ROME RESEARCH SITE
FIRE PROTECTION
NOTES, SYMBOLS,
& ABBREVIATIONS
F-001 10
EVS
EVS
FIRE SUPPRESSION SYSTEM GENERAL NOTES
1. PROVIDE MODIFICATIONS TO EXISTING WET PIPE TYPE FIRE SPRINKLER SYSTEMS SERVING THE SECOND FLOOR AREA OF B106 IN ACCORDANCE WITH
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODE REQUIREMENTS AND UNIFIED FACILITIES CRITERIA.
2. PERFORM FIRE PROTECTION SYSTEM WORK DURING NORMAL WORK HOURS. UNLESS OTHERWISE AGREED TO, SPRINKLER SYSTEM SHUTDOWN PERIOD
SHALL BE LIMITED TO 8 HOURS. SYSTEM SHALL BE PUT BACK IN SERVICE AT THE END OF WORKING HOURS.
3. NOTIFY CONTRACT ADMINISTRATOR AND LOCAL FIRE DEPARTMENT PRIOR TO TAKING SPRINKLER SYSTEM OUT OF SERVICE AND WHEN RETURNING
SYSTEM TO SERVICE.
4. PROVIDE FIRE WATCH, AND/OR PORTABLE FIRE EXTINGUISHERS, AND ANY OTHER TEMPORARY MEASURES TO PREVENT FIRE DURING SPRINKLER SYSTEM
DOWN TIME.
5. SHUTDOWN AND DRAIN INDIVIDUAL EXISTING SPRINKLER SYSTEM ZONES SERVING THE SECOND FLOOR WORK AREA AND TRUSS SPACE SYSTEMS.
6. COORDINATE AND PERFORM WORK IN A MANNER WHICH MINIMIZES SPRINKLER SYSTEM IMPAIRMENT FOR THE TWO SYSTEMS. DEVELOP PLAN INDICATING
EXTENT AND EXPECTED DURATION OF SYSTEM IMPAIRMENT AND REVIEW.
7. EXISTING SYSTEM PIPING AS INDICATED IS BASED ON LIMITED FIELD SURVEY. CONTRACTOR IS RESPONSIBLE FOR FINAL VERIFICATION OF ALL EXISTING
CONDITIONS, DIMENSIONS, AND PIPE SIZES PRIOR TO PREPARATION FOR BID. IN CASE OF ANY DISCREPANCY, NOTIFY THE CONTRACT ADMINISTRATOR.
8. PIPING AS SHOWN OR INDICATED IS DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE FOR FINAL PIPE LAYOUT, AND COORDINATION WITH ALL OTHER
TRADES.
9. PROVIDE CUTTING AND PATCHING OF WALLS, AND CEILINGS NECESSARY TO PERFORM INSTALLATION OF SPRINKLER SYSTEMS.
10. PROVIDE FIRESTOPPING AT ALL PIPE PENETRATIONS THROUGH FIRE RATED CONSTRUCTION TO MAINTAIN FIRE RESISTANCE RATINGS.
11. PROVIDE LABELS, INCLUDING FLOW DIRECTION ARROWS, FOR ALL CONCEALED SPRINKLER SYSTEM PIPING.
12. PROVIDE HYDROSTATIC TESTING OF INSTALLED PIPING SYSTEM IN ACCORDANCE WITH ALL APPLICABLE NFPA CODES, AND PROVIDE REPLACEMENT OF ALL
DEFECTIVE MATERIALS.
13. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERATE FIRE PROTECTION SYSTEMS AS
INDICATED ON THE DRAWINGS, AS SPECIFIED, AND IN COMPLIANCE WITH THE STANDARDS OF THE NATIONAL FIRE PROTECTION AGENCY AND ALL DOD
REGULATIONS.
14. ALTERATIONS TO THE SPRINKLER SYSTEM SHALL BE PIPE SCHEDULE DESIGNED UNLESS OTHER-WISE NOTED ON THE DRAWINGS. HEAD SPACING IN
GENERAL AND WATER QUANTITY SHALL BE BASED ON LIGHT HAZARD OCCUPANCY. ALL SHUTOFF VALVES IN THE SPRINKLER, STANDPIPE, AND COMBINED
SYSTEMS SHALL BE APPROVED INDICATING TYPE.
15. COORDINATE SPRINKLER HEAD LOCATIONS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS, MAKE MINOR
MODIFICATIONS FOR SUITABILITY PURPOSES.
16. SPRINKLERS INSTALLED IN THE CEILINGS OF FINISHED AREAS SHALL BE SYMMETRICAL IN RELATION TO CEILING SYSTEM COMPONENTS AND CENTERED IN
THE LONG DIMENSION CEILING TILE, UNLESS SHOWN OTHERWISE.
17. TEST MODIFIED SYSTEM IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 13 & 25 REQUIREMENTS.
RELOCATE RIO & RIF
30 31 MAY 2017
SM
ULDF 12-0305
BLDG. 106
FEEDS UPRIGHT
SPRINKLER SYSTEM
TO UPRIGHT
SPRINKLER SYSTEM
TYP (7)
SOUTH LOBBY - N.I.C.
OPEN TO
BELOW
OPEN TO
BELOW
N.I.C.
CORRIDOR B
E A
S T
C
O R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
R
D241E
D G o r r i d o r
E227
D233
D235
E203
E204
O200C
CORRIDOR D
DEMOLITION FIRE SPRINKLER PLAN
FD-101 11
EVS
EVS
N
SECOND FLOOR DEMO CEILING PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
RELOCATE RIO & RIF
30 31 MAY 2017
SM
3"
TO UPRIGHT SPRINKLER
SYSTEM
TYP (7)
FEEDS UPRIGHT SPRINKLER
SYSTEM
DN
N.I.C.
MODIFY EXISTING BRANCH PIPING TO PROPERLY
ACCOMMODATE 9 SPRINKLER HEADS
NEW BRANCH PIPING
CONNECT TO 4" MAIN SERVING
UPRIGHT SPRINKLER SYSTEM
TYP (7)
CORRIDOR B
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D r r i d o r
E227
D233
D235
E203
E204
PROPOSED FIRE
SPRINKLER PLAN
F-101 12
EVS
EVS
N
PROPOSED FIRE SPRINKLER PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
RELOCATE RIO & RIF
30 31 MAY 2017
SM
RIO BREAK
20 20 1725 N/A N/A 1/2
BASIS OF DESIGN - LIBERTY
PUMPS MODEL #405, OR
APPROVED EQUAL
LOWER
(INCHES)
DIA X HGT
TANK SIZETANK VOLUME
(GAL), MIN.
STORAGE
(°F) (°F)
DCW
TEMP
INLET
WATER
TEMP
UPPER
(kW),MIN.
CAPACITY
V/PH/HZ
1 DESIGNER NOTE: MUST BE ENERGY STAR RATED.
PLUMBING
NOTES, SYMBOLS
& ABBREVIATIONS
P-001 13
EVS
EVS
PLUMBING NOTES
A. INFORMATION, SUCH AS SIZE, LOCATION OR INVERTS OF EXISTING CONCEALED SERVICES, IS APPROXIMATE AND
BASED ON REPUTED INFORMATION FROM EXISTING DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
THIS INFORMATION IN THE FIELD.
B. PROVIDE 1/4 INCH PER FOOT SLOPE FOR ALL SANITARY LINES 3 INCH AND SMALLER AND 1/8 INCH PER FOOT SLOPE
FOR ALL SANITARY LINES 4" AND LARGER WITHIN THE BUILDING. UNLESS OTHERWISE NOTED.
C. COORDINATE LOCATION AND ROUTING OF PLUMBING LINES WITH OTHER TRADES.
D. PROVIDE FIRE PROOFING FOR ALL PENETRATIONS THROUGH RATED WALLS.
E. PROVIDE EASILY ACCESSIBLE CLEANOUTS AT THE BOTTOM OF ALL WASTE AND SOIL STACKS.
F. PROVIDE EASILY ACCESSIBLE CLEANOUTS AT ALL CHANGES IN DIRECTION GREATER THAN 45 DEGREES AS WELL AS
WHERE SHOWN ON PLANS.
G. PROVIDE EASILY ACCESSIBLE SHUTOFFS ON ALL BRANCH LINES, PROVIDE STOPS AT ALL FIXTURES.
H. PROVIDE ALL WORK IN ACCORDANCE WITH THE IPC, UFC, AND ANY LOCAL CODES THAT MAY TAKE PRECEDENCE.
I. PROVIDE CONNECTIONS TO SERVICES PROVIDED BY OTHER TRADES, UNLESS OTHERWISE NOTED.
J. PROVIDE ALL PERMITS AND TESTING REQUIRED.
K. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND
OPERABLE PLUMBING SYSTEMS AS INDICATED ON THE DRAWINGS AND AS SPECIFIED AND REQUIRED BY CODE
L. RUN ALL SOIL WASTE AND VENT PIPING WITH 2 PERCENT MINIMUM GRADE UNLESS OTHERWISE NOTED. HORIZONTAL
VENT PIPING SHALL BE GRADED TO DRIP BACK TO THE SOIL OR WASTE PIPE BY GRAVITY.
M. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE BOTTOM OF ALL PRESSURE PIPING AND TO THE INVERT OF
ALL GRAVITY PIPING.
N. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING BRANCHES IN WHICH BRANCH PIPING SERVES TWO OR
MORE FIXTURES.
O. UNLESS OTHERWISE NOTED ALL DOMESTIC COLD AND HOT WATER PIPING SHALL BE OF THE ½ IN. SIZE.
P. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO THE UNDERSIDE OF THE SUPPORT SYSTEM, WITH
SPACE FOR INSULATION IF REQUIRED.
Q. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING
ACCESS ARE ACCESSIBLE.
R. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A PIPE CHASE, THE SIZE SHOWN FOR THE PIPE DROPS
SHALL BE USED FOR THE LAST FIXTURE.
S. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING AND TO ALLOW FOR EXPANSION WHERE REQUIRED.
T. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
U. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND
LOW POINTS.
V. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING
RUNS (100FT OR MORE) TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.
W. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
X. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF THE PIPE BEFORE REDUCING THE
SIZE TO MAKE CONNECTIONS TO THE EQUIPMENT AND CONTROLS.
Y. PROVIDE CHAIN WHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED GREATER THAN 7'0” ABOVE
FLOOR LEVEL.
Z. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT WITH ACCESSIBLE STOPS
AA. UNLESS OTHERWISE NOTED DRAINS SHALL BE INSTALLED AT THE LOW POINT OF ROOFS, ARE-WAYS, FLOORS, ETC…
AB. PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE SYSTEMS AT ENDS OF RUNS, AT CHANGES IN DIRECTION, NEAR THE BASE OF STACKS, EVERY 50 FEET IN HORIZONTAL RUNS AND ELSEWHERE AS INDICATED.
AC. ALL CLEANOUTS SHALL BE THE FULL SIZE OF THE PIPE FOR PIPE SIZES 6” AND SMALLER, AND SHALL BE 6” FOR PIE
SIZES LARGER THAN 6”.
AD. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION INDICATORS AND MAXIMUM
ADJUSTABLE STOPS (MEMORY STOPS).
AE. ALL VALVES SHALL BE INSTALLED SO THE VALVE REMAINS IN SERVICE WHEN THE EQUIPMENT OR PIPING ON THE
EQUIPMENT SIDE OF THE VALVE IS REMOVED.
AF. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AROUND
OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE GOVERNMENT.
AG. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER EQUIPMENT THAT
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS
POSSIBLE OR AS INDICATED ON THE DRAWINGS.
RELOCATE RIO & RIF
30 31 MAY 2017
SM
E227
D243A
F241
F240
F242
F244
F243
F246
F246A
F245
F233A
F233
F231
F229
F227
F227A
F226
F228
F234
E221
E223
E225
E220
E222
E224
E226
D213
E218
D215
D221
D225
D241A
D241
D241B
D241C
D241F
D241E
D253
D241D
D243
D253A
EAST CORRIDOR
CORRIDOR D
CORRIDOR 4
REMOVE EXISTING
KITCHENETTE AND PIPING.
CUT AND CAP PIPING AT
TAKEOFFS AND FLOOR
PENETRATIONS
N.I.C.
N.I.C.
SERVICE VALVE
CORRIDOR B
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D r r i d o r
E227
D233
D235
E203
E204
DEMOLITION
PD-101 14
EVS
EVS
N
SECOND FLOOR DEMO CEILING PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
RELOCATE RIO & RIF
30 31 MAY 2017
SM
SERVICE VALVE
DN
N.I.C.
90'-3"
CORRIDOR B
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207 B207A B211 B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206
F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D
G
C o r r i d o r
E227
D233
D235
E203
E204
PROPOSED PLUMBING PLAN
P-101 15
EVS
EVS
N
PROPOSED PLUMBING PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
RELOCATE RIO & RIF
30 31 MAY 2017
SM
MECHANICAL
NOTES, SYMBOLS,
& ABBREVIATIONS
M-001 16
EVS
EVS
GENERAL NOTES:
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED
ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE
B. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE PROTECTION) ARE DIAGRAMMATIC ONLY AND ARE INTENDED TO
CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
C. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND
APPLICABLE CODES AND REGULATIONS.
D. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE
APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE
CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
E. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL. ELECTRICAL WORK, ETC… SHOWN ON OTHER CONTRACT
DRAWINGS.
F. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
G. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO, AND WITHIN 50 FT. OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS
AND ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM MAINS WITHIN 50 FT. OF BOILER OR
PRESSURE-REDUCING VALVES.
H. MAINTAIN A MINIMUM 6'8” CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, ETC… THROUGHOUT ACCESS ROUTES IN
MECHANICAL ROOMS.
I. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
J. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION OF PIPE OR DUCT UP AND
DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
K. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
L. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL
BALANCING BUREAU (NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN ACCORDANCE WITH AABC STANDARDS.
M. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE USED.
N. REINFORCEMENT, DETAILING, AND PLACEMENT OF CONCRETE SHALL CONFORM TO ASTM 315 AND ACI 318. CONCRETE SHALL CONFORM TO ASTM C94.
CONCRETE WORK SHALL CONFORM TO ACI318, PART ENTITLED “CONSTRUCTION REQUIREMENTS”. COMPRESSIVE STRENGTH IN 28 DAYS SHALL BE 3000 PSI.
TOTAL AIR CONTENT OF EXTERIOR CONCRETE SHALL BE BETWEEN 5 AND 7 PERCENT BY VOLUME. SLUMP SHALL BE BETWEEN 3 AND 4 IN. CONCRETE SHALL BE
CURED FOR 7 DAYS AFTER PLACEMENT.
O. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS
REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE
FABRICATIONS.
P. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NATIONAL ELECTRIC CODE AND DIVISION 16 OF THE SPECIFICATION.
Q. CONCRETE HOUSEKEEPING PADS SHALL BE SIZED AND LOCATED BY MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL BE 6 IN. PAD
SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 6 IN. ON EACH SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY GENERAL CONTRACTOR.
IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE THE SIZE AND LOCATION OF CONCRETE HOUSEKEEPING PADS TO THE
GENERAL CONTRACTOR.
R. WHERE BEAMS ARE INDICATED TO BE PENETRATED WITH DUCTWORK OR PIPING, COORDINATE DUCTWORK AND PIPING LAYOUT WITH BEAM OPENING SIZE AND
OPENING LOCATIONS. COORDINATION SHALL BE DONE PRIOR TO THE FABRICATION OF DUCTWORK, CUTTING OF PIPING, OR FABRICATION OF BEAMS.
S. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT SHALL BE THE MECHANICAL CONTRACTOR'S
RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR
PROVIDES A PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR ITEM OF THE
MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL CONTRACTOR, WHOSE DECISION IS FINAL.
T. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS
OTHERWISE NOTED SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
U. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO PROVIDE SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND
OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR FOR INSTALLATION.
V. ALL EQUIPMENT, DUCTWORK, PIPING, ETC. SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION.
W. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. ALL
ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL JOINTS. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS. WELDING
TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
X. MECHANICAL EQUIPMENT, DUCTWORK, PIPING SHALL NOT BE SUPPORTED FROM A METAL DECK.
Y. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDE BY THE MECHANICAL CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL
CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR.
Z. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED.
AA. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH A PRODUCT SIMILAR TO 3M OR AN APPROVED EQUAL.
AB. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT SHALL BE PIPED TO THE NEAREST DRAIN WITH
APPROVED RIGID PIPING. SEE DETAILS SHOWN ON DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR THE DEPTH OF THE AIR CONDITIONING CONDENSATE
TRAP.
AC. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
AD. FIELD VERIFY CONDITIONS, REPORT ANY ERRORS TO THE CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE.
RELOCATE RIO & RIF
30 31 MAY 2017
SM
F241
F240
F242
F244
F243
F246
F246A
F245
F233A
F233
F231
F229
F227
F227A
F226
F228
F234
E221
E223
E225
E220
E222
E224
E226
D213
E218
D215
D221
D225
D241A
D241
D241B
D241C
D241F
D241E
D253
D241D
D243
D253A
EAST CORRIDOR
CORRIDOR D
CORRIDOR 4
N.I.C.
N.I.C.
AIR DUCT EXTENDS TO
SUPPLY AIR DIFFUSERS IN
ROOM - TO BE REMOVED
(TYP FOR ALL ROOMS)
TO STEAM FIN TUIBE
RADIATION -SEE SHEET
MD-102)
(TYP)
CORRIDOR B
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D r r i d o r
E227
D233
D235
E203
E204
HVAC DEMOLITION PLAN
MD-101 17
EVS
EVS
N
EXISTING HVAC PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
1. REMOVE DUCT ATTACHED TO EXSTING
LIEBERT UNIT #2. REMOVE LIEBERT #2 ON
FIRST FLOOR DIRECTLY BENEATH DUCT. SEE
DETAIL #4 SHEET M201
RELOCATE RIO & RIF
30 31 MAY 2017
SM
F241
F240
F242
F244
F243
F246
F246A
F245
F233A
F233
F231
F229
F227
F227A
F226
F228
F234
E221
E223
E225
E220
E222
E224
E226
D213
E218
D215
D221
D225
D241A
D241
D241B
D241C
D241F
D241E
D253
D241D
D243
D253A
EAST CORRIDOR
CORRIDOR D
CORRIDOR 4
N.I.C.
N.I.C.
CORRIDOR B
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D r r i d o r
E227
D233
D235
E203
E204
PIPING DEMOLITION PLAN
MD-102 18
EVS
EVS
N
GENERAL NOTES:
1. REMOVE STEAM FINTUBE RADIATOR, STEAM
PIPING, REFRIGERANT PIPING, AND ASSOCIATED
EQUIPMENT AS INDICATED.
2. CUT AND CAP REMOVED STEAM BRANCH PIPING
AND TAKEOFFS FROM REMAINING STEAM MAINS.
3. UPON REMOVAL OF EQUIPMENT PENETRATING
BUILDING ENVELOPE, REPAIR ENVELOPE TO
MATCH EXISTING. PROVIDE PROPER SEALING TO
PREVENT WATER, AIR, AND MOISTURE
INFILTRATION. REFER TO SPECIFICATIONS FOR
PROPER INFILL AND SEALING.
EXISTING PIPING PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
RELOCATE RIO & RIF
30 31 MAY 2017
SM
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
DN
N.I.C.
T
T
T
T
T
T
T
T
T
CORRIDOR B
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D
G
C o r r i d o r
E227
D233
D235
E203
E204
HVAC PROPOSED PLAN
M-101 19
EVS
EVS
N
PROPOSED HVAC LAYOUT PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
RELOCATE RIO & RIF
30 31 MAY 2017
SM
DN
N.I.C.
90'-3"
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D r r i d o r
E227
D233
D235
E203
E204
PIPING PROPOSED PLAN
M-102 20
EVS
EVS
N
GENERAL NOTES:
1.
PROPOSED PIPING PLAN
SCALE: 1/8"=1'-0"
AREA OF WORK
RELOCATE RIO & RIF
30 31 MAY 2017
SM
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D r r i d o r
E227
D233
D235
E203
E204
ELEVATIONS
M-201 21
EVS
EVS
N
AREA OF WORK
#1 - VACU B3 ELEVATION DETAIL - LOOKING EAST
SCALE: 1/8"=1'-0"
#2 - VACU B3 ELEVATION DETAIL LOOKING SOUTH
SCALE: 1/8"=1'-0"
#3 VACU B3 ELEVATION DETAIL
SCALE: 1/8"=1'-0"
RELOCATE RIO & RIF
30 31 MAY 2017
SM
E A
R
R I D
O R
CORRIDOR E
B200
B208
B210
B212
B214
B216
B218
B220
B207
B207A B211
B213
B215
C202
C204
C206
C208
C210
C212
C211
C218
C220
C222
C216
C214
C224
C213
C215
C217
C219
C221
D212
D216
D202
CORRIDOR C
CORRIDOR D
D201 D203
D205 D207
D209
D211
D213
D215
D221
D225
F205
F215
F225
F227 F229
F231
F233
F204
F206 F208
F210
F214
F216
F218
F234F228F226
E221
E223
E225
E222
E224
E226
E213
E211E209E207
E216
E214E212
E210
E208
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2
S t a i r
S t a i r
S t a i r
S t a i r
S t a i r
Stair 2A
F203
F207
F211
F217
E202
F218A
F202
O200
O203
O205
O207
CMF
CMF lobby
O214
O215
O213
O212
O210
O206
O204
E220
E218
O207C
D241A
D241B
D241
D241C
D241D
D243
D253
D243A
D253A
F241
F245
F240
F242
F244
F246
W2F
W2C
W2A
W2B
W2G
W2E
W2D
T-1
T-2
F243
F246A
C240
B241
B240
C241
E A
R
R I D
O R
W E
R
R I D
O R
W E
R
R I D
O R
CORRIDOR F
O200A
O201
O202
O202A
T-9
B204
B206
C O
R R
I D
D r r i d o r
E227
D233
D235
E203
E204
REFRIGERANT
LINESET
LIEBERT
DETAILS
M-501 22
EVS
EVS
N
AREA OF WORK
#1 - VACU B3 DETAIL - SOUTH MONITOR
SCALE: 1/8"=1'-0"
#2 - FIRST FLOOR LIEBERT AND CONDENSING UNIT DEMOLITION DETAIL
SCALE: 1/8"=1'-0"
NOTES
REMOVE INDICATED CONDENSING UNITS AS SHOWN.
REMOVE ASSOCIATED PIPING AND ELECTRICAL POWER
SERVICE ATTACHED TO CONDENSING UNITS.
RELOCATE RIO & RIF
30 31 MAY 2017
SM
DIAGRAM
M-601 23
EVS
EVS
RELOCATE RIO & RIF
30 31 MAY 2017
SM
SCHEDULES
M-602 24
EVS
EVS
RELOCATE RIO & RIF
30 31 MAY 2017
SM
| 120305 ARCH 100% |
| 120305 - G-001 |
| 120305 - AD-101 |
| 120305 - AD-102 |
| 120305 - A-101 |
| 120305 - A-102 |
| 120305 - A-201 |
| 120305 - A-202 |
| 120305 - A-203 |
| 120305 - I-101 |
| 120305 - I-102 |
| 12-0305 MECH 100% |
| 120305-F-001 |
| 120305-FD-101 |
| 120305-F-101 |
| 120305-P-001 |
| 120305-PD-101 |
| 120305-P-101 |
| 120305-M-001 |
| 120305-MD-101 |
| 120305-MD-102 |
| 120305-M-101 |
| 120305-M-102 |
| 120305-M-201 |
| 120305-M-501 |
| 120305-M-601 |
| 120305-M-602 |
120305 - ELEC 100%