RIO/RIF Relocation Site Visit Questions & Answers

FA8751-17-B-0007

Q1. Please provide clarification on how to bid survey of asbestos.

A1. Assume all floor tile is hot in area of work, assume area under wall partitions is hot in area of work, and assume the exterior walls on the south side of the building are hot- ¼” transite walls exist on the lower portion of the walls, under the windows. See SK-2 for more information.

Q2. What should be done with the existing raised floor tile system?

A2. Existing raised floor should be salvaged and turned over to the Government.

Q3. Are existing condition drawings available for the east wall windows?

A3. Photos and scanned renovation drawings provided.

Q4. How many data drops in each cube?

A4. Each “occupant” of the cubicles get one (1) quad cable drop. There is one cubicle in room E2D-01 that is a double occupancy cube, all others have a single occupant. Also ensure that one quad cable is provided for each printer/copier location.

Q5. In regards to the can lights in the conference room, what kind of lights are required?

A5. Provide Halo Model PD615ED010-PDM6A935-61VC or approved equal.

Q6. The drawings show a kitchen area, but there is no elevation drawing of the cabinets, could these be provided?

A6. See SK-1. Contractor to verify in field dimensions prior to ordering cabinets and notify the project manager of any discrepancies.

Q7. The specifications have a microwave listed that is not shown on the drawings. Will the contractor provide the microwave?

A7. Yes. The contractor will provide the microwave and refrigerator noted in the Kitchenette. The refrigerator is to be Energy Star rated.

Q8. The drawings show a projector and screen in the conference room but there is no specification on either. Will the contractor provide these and if so, can a specification be provided?

A8. See provided PWS.

Q9. Are the cover plates for the cubicles furnished by the furniture provider?

A9. Power receptacle cover plates are provided by the furniture manufacturer. Electrical contractor power requirements for cubicles ends with connection to cubicle power-pole whip at junction boxes shown. Data cover plates and the quad cable data runs to them are the responsibility of the electrical contractor.

Q10. Are all of the duplex receptacles mounted in the cubicles?

A10. Refer to answer #9.

Q11. Are there any fiber or patch panels being installed on this project?

A11. No fiber is included in this project.

Q12. In the Statement of Work, Paragraph 3. C. Horizontal Station Cabling in Communication Closet F2B-01, is this a typo? On the drawings, the closet is listed as F2D-04 and D212.

A12. The direction on drawing E-103, drawing note #4 is correct.

Q13. Are the patch panels already mounted in room D212?

A13. 19 inch rack space will be available, but all jack terminated patch and user jacks and furniture faceplates are contractor provided. Refer to statement of work for patch panel specifications.

Q14. In regards to the panel detail on sheet E-101, can you clarify the pipe size or the wire size for the 4 new panels to be installed?

A14. For 200 Amp feeds provide 4-3/0 & 1-#6 G. in 3” conduit and for 100 Amp feeds provide 4-#2 & 1-#8 G. in 1 ½” conduit.

Q15. In regards to the Moon Ring on sheet E-102, can you clarify what the CV400 in the part number is supposed to be?

A15. The latest model number for the basis of design fixture is: LP1/MR1SMB-D5-DÉCOR/3500K-0/10V/1%-EXT/F-AL-UNV.

Q16. In regards to the Moon Ring on sheet E-102, can you confirm that the specification required is surface back mounting and 3500K?

A16. The model number in answer #15 is the correct model number.