Bidder's_Library__1_-_Projected_and_Historical_Level_of_Effort.pdf

PDF 62 KB Posted

Attached to
Air Force System Networking
Solicitation number
FA8771-16-R-0023
Issued by

About this file

Bidder's Library 1 - Projected and Historical Level of Effort

View the file

Other files

File Type Posted
FA8771-16-R-0023-0003_Solicitation_-_Model_Contract_Amendment_3.pdf PDF
FA8771-16-R-0023_Solicitation_Cover_Letter_Amendment_3.pdf PDF
FA8771-16-R0023_Attachment_3_-_Evaluation_Factors_for_Award_-_Section_M_(3_Jun_2016).pdf PDF
FA8771-16-R-0023_Attachment_8_-_Security_Requirements_for_Classified_Services__(3_Jun_2016).pdf PDF
Solicitation_Questions_and_Answers__3.pdf PDF
Solicitation_Questions_and_Answers__2.pdf PDF
Solicitation_Questions_and_Answers__1.pdf PDF
FA8771-16-R-0023-0002_Solicitation_-_Model_Contract_Amendment_2.pdf PDF
FA8771-16-R-0023_Attachment_8_-_Security_Requirements_for_Classified_Services__(26_May_16).pdf PDF
FA8771-16-R-0023_Solicitation_Cover_Letter_Amendment_2.pdf PDF
FA8771-16-R-0023_Attachment_4_-_DD_Form_254_AFSN_(26_May_16).pdf PDF
FA8771-16-R0023_Attachment_2_-_Instructions_to_Offerors_-_Section_L__(25_May_2016).pdf PDF
FA8771-16-R-0023_Solicitation_Cover_Letter_Amendment_1.pdf PDF
FA8771-16-R0023-0001_Solicitation_-__Model_Contract_Amendment_1.pdf PDF
FA8771-16-R0023_Attachment_3_-_Evaluation_Factors_for_Award_-_Section_M.pdf PDF
FA8771-16-R0023_Attachment_6_-_Vendor_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
FA8771-16-R-0023_Solicitation_Cover_Letter.pdf PDF
Bidder's_Library__2_-_Technical_Requirements_Document.pdf PDF
FA8771-16-R0023_Solicitation_-_Model_Contract.pdf PDF
FA8771-16-R0023_Attachment_5_-_Vendor_Price_Proposal_Instructions.pdf PDF
FA8771-16-R0023_Attachment_2_-_Instructions_to_Offerors_-_Section_L.pdf PDF
FA8771-16-R0023_Attachment_4_-_DD254.pdf PDF
FA8771-16-R0023_Attachment_1_-_Performance_Work_Statement.pdf PDF
FA8771-16-R0023_Exhibit_A_-_Contract_Data_Requirement_List.pdf PDF
FA8771-16-R0023_Attachment_7_-_Status_of_Forces_Agreement_Clause.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOVERNMENT PROJECTED LEVEL OF EFFORT (LoE) DATA SUMMARY

The Government developed its projections based on historical workload experience and what it anticipates its workload to be throughout the entire contract period (base period through option period 4).

Tables 1a and 1b of this document provides potential Offerors with historical data for both the Operations Support Functions, paragraph 4.1 of the PWS, and the Lifecycle Implementation Functions, paragraph 4.2 of the PWS, respectively. Tables 2 and 3 of this document provides potential Offeror’s with what the Government estimates the level of effort could be for each represented PWS Specific Technical task found is each cited PWS paragraph in the tables.

Table 2 reflects the Government’s projections for the Operational Support Functions tasks found in PWS paragraph 4.1 and its subparagraphs. It reflects the PWS paragraph, functional area, number of FTEs and the number of events (per contract year) accomplished for each during that period. Each “event” is a single entity and is not based on, or influenced by, the number of personnel the contractor determines is required and ultimately assigned to the event. However, an event may or may not be comprised of multiple tasks. For example, an event may be for the contractor to support a trip to an Air Force site, but within the event the contractor would be responsible for completing several tasks (i.e., relocate a router, upgrade a switch, install a server, or trouble shoot and resolve an issue). In such cases, the contractor will not finish the event until all tasks are satisfactorily completed. If the contractor cannot complete all tasks relative to an event during one visit, the event will remain open until all tasks are completed even if multiple visits to the Air Force site are required. Once all tasks are satisfactorily completed, the event is closed.

Table 3 reflects the Government’s projections for the Lifecycle Implementation Functions tasks found in PWS paragraph 4.2 and its subparagraphs. Unlike Table 1, which shows the number of events accomplished, Table 2 shows the number of sites where work was performed, or the number of sites where work will be performed.

Offerors should note that there is a shift in the emphasis of the level of effort from the Operational Support Functions to the Lifecycle Implementation Functions beginning in the second option period. By the fourth option period the only tasks within the Operational Support Functions that will require FTEs are the Circuit Actions and Internet Protocol (IP) Address Management (PWS paragraphs 4.1.5 and 4.1.6 respectively). Offerors should further note that the Integration Facility Support and Basic Database Management tasks (PWS paragraphs 4.1.3 and 4.1.7 respectively) will move from the Operational Support Functions area to the Lifecycle Implementation Functions in the fourth option period.

TABLE 1a HISTORICAL DATA SUMMARY, OPERATIONAL SUPPORT FUNCTIONS (PARA 4.1)

PWS

Paragraph Reference

Functional Area Full Time Equivalents

(FTE)

Number of Events Per Contract

Year

4.1.1 Network Systems

Technical Support

5 716

4.1.2 Network Systems

Implementation Support

4 516

4.1.3 Integration Facility

Support Services

1 200

4.1.4 Project Support 2 839

4.1.5 Circuit Actions 2 702

4.1.6 Internet Protocol

(IP) Address Management

1 3073

4.1.7 Basic Database

Management

0.3 60

5.1.1 Task Lead 1 N/A

TABLES 1b, HISTORICAL DATA SUMMARY, LIFECYCLE IMPLEMENTATION

FUNCTIONS (PARA 4.2)

PWS Paragraph Reference Functional Area Full Time

Equivalents (FTE) Number of Sites

4.2.1 Base Network Implementation Support

5 Site Surveys/ 5 Installs Per Year

Switch Count Per Install: 80

4.2.3 Trusted Agent

Support 5 20 sites at a time (4 per

FTE)

4.2.4 Trusted Agent Project Support (for 4.2.3)

4 16 sites at a time (4 per

FTE)

TABLE 2: PROJECTED LEVEL OF EFFORT DATA SUMMARY

OPERATIONAL SUPPORT FUNCTIONS

PWS PARA

REF

BASE

PERIOD

OPT

PERIOD

OPT

PERIOD

OPT

PERIOD

OPT

PERIOD

4.1.1, Network Systems Technical Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

EVENTS

4.1.2, Network Systems Implementation Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

4.1.3, Integration Facility Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

4.1.4, Project Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

4.1.5, Circuit Actions

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

4.1.6, Internet Protocol (IP) Address Management

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

4.1.7, Basic Database Management

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

5.1.1, Task Lead

ESTIMATED

NUMBER OF

FTEs

1 1 1 1 1

TABLE 3: PROJECTED LEVEL OF EFFORT DATA SUMMARY

LIFECYCLE IMPLEMENTATION FUNCTIONS

PWS PARA

REF

BASE

PERIOD

OPT

PERIOD

OPT

PERIOD

OPT

PERIOD

OPT

PERIOD

4.2.1, Base Network Implementation Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

NUMBER OF

SITES

3 Site Surveys/ 5 Installs

– Switch Count per Install =

5 Site Surveys/5 Installs – Switch Count per Install =

6 Site

Installs – Switch Count per Install =

7 Site

Installs – Switch Count per Install =

8 Site

Installs – Switch Count per Install =

4.2.2, Audit Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

NUMBER OF

4.2.3, Trusted Agent Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

NUMBER OF

20 Sites at a time

(4 Per

20 Sites at a time (4 Per FTE)

Per FTE

Per FTE

4.2.4, Trust Agent Project Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

NUMBER OF

16 Sites at a time

(4 Per

16 Sites at

16 Sites at

Per FTE

24 Sites at

Per FTE

4.2.6, Lifecycle Implementation Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

NUMBER OF

(Approx.

3-5 Devices per site)

3-5 Devices

3-5 Devices

3-5 Devices

3-5 Devices per site)

4.2.7, Network Boundary Implementation Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

NUMBER OF

SITES

(Approx.

7 Devices per site)

(Approx. 7 Devices

4.2.8, Network Boundary Project Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

NUMBER OF

4.1.3, Integration Facility Support

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

4.1.7, Basic Database Management

ESTIMATED

NUMBER OF

FTEs

ESTIMATED

File details come from the government source that posted it. Updated .