JTC TRS CDRL Follow On Pkg Draft - 12 Feb 2020.pdf

PDF 2 MB Posted

Attached to
Joint Terminal Control Training and Rehearsal System (JTC TRS) Program Federal contract opportunity
Solicitation number
FA8621-20-R-0003-DRAFT
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This is a draft solicitation for the Joint Terminal Control Training and Rehearsal System (JTC TRS) program. The solicitation seeks to continue procuring and fielding upgradeable mission simulation systems to support joint terminal control training for all military services. Day-to-day training operations at JTC TRS sites will be conducted by government personnel, with limited contractor support for maintenance and upgrades. Contractor field support will be provided as needed or scheduled. For Joint Terminal Attack Controller Gunnery and Scoring System (JTAGSS) sites, contractors will operate systems for training, perform maintenance, and install approved configuration changes. Contractors must provide spare parts, repair support, and maintain system concurrency through a logistics process and Training System Support Center to meet repair time requirements defined in the performance specification and contract.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Terminal Control Training and Rehearsal System (JTC TRS) Program, newest first.
File Type Posted
JTC TRS Q and A Matrix FINAL.pdf PDF
JTC_TRS General Instructions 20200221.pdf PDF
Attachment 5-DD254.pdf PDF
JTC TRS Draft RFP Q&A Matrix Template.xlsx XLSX spreadsheet
FA8621-20-R-0003_Contract Terms.pdf PDF
Attachment 6-IUID JTC TRS.pdf PDF
M-6-SCENARIO 4 DESCRIPTION AND TEST POINTS.pdf PDF
M-2-SUPPLEMENTAL AND EME TEST POINTS - DRAFT.pdf PDF
Attachment 3_Draft Price Matrix.xlsx XLSX spreadsheet
Attachment 2-JTC-TRS FoS P-Spec 1.0 Jan 2020.pdf PDF
Attachment 11_SECTION_L_Draft.pdf PDF
L-2-Consent Letter.docx DOCX document
Attachment 8-GFP List.pdf PDF
Attachment 9-AFMCForm158 JTC TRS.pdf PDF
L-1_Past Performance Questionnaire.docx DOCX document
M-3-SCENARIO 1 DESCRIPTION AND TEST POINTS - DRAFT.pdf PDF
Attachment 10-DDForm 1653 JTC TRS.pdf PDF
Attachment 4-Trainer Repair Clause.pdf PDF
Attachment 13-Cross Reference Matrix.docx DOCX document
Software Database H Clauses.pdf PDF
Attachment 12_SECTION_M_Draft.pdf PDF
Attachment 7-Asset List_05 Nov Update.pdf PDF
M-4-SCENARIO 2 DESCRIPTION AND TEST POINTS - DRAFT.pdf PDF
M-1-SET PLAN and TEST POINTS - DRAFT.pdf PDF
Attachment 5-DD254.pdf PDF
L-4_PPI Tool.docx DOCX document
M-5-SCENARIO 3 DESCRIPTION AND TEST POINTS - DRAFT.pdf PDF
Attachment 1-JTC_TRS_PWS_PWS.pdf PDF
Draft RFP Cover_Letter.pdf PDF
L-3-Client Authorization Letter.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2/12/2020 1:57:51 PM CST CDRL Table of Contents

CONTRACT #: FA8621-20-R-0003

CONTRACTOR:

SET NAME: JTC TRS FOLLOW ON SYSTEM ITEM: JOINT TERMINAL CONTROL

TRAINING AND REHEARSAL

SYSTEM

PROGRAM: Simulators

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

A001 AFLCMC/WNSS DI-ADMN-81249B SEE BLK16

CONFERENCE AGENDA

A002 AFLCMC/WNSS DI-ADMN-81250B PWS: 3.1.2.1, 3.1.2.2, 3.1.2.5,

3.1.2.6, CONFERENCE MINUTES 3.1.2.7, 3.1.3, 3.10.8, 3.10.9,

3.13.4.1

A003 AFLCMC/WNSS DI-ADMN-81306/T PWS: 3.7.2.1

PROGRAM PROTECTION IMPLEMENTATION PLAN

PPIP

A004 AFLCMC/WNSS DI-ADMN-81401C PWS: 3.3.3

CONTRACT CHANGE PROPOSAL

CCP

A005 AFLCMC/WNSS DI-IPSC-81431A/T PWS: 3.3.5, 3.3.6, 3.10.2, 3.10.8,

SYSTEM/SUBSYSTEM SPECIFICATION 3.10.9, 3.13.3.4

SSS

A006 AFLCMC/WNSS DI-IPSC-81433A PWS: 3.10.4.1, 3.10.4.2, 3.13.3.5

SOFTWARE REQUIREMENTS SPECIFICATION

SRS

A007 AFLCMC/WNSS DI-IPSC-81435A PWS: 3.10.4.1, 3.13.3.5

SOFTWARE DESIGN DESCRIPTION

SDD

A008 AFLCMC/WNSS DI-IPSC-81436A PWS: 3.10.4.2, 3.13.3.5

INTERFACE DESIGN DESCRIPTION

IDD

A009 AFLCMC/WNSS DI-IPSC-81437A/T PWS: 3.1.3, 3.2.2, 3.13.3.5

DATABASE DESIGN DESCRIPTION 3.13.3.21

DBDD

A010 AFLCMC/WNSS DI-IPSC-81441A/T PWS: 3.3.5, 3.3.6, 3.13.3.4,

3.13.3.5

SOFTWARE PRODUCT SPECIFICATION

SPS

A011 AFLCMC/WNSS DI-IPSC-81442A/T PWS: 3.3.5, 3.3.6, 3.4.3, 3.10.4.2,

SOFTWARE VERSION DESCRIPTION 3.13.3.4, 3.13.3.5

SVD

A012 AFLCMC/WNSS DI-MCCR-80700A/T PWS: 3.3.4

COMPUTER SOFTWARE PRODUCT END ITEMS

A013 AFLCMC/WNSS DI-MGMT-80004A/T PWS: 3.13, 3.13.2.9, 3.13.3.1,

MANAGEMENT PLAN 3.13.3.16.4

A014 AFLCMC/WNS DI-MGMT-80259/T PWS: 3.13.5.4.1

PHYSICAL INVENTORIES REPORT

CHIEF FINANCIAL OFFICER (CFO) REPORT

A015 AFLCMC/WNSS DI-MGMT-80227/T PWS: 3.10.6

CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT

REPORT

A016 AFLCMC/WNS DI-MGMT-80441C/T PWS: 3.13.5.4.2, 3.13.5.4.3,

3.13.5.4.5, GOVERNMENT PROPERTY INVENTORY REPORT 3.15.3

A017 AFLCMC/WNSS DI-MGMT-81238/T PWS: 3.13.2.1, 3.13.2.2, 3.13.2.3,

CONTRACT FIELD SERVICE REPORT 3.13.2.5, 3.13.2.6, 3.15.4, 3.15.5.1

CFSR

A018 AFLCMC/WNSS DI-MGMT-81453B/T SEE BLK16

DATA ACCESSION LIST/INTERNAL DATA

DAL

A019 AFLCMC/WNSS DI-SAFT-81626/T PWS: 3.5

SYSTEM SAFETY PROGRAM PLAN

SSPP

A020 AFLCMC/WNSS DI-MGMT-81749B/T PWS: 3.1.9

THE 50/50 REQUIREMENT REPORT

A021 AFLCMC/WNSS DI-MGMT-81803/T PWS: 3.3.9

ITEM UNIQUE IDENTIFICATION (IUID) MARKING PLAN

IUID MARKING PLAN

A022 AFLCMC/WNSS DI-MGMT-81804A/T PWS: 3.3.9

IUID MARKING ACTIVITY & VERIFICATION REPORT

A023 AFLCMC/WNSS DI-MGMT-81836/T PWS: 3.11.3, 3.13.2.13

FACILITIES REQUIREMENTS DOCUMENT

SITE SURVEY

A024 AFLCMC/WNSS DI-MGMT-81861A/T PWS: 3.1.7

INTEGRATED PROGRAM MANAGEMENT REPORT

IPMR

A025 AFLCMC/WNS DI-MGMT-81947B/T PWS: 3.13.5.4.1, 13.13.5.4.5

GOVERNMENT FURNISHED PROPERTY INVENTORY AND

FORECASTING REPORT

A026 AFLCMC/WNSS DI-MGMT-82001/T PWS: 3.4.2.1, 3.8, 3.8.1, 3.8.2

DOD RISK MANAGEMENT FRAMEWORK PACKAGE

DELIVERABLES

RMF

A027 AFLCMC/WNSS DI-MISC-80508B/T PWS: 3.8.2.6

TECHNICAL REPORT-STUDY/SERVICES

A028 AFLCMC/WNSS DI-MISC-80748/T PWS: 3.1.10, 3.13.3.12, 3.13.3.14,

ENGINEERING SERVICES MEMORANDUM 3.13.3.18

ESM

A029 AFLCMC/WNSS DI-FACR-80966 PWS: 3.11.2

TRAINER FACILITIES REPORT

TFR

A030 AFLCMC/WNSS DI-NDTI-80566A/T PWS: 3.4, 3.4.3, 3.4.6

TEST PLAN

SYSTEM TEST PLAN

A031 AFLCMC/WNSS DI-NDTI-80603A/T BLK16

TEST PROCEDURES

A032 AFLCMC/WNSS DI-NDTI-80809B BLK16

TEST / INSPECTION REPORT

A033 AFLCMC/WNSS DI-QCIC-81794A PWS: 3.6, 5.2

QUALITY ASSURANCE PROGRAM PLAN

QAPP

A034 AFLCMC/WNSS DI-SAFT-80102C/T PWS: 3.5

SAFETY ASSESSMENT REPORT

SAR

A035 AFLCMC/WNSS DI-SESS-80639D PWS: 3.3.1, 3.3.3, 3.13.3.12,

3.13.3.18

ENGINEERING CHANGE PROPOSAL

ECP

A036 AFLCMC/WNSS DI-SESS-80642D PWS: 3.3.3

NOTICE OF REVISION

NOR

A037 AFLCMC/WNSS DI-SESS-80858C PWS: 3.2.3.1, 3.3.2

SUPPLIER'S CONFIGURATION MANAGEMENT PLAN

CMP

A038 AFLCMC/WNSS DI-SESS-81000F/T PWS: 3.2.3, 3.3.8, 3.10.8, 3.10.9,

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS 3.12, 3.13.3.4

A039 AFLCMC/WNSS DI-PSSS-81656B/T PWS: 3.12.2.11.1

BILL OF MATERIALS (BOM) FOR LOGISTICS AND SUPPLY

CHAIN RISK MANAGEMENT

BOM

A040 AFLCMC/WNSS DI-SESS-81785A PWS: 3.2

SYSTEM ENGINEERING MASTER PLAN

SEMP

A041 AFLCMC/WNSS TM 86-01P/T PWS: 3.1.2.3, 3.13.2.2, 3.13.3.4,

TECHNICAL MANUAL CONTRACT REQUIREMENTS 3.13.3.7, 3.13.3.16.4, 3.8.1.2

TMCR

A042 AFLCMC/WNSS DI-ADMIN-81373 PWS: 3.1.2.1, 3.1.2.5, 3.1.2.6, 3.1.3,

PRESENTATION MATERIAL 3.13.4.1

A043 AFLCMC/WNS DI-IPSC-81427B PWS: 3.10.4

SOFTWARE DEVELOPMENT PLAN

SDP

B001 AFLCMC/WNSS DI-MGMT-80004A/T PWS: APPENDIX C, 3.1.4

MANAGEMENT PLAN

INCREMENT IMPLEMENTATION PLAN

B002 AFLCMC/WNS DI-NDTI-80809B PWS: Appendix C, 4.1

TEST/INSPECTION REPORT

B003 AFLCMC/WNS DID-NDTI-80603A PWS: Appendix C, 4.1

TEST PROCEDURES

ACCEPTANCE TEST PROCEDURES

B004 AFLCMC/WNS DI-MISC-80508B PWS: Appendix C, 6.2

TECHNICAL REPORT-STUDY/SERIVICES

SECB WHITE PAERS & BRIEFINGS

B005 AFLCMC/WNS DI-FNCL-81566C/T PWS: APPENDIX C, 6.3

FUNCTIONAL COST-HOUR REPORT (DD FORM 1921-1)

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

CONFERENCE AGENDA

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81249B

5. CONTRACT REFERENCE

SEE BLK16

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 5:

PWS paragraph references as follow: 3.1.2.1, 3.1.2.5, 3.1.2.6 , 3.1.3, 3.13.4.1

BLOCKS 12 and 13:

The contractor shall deliver an agenda no later than five (5) calendar days prior to each conference, meeting, review and/or audit.

AFLCMC/WNSS 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

CONFERENCE MINUTES

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250B

5. CONTRACT REFERENCE

PWS: 3.1.2.1, 3.1.2.2, 3.1.2.5,

3.1.2.6, 3.1.2.7, 3.1.3, 3.10.8, 3.10.9, 3.13.4.1

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

Blk 16 Draft

Final

Reg Repro

16. REMARKS

BLOCK 5:

PWS paragraph references as follows: 3.10.9, 3.1.3.41

BLOCKS 10, 12, and 13:

The contractor shall deliver the draft minutes ten (10) calendar days after any conference or meeting to all attendees of the conference or meeting, and to those addressees listed in Blk 14. The government will have five (5) calendar days to provide comments after receipt of draft minutes. The contractor will then have five (5) calendar days to incorporate government comments and submit the final minutes.

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMIN

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

PROGRAM PROTECTION IMPLEMENTATION PLAN

3. SUBTITLE

PPIP

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81306/T

5. CONTRACT REFERENCE

PWS: 3.7.2.1

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This DID is tailored as follows:

Documents shall be provided via electronic media utilizing a standard Microsoft Office application compatible format.

PPIP shall include requirements identified in the Government’s Program Protection Plan (PPP), per para 3.7.2.1 of the Performance Work Statement.

BLOCKS 10, 12 & 13:

Preliminary/draft submitted ninety (90) calendar days after contract award.

The government will review and provide comments within fifteen (15) calendar days of receipt.

The contractor shall incorporate Government comments to the preliminary/draft and deliver the final submittal NLT thirty (30) calendar days after receipt of the comments.

Subsequent submissions as required or when provided with an updated Government PPP.

Updates to be submitted within thirty (30) Calendar days of receipt of updated PPP.

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

CONTRACT CHANGE PROPOSAL

3. SUBTITLE

CCP

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81401C

5. CONTRACT REFERENCE

PWS: 3.3.3

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

BLK16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 8: Approval will be via the government Configuration Control Board decision and contract modification.

BLOCKS 12 and 13:

a. The contractor shall prepare and submit a CCP whenever a change to any contractual document other than the System Specification is identified.

b. Whenever a CCP is requested by the Government, the contractor shall deliver the CCP in accordance with contracting officer’s direction.

c. The CCP shall be submitted in two volumes as follows (both volumes to be submitted together)

1. Technical Volume

2. Cost Volume Pricing, tables, & figures should also be submitted in an editable Excel Spreadsheet.

AFLCMC/WNSS 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

SYSTEM/SUBSYSTEM SPECIFICATION

3. SUBTITLE

SSS

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81431A/T

5. CONTRACT REFERENCE

PWS: 3.3.5, 3.3.6, 3.10.2, 3.10.8,

3.10.9, 3.13.3.4

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This data item is tailored as follows:

Para 3: Contractor format is acceptable. Microsoft Office compatible media is required.

BLOCKS 10, 12 and 13:

a. The contractor shall submit specifications within sixty (60) calendar days of completion of contract transition or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved specification using approved DI-CMAN-80642D (NORs) via DI-CMAN-80639D (ECPs).

AFLCMC/WNSPC 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

SOFTWARE REQUIREMENTS SPECIFICATION

3. SUBTITLE

SRS

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81433A

5. CONTRACT REFERENCE

PWS: 3.10.4.1, 3.10.4.2, 3.13.3.5

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4:

Para 2.a., Automated documents must be Microsoft Office compatible.

BLOCKS 10, 12 and 13:

a. The contractor shall submit specifications within sixty (60) calendar days of contract award, or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved specification using approved DI-CMAN-80642D (NORs) via DI-CMAN-80639D (ECPs).

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

SOFTWARE DESIGN DESCRIPTION

3. SUBTITLE

SDD

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81435A

5. CONTRACT REFERENCE

PWS: 3.10.4.1, 3.13.3.5

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4:

Para 3, All electronic documentation must be Microsoft Office compatible.

BLOCKS 10, 12 and 13:

a. The contractor shall submit descriptions within sixty (60) calendar days of completion of contract transition, or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved design description using approved DI-CMAN-80642D (NORs) via DI-CMAN- 80639D (ECPs).

ASC/WNSPB 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

INTERFACE DESIGN DESCRIPTION

3. SUBTITLE

IDD

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81436A

5. CONTRACT REFERENCE

PWS: 3.10.4.2, 3.13.3.5

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4:

Para 3, all automated/electronic documentation must be Microsoft Office compatible.

BLOCKS 10, 12 and 13:

a. The contractor shall submit descriptions within sixty (60) calendar days of completion of contract transition, or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved design description using approved DI-CMAN-80642D (NORs) via DI-CMAN- 80639D (ECPs).

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

DATABASE DESIGN DESCRIPTION

3. SUBTITLE

DBDD

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81437A/T

5. CONTRACT REFERENCE

PWS: 3.1.3, 3.2.2, 3.13.3.5 3.13.3.21

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This data item is tailored as followed:

REMOVE paragraphs: 4d and Document Format Paragraph 5, 3a, 4.x, 5.x REMOVE: "identify the project sponsor, acquirer, user, developer, and support agencies" from paragraph 1.2 REMOVE: "If all such decisions are explicit in the system or CSCI requirements, this section shall so state. Design decisions that respond to requirements designated critical, such as those for safety, security or privacy, shall be placed in separate subparagraphs. If a design decision depends upon system states or modes, this dependency shall be indicated. If some or all of the design decisions are described in the documentation of a custom or commercial database management system (DBMS), they may be referenced from this section. Design conventions needed to understand the design shall be presented or referenced." from paragraph 3

All automated/electronic documentation must be Microsoft Office compatible.

BLOCKS 10, 12 and 13:

a. The contractor shall submit descriptions within sixty (60) calendar days of completion of contract transition, or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved design description using approved DI-CMAN-80642D (NORs) via DI-CMAN- 80639D (ECPs).

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A010

2. TITLE OF DATA ITEM

SOFTWARE PRODUCT SPECIFICATION

3. SUBTITLE

SPS

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81441A/T

5. CONTRACT REFERENCE

PWS: 3.3.5, 3.3.6, 3.13.3.4,

3.13.3.5

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This DID is tailored as follows:

Para 3: All automated/electronic documentation must be delivered in Microsoft Office compatible format.

BLOCKS 10, 12 and 13:

a. The contractor shall submit specifications within sixty (60) calendar days of completion of contract transition, or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved specification using approved DI-CMAN-80642D (NORs) via DI-CMAN-80639D (ECPs).

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER IPSC

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A011

2. TITLE OF DATA ITEM

SOFTWARE VERSION DESCRIPTION

3. SUBTITLE

SVD

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81442A/T

5. CONTRACT REFERENCE

PWS: 3.3.5, 3.3.6, 3.4.3, 3.10.4.2,

3.13.3.4, 3.13.3.5

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This DID is tailored as follows:

Para 3: All automated/electronic documentation must be delivered in Microsoft Office compatible format.

BLOCKS 10, 12 and 13:

a. The contractor shall submit descriptions within sixty (60) calendar days of completion of contract transition, or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved version description using approved DI-CMAN-80642D (NORs) via DI-CMAN- 80639D (ECPs).

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MCCR

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A012

2. TITLE OF DATA ITEM

COMPUTER SOFTWARE PRODUCT END ITEMS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MCCR-80700A/T

5. CONTRACT REFERENCE

PWS: 3.3.4

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This DID is tailored as follows

Para 10.1 Content. The Computer Software Product End Item shall contain the source, object, executable code, compiler and software development folders. For geographic databases, the content shall be visual and sensor datasets, terrain elevation, imagery, terrain features, models, moving models, and metadata.

Paragraph 10.2 Media. The Computer Software Product End Item shall be submitted on CD-ROM/DVD or other government approved data storage media.

Paragraph 10.3 Format. Contractor format is acceptable. For geographic databases the format and method used to store and retrieve the data shall be open commercial standards except for metadata, which shall be in Microsoft Word format.

BLOCKS 10, 12 and 13:

a. The contractor shall submit end items within sixty (60) calendar days of completion of contract transitiion, or 30 days before a Design Acceptance Test (DAT). Government will review and comment within thirty (30) calendar days.

b. The contractor shall incorporate Government comments (if any) and resubmit within thirty (30) calendar days.

c. Updates and revisions are required to maintain the document in a current status. The contractor shall update/revise the approved end item using approved DI-CMAN-80642D (NORs) via DI-CMAN-80639D (ECPs).

TSSC 0 0 1

AFLCMC/WNSS 1 1 0

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A013

2. TITLE OF DATA ITEM

MANAGEMENT PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80004A/T

5. CONTRACT REFERENCE

PWS: 3.13, 3.13.2.9, 3.13.3.1,

3.13.3.16.4

6. REQUIRING OFFICE

AFLCMC/WNSS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This DID is tailored as follows:

The requirements of this DID shall be submitted in electronic format that is Microsoft Office compatible.

BLOCKS 10 and 12:

Submission shall be delivered thirty (30) calendar days after contract award.

AFLCMC/WNSS 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

JOINT TERMINAL CONTROL TRAINING AND

REHEARSAL SYSTEM JTC TRS

E. CONTRACT/PR NO.

FA8621-20-R-0003

F. CONTRACTOR

1. DATA ITEM NO.

A014

2. TITLE OF DATA ITEM

PHYSICAL INVENTORIES REPORT

3. SUBTITLE

CHIEF FINANCIAL OFFICER (CFO) REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80259/T

5. CONTRACT REFERENCE

PWS: 3.13.5.4.1

6. REQUIRING OFFICE

AFLCMC/WNS

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

QTRLY

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This DID is tailored as follows:

BLOCK 7: Property delivered and accepted for the Air Force.

BLOCK 11: Date the CFO Report was prepared.

BLOCK 12: CFO Report is due at the end of each quarter of the fiscal year to meet the HAF suspense of the 5th calendar day following the end of each quarter of the fiscal year.

BLOCK 13: Submit subsequent reports by the 5th day following the end of each quarter.

BLOCK 14:

a. Submit report in CFO Template Format.

b. Submit via electronic media using Microsoft Office.

c. Submit via the system used by the Program for CDRL deliveries.

d. Distribution determined by Program Office but a copy must be submitted to HAF/A4LR, colquitt.lawrence@us.af.mil

The CFO Report is required until the Program implements electronic transactional reporting via Accountable Property Systems of Record (APSR) interfacing.

AFLCMC/WNS 1

HAF A4LR 1

15. TOTAL 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

CDRL: GOVERNMENT FURNISHED PROPERTY INVENTORY AND FORECASTING REPORT

The following are the instructions for the creation of DD Form 1423 for the above CDRL. PWS references and distribution requirements are program specific. REMINDER: The referenced DID may not be the newest. The version may be checked at: https://quicksearch.dla.mil/qsSearch.aspx

Block Input 1 CDRL Number

2 GOVERNMENT FURNISHED PROPERTY INVENTORY AND FORECASTING REPORT

4 DI-MGMT-81947B/T

5 (Insert PWS References)

6 AFLCMC/WNS

7 LT

8 N/A 9 D

10 BLK16

12 BLK 16

13 BLK16

14 Insert Distribution Addressees) 15 (Total Addressees)

Blocks 10, 12 and 13: The contractor shall submit this record 90 days after contract transition and on a quarterly basis for the remainder of the contract period.

The DID is tailored as follows:

a. Serial number input is mandatory if the asset contains a serial number

b. Item cost input is mandatory using deemed cost methodology.

Note: The contractor shall include General Equipment Valuation adjustments resulting from contract modifications, modernizations, upgrades, improvements, and new procurements in this report. GEV adjustments that occur outside the deliverables reporting window shall be annotated on the Material Inspection and Receiving Report (DD250) at the time of USG acceptance.

Created By: Gregory Zele Date: 9-Oct-2019 Last Modified By: Gregory Zele Date:21-Oct-2019CDRL: GOVERNMENT FURNISHED PROPERTY INVENTORY AND FORECASTING REPORT

The following are the instructions for the creation of DD Form 1423 for the above CDRL. PWS references and distribution requirements are program specific. REMINDER: The referenced DID may not be the newest. The version may be checked at: https://quicksearch.dla.mil/qsSearch.aspx

Input CDRL Number

GOVERNMENT FURNISHED PROPERTY INVENTORY AND FORECASTING REPORT

DI-MGMT-81947B/T

(Insert PWS References)

AFLCMC/WNS

LT

N/A D

BLK16

BLK 16

BLK16

Insert Distribution Addressees) (Total Addressees) Blocks 10, 12 and 13: The contractor shall submit this record 90 days after contract transition and on a quarterly basis for the remainder of the contract period.

The DID is tailored as follows:

a. Serial number input is mandatory if the asset contains a serial number

b. Item cost input is mandatory using deemed cost methodology.

Note: The contractor shall include General Equipment Valuation adjustments resulting from contract modifications, modernizations, upgrades, improvements, and new procurements in this report. GEV adjustments that occur outside the deliverables reporting window shall be annotated on the Material Inspection and Receiving Report (DD250) at the time of USG acceptance.

Date: 9-Oct-2019 Date:21-Oct-2019

Chief Financial Officer (CFO) Reporting Tool Instructions For Contractors

1 | P a g e

CFO reporting originates in the CFO Act of 1990. It provides that all Government owned property and equipment must be financially accounted for and reported. Documentation provided by the contractor will have its accuracy validated by the Program Office on a quarterly basis to be used for governmental Financial Improvement and Audit Readiness (FIAR) reporting.

Accountable Property Systems of Record (APSR) are covered in Air Force Instruction (AFI) 23-111 Management of Government Property in Possession of the Air Force. AFI 23-111 provides for the accountability of logistics and financial information for all accounting systems. All property has an APSR to complete this requirement. All required data must be collected using this CFO reporting template. This requirement will remain in place until the program is automated and data is being collected via the standard APSR, Defense Property Accountability System

(DPAS).

These instructions are divided by 3 tabs:

Tab 1 – Summary (Program).

Tab 2 - Transaction Details.

Tab 3 - Ending balance List of Assets by Condition Code.

2 | P a g e

Tab 1 – Summary

1. Header: Input the Name of your program and your applicable DoDAAC.

Name of Program and DoDAAC:

Column A: Input your program’s prior year quarter’s financial ending balance.

1st Quarter 1st Quarter 2nd Quarter 2019 2019 2019

Ending Balance Prior Quarter

$ Value

Ending Balance Prior Quarter

Quantity

Beginning Balance Current Quarter

$ Value

Name of Program and DoDAAC:

2. Column B: Input your program’s prior year’s quarter ending balance by quantity.

1st Quarter 1st Quarter 2nd Quarter 2019 2019 2019

Ending Balance Prior Quarter

$ Value

Ending Balance Prior Quarter

Quantity

Beginning Balance Current Quarter

$ Value

Name of Program and DoDAAC:

3. Column C: Input your Program’s second quarter financial beginning balance. Please note the ending balance from the prior quarter and the beginning balance from the current quarter must match equally.

1st Quarter 1st Quarter 2nd Quarter 2019 2019 2019

Ending Balance Prior Quarter

$ Value

Ending Balance Prior Quarter

Quantity

Beginning Balance Current Quarter

$ Value

Name of Program and DoDAAC:

4. Column D: Input the dollar value of all new acquisitions.

New Acquisitions (Delivered) - D4S

$ Value

Customer Returns - D6x

$ Value

Shipments/Issue - D7x

$ Value

5. Column E: Input the dollar value of any customer returned assets.

New Acquisitions (Delivered) - D4S

$ Value

Customer Returns - D6x

$ Value

Shipments/Issue - D7x

$ Value

3 | P a g e

6. Column F: Input the dollar value of any shipment/issues

Customer Returns - D6x

$ Value

Shipments/Issue - D7x

$ Value

In-Transits

$ Value

7. Column G: Input the dollar value of all spares in transit. Only use this field if you have the capability to capture spares that have shipped but not received at destination. Until the receipt acknowledgement is received, in-transits must be included as part of ending inventory. If you do not have this capability, then you must skip this column.

Shipments/Issue - D7x

$ Value

In-Transits

$ Value

Disposals - D7J

$ Value

8. Column H: Input the dollar value of all disposals in this quarter.

In-Transits

$ Value

Disposals - D7J

$ Value

Condition Code Changes - D8C/D9C

$ Value

9. Column I: Input all condition code changes that were made by the C-ICP for the assets located in the warehouse.

Disposals - D7J

$ Value

Condition Code Changes - D8C/D9C

$ Value

Price Change - DBx/DCx

$ Value

10. Column J: Input the dollar value of all price changes in this quarter. Please note that that you record only the dollar amount for the actual change in the value.

Condition Code Changes - D8C/D9C

$ Value

Price Change - DBx/DCx

$ Value

Physical Inventory Adjustments - Gains

- D8x $ Value

4 | P a g e

11. Column K: Input the dollar value for the gain in the physical inventory in the current quarter.

Price Change - DBx/DCx

$ Value

Physical Inventory Adjustments - Gains

- D8x $ Value

Physical Inventory Adjustments - Losses -

D9x $ Value

12. Column L: Input t the dollar value for all the losses in the physical inventory for the current quarter.

2nd Quarter

Physical Inventory Adjustments - Gains

- D8x $ Value

Physical Inventory Adjustments - Losses -

D9x $ Value

Ending Balance

Quantity

13. Column M: Input the current quarter quantity ending balance.

2nd Quarter 2nd Quarter 2019 2019

Physical Inventory Adjustments - Losses -

D9x $ Value

Ending Balance

Quantity

Ending Balance (Total of Columns:

C, D, E, F, G, H, J, K, L) $ Value

$0.00

14. Column N: No input is necessary. The formula calculates the total dollar value of (C, D, E, F, G, H, J, K, & L) current quarter ending balances.

2nd Quarter 2nd Quarter 2019 2019

Physical Inventory Adjustments - Losses -

D9x $ Value

Ending Balance

Quantity

Ending Balance (Total of Columns:

C, D, E, F, G, H, J, K, L) $ Value

$0.00

15. Spare Parts, Column P:

Input the dollar value of the assets with condition codes listed – A, B, C & D.

Serviceable Condition Codes (A,B,C,D)

$Value

Assets in Condition Codes: E,J K,L,Q

$Value

Unserviceable Condition Codes

(F,G,M,R) $ Value

Assets in All other Condition

Codes $Value

Total Dollar Value (Total of Column P, Q, R and

S)

$ Value $0.00

SPARE PARTS

5 | P a g e

16. Column Q:

Input the dollar value with the condition codes listed – E, J, K, L, & Q.

Serviceable Condition Codes (A,B,C,D)

$Value

Assets in Condition Codes: E,J K,L,Q

$Value

Unserviceable Condition Codes

(F,G,M,R) $ Value

Assets in All other Condition

Codes $Value

Total Dollar Value (Total of Column P, Q, R and

S)

$ Value $0.00

SPARE PARTS

17. Column R:

Input the dollar value with the condition codes listed – F, G, M, & R.

Serviceable Condition Codes (A,B,C,D)

$Value

Assets in Condition Codes: E,J K,L,Q

$Value

Unserviceable Condition Codes

(F,G,M,R) $ Value

Assets in All other Condition

Codes $Value

Total Dollar Value (Total of Column P, Q, R and

S)

$ Value $0.00

SPARE PARTS

18. Column S:

Input the dollar value with the condition codes listed – All other condition codes not listed in previous columns.

Serviceable Condition Codes (A,B,C,D)

$Value

Assets in Condition Codes: E,J K,L,Q

$Value

Unserviceable Condition Codes

(F,G,M,R) $ Value

Assets in All other Condition

Codes $Value

Total Dollar Value (Total of Column P, Q, R and

S)

$ Value $0.00

SPARE PARTS

19. Column T:

No Input is necessary. The formula calculates the total dollar value of (Column P, Q, R, S) the current quarter balances.

Serviceable Condition Codes (A,B,C,D)

$Value

Assets in Condition Codes: E,J K,L,Q

$Value

Unserviceable Condition Codes

(F,G,M,R) $ Value

Assets in All other Condition

Codes $Value

Total Dollar Value (Total of Column P, Q, R and

S)

$ Value $0.00

SPARE PARTS

6 | P a g e

Tab 2 – Transaction detail: Submit all transactions that make up the information in the following columns

Column A Column B Column C Column D

Transaction Code Code Description Program NSN

Transaction Details

1. Column A: Input the transaction code.

2. Column B: Input the transaction Code Description

3. Column C: Input the name of the program for the transaction.

4. Column D: Input the National Stock Number for the transaction.

Collumn E Column F Column G Column H

Part Number Nomenclature Unit of Issue Qty

5. Column E: Input the Part number for the transaction.

6. Column E: Input the Part number for the transaction.

7. Column F: Input the nomenclature (name) for the asset for which the transaction is being accomplished.

8. Column G: Input the unit of issue for each transaction.

9. Column H: Input the quantity for each transaction.

Column I Column J Column K

Condition Code Unit Cost Extended Cost

10. Column I: Input the current condition code for each transaction.

11. Column J: Input the unit cost (for only 1 if the quantity is more than 1) for each transaction.

12. Column K: Input the total cost of the items (the total quantity plus the unit cost) for the transaction.

7 | P a g e

Tab 3 – Ending Balance List of Assets by Condition Code.

A B C D E F G H I

Program NSN Part Number Nomenclature Unit of Issue Qty Condition Code Unit Cost Extended Cost Ending Balance List of Assets by Condition Code

1. Column A: Input the name of the Program

2. Column B: Input the National Stock number (NSN)

3. Column C: Input the Part Number

4. Column D: Input the Nomenclature

5. Column E: Input the Unit of Issue

6. Column F: Input the total quantity of each NSN

7. Column G: Input the Condition Code

8. Column H: Input the single unit cost per NSN

9. Column I: Input the Extended cost per line. This would be the total quantity multiplied by the Unit cost.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

This is the start of the file's text. The full file is on GovTribe.