PBR_Draft_RFP_Questions_Responses_cont_Q269-285_6_Mar_2013.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_7_Mar_13.doc DOC document
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure.doc DOC document
Attachment_L-4_Subcontractor_Consent_Letter_Sample.doc DOC document
NM-AZ_PBR_Draft_RFP_Additional_Questions_and_Responses_12_Mar_13.pdf PDF
NM-AZ_PBR_Final_SECTION_M_Evaluation_Criteria_11_Mar_13.doc DOC document
Attachment_L-2_MilestonePaymentSchedule_with_price.xls XLS spreadsheet
Attachment_L-3_Past_Performance_Questionnaire.doc DOC document
Attachment_L-1_MilestonePaymentSchedule_without_price.xls XLS spreadsheet
Attachment_L-5_Client_Authorization_Letter_Sample.doc DOC document
NM-AZ_PBR_Final_SECTION_M_Evaluation_Criteria_25_Feb_13.doc DOC document
NM-AZ_PBR_Site_Visit_Questions_Responses_011613.doc DOC document
NM-AZ_PBR_Draft_RFP_Questions_Responses_26_Feb_13.doc DOC document
NM-AZ_PBR_Atch_1_SOO_Final_20_Feb_13.doc DOC document
Additional_Site_Visit_QAs_26_Feb_13.doc DOC document
NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_25_Feb_13.doc DOC document
Atch_3_-_DBA_WDs_NM-AZ_PBR.pdf PDF
NM-Az-DraftSectionM(10_Jan_13).doc DOC document
NM-AZ_Encl_1_Site_Listing_r1_11_Jan_13.xls XLS spreadsheet
DRAFT_RFP_NM-AZ_FBO_21_DEC_2012.pdf PDF
NM-AZ_PBR_Bonding_Stream.pdf PDF
NM-AZ_PBR_SOO_FA8903-12-R-0050.doc DOC document
NM-AZ_PBR_SOO_Enc_5_-_Acronyms_ _Definitions.doc DOC document
NM-AZ_PBR_SOO_Enc_1_-_FA8903-12-R-0050.xls XLS spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cannon

DocumentSiteFile Location
1997 Passive Soil Gas Survey Report- Fire Training Area No. 4 SWMU Nos. 109, 110, 111, 112.pdfAT010ItemnmazgroupFY13/cannonFY13/Contractors
2000 Preferred Alternative Justification for the Corrective Measures Study SWMUs 109, 110, 111, 112- Fire Training Area Num.pdfAT010ItemnmazgroupFY13/cannonFY13/Contractors
2001 Final Corrective Measures Study Report for SWMUs 109, 110, 111, and 112- Fire Training Area Four.pdfAT010ItemnmazgroupFY13/cannonFY13/Contractors
2005 Phase I Investigation Soil Corrective Measures Fire Training Area 04 Report.pdfAT010ItemnmazgroupFY13/cannonFY13/Contractors
2006 NMED letter to Cannon AFB - Requirement for Further Corrective Action Final No Further Action Report for Fire Training.pdfAT010ItemnmazgroupFY13/cannonFY13/Contractors
2007 NMED letter to Cannon AFB - Extension Request Approval - Fee Assessment Voluntary Corrective Measures Report Fire Trai.pdfAT010ItemnmazgroupFY13/cannonFY13/Contractors
1997 Decision Document Fire Department Training Area No. 1 SWMU No. 78 , IRP No. FT-06.pdfFT006ItemnmazgroupFY13/cannonFY13/Contractors
1997 Decision Document Fire Department Training Area No. 1 SWMU No. 78.pdfFT006ItemnmazgroupFY13/cannonFY13/Contractors
1997 Decision Document- Fire Department Training area No. 1 Swum 78,FT-06.pdfFT006ItemnmazgroupFY13/cannonFY13/Contractors
2005 Pre-draft- Work Plan Field Sampling Plan, Quality Assurance Project Plan, Site Safety and Health Plan.pdfFT006ItemnmazgroupFY13/cannonFY13/Contractors
2008 Final Work Plan Addendum- Field Sampling Plan- Quality Assurance Project Plan- Site and Safety Health Plan- RFI.pdfFT006ItemnmazgroupFY13/cannonFY13/Contractors
2009 Final RCRA Facility Investigation for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Report.pdfFT006ItemnmazgroupFY13/cannonFY13/Contractors
AR-1443.pdfFT006ItemnmazgroupFY13/cannonFY13/Contractors
10-08 Corrective Action Complete Proposals.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
1-1993 Final Volume 1 RFI Landfill No. 2 (SWMU No 82,IRP No LF-2).PDFLF002ItemnmazgroupFY13/cannonFY13/Contractors
1-1993 Final Volume II Appendixes A and B RCRA Facility Investigation Report for Landfill No. 2 (SWMU No. 82,IRP No. LF-2).PDFLF002ItemnmazgroupFY13/cannonFY13/Contractors
1-1993 Final Volume III Appendixes C and D RCRA Facility Investigation Report for Landfill No. 2 (SWMU No. 82,IRP No. LF-2).PDFLF002ItemnmazgroupFY13/cannonFY13/Contractors
1-94 RFI QC Summary Report.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
1-97 Decision Document- Landfill No. 2- SWMU 82 aka LF-02.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
7-07 NMED letter to Cannon AFB - Notice of Disapproval of Final Report RCRA Facility Investigation for 21 SWMUs.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
8-09 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
AR-1094 Cannon AFB letter to NMED - transmittal letter for response to NMED comments of RCRA Facility Investigation (RFI) R.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
AR-1326.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
AR-1651RCRA Facility Investigation Reports for LF-01, LF-02, LF-05.pdfLF002ItemnmazgroupFY13/cannonFY13/Contractors
12-07 RCRA Facility Investigation Report.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
12-08 Final 2008 Biennial Groundwater Monitoring and Annual Landfill Inspection Report.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
12-08 Final Long Term Monitoring and Maintenance Work Plan.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
1-97 Final Quarterly and Semiannual Monitoring Report for June 1997 Sampling Event Long-Term Monitoring and Well Installati.PDFLF003ItemnmazgroupFY13/cannonFY13/Contractors
1-98 Final Third Quarterly Monitoring Well R and Final Semiannual Monitoring Wells N and O December 1997 Sampling Event Lon.PDFLF003ItemnmazgroupFY13/cannonFY13/Contractors
2-10 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval corrective action complete proposals 2008.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
3-09 NMED letter from John E. Kieling to Col Timothy J. Leahy- Approval of the 2008 Biennial groundwater monitoring and ann.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
4-96 US EPA letter to Cannon AFB - Approval of Draft RFI Report Phase II RFI Investigation.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
5-06 Petition for No Further Action.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
6-00 Final Annual Summary Report Assessment Monitoring 1999 Sampling Events Long-Term Monitoring.PDFLF003ItemnmazgroupFY13/cannonFY13/Contractors
6-09 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval of Long-term monitoring and maintenance work.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
7-02 Final Revised Long-Term Monitoring Work Plan Sampling and Analysis Plan Site Safety , Health Plan.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
7-08 Corrective Action Complete Proposals.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
7-09 Long-Term Monitoring and Maintenance Work Plan.pdfLF003ItemnmazgroupFY13/cannonFY13/Contractors
8-98 Final Work Plan Contains Field Sampling Plan Quality Assurance Project Plan Site Safety and Health Plan Long-Term Moni.PDFLF003ItemnmazgroupFY13/cannonFY13/Contractors
9-99 Final Annual Summary Report Assessment Monitoring 1998 Sampling Events Long-Term Monitoring.PDFLF003ItemnmazgroupFY13/cannonFY13/Contractors
02 Final Revised Long-Term Monitoring Work Plan- Sampling and Analysis Plan Site Safet.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
03 Final December 2002- Annual Monitoring Report.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
08 Corrective Action Complete Proposals.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
08 Final Long Term Monitoring and Maintenance Work Plan.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
09 Long-Term Monitoring and Maintenance Work Plan.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
09 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval of Long-term monitoring and maintenance work p.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
09 NMED letter from John E. Kieling to Col Timothy J. Leahy- Approval of the 2008 Biennial groundwater monitoring and annua.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
09 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
96 US EPA letter to Cannon AFB - Approval of Draft RFI Report Phase II RFI Investigation.pdfLF004ItemnmazgroupFY13/cannonFY13/Contractors
1992 Landfill No. 5 SWMU No. 113,IRP No. LF-5 Decision Document (Draft).PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1992 NMED Letter to Base Transmitting Closure Plan Approval, Cell 3 of Landfill 5 NM7572124454.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1993 Draft Work Plan - Volume I Work Plan Data Management Plan Project Management Plan Site Safety and Health Plan RFI.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1993 Hazardous Waste Disposal Deed Recordation and Notification from Count of Curry New Mexico.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
1994 Letter from ACC James, E Strasler Lt Col, to Ms. Barbara Hoditschek RCRA Facility Investigation for Landfill No. 5 (SW.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 Base Letter to NMED Transmitting Responses to NMED's Notice of Deficiencies on the Landfill 5 Post Closure Care Plan.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 Draft Phase I RCRA Facility Investigation Report Landfill No. 5 SWMU No. 113,IRP No. LF-5 Appendix A Geophysical Surve.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 Draft Phase I RCRA Facility Investigation Report Landfill No. 5 SWMU No. 113,IRP No. LF-5 Appendix B Soil Gas Survey.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 Draft Version 2 Cannon Air Force Base Landfill 5, Cell 3 Post-Closure Plan.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 Final Work Plan - Volume I Work Plan Data Management Plan Project Management Plan Site Safety and Health Plan RCRA Fac.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 Final Work Plan - Volume II Data Collection Quality Assurance Plan RFI Phase I for Landfill No 5.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 Letter from Christopher S. Long Colonel USAF to Mr. William Honker US EPA Region IV- 4th Qtr Progress report.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
1995 NMED Letter to Base Concerning Notice of Deficiency (NOD) - Landfill 5, Cell 3 Post Closure Care Plan, February 28, 19.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1997 RCRA Ground-Water Sampling at Landfill 5 Data Report for December 16-17, 1996 Sampling.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1997 RCRA Ground-Water Sampling at Landfill 5 Data Report for March 4-5, 1997 Sampling.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1997 RCRA Ground-Water Sampling at Sewage Lagoons and at Landfill 5 Data Report for August 18-20, 1997 Sampling.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
1997 Statistical Analysis Report for Samples Collected August, December, 1996, March, and May 1997 from RCRA Ground-Water M.PDFLF005ItemnmazgroupFY13/cannonFY13/Contractors
2002 RCRA Ground-Water monitoring at Sewage Lagoons and at Landfill 5.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
2003 RCRA Ground-water Monitoring at Sewage Lagoons, Landfill 5, and perimeter Wells Analytical Results of Samples Collecte.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
2006 RCRA Groundwater Monitoring at Sewage Lagoons Landfill 5, and Perimeter Wells Analytical Results of Samples Collected.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
2006 RCRA Ground-Water Monitoring at Sewage Lagoons, Landfill 5- Analytical Results of Samples Collected June 5, 6, and 7,.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
2007 RCRA Ground-Water Monitoring at Sewage Lagoons, Landfill 5, and non-RCRA sites Analytical Results of Samples Collected.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
AR-1330.pdfLF005ItemnmazgroupFY13/cannonFY13/Contractors
AR-1325 2002 Revised draft Long-term Monitoring Work Plan. Sampling and Analysis plan Quality Assurance Project Plan Site.pdfLF025ItemnmazgroupFY13/cannonFY13/Contractors
AR-1434 2007 NMED letter from John E. Kieling to Col Scott D. West- Approval of the RCRA facility investigation (RFI) repor.pdfLF025ItemnmazgroupFY13/cannonFY13/Contractors
AR-1465 NMED Letter LF-25SWMU 97 and sewage lagoons (SWMU101).pdfLF025ItemnmazgroupFY13/cannonFY13/Contractors
AR-1628 2010 Biennial Groundwater Monitoring and Annual Landfill Inspection Report; Landfills 3, 4, 25, and Sewage Lagoons,.pdfLF025ItemnmazgroupFY13/cannonFY13/Contractors
1997 Corrective Measure Completion Report. Appendix II and III Solid Waste management Units. Volume I.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
1999 NMED letter to Cannon AFB - Request for Supplemental Information for Corrective Measure Completion Report Appendix II.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2003 Draft statement of Basis.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2007 Final Revision 1 RCRA Facility Investigation for 21 SWMUs.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2007 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2007 NMED letter to Cannon AFB - Notice of Disapproval of Final Report RCRA Facility Investigation for 21 SWMUs.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2008 Final Work Plan Addendum- Field Sampling Plan- QAPP- SSHP- RFI for SWMUs 34, 78, 85, 91, 95, and 107.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2008 NMED letter to Timothy J. Leahy Col from John E. Kieling NMED regarding Approval with direction RCRA Facility Investig.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2009 Draft RCRA Facility Investigation for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Report.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2010 Corrective Action Complete Revised.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
2010 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval corrective action complete proposals (Octobe.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR Index.xlsxMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-0798Management Action Plan SWMU 1SWMU 10SWMU 101SWMU 102SWMU 103SWMU 108SWMU 109SWMU 11SWMU 110SWMU 111etc.PDFMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-0806 Statement of Basis April 2001.PDFMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-0898 Scope of Work for RCRA Facility Investigation.PDFMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-0928 Community Relations Plan.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-0967 Final RCRA Facility Investigation Report for 21 SWMUs.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1091 NMED letter to Cannon AFB - Notice of Disapproval of Final Report RCRA Facility Investigation for 21 SWMUs.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1206 Final RCRA Facility Investigation for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Report.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1320 Final Revision 1 RCRA Facility Investigation for 21 SWMUs.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1393 NMED letter to Col John D. Posner from Cindy Padilla Final Permit Decision Class 3 permit Modification for No Fur.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1484 NMED letter from John E. Kieling to Col Stephen Clark- Request for facility-wide long term groundwater monitoring p.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1490 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan fo.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1627 Approval with Modifications 2010 Biennial Groundwater Monitoring and Annual Landfill Inspection Report; Landfills 3.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
AR-1656 Notice of Approval Final RFI for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Repor.PDFMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
CAFB_Final_Perm 2003.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
ER_CANNON_FNL (former CRP sites).pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
Final 2011 Annual IC Report.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
Final_CAFB_Dec2010 Biennial Report.pdfMultiple SitesItemnmazgroupFY13/cannonFY13/Contractors
1996 RCRA Ground-Water Sampling at Sewage Lagoons and Well P of Playa Lake Data Report for June 24-26, 1996 Sampling.PDFSD012ItemnmazgroupFY13/cannonFY13/Contractors
1998 Summary of Risk Evaluations at the Playa Lake (SWMU 103) Draft Volume II of II Appendixes A-E.pdfSD012ItemnmazgroupFY13/cannonFY13/Contractors
2009 Contractor Quality Control Plan for the South Playa Lake Solid Waste Diversion.pdfSD012ItemnmazgroupFY13/cannonFY13/Contractors
2009 General Work Plan for the South Playa Lake Solid Waste Diversion at Cannon Air Force Base, New Mexico.pdfSD012ItemnmazgroupFY13/cannonFY13/Contractors
2009 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval Playa Lake ,SWMU 103, Corrective Measures St.pdfSD012ItemnmazgroupFY13/cannonFY13/Contractors
AR-0987 Statement of Basis Approval of No Further Action for 72 Sites at Cannon AFB.pdfSD012ItemnmazgroupFY13/cannonFY13/Contractors
AR-1442 1997 Decision Document Stormwater Collection Point SWMU 85 SD-12.pdfSD012ItemnmazgroupFY13/cannonFY13/Contractors
AR-1491Email correspondence between Cheryl Frischkorn NMENV and Gerald Pelfrey USAF concerning SWMU 73 Stormwater drainage.pdfSD022ItemnmazgroupFY13/cannonFY13/Contractors
5-93 Letter from Mac A Crawford to David Dentino- Removal of IRP Sites from the Cannon AFB IRP Listing.pdfSW002ItemnmazgroupFY13/cannonFY13/Contractors
2003 Statement of Basis Draft.pdfSW004ItemnmazgroupFY13/cannonFY13/Contractors
2010 Corrective Action Complete Proposals- 2nd set.pdfSW004ItemnmazgroupFY13/cannonFY13/Contractors
2010 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval corrective action complete prpsls.pdfSW006ItemnmazgroupFY13/cannonFY13/Contractors

&L2 Aug 2012&RFA8903-12-R-0050 Cannon AFB &R&P of &N 2010 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval corrective action complete prpsls.pdf 2010 Corrective Action Complete Proposals- 2nd set.pdf 2003 Statement of Basis Draft.pdf 5-93 Letter from Mac A Crawford to David Dentino- Removal of IRP Sites from the Cannon AFB IRP Listing.pdf AR-1491Email correspondence between Cheryl Frischkorn NMENV and Gerald Pelfrey USAF concerning SWMU 73 Stormwater drainage.pdf AR-1442 1997 Decision Document Stormwater Collection Point SWMU 85 SD-12.pdf AR-0987 Statement of Basis Approval of No Further Action for 72 Sites at Cannon AFB.pdf 2009 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval Playa Lake ,SWMU 103, Corrective Measures St.pdf 2009 General Work Plan for the South Playa Lake Solid Waste Diversion at Cannon Air Force Base, New Mexico.pdf 2009 Contractor Quality Control Plan for the South Playa Lake Solid Waste Diversion.pdf 1998 Summary of Risk Evaluations at the Playa Lake (SWMU 103) Draft Volume II of II Appendixes A-E.pdf 1996 RCRA Ground-Water Sampling at Sewage Lagoons and Well P of Playa Lake Data Report for June 24-26, 1996 Sampling.PDF Final_CAFB_Dec2010 Biennial Report.pdf Final 2011 Annual IC Report.pdf ER_CANNON_FNL (former CRP sites).pdf CAFB_Final_Perm 2003.pdf AR-1656 Notice of Approval Final RFI for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Repor.PDF AR-1627 Approval with Modifications 2010 Biennial Groundwater Monitoring and Annual Landfill Inspection Report; Landfills 3.pdf AR-1490 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan fo.pdf AR-1484 NMED letter from John E. Kieling to Col Stephen Clark- Request for facility-wide long term groundwater monitoring p.pdf AR-1393 NMED letter to Col John D. Posner from Cindy Padilla Final Permit Decision Class 3 permit Modification for No Fur.pdf AR-1320 Final Revision 1 RCRA Facility Investigation for 21 SWMUs.pdf AR-1206 Final RCRA Facility Investigation for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Report.pdf AR-1091 NMED letter to Cannon AFB - Notice of Disapproval of Final Report RCRA Facility Investigation for 21 SWMUs.pdf AR-0967 Final RCRA Facility Investigation Report for 21 SWMUs.pdf AR-0928 Community Relations Plan.pdf AR-0898 Scope of Work for RCRA Facility Investigation.PDF AR-0806 Statement of Basis April 2001.PDF AR-0798Management Action Plan SWMU 1SWMU 10SWMU 101SWMU 102SWMU 103SWMU 108SWMU 109SWMU 11SWMU 110SWMU 111etc.PDF AR Index.xlsx 2010 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval corrective action complete proposals (Octobe.pdf 2010 Corrective Action Complete Revised.pdf 2009 Draft RCRA Facility Investigation for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Report.pdf 2008 NMED letter to Timothy J. Leahy Col from John E. Kieling NMED regarding Approval with direction RCRA Facility Investig.pdf 2008 Final Work Plan Addendum- Field Sampling Plan- QAPP- SSHP- RFI for SWMUs 34, 78, 85, 91, 95, and 107.pdf 2007 NMED letter to Cannon AFB - Notice of Disapproval of Final Report RCRA Facility Investigation for 21 SWMUs.pdf 2007 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan.pdf 2007 Final Revision 1 RCRA Facility Investigation for 21 SWMUs.pdf 2003 Draft statement of Basis.pdf 1999 NMED letter to Cannon AFB - Request for Supplemental Information for Corrective Measure Completion Report Appendix II.pdf 1997 Corrective Measure Completion Report. Appendix II and III Solid Waste management Units. Volume I.pdf AR-1628 2010 Biennial Groundwater Monitoring and Annual Landfill Inspection Report; Landfills 3, 4, 25, and Sewage Lagoons,.pdf AR-1465 NMED Letter LF-25SWMU 97 and sewage lagoons (SWMU101).pdf AR-1434 2007 NMED letter from John E. Kieling to Col Scott D. West- Approval of the RCRA facility investigation (RFI) repor.pdf AR-1325 2002 Revised draft Long-term Monitoring Work Plan. Sampling and Analysis plan Quality Assurance Project Plan Site.pdf AR-1330.pdf 2007 RCRA Ground-Water Monitoring at Sewage Lagoons, Landfill 5, and non-RCRA sites Analytical Results of Samples Collected.pdf 2006 RCRA Ground-Water Monitoring at Sewage Lagoons, Landfill 5- Analytical Results of Samples Collected June 5, 6, and 7,.pdf 2006 RCRA Groundwater Monitoring at Sewage Lagoons Landfill 5, and Perimeter Wells Analytical Results of Samples Collected.pdf 2003 RCRA Ground-water Monitoring at Sewage Lagoons, Landfill 5, and perimeter Wells Analytical Results of Samples Collecte.pdf 2002 RCRA Ground-Water monitoring at Sewage Lagoons and at Landfill 5.pdf 1997 Statistical Analysis Report for Samples Collected August, December, 1996, March, and May 1997 from RCRA Ground-Water M.PDF 1997 RCRA Ground-Water Sampling at Sewage Lagoons and at Landfill 5 Data Report for August 18-20, 1997 Sampling.PDF 1997 RCRA Ground-Water Sampling at Landfill 5 Data Report for March 4-5, 1997 Sampling.PDF 1997 RCRA Ground-Water Sampling at Landfill 5 Data Report for December 16-17, 1996 Sampling.PDF 1995 NMED Letter to Base Concerning Notice of Deficiency (NOD) - Landfill 5, Cell 3 Post Closure Care Plan, February 28, 19.PDF 1995 Letter from Christopher S. Long Colonel USAF to Mr. William Honker US EPA Region IV- 4th Qtr Progress report.pdf 1995 Final Work Plan - Volume II Data Collection Quality Assurance Plan RFI Phase I for Landfill No 5.PDF 1995 Final Work Plan - Volume I Work Plan Data Management Plan Project Management Plan Site Safety and Health Plan RCRA Fac.PDF 1995 Draft Version 2 Cannon Air Force Base Landfill 5, Cell 3 Post-Closure Plan.pdf 1995 Draft Phase I RCRA Facility Investigation Report Landfill No. 5 SWMU No. 113,IRP No. LF-5 Appendix B Soil Gas Survey.PDF 1995 Draft Phase I RCRA Facility Investigation Report Landfill No. 5 SWMU No. 113,IRP No. LF-5 Appendix A Geophysical Surve.PDF 1995 Base Letter to NMED Transmitting Responses to NMED's Notice of Deficiencies on the Landfill 5 Post Closure Care Plan.PDF 1994 Letter from ACC James, E Strasler Lt Col, to Ms. Barbara Hoditschek RCRA Facility Investigation for Landfill No. 5 (SW.pdf 1993 Hazardous Waste Disposal Deed Recordation and Notification from Count of Curry New Mexico.pdf 1993 Draft Work Plan - Volume I Work Plan Data Management Plan Project Management Plan Site Safety and Health Plan RFI.PDF 1992 NMED Letter to Base Transmitting Closure Plan Approval, Cell 3 of Landfill 5 NM7572124454.PDF 1992 Landfill No. 5 SWMU No. 113,IRP No. LF-5 Decision Document (Draft).PDF 96 US EPA letter to Cannon AFB - Approval of Draft RFI Report Phase II RFI Investigation.pdf 09 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan.pdf 09 NMED letter from John E. Kieling to Col Timothy J. Leahy- Approval of the 2008 Biennial groundwater monitoring and annua.pdf 09 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval of Long-term monitoring and maintenance work p.pdf 09 Long-Term Monitoring and Maintenance Work Plan.pdf 08 Final Long Term Monitoring and Maintenance Work Plan.pdf 08 Corrective Action Complete Proposals.pdf 03 Final December 2002- Annual Monitoring Report.pdf 02 Final Revised Long-Term Monitoring Work Plan- Sampling and Analysis Plan Site Safet.pdf 9-99 Final Annual Summary Report Assessment Monitoring 1998 Sampling Events Long-Term Monitoring.PDF 8-98 Final Work Plan Contains Field Sampling Plan Quality Assurance Project Plan Site Safety and Health Plan Long-Term Moni.PDF 7-09 Long-Term Monitoring and Maintenance Work Plan.pdf 7-08 Corrective Action Complete Proposals.pdf 7-02 Final Revised Long-Term Monitoring Work Plan Sampling and Analysis Plan Site Safety , Health Plan.pdf 6-09 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval of Long-term monitoring and maintenance work.pdf 6-00 Final Annual Summary Report Assessment Monitoring 1999 Sampling Events Long-Term Monitoring.PDF 5-06 Petition for No Further Action.pdf 4-96 US EPA letter to Cannon AFB - Approval of Draft RFI Report Phase II RFI Investigation.pdf 3-09 NMED letter from John E. Kieling to Col Timothy J. Leahy- Approval of the 2008 Biennial groundwater monitoring and ann.pdf 2-10 NMED letter from James Bearzi to Col Stephen Clark- Notice of disapproval corrective action complete proposals 2008.pdf 1-98 Final Third Quarterly Monitoring Well R and Final Semiannual Monitoring Wells N and O December 1997 Sampling Event Lon.PDF 1-97 Final Quarterly and Semiannual Monitoring Report for June 1997 Sampling Event Long-Term Monitoring and Well Installati.PDF 12-08 Final Long Term Monitoring and Maintenance Work Plan.pdf 12-08 Final 2008 Biennial Groundwater Monitoring and Annual Landfill Inspection Report.pdf 12-07 RCRA Facility Investigation Report.pdf AR-1651RCRA Facility Investigation Reports for LF-01, LF-02, LF-05.pdf AR-1326.pdf AR-1094 Cannon AFB letter to NMED - transmittal letter for response to NMED comments of RCRA Facility Investigation (RFI) R.pdf 8-09 NMED letter from John E. Kieling to Ronald Lancaster- Approval of long-term monitoring and maintenance work plan.pdf 7-07 NMED letter to Cannon AFB - Notice of Disapproval of Final Report RCRA Facility Investigation for 21 SWMUs.pdf 1-97 Decision Document- Landfill No. 2- SWMU 82 aka LF-02.pdf 1-94 RFI QC Summary Report.pdf 1-1993 Final Volume III Appendixes C and D RCRA Facility Investigation Report for Landfill No. 2 (SWMU No. 82,IRP No. LF-2).PDF 1-1993 Final Volume II Appendixes A and B RCRA Facility Investigation Report for Landfill No. 2 (SWMU No. 82,IRP No. LF-2).PDF 1-1993 Final Volume 1 RFI Landfill No. 2 (SWMU No 82,IRP No LF-2).PDF 10-08 Corrective Action Complete Proposals.pdf AR-1443.pdf 2009 Final RCRA Facility Investigation for SWMUs 34, 78, 85, 91, 95, and 107 Addendum Report.pdf 2008 Final Work Plan Addendum- Field Sampling Plan- Quality Assurance Project Plan- Site and Safety Health Plan- RFI.pdf 2005 Pre-draft- Work Plan Field Sampling Plan, Quality Assurance Project Plan, Site Safety and Health Plan.pdf 1997 Decision Document- Fire Department Training area No. 1 Swum 78,FT-06.pdf 1997 Decision Document Fire Department Training Area No. 1 SWMU No. 78.pdf 1997 Decision Document Fire Department Training Area No. 1 SWMU No. 78 , IRP No. FT-06.pdf 2007 NMED letter to Cannon AFB - Extension Request Approval - Fee Assessment Voluntary Corrective Measures Report Fire Trai.pdf 2006 NMED letter to Cannon AFB - Requirement for Further Corrective Action Final No Further Action Report for Fire Training.pdf 2005 Phase I Investigation Soil Corrective Measures Fire Training Area 04 Report.pdf 2001 Final Corrective Measures Study Report for SWMUs 109, 110, 111, and 112- Fire Training Area Four.pdf 2000 Preferred Alternative Justification for the Corrective Measures Study SWMUs 109, 110, 111, 112- Fire Training Area Num.pdf 1997 Passive Soil Gas Survey Report- Fire Training Area No. 4 SWMU Nos. 109, 110, 111, 112.pdf

Holloman

DocumentSiteItem TypeFile Location
AR-1387 Ltr Regarding RCRA FI at LF10 and LF29 Aug 2007.pdfLF010ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1389 Fee Assessment RCRA FI LF10 and LF29.pdfLF010ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1372 CM WP Site SS61 Soil Remediation May 2007.pdfLF029ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1467 LF29 Work Plan January 2009.pdfLF029ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1471 LTR Regarding Work Plan for Site LF29.pdfLF029ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1068 Management Action Plan, December 1997.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1147 Qtrly Status Report Multi Site 1999.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1154 Management Action Plan 1998.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1169 2001 GW LTM Report July 2002.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1175 LTR Review of LTM GW Mon. Report Feb 2003.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1179 Work Plan 2003 LTM April 2003.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1202 Chemical Data Acq. Plan GW LTM Sept 1999.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1214 Environmental Restoration Program Management Action Plan Dec 2003.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1220 Community Relations Plan July 2004.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1235 2002 GW LTM Report January 2004.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1321 LTR Regarding Supplemental RFI Work Plan for 12 SWMUs Jan 2006.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1351 GW LTM Report Oct 2006.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1366 Statement of Basis for NFA, 10 Sites March 2007.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1367 Notice of Deficiency CM WP Multiple Sites November 2006.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1379 Notice of Deficiency RCRA FA Sampling Work Plan, Multiple Sites Jan 2007.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1402 Site Summaries 2007.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1406 Haz and SW Amendment Qtrly Report Dec 2007.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1413 WP RFI Basewide Sewer System, February 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1414 Ltr. BW BG Study WP Submittal Feb 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1422 Basis for NFA at 8 SWMUs May 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1427 RCRA Permit Mod Notification June 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1429 Notice of Disapproval SWMU Assessment Report, Septic Tanks, March 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1430 LTR Background Metals Study Extension June 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1434 Fee Assess for Sampling DataSS72, SS73 and others June 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1438 Request for RCRA Permit Modification July 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1445 Fee Assess. RFA SS72, SS73 and others August 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1448 Response to NOD for SWMU Assessment Report, Septic Tanks August 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1457 Submittal LTR, Vol. Corr. Measures WP, SWMU 8 (Multi-Site) 2008.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1470 LTR BW BG Study Subumittal.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1477a Final BW BG Study Report January 2009.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1477b BW BG Study Volume II Jan. 2009.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1479 LTR Fee Assessment Basewide Background Study Report Jan 2009.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-468 RI for Multiple Sites October 1992.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-675 Decision Documents for Various Sites August 1991.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-780 DF WP RFI at multiple sites, February 1994.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-846 IRP Program Multi Site 1995.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-896 Management Action Plan 1995.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-973 DDs for Multiple Sites September 1995.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
ER_HOLMN_FNL.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
Holloman AFB CSE Phase I-Final_MASTER.pdfMulti-siteItemnmazgroupFY13/hollomanFY13/Contractors
AR-1405 LTR Regarding OT14 Work Plan Dec 2007.pdfOT014ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1408 LTR Fee Assessment Vol. Corr. Measures WP, Site OT14 Soil Remediation.pdfOT014ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1426 Notice of Disapproval OT14 Vol. Corrective Measures WP May 2008.pdfOT014ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1437 Response LTR to Notice of Disapproval of Vol. Corr. Measures WP, Site OT14_ July 2008.pdfOT014ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1443 Approval of Response to Notice of Disapproval of Vol CM WP, Site OT14_Aug 2008.pdfOT014ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1375 Fee Assessment SWMU Assessment Report, April 2007.pdfOT016ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1419 ACM Report SS12 and OT20 April 2008.pdfOT020ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1420 ACM Report SS12 and OT20 April 2008.pdfOT020ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1428 Fee Assessment ACM SS12 and OT20 April 2008.pdfOT020ItemnmazgroupFY13/hollomanFY13/Contractors
AR-634 DF DD Site OT32 March 1991.pdfOT032ItemnmazgroupFY13/hollomanFY13/Contractors
AR-647 DD for Site OT34, April 1993.pdfOT034ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1391 NOD for SWMU Assessment Report, Septic Tanks.pdfOT037ItemnmazgroupFY13/hollomanFY13/Contractors
AR-629 DF DD OT37 March 1991.pdfOT037ItemnmazgroupFY13/hollomanFY13/Contractors
AR-642 Site OT52 DD April 1993.pdfOT052ItemnmazgroupFY13/hollomanFY13/Contractors
AR-641 Site OT53 DD April 1993.pdfOT053ItemnmazgroupFY13/hollomanFY13/Contractors
AR-650 DD Site OT054 April 1993.pdfOT054ItemnmazgroupFY13/hollomanFY13/Contractors
AR-649 Site OT55 DD April 1993.pdfOT055ItemnmazgroupFY13/hollomanFY13/Contractors
AR-625 SD15 DD March 1991.pdfSD015ItemnmazgroupFY13/hollomanFY13/Contractors
AR-971 DF SI Report Sites SS06, and others Oct 1995.pdfSD015ItemnmazgroupFY13/hollomanFY13/Contractors
AR-230 Site SD25 Site Closeout Document 1993.pdfSD025ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1231 Characterization Requirements for 7 SWMUs May 2004.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1260 LTR Regarding Work Plan for Characterization of 7 SWMUs Nov 2004.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1373 Supplemental RCRA Facility Investigation for 6 SWMUs May 2007.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1395 LTR Supp. RFI Submittal SD33 and others Oct 2007.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1398 Fee Assess. RFI Rpt. SD33 and others Nov. 2007.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1423 Multi Site SA GW Monitoring Report, May 2008.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1433 Ltr Submittal of GW Mon. Report, SD33 and others June 2008.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1446 Fee Assess. SD33 and others Aug 2008.pdfSD033ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1141 NFA LTR SD47 and others Oct. 1998.pdfSD047ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1203 Draft IRA WP Sites SS02_05 August 2003.pdfSD047ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1211 CM WP Site 02_05 Nov. 2003.pdfSD047ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1454 CM WP SD47 and others Oct. 2008.pdfSD047ItemnmazgroupFY13/hollomanFY13/Contractors
AR-244 Closing Report SD47 Undated.pdfSD047ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1392 LTR SS13 WP Submittal 2007.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1397 Fee Assess CM WP SS13 Oct. 2007.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1409 LTR Re SS13 WP 2008.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1416 CM WP Site SS13 March 2008.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1417 LTR RE SS13 WP 2008.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1447 LTR RE SS13 WP 2008.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1451 LTR Regarding SS13 WP 2008.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1456 LTR Regarding SS13 WP.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1463 LTR Regarding SS13 WP 2008.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-626 SS13 DD April 1993.pdfSS013ItemnmazgroupFY13/hollomanFY13/Contractors
AR-652 Site SS18 DD April 1993.pdfSS018ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1213 PASI WP AOC2 Dec. 2003.pdfSS026ItemnmazgroupFY13/hollomanFY13/Contractors
AR-637 DF DD SS26 March 1991.pdfSS026ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1424 RCRA Fac. Ass. Confirmatory Sampling Report Multiple Sites May 2008.pdfSS072ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1052 WP WP49 Closure Project June 1997.pdfWP049ItemnmazgroupFY13/hollomanFY13/Contractors
AR-1096 Draft Report Sewage Lagoons Closure WP49 January 1998.pdfWP049ItemnmazgroupFY13/hollomanFY13/Contractors

&L2 Aug 2012&RFA8903-12-R-0050 Cannon AFB &R&P of &N

Kirtland

DocumentSiteFile Location
2780_Transmittal to NMED Revised Drawings and Variance Reports for CMI WP, LF-01, Jul-04.PDFLF001, Landfill No.1Itemnmazgroupfy13/kirtlandFY13/Contractors
3037_CMI LF-001, Aug 2006.PDFLF001, Landfill No.1Itemnmazgroupfy13/kirtlandFY13/Contractors
3038_CMI LF-001 Aug 2006.PDFLF001, Landfill No.1Itemnmazgroupfy13/kirtlandFY13/Contractors
3345_Final WP Addendum LF-001, LF-002, LF-008) (Long-Term MM Plan) (USAF 2006).PDFLF001, Landfill No.1Itemnmazgroupfy13/kirtlandFY13/Contractors
3387_Revised Final Work Plan and Replacement Pages for Monitoring Well Installation, LF-001, Oct-06.PDFLF001, Landfill No.1Itemnmazgroupfy13/kirtlandFY13/Contractors
0297_Monitoring Wells Installation Plan, LF-02, Sep-11.PDFLF002, Landfill No. 2Itemnmazgroupfy13/kirtlandFY13/Contractors
3127_CMI Report, LF-002, Feb 2007.pdfLF002, Landfill No. 2Itemnmazgroupfy13/kirtlandFY13/Contractors
3128_CMI Report, LF-002, Feb 2007.pdfLF002, Landfill No. 2Itemnmazgroupfy13/kirtlandFY13/Contractors
3271_Completion Report, GW monitoring well, LF-002.PDFLF002, Landfill No. 2Itemnmazgroupfy13/kirtlandFY13/Contractors
3456_Annual Monitoring and Maintenance Activities Report, LF-001, LF-002, LF-008 - Final Report Volume II.pdfLF002, Landfill No. 2Itemnmazgroupfy13/kirtlandFY13/Contractors
2806_KAFB Submission to NMED of the CMI Report LF-08.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
2985_NMED NOA with condition; LF-008.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3025_CMI report and App A, LF-008.pdfLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3026_CMI report App B - E, LF-008.pdfLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3027_CMI report App F - O, LF-008.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3110_Fee assessment for CMI report, LF-008.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3115_Correction Fee Assessment for CMI Report LF-008.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3383_Data Summary Report LF-08 Evapotranspiration Cover Inspection and Groundwater Monitoring December 2005_January 2006 Ev.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3569_NMED approval of the KAFB Notice of Intent on July 19, 2011 to discharge approximately 120 gallons of non-hazardous pu.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
3570_NMED Approval of Notice of Intent to Discharge 120 gal. from monitoring well KAFB-0312.PDFLF008, Landfill No. 4, 5 & 6Itemnmazgroupfy13/kirtlandFY13/Contractors
0397_Annual Monitoring and Maintenance Activities Report; LF-01, LF-02, LF-08.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
0407_QAPP LTM; LF-001, LF-002, and LF-008.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
2885_KAFB submission of revised CMI WP, LF-01, LF-02.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
2914_KAFB submission to NMED of proposed Revised Schedules for Completion for Landfill, LF-001 and LF-002 as requested in N.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
2970_NMED KAFB Monthly Meeting Minutes.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
2980_Transmittal of response to notice of approval, LF-008.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
2989_NMED-KAFB Monthly Meeting Minutes, 6-Apr-06.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
2990.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
2990_LTM Groundwater Monitoring Summary Report for Fiscal Year 2004.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3047_CMI LF-001, Aug 2006.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3056_trs ltr for 10-Oct-2006 agenda, ERP update newsletter.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3095_LTM Plan, LF-001, LF-002, LF-008.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3104_Weekly Progress Meeting, Landfill Repairs LF-001, LF-007, and LF-008.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3107.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3214.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3214_Completion Report for Erosion Repairs, LF-01, LF-08, Jul-07.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3270_Completion Report, GW monitoring well, LF-001.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3317_Submission of the Annual Monitoring and Maintenance Activities Report, LF-001, LF-002, LF-008.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3384_Groundwater Monitoring Well Installation Work Plan LF-01 and LF-02, Apr-06.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3455_Annual Monitoring and Maintenance Activities Report, LF-001, LF-002, LF-008 - Final Report Volume 1.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3456.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3471_NMED favorable response to KAFB NOI to discharge monitoring purge water.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3482_fee assessment; Alternative Landfill Cover performance 2009 annual monitoring; LF-001, LF-002, LF-008.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3514_Annual Monitoring and Maint Activities Report, Jul-10, LF-00, LF-02, LF-08.PDFMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
3519_QAPP, LF-01, LF-02, LF-08, Final, Jan-11.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
ER_KRTLD_FNL Former CRP Sites.pdfMulti-siteItemnmazgroupfy13/kirtlandFY13/Contractors
0280_UST 58, Annual Remediation and Monitoring Report, 01 Aug 10 thru 31 July 11.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
0284_NMED, PSTB acceptance of Site 58 Annual Report.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
2865_Kirtland Air Force Base Site 58 Remediation Monitoring Activities Report 10 March 2005 through 30 June 2005.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
2870_Kirtland Air Force Base Site 58 Remediation Monitoring Activities Report 30-Ju-05 through 23-Sep-05.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
2874_KAFB Site 58 Remediation Monitoring Report 23-Sep to 20-Dec-05.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
2881_Transmittal of Quarterly Report, UST Site 58, Dec-05.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
2975_SAP, UST-058, May-06.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
2993_Site 58 Remediation Monitoring Activities Report 20-Dec-05 to 21-Mar-06, 12-Jun-06.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
2996_Approval RFI SAP, CMD, UST-58, 5-May-06.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3034_Site 58 Remediation Monitoring Activities Report, 21-Mar-06 thru 13-Jun-06.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3052_Approval for time extension, Site 58, Phase5 Investigation, Sampling and Corrective Action Design.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3113_UST Site 58 Investigation Report, 25-Jan-07.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3117_Site 58 Remediation Monitoring Activities Report, Quarterly Report, for the period of 13 Jun through 30 Sep 06.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3135_Site 58 Quarterly report for the period of 01 Oct thru 31 Dec 06.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3160_UST Monitoring Report, for the period of 1-Oct-07 thru 31-Dec-06, UST-058.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3179_Site 58 Quarterly Report period of 01 Jan thru31 Mar 07.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3237.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3238_Kirtland AFB submission of Site 58 Quarterly Report for the period 01-April-07 through 30-June-2007.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3260_KAFB Site 58 Quarterly Report submitted to NMED providing a summary of the soil vapor extraction system operation and.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3279_Site 58 Remediation and Monitoring Activities Report, 1 Oct through 31 Dec 07.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3326_UST-058 Quarterly Report for the period of 1 Apr through 30 Jun 08.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3335_KAFB Submission to NMED of the UST-058 Site Quarterly Report for the period from 1-Jul through 20- Sep-08.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3350_The Environmental Management (EM) Branch at Kirtland AFB submittal of a copy of the Site 58 UST Quarterly Report.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3366_KAFB submittal of the Phase II Investigation Sampling and Analysis Plan Underground Storage Tank Site 58, 14-Oct-2008.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3401_NMED approval of the Phase II Investigation Report for the UST-058.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3404_Site 58 Remediation and Monitoring Activities Report 1-Jan-09 through 31-Mar-09, Jun-09.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3407_NMED approval of the KAFB, Site 58 Remediation and Monitoring Activities Report, 01 January 2009 through 31 March 2009.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3418_UST Site 58 Remediation and Monitoring Report 01-Aprl through 30-Jun-09, August 2009.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3429_NMED approval, Site 58 Remediation-Monitoring Report, 01-Apr to 30-June 09.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3436_KAFB submittal, UST 58 Phase II Investigation SAP addendum.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3467_UST-058; Sampling and Optimization WP.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3469_Technical Approval of Phase 5 WP, UST-058.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3477_change of reporting requirements, Site 58.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3501_PSTB acceptance of Annual report, Site 58.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3503_UST Site 58 Remediation and Monitoring Report 01 July 2009 - 31 July 2010, October 2010.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3513_UST Site 58, Phase II Investigation Report, 30-Apr-09.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3535_UST 58 Sampling and Optimization WP.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
3545_NMED approval for passive bio-venting and the passive application of oxygen releasing compound, Site 58.pdfPL567, UST058Itemnmazgroupfy13/kirtlandFY13/Contractors
0282_Jan-June 2011 ICM Report ST-70.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2791_KAFB Transmittal letter, RFI Report, ST-70E (Former ST-219) Jun-05.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2804_KAFB Transmittal to NMED, RFI Report, ST-70E (Former ST-219) Jun-05.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2905_RFI, ST-70E (Former ST-219), 23-Nov-05.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2906_RFI Appendicies A-L, ST-70E (Former ST-219), 23-Nov-05.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2907_RFI Appendices M-V, ST-70E (Former ST-219), 23-Nov-05.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2938_NMED NOD, RFI, ST-70E, Nov-05.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2943_NMED Fee Assessment, RFI, ST-70E, 23-Nov-05.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors
2946_KAFB confirmation letter for verbal conversations between KAFB and NMED for the disposal of groundwater monitoring pla.pdfST070 E, Oil/Water Separator (ST-219)Itemnmazgroupfy13/kirtlandFY13/Contractors

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .