NM-AZ_PBR_Final_SECTION_L_Proposal_Instructions_25_Feb_13.doc
DOC document 207 KB Posted
- Solicitation number
- FA8903-12-R-0050
About this file
Revised Section L
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25 February 2013
SECTION L - New Mexico-Arizona Performance-Based Remediation (NM-AZ PBR) Instructions, Conditions, and Notices to Offerors or Respondents
L-III ‑ INFORMATION TO OFFERORS (ITO) and INSTRUCTIONS FOR PROPOSAL PREPARATION 1 Program Structure and Objectives
This requirement is for environmental remediation activities associated with the NM-AZ PBR (Cannon AFB, NM, Kirtland AFB, NM, Holloman AFB, NM, and Luke AFB, AZ. This scope of work entails a full range of construction and engineering activities necessary for investigation, design, remedial action, remedial construction, and environmental remediation activities to achieve minimum performance objectives (MPOs) and stretch goals and support progress to Site Closeout (SC) at 85 Installation Restoration Program (IRP) sites and 21 Military Munitions Response Program (MMRP) sites under this PBR contract using a competitive Firm-Fixed-Price (FFP) pricing arrangement under FAR Part 15. This is considered a construction effort and is being solicited under NAICS code 562910, Environmental Remediation Services.
2 General Instructions
a) The offeror's proposal must include all data and information requested by this ITO and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the Statement of Objectives (SOO) and its attached Enclosures. Non-conformance with the instructions provided in this ITO may result in an unfavorable proposal evaluation.
b) The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror's proposal.
c) Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
d) The proposal acceptance period is specified in Section A of the solicitation. The offeror shall make a clear statement in Section A of the contract documentation volume that the proposal is valid through this date.
e) In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of unsuccessful proposals.
2.1 General Information
2.1.1 Point of Contact (POC)
The Contracting Officer (CO) is the sole POC for this acquisition. Address any questions or concerns you may have to the CO. Written requests for clarification may be sent to the CO at the address located in Section A of the solicitation. The CO for this acquisition is as follows:
Contracting Officer:
Ms. Naomi Alvarado
Phone (210) 395-8151
Email: naomi.alvarado@us.af.mil
2.1.2 Debriefings
The CO will promptly notify offerors of any decision to exclude them from the competitive range; whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a preaward debriefing or they may choose to wait until after the source selection decision to request a postaward debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
2.1.3 Discrepancies
If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale as well as the remedies the offeror is asking the CO to consider as related to the omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion. This reservation includes matters of additional or substitute pages of the initial proposal.
2.1.4 Electronic Reference Documents
All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) website at http://www.fedbizopps.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
2.1.5 Oral Presentations
Oral presentations will not be used for this requirement.
2.1.6 Communications
Exchanges of source selection information between Government and Offerors will be controlled by the CO. Email may be used to transmit such information to offerors only if the email can be sent and received encrypted and includes “Source Selection Information – See FAR 2.101 & 3.104” in the Subject line.
2.2 Organization/Number of Copies/Page Limits
The offeror shall prepare the proposal as set forth in the Proposal Organization Table (Table 2.2 below). The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies as specified in Table 2.2. The attachments identified in the table shall be separately bound in three-ring, loose-leaf binders, as necessary. The contents of each proposal volume are described in the ITO paragraph as noted in the table below:
Table 2.2 Proposal Organization
| Volume |
| ITO Paragraph Number |
| Title |
| Page Limit |
| Original Unbound |
| Hard Copies |
| CD Copies |
| I |
| 3 |
| VOLUME I - CONTRACT DOCUMENTATION |
| 3.1 |
| Volume Organization |
| Unlimited |
| 1 |
| 2 |
| 2 |
| 3.2 |
| Contact Information |
| 3.3 |
| Executive Summary |
| 3.4 |
| Standard Proposal Information |
| 3.5 |
| Validity Statement |
| 3.6 |
| Organizational Conflict of Interest |
| 3.7 |
| Construction Bonding |
| 3.8 |
| Exceptions to Solicitation Requirements |
| II |
| 4 |
| VOLUME II – FACTOR 1: TECHNICAL |
| 4.1 |
| Volume Organization |
| Unlimited |
| 1 |
| 6 |
| 3 |
| 4.2 |
| Standard Proposal Information |
| 4.3 |
| General |
| 80 front and back |
(excludes 10, 11”X17” pages for Summary Table; excludes post-POP Life-Cycle Cost Activities and Assumptions; excludes IMS and MPS without cost)
| 4.4 |
| Technical Risk Submission |
| 4.5 |
| Technical Subfactor 1.1- Technical Approach |
| 4.6 |
| Technical Subfactor 1.2- Plan B Contingency Approach |
| 4.7 |
| Technical Subfactor 1.3 – Management Approach |
| 12 |
| 4.8 |
| Technical Subfactor 1.4 - Corporate Experience |
| 5 |
| III |
| 5 |
| VOLUME III – FACTOR 2: PAST PERFORMANCE |
| 5.1 |
| Volume Organization |
| Unlimited |
| 1 |
| 2 |
| 2 |
| 5.2 |
| Standard Proposal Information |
| 5.3 |
| Past Performance Summary |
| 5 |
| 5.4 |
| Organizational Structure Change History |
| Unlimited |
| 5.5 |
| Past Performance Information Sheets |
| No more than 5 (1 page per project) |
| 5.6 |
| Past Performance Questionnaires |
| Tab Only |
| 5.7 |
| Consent Letters |
| Unlimited |
| 5.8 |
| Client Authorization Letters |
| IV |
| 6 |
| VOLUME IV – FACTOR 3: PRICE |
| 6.1 |
| Volume Organization |
| Unlimited |
| 1 |
| 2 |
| 2 |
| 6.2 |
| Standard Proposal Information |
| 6.3 |
| General Instructions |
| 6.4 |
| Submission of Schedule B |
| 6.5 |
| Milestone Payment Schedule (MPS) with price |
2.3 Proposal Format
2.3.1 Guidance
a) This section of the ITO provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal.
b) The Offeror's proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions.
c) All the requirements specified in this solicitation are mandatory.
d) You are representing that your firm will perform all the requirements specified in the solicitation by submitting your proposal.
e) These instructions are intended to elicit brief and specific responses. However, simply stating that the Offeror understands and intends to comply with this effort or paraphrasing statements in the solicitation is inadequate.
f) The offer shall comply with the requirements as stated in the solicitation.
2.3.2 Sufficient Detail
a) The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims.
b) The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements.
c) Offeror(s) shall assume that the Government has no prior knowledge of their capabilities and experience, and will base its evaluation solely on the information presented in the Offeror's proposal.
2.3.3 Elaborate Presentations Not Desired
Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are NOT desired.
2.3.4 Price Information
All pricing information shall be addressed ONLY in the Price Proposal Volume (Volume IV). Post-Period of Performance (POP) Life-Cycle Cost (LCC) estimates and Landfill closure estimates are not considered pricing information and will not be evaluated as such. The electronic version of the Schedule outlined in Section B Schedule B shall be in both Microsoft Word and pdf. The electronic version of the MPS shall be submitted in Microsoft Excel and pdf. Prices shall be provided in whole-dollar amounts in both the hardcopy and electronic version of the Schedule outlined in Section B of the RFP and the MPS. The Offeror shall provide the proposed total amount of construction for each SubCLIN and include a milestone for the construction bonding fee. SubCLIN construction amounts and bonding fee amounts shall be totaled and provided for evaluation of bonding requirements. See Attachment L-2 for MPS submission format.
2.3.5 No Cross-Referencing
a) Each volume shall be written on a stand‑alone basis so that its contents may be evaluated without cross-referencing to other volumes of the proposal.
b) Information required for proposal evaluation, which is not found in its designated volume, will be assumed to have been omitted from the proposal.
c) Each response to each Subfactor shall be self-contained. No cross-referencing between Subfactor responses is allowed.
2.3.6 Tab Indexing
a) Tab indexing shall be used to identify sections within each volume.
b) Tabs for items identified in the Title column of Table 2.2 Proposal Organization shall be utilized.
c) Tabs do not count against the page limitations for their respective volumes.
d) Note: DO NOT include proposal information on tabs.
2.3.7 Table of Contents
a) Table of Contents.
Each volume shall contain a detailed table of contents to delineate the subparagraphs within that volume.
b) Master Table of Contents.
i. Volume I, Contracting Documentation, shall contain a consolidation of the individual Tables of Contents for all Volumes (I through IV).
ii. A separate e-file of the Master Table of Contents shall be provided in accordance with the Electronic Copy requirements in paragraph 2.3.10.3.
c) The Table of Contents will not count against the page limitations for their respective volumes.
2.3.8 List of Tables and Figures
a) Each volume shall contain a list of all tables and figures within that volume.
b) The List of Tables and Figures will not count against the page limitations for their respective volumes.
2.3.9 Glossary of Abbreviations and Acronyms
a) Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each.
b) One glossary may be developed for the entire proposal and provided in each volume.
c) Glossaries do not count against the page limitations for their respective volumes.
2.3.10 Proposal Copies
a) All copies of an Offeror’s proposal must be submitted together.
b) All Prime and Team Member(s) information must be incorporated into one coherent submittal.
c) Staples shall not be used.
d) Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on disclosure and use of data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.
2.3.10.1 “Original” Unbound Proposal
One hardcopy of each volume shall be clearly identified as “original.” The “original” shall be formatted as follows:
a) Clearly marked as “Original”
b) Unbound
c) Hole-punched with a standard 2-hole punch at the top of each page
d) Printed head-to-foot so that each page can be read when placed in a standard 2-hole file folder
e) Each volume shall have a cover sheet, clearly marked as volume number, “ORIGINAL,” Offeror's name, solicitation title, and solicitation number.
2.3.10.2 Hard Copies
a) Each hard copy volume of the proposal shall be separately bound in a three-ring loose-leaf binder, which shall permit the volume to lie flat when open.
b) A cover sheet shall be bound in each book, clearly marked as to volume number, copy number, Offeror's name, solicitation title, and solicitation number.
c) A Label shall be placed in the front cover of each binder clearly identifying volume number, copy number, Offeror's name, solicitation title, and solicitation number.
d) A Label shall be placed in the spine of each binder clearly identifying volume number, copy number, Offeror's name, solicitation title, and solicitation number.
e) All unclassified document binders shall have a color other than red or other applicable security designation colors.
f) The Technical Summary Table shall be submitted on 11 x 17 inch single-sided pages
g) The IMS shall be provided in hardcopy no larger than 11 x 17 inch single-sided pages.
2.3.10.3 Compact Disc (CD) Copies
General requirements
a) The content and page size of electronic copies must be identical to the hard copies. For electronic copies, indicate on each CD the Offeror’s name, volume number, and solicitation number and title. Use separate files to permit rapid location of all portions, including Subfactors, exhibits, annexes, and attachments, if any. All electronic copies shall be submitted on CD-ROM in a flexible plastic protective sleeve. Protective sleeves shall be hole-punched with a standard 2-hole punch at the top of each sleeve.
i. Electronic file directory titles and organization shall reflect the titles and organization of these instructions.
ii. Each directory shall contain a Microsoft Word file with the Master Table of Contents for that directory.
iii. The CD-ROMs will be used for proposal evaluation. The Government will not perform a word-by-word check of the “original” vs. the PDF version. However, if discrepancies are identified between the electronic proposal and the “original” paper proposal, the paper proposal shall prevail.
iv. Offerors shall ensure electronic copies on CD-ROM are virus-free.
v. Electronic copies of each volume shall be compatible with the following available Government equipment and software products:
Windows compatible PCs Adobe Acrobat Reader 9.0 Microsoft Office 2007 Microsoft Project 2007
vi. Sound or video (e.g. MPEG) files shall not be embedded into the proposal files.
vii. A separate CD-ROM shall be used for each volume.
b) Master copy CD-ROM requirements
i. Complete electronic copies of all volumes shall be submitted in Adobe Acrobat Portable Document File (PDF) searchable and selectable text format.
ii. A separate CD-ROM shall be used for each volume.
iii. Each CD-ROM and protective sleeve shall be clearly marked as to volume number, Offeror's name, solicitation title, and solicitation number.
2.3.11 Page Format Restrictions and Limitations
2.3.11.1 Page Format
a) Unless otherwise specified, all pages shall be printed double-sided on recycled paper as much as practicable. For example, original letters are exempted from the double-sided requirement.
b) Unless otherwise specified, pages shall be 8.5 x 11 inches, not including foldouts.
c) Text pages shall be portrait-oriented. Graphics and tables may be landscape-oriented if required to properly present the information.
d) Pages shall be typed with single-line spacing.
e) No condensed fonts allowed. Times New Roman, Arial, or similar font preferred. The font size shall be no less than 10 point.
f) Margins on all four edges of each sheet will be at least one inch.
g) Proprietary statements, security markings, and page numbers can fall within the defined margin area.
h) Except for the Price Volume, each required section within a volume shall be numbered consecutively.
i) These page format restrictions shall apply to responses to Evaluation Notices (ENs).
2.3.11.2 Foldouts
a) Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics.
b) Foldout pages may not be used for pages of text.
c) Legible tables, charts, graphs, diagrams, schematics and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, design drawings, plans, etc.
d) These displays shall be uncomplicated, legible and shall not exceed 11 x 17 inches in size.
e) All information (except documentation numbers, classification markings, and page numbers) shall be contained within an image area of 9 x 15-1/2 inches.
f) Foldout pages shall fold so that the Government can read and evaluate them without removal from proposal binder.
g) Foldout pages shall fold entirely within the volume.
2.3.11.3 Page Limitations
(a) Page limitations shall be treated as maximums.
(b) Each side of each 8 ½ x 11 inch sheet that displays printed material shall be counted as 1 page for page limitation purposes.
(c) Each side of each 11 x 17 inch sheet that displays printed material shall be counted as 2 pages for page limitation purposes.
(d) Compliance with page count limits shall be verified via the hardcopy.
(e) If page limits are exceeded, the excess pages (1) will be destroyed; and (2) will not be read or considered in the evaluation of the proposal.
(f) Page limitations shall be placed on responses to ENs. The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offeror(s).
2.3.11.4 Technical Summary Table
The Technical Summary Table shall be submitted on 11 x 17 inch single-sided pages. Though these pages (Summary Table) are part of the Technical Approach they will not be counted against the number of pages allocated for the technical volume. The Summary Table shall also be provided electronically via CD or DVD in MicrosoftTM Excel compatible format. The spreadsheet shall not contain any hard-pressed numbers or locked cells or formulas.
2.3.11.5 Post-POP LCC with Activities and Assumptions
The Post-POP LCC with Activities and Assumptions shall be submitted on 8.5 x 11 inch double-sided pages. Though these pages are part of the Technical Approach, they will not be counted against the number of pages allocated for technical volume.
2.3.11.6 Project Summary
Project summaries submitted for Subfactor 1.4, Corporate Experience, shall be submitted under the Technical Volume, but shall be submitted on five, single-sided 8.5 X 11 inch pages. Each project must be contained on a single page. The pages shall not be counted against the number of pages allocated for the Technical Approach.
2.3.11.7 Pages Counted
Each page shall be counted except the following:
(a) Volume I – Contract Documentation
(b) Volume IV – Pricing
(c) Executive
(d) Cover pages
(e) Table of contents
(f) List of tables and figures
(g) Glossary of Acronyms and Abbreviations
(h) Tabs
(i) Dividers
(j) Blank pages
(k) Integrated Master Schedule (IMS)
(l) Resumes
(m) MPS
(n) Technical Summary Table
(o) Post-POP LCC with Activities and Assumptions
3 VOLUME I - CONTRACT DOCUMENTATION
3.1 Volume Organization
a) Executive Summary
b) Master Table of Contents
c) Table of Contents
d) List of Tables and Figures
e) Glossary of Abbreviations and Acronyms
f) Validity Statement
g) Contact Information
h) Exceptions to Terms and Conditions
i) Representations and Certifications
j) Proof of Bonding Capacity
3.2 Contact Information
The Offeror shall identify the POC in the cover letter (name, phone number and e-mail address) for any questions regarding the submitted proposal and the POC shall have authority to negotiate and bind the company.
3.3 Executive Summary
(a) The Executive Summary is a concise narrative summary of the entire proposal, excluding price.
(i) The summary shall include key mission capability features describing key technical, performance, and management features of the Offeror.
(ii) The summary shall also include key contract features describing subcontractors or teaming partners, and delivery schedules for the POP including schedules for the basic and all options.
(b) The salient features shall tie in with Section M evaluation criteria.
(c) Any summary material presented here shall not be considered as meeting the requirements for any portions of other volumes of the proposal.
3.4 Standard Proposal Information
(a) Provide a Master Table of Contents for the entire proposal (all volumes).
(b) Provide a Table of Contents for Volume I per ITO paragraph 2.3.7.
(c) Provide a List of Tables and Figures for Volume I per ITO paragraph 2.3.8.
(d) Provide a Glossary of Abbreviations and Acronyms for Volume I per ITO paragraph 2.3.9.
3.5 Validity Statement
(a) The cover letter shall include the Offeror’s ability to provide bonding for the proposed construction costs and confirm proposal validity of 180 days.
(b) The proposal acceptance period is specified in the SF 33, Page 1, Block 12 of the solicitation.
3.6 OCI Analysis and Mitigation Plan
(a) If your company (including Teaming Partners, subcontractors, subsidiaries and legacy companies) performed any cleanup-related work in the past/present at sites identified as part of this requirement, the Offeror shall submit identifying information – scope, applicable sites, specific document titles and descriptions, and contract or task order (TO) number in Volume 1, Contract Documentation. The Offeror shall identify any potential OCI issues or appearance of any potential OCI your company (including all Teaming Partners, subcontractors, subsidiaries and legacy companies) may have with respect to the scope of effort as outlined in the Statement of Objectives (SOO). OCIs may exist in at least the following three ways:
· Unequal access to information- access to non-public information that gives a contractor an unfair competitive advantage.
· Biased ground rules- when a contractor has in some sense set the ground rules for another procurement action creating the potential that the contractor may have tilted the playing field in the new competition (usually toward its own strengths and away from its weaknesses).
· Impaired objectivity- when the contract requires exercise of judgment and the independence of its judgment may be affected (e.g., when the contractor may be required to evaluate its own work in a way that could be adverse to its economic interests).
(b) If your company did perform past/present cleanup-related work at the sites for this PBR, a mitigation plan shall be submitted in Volume 1, Contract Documentation Volume to show how your company will either satisfactorily mitigate or eliminate any potential OCI issues or appearance of any potential OCI. If your firm (including all Teaming Partners, subcontractors, subsidiaries, and legacy companies) has not performed any work on the sites included as part of this requirement, then your offer must so state.
(c) Any submitted OCI analysis and plan will not be evaluated unless the Offeror is considered the apparent successful Offeror under the evaluation factors listed in this RFP. If the OCI analysis and plan needs to be evaluated, the Government will determine if an OCI exists and whether adequate mitigation is proposed. If adequate mitigation is not proposed, the Government may engage in exchanges with the apparent successful Offeror to determine if the problems with the mitigation plan may be resolved. If an OCI exists that cannot be adequately mitigated, the Government may seek waiver of the OCI issue or may award to another Offeror who does not have an OCI, or who has an OCI and has submitted a mitigation plan that is adequate, or may be made so after exchanges between the Government and the Offeror.
3.7 Construction Bonding
(a) Provide the total proposed amount for construction efforts by SubCLIN and total contract. Provide a construction amount for each fiscal year (FY) of the POP (i.e., FY1, FY2, FY3, etc., based on chronological milestone payment date). Provide the bonding fee total and the bonding fee by year.
(b) Provide assertion that the Prime contractor can meet the bonding requirements of the contract (100% performance and payment bond) with respect to the proposed totals for construction by year. Provide proof of excess bonding capacity commensurate with the proposed amount for construction with bonding capability letters from an approved surety listed with the Department of Treasury. Letters must be notarized and signed by an authorized representative of the surety. Letters signed by agents are unacceptable unless accompanied by a Power of Attorney granting proper authority to the agent. Bonding capability must be for the Prime only (stacking of Teaming Partners/ subcontractor bonds will not be accepted).
3.8 Exceptions to Solicitation Requirements
(a) Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors shall clearly identify any exceptions to Terms and Conditions of the solicitation. Exceptions are strongly discouraged. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being removed from consideration for award.
(b) Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken.
(c) Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation.
(d) This information shall be provided in the format and content of Table 3.8. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being removed from consideration for award.
Table 3.8 – Solicitation Exceptions Solicitation Document
| Paragraph/Page |
| Requirement/Portion |
| Rationale |
| Contract clause, solicitation paragraph, ITO, etc. |
| Applicable page and paragraph numbers |
| Identify the requirement or portion to which exception is taken |
| Justify why the requirement will not be met |
4 VOLUME II – FACTOR 1: TECHNICAL
4.1 Volume Organization
The Technical volume shall be organized according to the following general outline:
(a) Executive Summary (duplication of executive summary in Volume I, Contract Documentation)
(b) Table of Contents
(c) List of Table and Figures
(d) Glossary of Acronyms and Abbreviations
(e) Subfactor 1.1 – Technical Approach
(f) Subfactor 1.2 – Plan B Contingency Approach
(g) Subfactor 1.3 – Management Approach
(h) Subfactor 1.4 – Corporate Experience
4.2 Standard Proposal Information
(a) Provide a duplicate copy of the Executive Summary narrative as required in Volume I, Contracting ITO paragraph 3.3.
(b) Provide a Table of Contents for Volume II per ITO paragraph 2.3.7.
(c) Provide a List of Tables and Figures for Volume II per ITO paragraph 2.3.8.
(d) Provide a Glossary of Abbreviations and Acronyms for Volume II per ITO paragraph 2.3.9.
4.3 General
The Technical Volume shall be specific and complete. In the Technical Volume, address your proposed approach to meeting the minimum performance or capability requirements of each technical subfactor.
4.4 Technical Risk
Address Technical Risk associated with those aspects in each subfactor you consider to have the potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Classify each risk in accordance with DoD Source Selection Procedures Table 3, Technical Risk Rating. Provide the rationale for each risk and its rating, including quantitative estimates of the impact on cost, schedule, and performance. Describe the impact of each identified risk in terms of its potential to interfere with or prevent the successful accomplishment of other contract requirements (e.g., SOW or specification requirements), whether or not those requirements are identified as subfactors. Propose a realistic "work‑around" or risk mitigators for identified risks that will eliminate or reduce risk to an acceptable level. Identify and classify any new risks introduced by such risk mitigation.
(a) Marketing presentations are not wanted and will not be evaluated. Hard evidence of capabilities is required to receive credit for evaluation factors.
(b) Legibility, clarity, and coherence are very important.
(c) Your responses will be evaluated against Section M, Evaluation Factors.
(d) Provide as specifically as possible, the actual methodology you would use for accomplishing and satisfying the requirements.
(e) All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your Team will perform all the requirements specified in the solicitation. It is not necessary or desirable for you to tell us so in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.
(f) Technical Subfactors.
(1) Include capabilities of Prime and Team Members.
(2) Describe the Offeror’s proposed strategic approach to meeting the requirements of each Technical Subfactor.
4.5 Sub-Factor 1.1: Technical Approach:
The offeror shall submit a comprehensive technical approach that specifies the performance objective (to include at least the minimum objective for sites in Table 1 of the SOO and the AF specified objective only for sites in Table 2 of the SOO) and date they intend to achieve it for each site within the POP. Offerors shall explain why the selected performance objective for sites in Table 1 of the SOO (including the minimum acceptable performance objective if that is what is proposed) is an optimum solution for the government. The comprehensive approach shall describe how all the performance objectives in the SOO and other applicable agreements will be met or exceeded.
· Summary Table: The offeror shall provide a summary table which includes the following information for each site listed in the SOO: Site ID, Site Name, MPO, Proposed Performance Objective, Date of Achieving Performance Objective, Brief Description of the Technical Approach, and Projected SC Date (Quarter/Calendar Year or Indefinite). Site ID and Site Name should be copied from SOO Enclosure 1. Proposed Performance Objective is the performance objective to be achieved within the POP and shall meet or exceed the MPO listed in the SOO. A Projected SC Date shall be provided for all sites including those projected to be closed after the POP.
· The offeror shall provide the selected performance objective for each site.
· The offeror shall submit an approach to achieve SC or to move as close to SC as possible during the POP without expending large sums for contingencies for sites in Table 1 of the SOO. The offeror shall provide a business case analysis for why SC is either not technically feasible or not cost-effective for those sites not proposed to achieve SC.
· For all sites in Table 1 of the SOO that have or will have a signed Decision Document during the POP and the proposed performance objective is not SC, the Offeror shall provide Optimized Exit Strategies (OES). The OES shall include anticipated structure and elements as required in Section 1.0 of the SOO, technical rationale for proposed strategies, technologies expected to be implemented, locations and media targeted for restoration, and expected outcome or state at the end of the POP.
· Where the proposed performance objective for a site in Table 1 of the SOO includes an OES, the Offeror shall identify a performance model.
· Although proposals describing quantitative performance models are encouraged for all sites where the proposed performance objective includes an OES, conceptual-type performance models are acceptable during the proposal stage for all sites except those with a baseline evaluation prepared by the Air Force which does not pertain to any sites under this PBR.
· The Offeror shall provide a proposed approach to effectively demonstrate achievement of the Air Force specified performance objectives in Table 2 of the SOO without advancement toward a higher remediation performance objective or optimization.
· The offeror shall provide separate costs for the full value with activities and assumptions for closing each landfill, recycling its content (Reminder: proceeds of metal recycling must be returned to the Installation recycling manager), eliminating future environmental liabilities and returning the cleaned up landfill to productive use as compared to maintaining landfill caps, monitoring systems, and reporting requirements in perpetuity as part of this analysis.
· The offeror shall provide a post-POP LCC estimate. Sufficiently detailed assumptions must be provided for the anticipated activities in order for the government to validate the offeror’s post-POP LCC estimate. Specific instructions include:
· Post-POP LCC estimate must be un-escalated
· Post-POP LCC estimate must be on an FY13 cost basis
· Post-POP LCC estimate must be provided by site and by FY
· Detailed activities and assumptions must be provided and broken out by site, FY, and milestones. The Offeror shall provide activities and assumptions beginning with estimated completion of the performance objective or contract, whichever comes first, and carry them through offeror’s projected SC date (or FY43 for site with indefinite closeout date). Note: The Offeror shall not provide the total LCC in the technical volume. The government will compute total LCC by adding the post-POP LCC and the proposed price included under Factor 3.
· The offeror's technical approach shall also include an activity-based IMS with the following:
· Activities and milestones at a detailed level and sequenced events for completion of the proposed performance objectives.
· Performance objectives within the time designated.
· OES deliverables; activities and milestones associated with the OES strategy from sites in Table 1 of the SOO (i.e., interim and final performance goals associated with the performance model). At a minimum, the OES shall be structured to include sequential periods of: (1) Detailed OES development ending with preparation of an OES plan that includes quantitative and measureable performance goals which entails a reduction from baseline conditions throughout the POP, (2) OES implementation ending with an OES implementation completion report or remedial action completion report (RACR) documenting the remedial activities, and (3) OES performance evaluation including efforts to meet several interim objectives prior to the end of the POP, as well as attainment of overall performance goals at the end of the POP.
· Government and Regulatory review periods for deliverables.
· The Offeror's technical approach shall include a copy of the MPS without price information (Attachment L-1) and IAW Contract Line Item Number (CLIN) Structures/MPS/IMS Guidance (Attachment L-6).
4.6 Subfactor 1.2: Plan B Contingency Approach
The offeror shall identify all risks associated with the project and proposed technical approach, including potential system failures, and outline strategies for elimination or mitigation of the risks and/or contingencies to address the risks. (e.g., Plan B). The approach shall include the following:
· Risk factors associated with obtaining the performance objectives using the proposed technical approach.
· A description of how the proposed approach minimizes risks to meet the performance objective, including a description of risk mitigation strategies.
· Contingency plans (alternate technical approach/i.e., Plan B) that will be implemented to ensure achievement of the proposed performance objective. Contingency Plans shall not be additional activities of the same initial approach that is not working as proposed (i.e., more of Plan A is not equal to Plan B). The proposal shall include the decision logic and timing for implementation of the contingency plan if the proposed approach proves incapable of meeting the proposed performance objectives within the required timeframes.
4.7 Subfactor 1.3: Management Approach
The offeror shall submit a detailed management plan for achieving the proposed site-specific performance objectives and milestones as scheduled, managing the requirements, and ensuring quality services and deliverables. The plan shall include the following information:
· A description of a qualified field and management team, including key personnel, subcontractors, and other relevant team members and provide an organizational chart. Key personnel shall include Program Manager, Project Manager(s), Program Chemist, Program QA/QC, UXO Specialist, and Program Health and Safety Manager.
· A description of how the offeror will manage the work in order to meet the requirements of the SOO (for example, Project Manager(s), MMRP Support, Remediation Support, etc.).
· A description of the how the offeror will manage multiple and concurrent events.
· A description of the offeror’s procedures/processes to ensure high-quality services and deliverables.
· A description of how communication between stakeholders (Air Force, Contractor, Regulators, and Community) will be maintained.
· A description of how team members/subcontractors will be managed.
Key Personnel Qualifications: The Offeror shall submit resumes for the following key personnel:
· Program Manager
· Project Manager(s)
· Program Chemist
· Program QA/QC
· UXO Specialist
· Program Health and Safety Manager
4.8 Subfactor 1.4: Corporate Experience:
The offeror shall submit a maximum of five project/contract/TO summaries (narrative) demonstrating relevant experience as it relates to this PBR. The Government will not consider performance on a project/contract/TO that concluded more than five (5) years prior to the date of this solicitation. For projects/contracts/TOs that are actively being performed, performance must be substantially complete (minimum 80% complete as of the date of solicitation for this contract). Projects/contracts/TOs submitted by the offeror should be the most relevant in demonstrating their ability to perform the proposed effort. Three (3) of the five (5) projects must be from the Prime contractor. The offeror shall include the exact same copies of the project/contract/TO summaries in the volume for Factor 2, Past Performance.
Project/Contract/TO Summary Submissions shall include the following:
· The individual TO or delivery order number, or stand-alone contract number
· Title of the project and a brief description of the effort including the characteristics or aspects of the project that the Government will consider in determining relevance. Focus on the SOO aspects identified in the Technical and Managerial Factors.
· Number of Environmental Sites
· Type of contract/pricing arrangement, i.e. FFP, Time-and-Materials (T&M), Cost-Plus-Fixed-Fee (CPFF), etc.
· Original award amount and final total dollar amount (or estimate at completion) including modifications and options (with reasons for any changes in dollar amounts). If the project is currently ongoing, provide the percent complete at the time of proposal submission.
· Original and final POP (Start and End dates).
· Current contract POCs. Provide a current e-mail address and phone number. Provide a minimum of two Government POCs. Whenever possible, provide one from the technical or program management community and one from the contracting community. For commercial efforts, provide similar POCs.
· The status of the project, if it was completed on-time/budget and whether or not the Offeror encountered any performance issues or challenges. If issues or challenges did arise, provide information on how they were addressed by the offeror.
5 Volume III - Past Performance
5.1 Volume organization
(a) Executive Summary (duplication of executive summary in Volume I, Contract Documentation)
(b) Table of Contents
(c) List of Tables and Figures
(d) Glossary of Abbreviations and Acronyms
(e) Present/Past Performance Summary
(f) Organization Structure Change History
(g) Past Performance Information Sheet
(h) Present/Past Performance Questionnaires (PPQs) (Attachment L-3)
(i) Consent Letter(s) (Attachment L-4)
(j) Client Authorization Letter(s) (Attachment L-5)
5.2 Standard Proposal Information
(a) Provide a Table of Contents for Volume III per ITO paragraph 2.3.7.
(b) Provide a List of Tables and Figures for Volume III per ITO paragraph 2.3.8.
(c) Provide a Glossary of Abbreviations and Acronyms for Volume III per ITO paragraph 2.3.9.
5.3 Past Performance Summary
(a) Describe the role of the Prime and each team member that will perform on the NM-AZ PBR contract and identify the percentage of the proposed effort each will perform.
(b) Discuss how the projects submitted for evaluation demonstrate the Offeror’s ability to meet the Technical Subfactors:
Subfactor 1.1: Technical Approach
Subfactor 1.2: Plan B/Contingency Approach
Subfactor 1.3: Management Approach
Subfactor 1.4: Corporate Experience
(c) This information is to assist the evaluators in determining the relevance of projects submitted for past performance evaluation by confirming the role of the team member compared to the scope of the projects submitted for evaluation.
5.4 Organizational Structure Change History
Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/ performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
5.5 Past Performance Information Sheets
The Offeror shall provide copies of the project summaries under Experience as a part of the submission for this factor. Projects must demonstrate relevant experience in that projects submitted are of a nature similar to the efforts addressed under this solicitation in terms of size, scope, and technical and regulatory complexity in accordance with the requirements outlined in the SOO. The Government will not consider performance on a project that concluded more than five (5) years prior to the date of the solicitation. For projects that are actively being performed, performance must be substantially complete (minimum 80% complete as of the date of solicitation for this contract). Information provided in the Past Performance Information (PPI) Sheets will assist the Government in determining both the relevance and confidence ratings for past performance.
5.6 Past Performance Questionnaires (PPQs)
(a) Each Offeror is requested to submit the information shown in the project summaries for each relevant project identified in Subfactor 1.4 – Corporate Experience and IAW Section 5.6. The responsibility to track and ensure the completion/submission of the PPQ rests solely with the Offeror. Offerors shall ensure that the information is submitted directly to the Past Performance Evaluation Chair, Capt Richard Spencer (Richard.Spencer.9@us.af.mil
). The PPQ form is included as Attachment L-3 to this solicitation. Failure to submit early proposal information will not result in Offeror disqualification.
(b) Even though the assessment of Past Performance is separate and distinct from Determination of Responsibility required by FAR 9, past performance information contained herein may be used to support the Determination of Responsibility for the successful awardees.
(c) Information provided on PPQs assist the government in determining both the relevance and confidence ratings for past performance.
5.7 Consent Letters
The Offeror shall provide original consent letters from each team member and/or joint venture partner using the format (or similar) provided at Attachment L-4. This letter allows the release of team member adverse present/past performance information to the Offeror so the Offeror can respond to such information. For each identified effort for a commercial customer, the Offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror's performance. Offerors are cautioned that the Government will use data provided by each Offeror in this volume and data obtained from other sources in the evaluation of past performance.
5.8 Client Authorization Letters
(a) The Offeror shall provide original client authorization letters for the Prime and each team member and/or joint venture partner who identifies present/past performance efforts for a commercial customer using the format (or similar) provided at Attachment L-5, Example Format for Client Authorization Letter. This letter allows the release of Prime and team member present/past performance information from the commercial customer to the government.
(b) The Prime and each team member and/or joint venture partner shall execute a Client Authorization Letter for commercial customers.
(c) Client authorization letters are evaluated only to the extent that they are complete and present for each team member, and/or joint venture partner that presented past performance information for a commercial customer in the proposal.
5.8 Specific Content
Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the Offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a limited or no confidence rating, since the problems encountered may have been on a more complex program, or an Offeror may have subsequently demonstrated the ability to overcome the problems encountered. The Offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions in terms of improvements achieved or problems rectified.
6 Volume IV – PRICE (FACTOR 3)
6.1 Volume Organization
(a) Table of Contents
(b) List of Tables and Figures
(c) Glossary of Abbreviations and Acronyms
(d) Exceptions, Assumptions, and Rationale
6.2 Standard Proposal Information
(a) Provide a Table of Contents for Volume IV per ITO paragraph 2.3.7.
(b) Provide a List of Tables and Figures for Volume IV per ITO paragraph 2.3.8.
(c) Provide a Glossary of Abbreviations and Acronyms for Volume IV per ITO paragraph 2.3.9.
6.3 General Instructions
(a) These instructions are to assist the Offeror in submitting price information.
(b) Compliance with these instructions is mandatory.
(c) Failure to comply may render the proposal ineligible for award.
(d) Data beyond that required by this instruction shall not be submitted, unless it is considered essential to document or support the price.
(e) All information relating to the proposed price must be included in the section of the proposal designated as the price volume.
(f) In accordance with FAR 15.305 (a)(1), adequate price competition is anticipated which will establish price reasonableness. Therefore, cost or pricing data is not required. However, if after receipt of proposals, the PCO determines that there is inadequate price competition, and none of the exceptions in FAR 15.403-1 apply, the Offeror shall be required to submit cost or pricing data.
(g) Unrealistically or unreasonably low or high proposed labor rates may be grounds for eliminating a proposal from the competition.
(h) The Offeror shall propose a price on a FFP basis in accordance with the proposed CLIN/SubCLIN structure. The total price proposed shall be inclusive of all options.
6.4 Submission of Schedule B
Schedule B, as included in this RFP, contains parent CLINs for each Site included in this requirement. Parent CLINs shall not be altered. SubCLINs will be utilized IAW SubCLIN/MPS Guidance provided as Attachment L-6. Offerors will provide SubCLINs to accommodate the proposed performance objectives for each site. The Offeror shall provide a separate Schedule B that includes both the parent CLINs for each Site with the proposed SubCLINs as associated. Prices proposed for SubCLINs must equal the parent CLIN total proposed for the applicable Site.
6.5 Submission of MPS with Price
The Offeror shall complete and submit an MPS IAW Attachment L-2 and the instructions as follows:
a) The prices submitted in the MPS shall be submitted in Microsoft Excel format with all formulas intact.
b) The Offeror shall submit a copy of the MPS with the applicable price information. Dates for completion of each milestone must be submitted in the following format: Month/Day/Year. The IMS, MPS and Summary Table (Subfactor 1.1, Technical Approach) dates, activities and proposed objectives shall correlate. The MPS shall include SubCLINs and milestones for achievement of performance objectives.
c) The first SubCLIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .