17B7_Attachment_2_-_Drawings.pdf

PDF 16 MB Posted

Attached to
Relocate RIO and RIF, Building 106
Solicitation number
FA8751-17-B-0007
Issued by

About this file

Drawings

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROME RESEARCH SITE

FIRE PROTECTION

NOTES, SYMBOLS,

& ABBREVIATIONS

F-001 10

EVS

EVS

FIRE SUPPRESSION SYSTEM GENERAL NOTES

1. PROVIDE MODIFICATIONS TO EXISTING WET PIPE TYPE FIRE SPRINKLER SYSTEMS SERVING THE SECOND FLOOR AREA OF B106 IN ACCORDANCE WITH

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODE REQUIREMENTS AND UNIFIED FACILITIES CRITERIA.

2. PERFORM FIRE PROTECTION SYSTEM WORK DURING NORMAL WORK HOURS. UNLESS OTHERWISE AGREED TO, SPRINKLER SYSTEM SHUTDOWN PERIOD

SHALL BE LIMITED TO 8 HOURS. SYSTEM SHALL BE PUT BACK IN SERVICE AT THE END OF WORKING HOURS.

3. NOTIFY CONTRACT ADMINISTRATOR AND LOCAL FIRE DEPARTMENT PRIOR TO TAKING SPRINKLER SYSTEM OUT OF SERVICE AND WHEN RETURNING

SYSTEM TO SERVICE.

4. PROVIDE FIRE WATCH, AND/OR PORTABLE FIRE EXTINGUISHERS, AND ANY OTHER TEMPORARY MEASURES TO PREVENT FIRE DURING SPRINKLER SYSTEM

DOWN TIME.

5. SHUTDOWN AND DRAIN INDIVIDUAL EXISTING SPRINKLER SYSTEM ZONES SERVING THE SECOND FLOOR WORK AREA AND TRUSS SPACE SYSTEMS.

6. COORDINATE AND PERFORM WORK IN A MANNER WHICH MINIMIZES SPRINKLER SYSTEM IMPAIRMENT FOR THE TWO SYSTEMS. DEVELOP PLAN INDICATING

EXTENT AND EXPECTED DURATION OF SYSTEM IMPAIRMENT AND REVIEW.

7. EXISTING SYSTEM PIPING AS INDICATED IS BASED ON LIMITED FIELD SURVEY. CONTRACTOR IS RESPONSIBLE FOR FINAL VERIFICATION OF ALL EXISTING

CONDITIONS, DIMENSIONS, AND PIPE SIZES PRIOR TO PREPARATION FOR BID. IN CASE OF ANY DISCREPANCY, NOTIFY THE CONTRACT ADMINISTRATOR.

8. PIPING AS SHOWN OR INDICATED IS DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE FOR FINAL PIPE LAYOUT, AND COORDINATION WITH ALL OTHER

TRADES.

9. PROVIDE CUTTING AND PATCHING OF WALLS, AND CEILINGS NECESSARY TO PERFORM INSTALLATION OF SPRINKLER SYSTEMS.

10. PROVIDE FIRESTOPPING AT ALL PIPE PENETRATIONS THROUGH FIRE RATED CONSTRUCTION TO MAINTAIN FIRE RESISTANCE RATINGS.

11. PROVIDE LABELS, INCLUDING FLOW DIRECTION ARROWS, FOR ALL CONCEALED SPRINKLER SYSTEM PIPING.

12. PROVIDE HYDROSTATIC TESTING OF INSTALLED PIPING SYSTEM IN ACCORDANCE WITH ALL APPLICABLE NFPA CODES, AND PROVIDE REPLACEMENT OF ALL

DEFECTIVE MATERIALS.

13. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERATE FIRE PROTECTION SYSTEMS AS

INDICATED ON THE DRAWINGS, AS SPECIFIED, AND IN COMPLIANCE WITH THE STANDARDS OF THE NATIONAL FIRE PROTECTION AGENCY AND ALL DOD

REGULATIONS.

14. ALTERATIONS TO THE SPRINKLER SYSTEM SHALL BE PIPE SCHEDULE DESIGNED UNLESS OTHER-WISE NOTED ON THE DRAWINGS. HEAD SPACING IN

GENERAL AND WATER QUANTITY SHALL BE BASED ON LIGHT HAZARD OCCUPANCY. ALL SHUTOFF VALVES IN THE SPRINKLER, STANDPIPE, AND COMBINED

SYSTEMS SHALL BE APPROVED INDICATING TYPE.

15. COORDINATE SPRINKLER HEAD LOCATIONS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS, MAKE MINOR

MODIFICATIONS FOR SUITABILITY PURPOSES.

16. SPRINKLERS INSTALLED IN THE CEILINGS OF FINISHED AREAS SHALL BE SYMMETRICAL IN RELATION TO CEILING SYSTEM COMPONENTS AND CENTERED IN

THE LONG DIMENSION CEILING TILE, UNLESS SHOWN OTHERWISE.

17. TEST MODIFIED SYSTEM IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 13 & 25 REQUIREMENTS.

RELOCATE RIO & RIF

30 31 MAY 2017

SM

ULDF 12-0305

BLDG. 106

FEEDS UPRIGHT

SPRINKLER SYSTEM

TO UPRIGHT

SPRINKLER SYSTEM

TYP (7)

SOUTH LOBBY - N.I.C.

OPEN TO

BELOW

OPEN TO

BELOW

N.I.C.

CORRIDOR B

E A

S T

C

O R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

R

D241E

D G o r r i d o r

E227

D233

D235

E203

E204

O200C

CORRIDOR D

DEMOLITION FIRE SPRINKLER PLAN

FD-101 11

EVS

EVS

N

SECOND FLOOR DEMO CEILING PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

RELOCATE RIO & RIF

30 31 MAY 2017

SM

3"

TO UPRIGHT SPRINKLER

SYSTEM

TYP (7)

FEEDS UPRIGHT SPRINKLER

SYSTEM

DN

N.I.C.

MODIFY EXISTING BRANCH PIPING TO PROPERLY

ACCOMMODATE 9 SPRINKLER HEADS

NEW BRANCH PIPING

CONNECT TO 4" MAIN SERVING

UPRIGHT SPRINKLER SYSTEM

TYP (7)

CORRIDOR B

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D r r i d o r

E227

D233

D235

E203

E204

PROPOSED FIRE

SPRINKLER PLAN

F-101 12

EVS

EVS

N

PROPOSED FIRE SPRINKLER PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

RELOCATE RIO & RIF

30 31 MAY 2017

SM

RIO BREAK

20 20 1725 N/A N/A 1/2

BASIS OF DESIGN - LIBERTY

PUMPS MODEL #405, OR

APPROVED EQUAL

LOWER

(INCHES)

DIA X HGT

TANK SIZETANK VOLUME

(GAL), MIN.

STORAGE

(°F) (°F)

DCW

TEMP

INLET

WATER

TEMP

UPPER

(kW),MIN.

CAPACITY

V/PH/HZ

1 DESIGNER NOTE: MUST BE ENERGY STAR RATED.

PLUMBING

NOTES, SYMBOLS

& ABBREVIATIONS

P-001 13

EVS

EVS

PLUMBING NOTES

A. INFORMATION, SUCH AS SIZE, LOCATION OR INVERTS OF EXISTING CONCEALED SERVICES, IS APPROXIMATE AND

BASED ON REPUTED INFORMATION FROM EXISTING DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY

THIS INFORMATION IN THE FIELD.

B. PROVIDE 1/4 INCH PER FOOT SLOPE FOR ALL SANITARY LINES 3 INCH AND SMALLER AND 1/8 INCH PER FOOT SLOPE

FOR ALL SANITARY LINES 4" AND LARGER WITHIN THE BUILDING. UNLESS OTHERWISE NOTED.

C. COORDINATE LOCATION AND ROUTING OF PLUMBING LINES WITH OTHER TRADES.

D. PROVIDE FIRE PROOFING FOR ALL PENETRATIONS THROUGH RATED WALLS.

E. PROVIDE EASILY ACCESSIBLE CLEANOUTS AT THE BOTTOM OF ALL WASTE AND SOIL STACKS.

F. PROVIDE EASILY ACCESSIBLE CLEANOUTS AT ALL CHANGES IN DIRECTION GREATER THAN 45 DEGREES AS WELL AS

WHERE SHOWN ON PLANS.

G. PROVIDE EASILY ACCESSIBLE SHUTOFFS ON ALL BRANCH LINES, PROVIDE STOPS AT ALL FIXTURES.

H. PROVIDE ALL WORK IN ACCORDANCE WITH THE IPC, UFC, AND ANY LOCAL CODES THAT MAY TAKE PRECEDENCE.

I. PROVIDE CONNECTIONS TO SERVICES PROVIDED BY OTHER TRADES, UNLESS OTHERWISE NOTED.

J. PROVIDE ALL PERMITS AND TESTING REQUIRED.

K. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND

OPERABLE PLUMBING SYSTEMS AS INDICATED ON THE DRAWINGS AND AS SPECIFIED AND REQUIRED BY CODE

L. RUN ALL SOIL WASTE AND VENT PIPING WITH 2 PERCENT MINIMUM GRADE UNLESS OTHERWISE NOTED. HORIZONTAL

VENT PIPING SHALL BE GRADED TO DRIP BACK TO THE SOIL OR WASTE PIPE BY GRAVITY.

M. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE BOTTOM OF ALL PRESSURE PIPING AND TO THE INVERT OF

ALL GRAVITY PIPING.

N. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING BRANCHES IN WHICH BRANCH PIPING SERVES TWO OR

MORE FIXTURES.

O. UNLESS OTHERWISE NOTED ALL DOMESTIC COLD AND HOT WATER PIPING SHALL BE OF THE ½ IN. SIZE.

P. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO THE UNDERSIDE OF THE SUPPORT SYSTEM, WITH

SPACE FOR INSULATION IF REQUIRED.

Q. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

R. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A PIPE CHASE, THE SIZE SHOWN FOR THE PIPE DROPS

SHALL BE USED FOR THE LAST FIXTURE.

S. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING AND TO ALLOW FOR EXPANSION WHERE REQUIRED.

T. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

U. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND

LOW POINTS.

V. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING

RUNS (100FT OR MORE) TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.

W. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

X. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF THE PIPE BEFORE REDUCING THE

SIZE TO MAKE CONNECTIONS TO THE EQUIPMENT AND CONTROLS.

Y. PROVIDE CHAIN WHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED GREATER THAN 7'0” ABOVE

FLOOR LEVEL.

Z. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT WITH ACCESSIBLE STOPS

AA. UNLESS OTHERWISE NOTED DRAINS SHALL BE INSTALLED AT THE LOW POINT OF ROOFS, ARE-WAYS, FLOORS, ETC…

AB. PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE SYSTEMS AT ENDS OF RUNS, AT CHANGES IN DIRECTION, NEAR THE BASE OF STACKS, EVERY 50 FEET IN HORIZONTAL RUNS AND ELSEWHERE AS INDICATED.

AC. ALL CLEANOUTS SHALL BE THE FULL SIZE OF THE PIPE FOR PIPE SIZES 6” AND SMALLER, AND SHALL BE 6” FOR PIE

SIZES LARGER THAN 6”.

AD. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION INDICATORS AND MAXIMUM

ADJUSTABLE STOPS (MEMORY STOPS).

AE. ALL VALVES SHALL BE INSTALLED SO THE VALVE REMAINS IN SERVICE WHEN THE EQUIPMENT OR PIPING ON THE

EQUIPMENT SIDE OF THE VALVE IS REMOVED.

AF. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AROUND

OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE GOVERNMENT.

AG. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER EQUIPMENT THAT

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS

POSSIBLE OR AS INDICATED ON THE DRAWINGS.

RELOCATE RIO & RIF

30 31 MAY 2017

SM

E227

D243A

F241

F240

F242

F244

F243

F246

F246A

F245

F233A

F233

F231

F229

F227

F227A

F226

F228

F234

E221

E223

E225

E220

E222

E224

E226

D213

E218

D215

D221

D225

D241A

D241

D241B

D241C

D241F

D241E

D253

D241D

D243

D253A

EAST CORRIDOR

CORRIDOR D

CORRIDOR 4

REMOVE EXISTING

KITCHENETTE AND PIPING.

CUT AND CAP PIPING AT

TAKEOFFS AND FLOOR

PENETRATIONS

N.I.C.

N.I.C.

SERVICE VALVE

CORRIDOR B

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D r r i d o r

E227

D233

D235

E203

E204

DEMOLITION

PD-101 14

EVS

EVS

N

SECOND FLOOR DEMO CEILING PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

RELOCATE RIO & RIF

30 31 MAY 2017

SM

SERVICE VALVE

DN

N.I.C.

90'-3"

CORRIDOR B

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207 B207A B211 B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206

F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D

G

C o r r i d o r

E227

D233

D235

E203

E204

PROPOSED PLUMBING PLAN

P-101 15

EVS

EVS

N

PROPOSED PLUMBING PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

RELOCATE RIO & RIF

30 31 MAY 2017

SM

MECHANICAL

NOTES, SYMBOLS,

& ABBREVIATIONS

M-001 16

EVS

EVS

GENERAL NOTES:

A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED

ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE

B. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE PROTECTION) ARE DIAGRAMMATIC ONLY AND ARE INTENDED TO

CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

C. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND

APPLICABLE CODES AND REGULATIONS.

D. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE

APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE

CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.

E. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL. ELECTRICAL WORK, ETC… SHOWN ON OTHER CONTRACT

DRAWINGS.

F. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.

G. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO, AND WITHIN 50 FT. OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS

AND ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM MAINS WITHIN 50 FT. OF BOILER OR

PRESSURE-REDUCING VALVES.

H. MAINTAIN A MINIMUM 6'8” CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, ETC… THROUGHOUT ACCESS ROUTES IN

MECHANICAL ROOMS.

I. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.

J. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION OF PIPE OR DUCT UP AND

DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.

K. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.

L. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL

BALANCING BUREAU (NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN ACCORDANCE WITH AABC STANDARDS.

M. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE USED.

N. REINFORCEMENT, DETAILING, AND PLACEMENT OF CONCRETE SHALL CONFORM TO ASTM 315 AND ACI 318. CONCRETE SHALL CONFORM TO ASTM C94.

CONCRETE WORK SHALL CONFORM TO ACI318, PART ENTITLED “CONSTRUCTION REQUIREMENTS”. COMPRESSIVE STRENGTH IN 28 DAYS SHALL BE 3000 PSI.

TOTAL AIR CONTENT OF EXTERIOR CONCRETE SHALL BE BETWEEN 5 AND 7 PERCENT BY VOLUME. SLUMP SHALL BE BETWEEN 3 AND 4 IN. CONCRETE SHALL BE

CURED FOR 7 DAYS AFTER PLACEMENT.

O. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS

REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE

FABRICATIONS.

P. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NATIONAL ELECTRIC CODE AND DIVISION 16 OF THE SPECIFICATION.

Q. CONCRETE HOUSEKEEPING PADS SHALL BE SIZED AND LOCATED BY MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL BE 6 IN. PAD

SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 6 IN. ON EACH SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY GENERAL CONTRACTOR.

IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE THE SIZE AND LOCATION OF CONCRETE HOUSEKEEPING PADS TO THE

GENERAL CONTRACTOR.

R. WHERE BEAMS ARE INDICATED TO BE PENETRATED WITH DUCTWORK OR PIPING, COORDINATE DUCTWORK AND PIPING LAYOUT WITH BEAM OPENING SIZE AND

OPENING LOCATIONS. COORDINATION SHALL BE DONE PRIOR TO THE FABRICATION OF DUCTWORK, CUTTING OF PIPING, OR FABRICATION OF BEAMS.

S. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT SHALL BE THE MECHANICAL CONTRACTOR'S

RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR

PROVIDES A PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR ITEM OF THE

MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL CONTRACTOR, WHOSE DECISION IS FINAL.

T. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS

OTHERWISE NOTED SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.

U. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO PROVIDE SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND

OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR FOR INSTALLATION.

V. ALL EQUIPMENT, DUCTWORK, PIPING, ETC. SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION.

W. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. ALL

ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL JOINTS. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS. WELDING

TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.

X. MECHANICAL EQUIPMENT, DUCTWORK, PIPING SHALL NOT BE SUPPORTED FROM A METAL DECK.

Y. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDE BY THE MECHANICAL CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL

CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR.

Z. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED.

AA. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH A PRODUCT SIMILAR TO 3M OR AN APPROVED EQUAL.

AB. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT SHALL BE PIPED TO THE NEAREST DRAIN WITH

APPROVED RIGID PIPING. SEE DETAILS SHOWN ON DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR THE DEPTH OF THE AIR CONDITIONING CONDENSATE

TRAP.

AC. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.

AD. FIELD VERIFY CONDITIONS, REPORT ANY ERRORS TO THE CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE.

RELOCATE RIO & RIF

30 31 MAY 2017

SM

F241

F240

F242

F244

F243

F246

F246A

F245

F233A

F233

F231

F229

F227

F227A

F226

F228

F234

E221

E223

E225

E220

E222

E224

E226

D213

E218

D215

D221

D225

D241A

D241

D241B

D241C

D241F

D241E

D253

D241D

D243

D253A

EAST CORRIDOR

CORRIDOR D

CORRIDOR 4

N.I.C.

N.I.C.

AIR DUCT EXTENDS TO

SUPPLY AIR DIFFUSERS IN

ROOM - TO BE REMOVED

(TYP FOR ALL ROOMS)

TO STEAM FIN TUIBE

RADIATION -SEE SHEET

MD-102)

(TYP)

CORRIDOR B

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D r r i d o r

E227

D233

D235

E203

E204

HVAC DEMOLITION PLAN

MD-101 17

EVS

EVS

N

EXISTING HVAC PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

1. REMOVE DUCT ATTACHED TO EXSTING

LIEBERT UNIT #2. REMOVE LIEBERT #2 ON

FIRST FLOOR DIRECTLY BENEATH DUCT. SEE

DETAIL #4 SHEET M201

RELOCATE RIO & RIF

30 31 MAY 2017

SM

F241

F240

F242

F244

F243

F246

F246A

F245

F233A

F233

F231

F229

F227

F227A

F226

F228

F234

E221

E223

E225

E220

E222

E224

E226

D213

E218

D215

D221

D225

D241A

D241

D241B

D241C

D241F

D241E

D253

D241D

D243

D253A

EAST CORRIDOR

CORRIDOR D

CORRIDOR 4

N.I.C.

N.I.C.

CORRIDOR B

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D r r i d o r

E227

D233

D235

E203

E204

PIPING DEMOLITION PLAN

MD-102 18

EVS

EVS

N

GENERAL NOTES:

1. REMOVE STEAM FINTUBE RADIATOR, STEAM

PIPING, REFRIGERANT PIPING, AND ASSOCIATED

EQUIPMENT AS INDICATED.

2. CUT AND CAP REMOVED STEAM BRANCH PIPING

AND TAKEOFFS FROM REMAINING STEAM MAINS.

3. UPON REMOVAL OF EQUIPMENT PENETRATING

BUILDING ENVELOPE, REPAIR ENVELOPE TO

MATCH EXISTING. PROVIDE PROPER SEALING TO

PREVENT WATER, AIR, AND MOISTURE

INFILTRATION. REFER TO SPECIFICATIONS FOR

PROPER INFILL AND SEALING.

EXISTING PIPING PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

RELOCATE RIO & RIF

30 31 MAY 2017

SM

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

DN

N.I.C.

T

T

T

T

T

T

T

T

T

CORRIDOR B

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D

G

C o r r i d o r

E227

D233

D235

E203

E204

HVAC PROPOSED PLAN

M-101 19

EVS

EVS

N

PROPOSED HVAC LAYOUT PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

RELOCATE RIO & RIF

30 31 MAY 2017

SM

DN

N.I.C.

90'-3"

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D r r i d o r

E227

D233

D235

E203

E204

PIPING PROPOSED PLAN

M-102 20

EVS

EVS

N

GENERAL NOTES:

1.

PROPOSED PIPING PLAN

SCALE: 1/8"=1'-0"

AREA OF WORK

RELOCATE RIO & RIF

30 31 MAY 2017

SM

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D r r i d o r

E227

D233

D235

E203

E204

ELEVATIONS

M-201 21

EVS

EVS

N

AREA OF WORK

#1 - VACU B3 ELEVATION DETAIL - LOOKING EAST

SCALE: 1/8"=1'-0"

#2 - VACU B3 ELEVATION DETAIL LOOKING SOUTH

SCALE: 1/8"=1'-0"

#3 VACU B3 ELEVATION DETAIL

SCALE: 1/8"=1'-0"

RELOCATE RIO & RIF

30 31 MAY 2017

SM

E A

R

R I D

O R

CORRIDOR E

B200

B208

B210

B212

B214

B216

B218

B220

B207

B207A B211

B213

B215

C202

C204

C206

C208

C210

C212

C211

C218

C220

C222

C216

C214

C224

C213

C215

C217

C219

C221

D212

D216

D202

CORRIDOR C

CORRIDOR D

D201 D203

D205 D207

D209

D211

D213

D215

D221

D225

F205

F215

F225

F227 F229

F231

F233

F204

F206 F208

F210

F214

F216

F218

F234F228F226

E221

E223

E225

E222

E224

E226

E213

E211E209E207

E216

E214E212

E210

E208

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2

S t a i r

S t a i r

S t a i r

S t a i r

S t a i r

Stair 2A

F203

F207

F211

F217

E202

F218A

F202

O200

O203

O205

O207

CMF

CMF lobby

O214

O215

O213

O212

O210

O206

O204

E220

E218

O207C

D241A

D241B

D241

D241C

D241D

D243

D253

D243A

D253A

F241

F245

F240

F242

F244

F246

W2F

W2C

W2A

W2B

W2G

W2E

W2D

T-1

T-2

F243

F246A

C240

B241

B240

C241

E A

R

R I D

O R

W E

R

R I D

O R

W E

R

R I D

O R

CORRIDOR F

O200A

O201

O202

O202A

T-9

B204

B206

C O

R R

I D

D r r i d o r

E227

D233

D235

E203

E204

REFRIGERANT

LINESET

LIEBERT

DETAILS

M-501 22

EVS

EVS

N

AREA OF WORK

#1 - VACU B3 DETAIL - SOUTH MONITOR

SCALE: 1/8"=1'-0"

#2 - FIRST FLOOR LIEBERT AND CONDENSING UNIT DEMOLITION DETAIL

SCALE: 1/8"=1'-0"

NOTES

REMOVE INDICATED CONDENSING UNITS AS SHOWN.

REMOVE ASSOCIATED PIPING AND ELECTRICAL POWER

SERVICE ATTACHED TO CONDENSING UNITS.

RELOCATE RIO & RIF

30 31 MAY 2017

SM

DIAGRAM

M-601 23

EVS

EVS

RELOCATE RIO & RIF

30 31 MAY 2017

SM

SCHEDULES

M-602 24

EVS

EVS

RELOCATE RIO & RIF

30 31 MAY 2017

SM

120305 ARCH 100%
120305 - G-001
120305 - AD-101
120305 - AD-102
120305 - A-101
120305 - A-102
120305 - A-201
120305 - A-202
120305 - A-203
120305 - I-101
120305 - I-102
12-0305 MECH 100%
120305-F-001
120305-FD-101
120305-F-101
120305-P-001
120305-PD-101
120305-P-101
120305-M-001
120305-MD-101
120305-MD-102
120305-M-101
120305-M-102
120305-M-201
120305-M-501
120305-M-601
120305-M-602

120305 - ELEC 100%

File details come from the government source that posted it. Updated .