QA_Set_4_Whiteman.pdf

PDF 46 KB Posted

Attached to
MMHS Materials Handling System, Whiteman AFB Missouri Federal contract opportunity
Solicitation number
FA8604-19-R-8117
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to MMHS Materials Handling System, Whiteman AFB Missouri, newest first.
File Type Posted
FA860419R8117007.pdf PDF
GWH803-01.dwg DWG drawing
FA860419R8117006.pdf PDF
QA_Set_6_Whiteman.pdf PDF
FA860419R8117005.pdf PDF
QA_Set_5_Whiteman.pdf PDF
GWH803-01.dwg DWG drawing
FA860419R8117004.pdf PDF
QA_Set_3_Whiteman.pdf PDF
GWH803-01.dwg DWG drawing
FA860419R8117003.pdf PDF
FA860419R8117002.pdf PDF
QA_Set_1_Whiteman.pdf PDF
GWH803-03.dwg DWG drawing
GWH803-01.dwg DWG drawing
FA860419R8117001.pdf PDF
QA_Set_2_Whiteman.pdf PDF
GWH803-01.dwg DWG drawing
GWH803-02.dwg DWG drawing
Proposal_Checklist.Pricing_Summary_Sheet.pdf PDF
RFP_FA8604-19-R-8117.pdf PDF
GWH803-03.dwg DWG drawing
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604-19-R-8117

Questions Set 4 05/24/19 Q1. In section 3.2.2 it states each drawer cabinet must have a static load rating of 24,000 lbs. Is this a mistake?

A1. The modular cabinet housing capacity requirement has been lowered to 10,000 pounds. See Revision 2 to Appendix C, specifically paragraph 3.2.2.

Q2. Will other load ratings be considered?

A2. New housing minimum capacity has been established in Revision 2 to Appendix C.

Q3. Who would be handling the purchase?

A3. The requirement was developed for resolution entirely by the contractor.

Q4.Is the Air Force interested in GSA solutions?

A4. The requirement does not anticipate direct GSA Schedule acquisitions.

File details come from the government source that posted it.